uk performance-based navigation (pbn) implementation status geoff burtenshaw technical advisor,...
TRANSCRIPT
UK Performance-based Navigation (PBN) Implementation StatusUK Performance-based Navigation (PBN) Implementation Status
Geoff Burtenshaw Technical Advisor, Navigation SystemsDirectorate of Airspace Policy
02 July 2012 1ICAO-EUR PBN TF/7
PBN Regulatory EnablersPBN Regulatory Enablers102 July 2012 2ICAO-EUR PBN TF/7
Delivering a Future Airspace Strategy (FAS)Delivering a Future Airspace Strategy (FAS)
The FAS Industry Implementation Group (FASIIG)
Objective:
“To work collaboratively across the aviation industry (NATS, CAA, Airports, Airlines, Military, GA) to develop and agree an implementation plan to deliver the CAA’s Future Airspace Strategy for the 2015-2020 timescale. The FASIIG will work within a fixed two year timescale in order to deliver an implementation plan which delivers a set of tangible benefits within the 2015-2020 timescale or earlier where possible.”
02 July 2012 3ICAO-EUR PBN TF/7
Delivery of FASDelivery of FAS
• Develop a FAS Implementation Plan by end of 2012
• Align it to near and longer term SESAR objectives
• Monitor & manage the action plan to ensure timely
progress
• The FASIIG will provide the opportunity to develop
cross industry positions for input to government and
regulatory policy making
• Identify key airspace, technical and policy constraints
to realisation of the FAS
• PBN seen as a key element of the FAS implementation
plan
02 July 2012 4ICAO-EUR PBN TF/7
PBN Regulatory Enablers PBN Regulatory Enablers
• UK Air Navigation Order (CAP 393) Articles
124/125– Area navigation and required navigation
performance capabilities
Aircraft registered in the UK (124)
Aircraft registered elsewhere than the UK (125)
• Policy for the Application of PBN in UK/Irish
Airspace
02 July 2012 5ICAO-EUR PBN TF/7
ANO Articles 124/125ANO Articles 124/125
• An aircraft must not fly in required navigation
performance airspace unless it is equipped with area
navigation equipment which enables the aircraft to
maintain the navigation performance capability
notified, prescribed or otherwise designated for that
airspace– The equipment must be approved, installed in an acceptable
manner, maintained and operated in accordance with approved
procedures
– An aircraft need not comply with these requirements if ATC,
having been made aware of the lack of compliance, authorises
the flight or the aircraft complies with any ATC instructions
02 July 2012 6ICAO-EUR PBN TF/7
Policy for the Application of PBN in UK/Irish AirspacePolicy for the Application of PBN in UK/Irish Airspace
• Approved at FAB Supervisory Committee Meeting in Dublin on 13 October 2011
• Comprises 12 high-level policy statements• The PBN Policy sets out a specific
framework with guidance and support to ANSPs and operators to help facilitate implementation
• Subject to review and update in late 2012
02 July 2012 7ICAO-EUR PBN TF/7
PBN CaveatsPBN Caveats
• PBN is only one element of technological and operational enhancements providing enablers for FAS
• Environmental policy, cost and business drivers will have an impact on how quickly PBN can be moved forward
• The PBN Policy does not contain all of the answers to implementation issues, these will have to be developed separately through the UK/Irish PBN Implementation Working Group
02 July 2012 8ICAO-EUR PBN TF/7
AIC - Application of PBN in UK AirspaceAIC - Application of PBN in UK Airspace
• Approximates to a UK PBN Implementation
Plan
• A roadmap for ANSPs and Airports seeking to
introduce PBN as part of their airspace
changes
– Intended to provide framework for LAMP and
NTCA
– Link to Air Navigation Order (ANO) Articles 124
and 125
– Still very much an enabling AIC
– Sets out 2014, 2016 and 2018 objectives based
on anticipated aircraft capabilities
• AIC needs to be read in conjunction with PBN
Policy document
• Yellow 023/2012 refers
02 July 2012 9ICAO-EUR PBN TF/7
Current StatusCurrent Status202 July 2012 10ICAO-EUR PBN TF/7
Current StatusCurrent Status
• En-route– From 7 April 2011, B-RNAV (RNAV 5) became
applicable on all UK ATS routes at all
levels/altitudes in controlled airspace as
promulgated in the UK AIP
02 July 2012 11ICAO-EUR PBN TF/7
Current StatusCurrent Status
• Terminal Airspace– Still no P-RNAV (RNAV 1) SIDs or STARs
implemented, although STARs are largely
