uspacom neo accountability working group lcdr mark haney uspacom j123 neo accountability officer 1

17
USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

Upload: julia-fitzgerald

Post on 19-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

USPACOM NEO Accountability Working Group

LCDR Mark Haney

USPACOM J123

NEO Accountability Officer

1

Page 2: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

Roll Call

• USPACOM

• USARPAC• PACFLT• PACAF• MARFORPAC

• JAPAN– USFJ– CNFJ– III MEF

• KOREA– USFK– 8th Army– DMDC

• GUAM

• CONUS

2

Page 3: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

PACOM NTS Working Group Purpose / Goals

• Bring together SME’s and theater resources – Process improvement– Leverage talent for regional crises– Build a support network

• Accountability / Readiness– System deployment locations– Readiness of those systems (and how to report it)

• Equipment• Personnel

– Issue corrections (Tomodachi, Exercise Lessons Learned)

• Develop overarching PACOM Theater Guidance (Instruction / Plan)– Standardize NTS procedures– Set and monitor standards of readiness– Establish beginning to end accountability for PACOM NEO– Integration of NTS into exercises

3

Added a tracker for this

Page 4: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

Step 1:

NTS Accountability TMS

- #’s and location

- Annual Funding

- POC Information

Step 2:

Establish a Monthly NTS Working Group

DCO / Website

Step 3:

Develop a PACOM training standard for

theater NTS

Step 4:

Develop DRRS reporting requirements

based on Step 3 products

Step 5:

- PACOM Instruction

- Look at capability versus need

As of 31 October 2012

PACOM NTS Improvement Plan (Working Copy)

Issue Identification / Correction

New website coming on APAN

Q2 Equipment validation

Page 5: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

NTS Readiness Requirements / Reporting

• Equipment– Are there established maintenance standards? procedures?– If not, what we need to create (or validate):

• A step by step check sheet to validate operation• Frequency requirement

– Current Version installed (v4.1.32)

• Personnel– DMDC has online training programs – anybody using it?– Regardless need to standardize training for theater

• If DMDC training is not good we need to improve it• Frequency requirement?• # of individuals by location (equipment based)

• Defense Readiness Reporting System (DRRS)– Based on the above, develop reporting standards that each location would send

up CoC to input into PACOM readiness report– Validate in exercises – or create a stand alone Theater NTS exercise

5

First Focus Area – Next

Slide

Is the Yokota Training a good

model?

Page 6: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

First PACOM task for FY13 Q2: Equipment Validation

6

Every Location

W/Amplifying Comments

Every NTS Unit

For all of PACOM

Page 7: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

Yokota Training Session – Feedback?

7

• Any improvements needed on the training plan?

• What is needed to make it exportable?

Page 8: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

PACOM NTS Issue Tracker

• 1. APIS Interface (Advanced Passenger Information System)– Required for CONUS entry (DHLS / CBP)– Need a way to standardize this for PACOM (I now have an account)

• 2. GATES Interface (Global Air Transportation Execution System)– Since Tomodachi, GATES manifest feature added– Does it work? Is it compatible? Adequate information?– GATES and APIS have had SAT interface test (DMDC)

• 3. Manifests – adequate amount of information– *** Does not have all required APIS fields– Will require an eAPIS output as well (text or uploadable) if GATES not available locally

• 4. Ability to burn to CD – I found the same issue on my ATG 630– Possible solution is to upgrade to IE8 (max for Windows XP)– Any issue with this from DMDC?

• 5. Web Application – Unable to access WORKSTATION data from non NTS terminal.

• 6. RFI from DMDC – FY13 Hardware requirements

8

#1 Issue

APIS Issue

Page 9: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

Issue #5: Web application error from non NTS machine

9

When I click this. . .

I get this . . .

Page 10: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

NTS Conference SEP 19-20 08-12

• Roles and responsibilities– NORTHCOM– Army G1

• Funding – JS JROCM

• New rollout? If so….funding again

10

Page 11: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

Round Table Discussion

• New topics for this forum?• What do you need from PACOM?

11

Page 12: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

Questions?

12

Page 13: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

Draft DRRS Reporting Requirements

• TCP• ST 4.2.4: Establish and Coordinate Training of Joint and Combined

Forces

• Equipment Readiness– Ensure, on a quarterly basis, all theater NTS machines are

capable of performing PACOM established readiness checks, confirmed by publishing to the DMDC Main Server.

• % based – maybe also geographic?

• Personnel Readiness– Ensure minimum personnel are trained IAW PACOM established

standards for each deployed NTS• Are there established personnel requirements?

13

Page 14: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

Other Topics – Round Table

• Funding

• Purchasing – EOY monies

• Joint Staff JROCM Status

• DMDC NTS/ETAS Conference Sep 19-20

• Your Concerns?

14

Page 15: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

THEATER NTS DEPLOYMENT / ORGANIZATION

15

PACOM

Camp Smith, HI - 1

USARPAC

Fort Shafter, HI – 22

(@ Zama)

PACAF

Hickam AFB – 16

Anderson AFB, Guam - 8 Units

PACFLT

?

MARFORPAC

CLB-3 -6

JAPAN CNFJ

33 UnitsCNFJ HQNAF AtsugiCFAS SaseboCFAY YokosukaCNFJ White BeachCFAO Okinawa

USARJ

22 UnitsZama

Kadena – 17 (5@Misawa)

Yokota - 6

Misawa– 5 (+ 5?)

III MEF – 54

31st MEU - 6

MCAS Iwakuni – 6

Okinawa - 24KinserCourtney Schwab

KOREA EUSA G-1

127 Units

Osan AFB – 5 Units

Kunsan AFB - 5 Units

CONUS JB Elmo-Richardson, AK

– 6 Units

Hawaii /

Guam

CNFK Chinhae - 2 MARFORK

Pohang -1

I MEF

Camp Pendleton, CA

– 70 Units

Page 16: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

TOMODACHI Update / Current Issues?

• Does the current version:– Ability for a GATES spreadsheet to be downloaded?– Produce an APIS Report? – Expanded Data fields?– Improved Manifest (local)?– System stability?

• Has the following been addressed:– Training issues?– Distribution of registration vs conveyance?– Software / Hardware updates

• What are the current issues?– Courageous Channel 2012?

16

Page 17: USPACOM NEO Accountability Working Group LCDR Mark Haney USPACOM J123 NEO Accountability Officer 1

UNCLASSIFIED

UNCLASSIFIED

PACOM Theater NTS Guidance

• Impetus under rewrite of DoDD 3025.14 Evac of U.S. Citizens…– PACOM Phase 0 NEO DRRS Reporting– Initially publish a NTS Instruction for PACOM– PACOM Plan development – in which NTS will be incorporated

• Things to be incorporated:– Readiness standards and reporting requirements– Event Execution Guidance (Accountability in general)

• Command and Control• Naming Conventions – Web Application• Required Fields / Field standards• Report requirements (inside and outside of NTS, APIS, PACOM)• Beginning to End Accountability• How to track all departures?

– What else??

17