tunnel renewal + safety @ sbb - ita-aites

48
ITA Cosuf, Rome, 22.06.2012 Tunnel Renewal + Safety @ SBB Jan Dirk Chabot SBB Bern, I-AT-IU-TEC Roma, 22.06.2012

Upload: others

Post on 28-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tunnel Renewal + Safety @ SBB - ITA-AITES

ITA Cosuf, Rome, 22.06.2012

TunnelRenewal + Safety @ SBB

Jan Dirk ChabotSBB Bern, I-AT-IU-TECRoma, 22.06.2012

Page 2: Tunnel Renewal + Safety @ SBB - ITA-AITES

Number + age of tunnels SBB

Damages / impacts

Tunnel safety

Renewal cases and methods

Tunnel Renewal + Safety @ SBBContent ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 2

Page 3: Tunnel Renewal + Safety @ SBB - ITA-AITES

2012Tunnels single track: 158 pcs., 123.4 km

Tunnels double track: 133 pcs., 134.0 km

Total: 291 pcs., 257 km

1850 60 1900 1950

10

20

30

40

50

0

year

Number oftunnels SBB

60

70

70 80 90 10 20 30 40 60 70 80 90 2000 10 20

masonry

brickwork

concrete (in situ)

Tunnel Renewal + Safety @ SBBQuantity + age of tunnels SBB ITA-Cosuf Rome 22.06.2012

Number + age of single + double track tunnels on SBB network

SBB • I• AT-IU • 22.06.2012 3

Page 4: Tunnel Renewal + Safety @ SBB - ITA-AITES

Tunnel length 257 km

Number of tunnels 264

Number of objectsto be inspected 291

(thereout cut & cover 32)

Tunnel Renewal + Safety @ SBBTunnels SBB today ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 4

Page 5: Tunnel Renewal + Safety @ SBB - ITA-AITES

Gotthard Base Tunnel2 x 57 km

DML 5.3 km

Eppenberg3.5 km

Ceneri Base Tunnel2 x 15.4 km

CEVA9 km Tunnel de Sierre

0.4 km

Cross-city tunnel Zurich DML 5.5 kmGotthard Base Tunnel 2 x 57.0 kmCeneri Base Tunnel 2 x 15.4 kmTunnel de Sierre 0.4 kmEppenbergtunnel 3.5 kmCEVA (S-Bahn Geneva) 8.8 km

+ 163 km

Tunnel Renewal + Safety @ SBBTunnels SBB tomorrow (-2019) ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 5

Page 6: Tunnel Renewal + Safety @ SBB - ITA-AITES

AA

GE

BN

ZUE

SG

BS

LS

SH

YV FRI

NE

CF

BI

DMT

SO

OL

BR

LB

RK

W

ZG

GD

BG

RH

BU

SMG

LO

SIO

IO

TH

CH

PF

RUET

BCT

PONT

ORBEPAY

MRT

KZ

GMM

MOUTA

LY

LTH

HWIL

KF

WH

MR

SUHR

ZF

LST

KLW

ZOER

TW

BUE

LSG

WIL

GSS

WZ

EW

LIN

WA

UZ

GOE

EF

STG

SM

VI

ZERM

KR

MX

PAL

BUL

BUER

WE

BD

TG

EGL

KB

WAH

SCBG

LN

BDF

ZOL

TR

GLO

POR

SCB

LOC

VAL

ZB

Frasne

LEN

DOMO

INS

RW

VV

TAV

KA

FLE

LF

ROM

OEN

SS

MA

BOU

PT

DAY

BRA

SP

SEU

HI

BAEW BMA

SLG

NW

LFG

HO

BW

REI

LPN

HA

GI

VER

FLM

CD

WLARCH

CTM

HB

SPK

LBIN

WI

NG

NIE

RA

WO BGW

WUER

RS

SA

LZ

LG

BEL

REIK

PUI

Haf

OT

GEAP

VAREMEN

CHI

GAL

Arcisate

STAO

MICL

Combe ConversMont Sagne

La LucheLa Sauge

Col-des-Roches

Wolf

Angenstein

Vorbourg

Choindez I - IIIVerrerie-de-MoutierVerrerie-de-RochesMoutier I - IX

Bertholod

Crêtes (Burier)

St. Maurice

Hauenstein Basis (HBT)

