uwi west stand 3d ff

1
Cold Water Hot Water Sanitary Condensate Drain Vent Pipe GENERAL NOTES Scale Project number Date Drawn by Checked by LEGEND Grafton Cot #2 , Holetown St.James DESIGN ENGINEERS. Consultant LTD UWI ATHLETICS & FOOTBALL STADIUM. WEST STANDS Cave Hill Campus St. Michael 1/8" = 1'-0" 06/17/2014 3:19:46 PM A104 PLUMBING 3D FIRST FLOOR 01 06/13/14 DH DH No. Description Date 1/8" = 1' 0" 1) All 3D Drawings to be used in Conjunction with Auto-Cad Drawings.

Upload: damian-harper

Post on 13-Apr-2017

71 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UWI West Stand 3D FF

Cold WaterHot WaterSanitaryCondensate DrainVent Pipe

GENERAL NOTES

Scale

Project number

Date

Drawn by

Checked by

LEGEND

Grafton Cot #2 , Holetown St.James

DESIGN ENGINEERS.Consultant LTD

UWI ATHLETICS &FOOTBALL STADIUM.WEST STANDSCave Hill Campus St.Michael

1/8" = 1'-0"

06/1

7/20

14 3

:19:

46 P

M

A104

PLUMBING 3D FIRSTFLOOR

0106/13/14

DHDH

No. Description Date

1/8" = 1' 0"

1) All 3D Drawings to be used in Conjunction with Auto-Cad Drawings.