Uniting Water and People. University of Minnesota and Minnesota Professionals Technical Advisory Committee Presentation November 1 st 2010. Simajhuleu. Previous Involvement. What We Have Learned. COCCODE Maintain current system Collect annual fee Skilled Masons Part time plumber - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Uniting Water and People

Uniting Water and People

University of Minnesota and Minnesota Professionals

Technical Advisory Committee Presentation November 1st 2010

Page 2: Uniting Water and People

Simajhuleu

Page 3: Uniting Water and People

Previous Involvement

Page 4: Uniting Water and People

What We Have Learned

• COCCODE

– Maintain current system

– Collect annual fee

– Skilled Masons

– Part time plumber

– Elected every two years

– Capable and Motivated

Page 5: Uniting Water and People

Existing System

Water Area A & B(details not included)

3 Supply Springs ≈2.7 L/s

Water Area C

Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram

Page 6: Uniting Water and People

3 Supply Springs ≈2.7 L/s

Existing System

Water Area A & B(details not included)

Water Area C

Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram

Page 7: Uniting Water and People

3 Supply Springs ≈2.7 L/s

Water Area C

Existing System

Water Area A & B(details not included)

Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram

Page 8: Uniting Water and People

3 Supply Springs ≈2.7 L/s

Water Area C

Existing System

Water Area A & B(details not included)

Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram

Page 9: Uniting Water and People

3 Supply Springs ≈2.7 L/s

Water Area C

Existing System

Water Area A & B(details not included)

Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram

Page 10: Uniting Water and People

3 Supply Springs ≈2.7 L/s

Water Area C

Existing System

Water Area A & B(details not included)

Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram

Page 11: Uniting Water and People
Page 12: Uniting Water and People

Design Assumptions

Requirements

• All Static Pressure below 80 psi

• All Dynamic Pressures greater than 0 psi at peak flow

Objectives

• Listed in 3.1

Page 13: Uniting Water and People

Proposed System with Existing System Interactions

Water Area A & C(details not included)

connection3

1

2

4

connection

Page 14: Uniting Water and People

Proposed System with Existing System Interactions

Water Area A & C(details not included)

connection3

1

2

4

connection

Page 15: Uniting Water and People

Proposed System with Existing System Interactions

Water Area A & C(details not included)

connection3

1

2

4

connection

Page 16: Uniting Water and People

Proposed System with Existing System Interactions

Water Area A & C(details not included)

connection3

1

2

4

connection

Page 17: Uniting Water and People

Proposed System with Existing System Interactions

Water Area A & C(details not included)

connection3

1

2

4

connection

Page 18: Uniting Water and People
Page 19: Uniting Water and People

Community Involvement• At least 2 skilled

masons and plumber on site

• 10% of material costs• Digging of the entire

trench for pipeline

Page 20: Uniting Water and People

Community Outreach

Page 21: Uniting Water and People

Operation and Maintenance

Page 22: Uniting Water and People

Sustainability

Page 23: Uniting Water and People