Vendôme Intermodal Hub Transitional Measures

Good Neighbourly Relations Committee October 28, 2014

Vendôme Intermodal Hub – Transitional Measures

• Objectives

– Reduce the impact of projected ridership growth;

– Improve the flow of traffic in the metro and train stations;

– Facilitate pedestrian traffic to the MUHC;

– Implement measures to ensure the rapid evacuation of facilities and

expedite emergency responses in the Vendôme hub, as required.

• Project Map

a. Interventions in the station (STM)

b. Interventions in the tunnel (STM and AMT)

c. Interventions to exterior access (AMT)

d. Extension of existing tunnel (AMT)

a

c

d

b

Vendôme Intermodal Hub – Transitional Measures

• Scope of STM Work

1

5

4

2 3

1) Demolish a floor slab to build a new staircase;

2) Build new stairs (4 flights), from the fare booth mezzanine to the pedestrian walkway, and install exit turnstiles;

3) Reposition existing turnstiles;

4) Demolish the existing staircase to build a new one leading to the AMT corridor;

5) Demolish a storage room to make room for the 2nd corridor and install gates and fire doors.

Vendôme Intermodal Hub – Transitional Measures

• Scope of STM Work – Zone 1

Vendôme Intermodal Hub – Transitional Measures

retour au plan

Location of new staircase Slab to demolish for new staircase

• Scope of STM Work – Zone 2

AFTER BEFORE

Vendôme Intermodal Hub – Transitional Measures

retour au plan

Walkway New staircase leading from the ticket booth mezzanine to the walkway

• Scope of STM Work – Zone 3

Vendôme Intermodal Hub – Transitional Measures

retour au plan

Turnstiles to relocate

• Scope of STM Work – Zone 4

Vendôme Intermodal Hub – Transitional Measures

retour au plan

Stairway to demolish to build a new one (leading to the AMT corridor)

AMT corridor

• Scope of STM Work – Zone 5

Vendôme Intermodal Hub – Transitional Measures

retour au plan

Storage room to demolish

Vendôme Intermodal Hub – Transitional Measures

• Scope of AMT Work – Train Station Tunnel

Vendôme Intermodal Hub – Transitional Measures

• Scope of AMT Work – Train Station Tunnel

Relocation of equipment

(fare vending machine,

information kiosk, benches)

Redesign of the metropolitan ticket office

Vendôme Intermodal Hub – Transitional Measures

• Scope of AMT Work – Train Station Tunnel

Extension of the station tunnel toward the MUHC

Vendôme Intermodal Hub – Transitional Measures

• Scope of AMT Work – Train Station Tunnel

Access to new path and to the fare vending machine via the

northern station entrance

• Envergure des travaux AMT – Sentier

New path between de Maisonneuve Blvd. and the train station

Vendôme Intermodal Hub – Transitional Measures

Vendôme Intermodal Hub – Transitional Measures

Pôle intermodal Vendôme - Mesures transitoires

• Scope of AMT Work – Path

New path between de Maisonneuve Blvd. and the train station

• Mitigation Measures

– Work will be phased to ensure customer traffic flow and safety

– STM work will be performed mainly at night

– Work to extend the train station tunnel to the MUHC will be performed starting from the south

– Path work will have no impact on customers

– Relocation of the 102 bus stop to the bus loop

– Opportunity analysis underway to assess the relevance of improving the public transit network to address the service needs of customers with functional limitations from the metro

Vendôme Intermodal Hub – Transitional Measures

• Next Steps

– Short Term – Transitional Measures:

• Work in the existing station entrance until June 2015 (2 phases)

• Fare vending machine and path work: until March 2015

• Tunnel work: until February/March 2015

– Medium Term – Permanent Solution:

• Confirmation of government funding for the permanent solution

• Implementation of permanent solution

Vendôme Intermodal Hub – Transitional Measures

• Financing

– This work is funded by the ministère des Transports du Québec and

Mobility Montréal.

Vendôme Intermodal Hub – Transitional Measures

Thank you!!

Vendôme Intermodal Hub – Transitional Measures

For more details:

stm.info/travaux

amt.qc.ca/vendome