URBAN DESIGN STUDY FOR THE URBAN DESIGN STUDY FOR THE NEW CENTRAL HARBOURFRONTNEW CENTRAL HARBOURFRONT
Review of Outstanding Issues Raised at the Consolidation Forum
4th Steering Group Meeting26 March 2008
Harbour-front Enhancement Committee Task Group on Urban Design Study
for the New Central Harbourfront4 May 2009
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
2
• A Consolidation Forum was organized by TGUDS on 28 February 2009 to:
(i) report the public views gathered from different channels during Stage 2 PE
(ii) allow the public to present their alternative design proposals and other comments/suggestions, and the Study Team and concerned Government departments to respond
(iii) conduct a focused, in-depth and structured public discussion on the critical issues.
IntroductionIntroduction
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
3
In the morning session:
• Presentations were made by the Study Team and 16 individuals/ organizations
• Floor discussion was conducted and five major issues were drawn up
In the afternoon session:
• A technical panel (technical departments and study consultants) responded to the comments and queries from participants
IntroductionIntroduction
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
4
• The following issues were agreed to be further reviewed by the Technical Panel:
1. Technical Feasibility of the “Lagoon” Proposal
2. Star Ferry Clock Tower (SFCT) at Original Location
3. Comprehensive Review on Public Transport Facilities
4. Additional Decks over Roads
IntroductionIntroduction
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
5
Responses to the Key IssuesResponses to the Key Issues
- To explore the “Lagoon” proposal to complement Queen’s Pier at its original location
Issue 1: “Lagoon” Proposal Requested by HKIAIssue 1: “Lagoon” Proposal Requested by HKIA
(Presented by HKIA)
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
6
Comments from TD:
- Realigning Road P2 to join Road P1 and deleting Road D6 is not viable as it would adversely affect the capacity of existing main roads.
- TD has an alternative proposal for realigning Road P2 with the lagoon located to its south:
Technical Feasibility of the “Lagoon” ProposalTechnical Feasibility of the “Lagoon” Proposal
Responses to the Key IssuesResponses to the Key Issues
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
7
Responses to the “Lagoon” ProposalResponses to the “Lagoon” Proposal
- Two options of the lagoon were explored to illustrate the possible design with the constraints.
- Option A: A lagoon with shallow water depth to complement Queen’s Pier at its original location
- Option B: A lagoon with shallow water depth to complement Queen’s Pier and SFCT located at their original locations
Option A Option B
Responses to the Key IssuesResponses to the Key Issues
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
8
Comments from DSD, HyD and Study Team:
- Concerns about the access for maintenance of proposed box culvert underneath Road P2
- Proposed realignment of Road P2 will diagonally bisect part of Sites 3 and 4
- Depth of lagoon constrained by shallow water depth due to underground AREOT, culvert and formation level of promenade
- Size of the lagoon constrained by the realigned Road P2
- The reassembly of QP by the harbour to revive its pier function is preferred by the general public
Analysis of the “Lagoon” ProposalAnalysis of the “Lagoon” Proposal
Responses to the Key IssuesResponses to the Key Issues
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
9
- To locate the SFCT at its original location in Site 3, and study of the engineering solutions to constraints imposed by the underground AREOT reserve and utilities.
Issue 2: SFCT at Original LocationIssue 2: SFCT at Original Location
Responses to the Key IssuesResponses to the Key Issues
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
10
Technical Feasibility of SFCT at Original LocationTechnical Feasibility of SFCT at Original Location
Comments from CEDD and HyD:
- CEDD advises that it is technically feasible to adopt a supporting deck to span over the culvert for SFCT and exhibition gallery.
- Piles could be driven on both sides of the culvert. CEDD considers the allowable space (4.5m to 5m) for the piling foundation of the supporting deck is sufficient.
- CEDD estimates that the additional foundation cost of putting SFCT in its original location is approximately $20M.
