Exclusively offered by:Lohrmann International GmbHSonnenberger Strasse 16 Tel. +49 611 701888 www.lohrmann.com65193 Wiesbaden (GERMANY) Fax +49 611 701895 [email protected]

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

AGENDA:

Project-introduction and brief description 1.

- General Capacities 1.1

- Facts 1.2

- Summary 1.3

The Project 2.

- Main units, age, last revamp & capacities 2.1

- Products & specifications 2.2

- Scope of supply & services 2.3

- Layout & required space 2.4

- Commercial and economical evaluations 2.5

- Cost comparison 2.5.1

- Budgetary offer total investment estimation 2.5.2

- Estimated return of invest and costs 2.5.3

- Approach 2.6

- Timing 2.7

- Actions 2.8

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

1. Project-introduction and brief description

1.1 General Capacity

The capacity of the refinery is equivalent to 80,000 bpd. (= 4 Mil. MT/a) crude oil feed.

Crude Oil was received from the CIS, North Sea, North Africa and West Africa.

The Refinery was originally designed for Arabian Light Sweet Crude Oil.

1.2 Facts

• The refinery is still in full commercial operation and is planned for shutdown mid 2008.

• Location of the refinery is the southern German town Ingolstadt, aprx. 100 km. north of Munich (Airport)

• Reason for taking this refinery out of operation is solely its close vicinity to the city community with fast growing industrial areas, leading the Owner to extend and complete his refining facilities in other close by locations, coming on-stream mid 2008.

• All of the refining facilities are in best overall and mechanical conditions, proper maintained, and by design fully in line with the development of technology and catalyst requirements, norms and standards of product qualities, and European environmental standards.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

1.3 Summary

To summarize, the above refining facilities are:

– of best up-to-date European design and safety standards,

– capable of refining a broad range of feeds ( crude and intermediates ),

– capable of refining at maximum light end products

– ( Hydrogen, LPG`s, Gasolines )

– capable to operate with high flexibility and at deep conversion.

Overall the offer represents an excellent opportunity ,

– to close potential refining gaps,

– to save valuable lead time ( at least 15 month ) compared to a new refinery complex,

– apart from the fact considerable investment capital is saved.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

2. The Project

2.1 Main units, age, last revamp & capacities

Below tabulation indicates the Processing Facilities for sale as currently operated. Processing and Utility Units:

UnitsLicensor Year Initial

Operation YearLastRevamp

Design Cap.MT/d

Design Cap.MT/a

Design Cap.bpd

PROCESS UNITS:

Combicracker (version1) Snamprogetti 1965 1989 5430 1950000 39000

Crude Distill. (version2) N.A. 1965 1989 11100 4000000 80000

Hydrotreat (Unifiner) UOP 1965 2004 1130 410000 8100

Amin-Regeneration and Sour Water Stripper N.A. 1965 530 190000 3800

Sulfur 1 Lurgi 1965 2006 13 5000 100

LPG-Rec/ C3+-Rec/Splitter N.A. 1965 260 each 95000 1900

Fluid CatalyticCracker (FCC) UOP 1993 2650 955000 19100

Hydrobon UOP 1975 2003 3360 1210000 24200

Dehexanizer UOP 2003 2880 1040000 20800

Contin. Reformer(CCR) UOP 1975 2040 740000 14700

Isomerization (Penex/DIH) UOP 1975 1440 520000 10400

Sulfur 2 Amoco 1978 1993 17 6000 120

MD-Desulfurization(HDS) Snamprogetti 1978 2520 910000 18200

UTILITY UNITS:

Cooling Water System N.A. 1965 1975 36000

Waste Water Treatment Lurgi 1965 2005 3600

Hotoil-System/ Steam Gen. UOP 1965 1975 8640

Nitrogen/ Plant& Instr.Air N.A. 1965 1975

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

2.2 Product Yields/ Specifications

Products Cap. Mt/a x1000Current Oper.

Cap. Mt/a x1000Alternate Oper.

Product Specification

Motor Gasolines 2000 1750 EN 228, issue 2005

Diesel 870 1100 EN 590, issue 2005

Kerosene (Jet Fuel) 75 100 Refinery Spec.

Fuel Oil 100 120 ISO 8217/ IMO & EU directive

Heavy Fuel Oil 500 380 ditto

LPG 75 60 EN 589

Ref. Gas (Fuel Gas) 60 50 Refinery spec.

Hydrogen 1.7 1.5 Refinery spec.

Sulfur 10 60 Refinery spec.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Note 1) EN 228, 2005 requires gasoline qualtity parameters : Sulfur value in brackets (=10 ppm max ) is 2009 requirement

Aromatics, vol%, max 35

Olefins, vol%, max 18

Benzene, vol%, max 1.0

Oxygen,wt%, max 2.7

Sulfur, ppm, max 50(10)

RVP, kPa 60/70

Lead, g/l max none

Note 2) EN 590, 2005 requires diesel quality parameters :

Poly Aromatics, vol%, max 11.0

Sulfur, ppm, max 50/(10)

Cetane number, min 51

Density @ 15°C, kg/m3 845

Distillation, T95°C, max 360

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

2.3 Scope of Supply & Services

Within the offer included:

• „As is / Where is“ Refinery (version 1.)

• Dismantling, Cleaning, Preservation, Packing and Labeling/Marking (digital documentation of packing)

• Loading on Truck

• Pre- / Basinc Engineering and Process Simulation on the new crude oil

Optional:

• Procurement and supply of complementary materials / Detail engineering

• Transportation / Construction / Re-assembly / Advisory

• Start Up Assistance, Training

• Re-Build Combi-Cracker to Crude Distillation ( version 1 )

- current operation as Visbreaker/ Thermal Cracker

• Add new Crude Distillation as Atmos. & Vac. Distill. ( version 2 )

- alternate operation with full „as-built“- conversion cap.