covered by the extension of the B-RNAV mandate
– NATS London Airspace Management Programme
(LAMP) and Northern Terminal Control Area
(NTCA) Projects
– Gatwick RNAV 1 SIDs (transposing trials to
permanent procedures)
– Newcastle RNAV 1 SIDs, Leeds/Bradford RNAV 1
SIDs and STARs
02 July 2012 12ICAO-EUR PBN TF/7
13
Current StatusCurrent Status
• RNP APCH implementation today– High levels of interest to implement RNAV (GNSS) Approaches
APV Demand may exceed IAP design and regulation capacity
– Profile raised by EC 7th Framework Funding call for LPV implementation (ACCEPTA)
14 aerodromes successful in UK All will include LNAV Reversion CAA encouraging inclusion of LNAV/VNAV Minima on charts where
beneficial
Runway ends LNAV
Runway endsLNAV/VNAV
Runway endsLPV
In Service 18 9 2
In Design 2012/13 44 18 38
02 July 2012 ICAO-EUR PBN TF/7
Other DevelopmentsOther Developments
• SID and NPR Working Group:– Define the components of instrument departure
procedures promulgated either conventionally or
utilising PBN (RNAV/RNP)
– Identify and clarify the issues surrounding the
replication of conventionally promulgated
Standard Instrument Departures (SID) and any
associated Noise Preferential Routes (NPR)
– Propose possible solutions to any issues
identified above
02 July 2012 14ICAO-EUR PBN TF/7
Trial of RNP 1 Departures with RFTrial of RNP 1 Departures with RF
• Conducting feasibility
assessment for
potential RNP 1 with
Radius to Fix (RF)
Departure trials at
London Stansted RWY
04 DVR and RWY 22
CLN
• Trial commencement –
after the London 2012
Olympics
02 July 2012 15ICAO-EUR PBN TF/7
• Objective:– To publish RNAV Holding Policy
– Ensure that the RNAV hold and STAR is at least
as safe as the current conventional procedures
– Hold separation standards
Hold to adjacent hold
Hold to route or edge of Controlled Airspace
RNAV Holding Policy
18 April 201202 July 2012 16ICAO-EUR PBN TF/7
CAA Policy Regarding Instrument Approach Procedures To Aerodromes Without an Instrument Runway and/or Approach Control
CAA Policy Regarding Instrument Approach Procedures To Aerodromes Without an Instrument Runway and/or Approach Control
• Development of Policy and Guidance (CAP)
• Consultation over the summer of 2012
• Publication by end of 2012
02 July 2012 17ICAO-EUR PBN TF/7
Navaid RationalisationNavaid Rationalisation• NATS programme to “right-size” the UK conventional navigation
infrastructure compatible with a PBN environment
• Consistent with changes to require RNAV 5 on all UK ATS routes since
April 2011 and AIC Yellow 107/2011 allowing Routes and Procedures to
be flown with an equivalent to ADF
• Removal of 8 en-route NDBs by 2018
• Reduction of en-route VORs from 46 to 19 by 2018
• VOR dependencies:
– Terminal airspace conventional procedures e.g., SIDs
– Instrument Approach procedures
– Use for training (civil and military)
– Means of procedural separation
– Mitigation against controlled airspace infringements
• Fragmented ownership of airports/procedures
02 July 2012 18ICAO-EUR PBN TF/7
Proposed Rationalised VOR Network and CoverageProposed Rationalised VOR Network and Coverage
02 July 2012 19ICAO-EUR PBN TF/7
CAA Web Page RefreshCAA Web Page Refresh
• Web page refresh in progress – 1st phase
complete
• High level PBN pages with pointers to
internal and external material
• Access to RNAV (GNSS) Approach pages
• Dedicated contact point:– [email protected]
02 July 2012 20ICAO-EUR PBN TF/7
SummarySummary302 July 2012 21ICAO-EUR PBN TF/7
SummarySummary
• PBN is a key enabler for the Future Airspace Strategy (FAS) and indeed, the CAA Environmental Strategy
• CAA PBN Policy in place• Industry implementation programme now being
developed by the FASIIG• AIC (Y) 023/2012 sets out the application roadmap
leading into the introduction of the SES PBN IR• RNP APCH offers access for all types of aircraft and to
all aerodromes*– Processes established to assist in deployment and CAA
working to smooth the approval path
02 July 2012 22ICAO-EUR PBN TF/7
* Emerging CAA policy for Non-Instrument Runways and where No-Approach Service available
SummarySummary
• Navigation infrastructure is part of the PBN solution
• NATS VOR replacement programme is therefore an
opportunity to “right-size” UK navigation
infrastructure through rationalisation
• Through FAS, the CAA is seeking to modernise and
future-proof UK airspace and infrastructure
02 July 2012 23ICAO-EUR PBN TF/7