Responses to the Key IssuesResponses to the Key Issues
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
11
Response to Request for SFCT at Original LocationResponse to Request for SFCT at Original Location
- Two alternative design schemes for reconstructing Clock Tower, at Site 4 and at its original location at Site 3, were explored.
Responses to the Key IssuesResponses to the Key Issues
Concept A: SFCT at Site 4 Concept B: SFCT at Original location (Site 3)
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
12
Analysis of SFCT at Original Location (from urban design perspective)Analysis of SFCT at Original Location (from urban design perspective)
Responses to the Key IssuesResponses to the Key Issues
Concept A (at Site 4)
Concept B (at original location at Site 3)
- Linear relationship with City Hall and the harbourfront to create a visual and physical connection
- Allows visitors to reminisce the original location of the old SFCT and the previous Central coastline
- Clock Tower and gallery design to integrate with the developments at Site 4
- Clock Tower and gallery fairly visible from various parts of the waterfront but the landscaped deck and developments adjacent to the Clock Tower may obstruct views from the east direction
- The Clock Tower and gallery can be clearly visible from various parts of the waterfront from all four directions
- Clock Tower at its original location may be very close to Road P2 and the noise level may be high at times.
- The Clock Tower can be integrated with the promenade design to be maintained by the government, giving a degree of certainty to its surrounding environment
- The Clock Tower may need to be integrated with the design of Site 3, the development of which is uncertain at this stage
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
13
- Request for TD to further review the traffic demand and location of drop-offs and bus stops in front of the ferry piers.
Issue 3: Comprehensive Review on Public Transport FacilitiesIssue 3: Comprehensive Review on Public Transport Facilities
Responses to the Key IssuesResponses to the Key Issues
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
14
Comments from TD:
- TD has conducted a comprehensive review on the public transport facilities in the study area.
- PTI at Site 2 will be removed to allow for more ground level space.
Response to Request for Comprehensive Review on Public Response to Request for Comprehensive Review on Public Transport FacilitiesTransport Facilities
Responses to the Key IssuesResponses to the Key Issues
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
15
Revised Public Transport Provisions advised by TD:
- Site 1: 2 taxi pick-up/drop-off points, 2 bus bays, 1 taxi stand, 1 cross harbour taxi stand, 1 loading/unloading bay
- Site 3: 4 GMB bays, 2 coach bays, 1 loading/unloading bay, 1 taxi stand
Analysis of Comprehensive Review on Public Transport FacilitiesAnalysis of Comprehensive Review on Public Transport Facilities
Responses to the Key IssuesResponses to the Key Issues
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
16
- Request to examine the provision of additional decks over major roads to the waterfront at Site 6.
Issue 4: Additional Decks over RoadsIssue 4: Additional Decks over Roads
Responses to the Key IssuesResponses to the Key Issues
Site 6Site 6
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
17
Comments from TD:
- Both at-grade and grade separated facilities have been provided in the area. TD confirms that the existing planned provisions are sufficient.
Response to Request for Additional Decks over RoadsResponse to Request for Additional Decks over Roads
Responses to the Key IssuesResponses to the Key Issues
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
18
- Large elevated decks are already planned in Tamar and HKCEC (The Atrium Link). A landscaped deck is also proposed at Site 3.
- An elevated walkway is already planned to be provided to Site 6. Additional decks will affect the visual corridor to the harbour.
- The waterfront open space around Site 6 is limited. The proposed deck and access stairs/ ramps will further reduce the size of the waterfront open space.
Analysis of Request for Additional Decks over RoadsAnalysis of Request for Additional Decks over Roads
Responses to the Key IssuesResponses to the Key Issues
Tamar DeckTamar Deck
Site 3 Landscaped DeckSite 3 Landscaped Deck
Deck near Deck near HKCECHKCEC
Urban Design Study for the New Central Harbourfront 中環新海濱城市設計研究
規劃署 Planning Department
凱達環球有限公司
19
Thank You Thank You 多謝多謝