• Complement Process units for materials not subject for transfer to new location

- ( like Civil, Buildings, Concrete Structures, Insulation, Painting, Fire Protection ) or partly transfer has to be assumed

• Complement internal infrastructure (ISBL= utility units ) for new location requirements

• Add new external infrastructure ( OSBL-facilities )

SCOPE - Complementary Process & Utility Units (at new location)

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

• Flare(s)

• Incinerator(s)

• Cooling Towers

• Fire Fighting Facilities

• Intermediate Product Tanks

• Control Rooms

• Electrical Substations

• Warehouses, Lab`s

• Supply Networks w/i Battery Limits (BL) likeRW / CW / PA / IA / N / ST / C / HO

SCOPE - Internal Infrastructure Requirements

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

• Storage Facilities

• Pipeline Shipment (to / from Plant)

• Loading- & Unloading Facilities

• Power Station & HV Distribution

• Raw Water Intake Station

• Administration Building

• Supply Networks w/i OSBL

• Roads, Pavements, Trenches, Dikes

• Fences

SCOPE - External Infrastructure Requirements

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

• Assumptions

SCOPE - Complementary Supplies / Materials (when transfered)

In Sales Price (SP) To complement

Equipment 100 % 0 %

Civil & Buildings 0 % + 100 %

Piping 80 % + 20 %

Structural Steel 80 % + 20 %

Instrumentation 30 % + 70 %

Electrical 50 % + 50 %

Insulation/Painting/Fire Protect. 0 % + 100 %

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Layout Consumption (in sq.-meters) Total

- Process Units: 280 x 510 m 142,800 m²

- Tankage: 944,500 m²

- Total: 830 x 1,310 m 1,087,300 m²

Tankage (space in cub.-meters)

- Total A1 Inventory (Floating Roof Tanks) 670,000 m³

- Total A2 Inventory ( Cone Roof Tanks) 65,000 m³

- Total A3 Inventory ( Cone Roof/ Spheres) 790,000 m³

2.4 Layout and Space

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

2.6 Approach

Approach in Phases

Phase 0 Questionaire Refinery ComplexSign Pre-contract (BE/S)

Phase 1 Project SpecificationSign EPCM- Contract (DE/P/CM)

Phase 2 Detail Engineering/ Definition of Complementaries/ Disassembly / Transportation, Sign Supplies- Contract (E/P/CA)

Phase 3 Construction Advisory & Start Up Assistance

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

• Site Information

• Meteorological Data

• Plant Definitions (Feedstocks/ Product Qualities/ UtilityRequirements/ Environmental & Safety Standards )

• Design Definitions (Norms/ Standards/ Units of Measure)

• Licensor Requirements

• Update Expose

Phase 0 - Questionnaire Refinery Complex

Phase 1 - Project Specification

• Description of the Project

• Process Simulations ( new H&MB)

• Process & Design Criteria

• Product Slate/ Capacities

• Site Information/ Meterological Data

• Feedstock Definitions

• Product Program & Product Quality Specifications

• Estimated Utility Demand/ Existing Infrastructure

• Environmental Impact

• External Infrastructure Requirements

• Plot Plan Requirements

• Investment Cost

• Project Execution Schedule

• Financial & Economic Evaluation

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Phase 2 - Detail Engineering / Definition of Complementary Supplies

• Complement Existing Documentation

• Provide Eng. Documentation for New Facilities

• Provide Project Management Criteria & Tools

• Establish Inquiries & POR`s for Complementary Supplies

• Provide Project Execution Plan ( Cleaning / Marking / Material Identification / Dis-assembly / Transport to Seaport and Site / Construction & Re-assembly / -Precommissioning/ Start Up )

• Provide Training at Current Location

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Phase 3 - Construction Advisory / Start Up Assistence

• Provide Construction Execution Plan

• Provide Construction Advisory Criteria & Tools

• Establish Consortium for Site Construction

• Provide Construction Project Controls

• Provide Training at Previous Owners Facilities

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

TIMING

Project Execution Schedule Milestones (fast track)

• Questionaire: now

• Award Pre-Contract: latest 31. March 2007 !

• Project Spec (Phase1): 1. Januar 2007 to 30. September 2007

• Award EPCM-Contract: latest 30. September 2007

• Detail Eng. (Phase2): 1. October 2007

• Procure of Compl. Supplies: 1. April 2008

• Plant Shutdown: 30. June 2008

• Material Transports to Site: 1. September 2008 to 20. December 2009

• Award CASU-Contract (Phase3): 30. March 2008

• Construction at Site: 1. April 2008 to 30. November 2009

• Commissioning/Start Up: 1. December 2009 to 31. January 2010

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Contractual

• Consortium Build Up ( capable EPC-Companies only )

• Managing Contractor: Lohrmann International

• Multiple Contracts: Pre-contract for Phase 1

EPCM-contract for Phase 2

CASU-contract for Phase 3

• Contracting Mode: Lumpsum

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Used Oil Refinery for Sale and Relocation, 80,000 bpd.

Thank you for your attention.

Related Webpage: www.used-refinery.com

Lohrmann International GmbHSonnenberger Strasse 16 Tel. +49 611 701888 www.lohrmann.com65193 Wiesbaden (GERMANY) Fax +49 611 701895 [email protected]