LiesbergBärschwil

Untere SchächliObere SchächliEntlenstaldenWilzigen

Wiggen

Wolhusen

Zuger StadttunnelLothenbachBühl (ZG)Rossplatten (ZG)

St. AdrianRuffibachKalkofenMühlefluh (ZG)

Windgällen Pfaffensprung

MuhrenMühleKirchbergWattingen

RohrbachLeggistein

GotthardGotthard (Autorampe)

StalvedroLa LumePianotondoTravi

CostaPrecassino-Meggiagra

CrocettoGiustizia

Kerenzerberg Bommerstein

Villangeaux

Epoisats

Adler

Burgdorfer

Aarburger

Erlenbach

Landikon

Schloss LaufenKannenfeldSchützenmatt

Gibet

Villnachern

Ricken (Sohle)

Balerna

Rosenberg (Flachdecke)Rosenberg (Kabelrohrblock)

Rindelfluh G100Rindelfluh G200

SvitoDragonato

Des Loges

Scheme network31.05.2012

Bristen

Legende

Tunnel Renewal 2012

Tunnels to be renewed

Tunnels renewed

Simplon I + II

Tunnel Renewal + Safety @ SBBClustering Tunnel Renewal (2010-2019) ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 6

Page 7: Tunnel Renewal + Safety @ SBB - ITA-AITES

After approx. > 40-60 years of use 1st refurbishment / Renewal

resp. next refurbishment of an earlier refurbishment.

Causes / origin:

Tunnel mit Mauerwerkverkleidung

Tunnel mit Betonverkleidung

3

4

5

5

5

1

7

1

9 1

1

7

7

7

11

7

1

1

1

2

3

3

4

5

5

6

6

77

88

9

10

11

11

1212

Enlarging tunnel profiles (e.g. Optimizing profile in tunnel,higher / wider trains)

Damages masonry / lining(contact with groundwater / frost)

Water ingress (dripping / iceformation) / defective drainage

Retrofit Safety elementsescape way, tunnel lighting, signalization

SBB

SBB

SBB

Tunnel Renewal + Safety @ SBBtypical damages / refurbishment works ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 7

Page 8: Tunnel Renewal + Safety @ SBB - ITA-AITES

Lime deposits

Swelling

Infiltrations

H2O

Concrete-«corrosion» / (Weathering)

Tunnel Renewal + Safety @ SBBImpact: Water ITA-Cosuf Rome 22.06.2012

(Re-) Actions of water

Corrosion of steel + technique

SBB • I• AT-IU • 22.06.2012 8

Page 9: Tunnel Renewal + Safety @ SBB - ITA-AITES

SBB • I• AT-IU • 22.06.2012 9

Ecological electricity??

Pic. Marti Renesco AG

Example of damages:

- water ingress, leakage, damages of lining,

- repair of joints

SBB SBB

SBB

Tunnel Renewal + Safety @ SBBImpact: Water ITA-Cosuf Rome 22.06.2012

Page 10: Tunnel Renewal + Safety @ SBB - ITA-AITES

Weathering of tunnel lining due influence of mountain- / groundwater (evaporation-inducted salt-enrichment in mortar / concrete)

+ Humidity-contact for decades + Temperature

+ influence of surrounding geology

Concentration of salts in groundwater

Partially detention in the lining

Concentration salts in liningaccumulation of salts until / destruction of cement (crystallization and / or Ettringite / Thaumasite).

Esp.where change dry / wet

Amount of ground water

evaporation

Accumulation of harmful salts in the concrete or mortar due a „stream“ of humidity for decades trough the lining or invert.

Tunnel-interiorgeology

Lining

SBB

SBB

SBB

Tunnel Renewal + Safety @ SBBImpact: Water ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 10

Page 11: Tunnel Renewal + Safety @ SBB - ITA-AITES

Most tunnels have a drained concept drainage system,

No water pressure behind lining / under vault – permanent function!

SBB

SBB

Tunnel Renewal + Safety @ SBBTypical damages & Problems: Water ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 11

Page 12: Tunnel Renewal + Safety @ SBB - ITA-AITES

12

Minimising impact in case of fire due to waste / paper in cable-ducts / electrical boxes for rail technique: protection with barriers / cover panels of the cable ascents

SBB SBB

SBB

Tunnel Renewal + Safety @ SBBFire prevention ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 12

Page 13: Tunnel Renewal + Safety @ SBB - ITA-AITES

New catenary / rigid electrical rail

Tunnel Safety (emergency light)

Cable ducts

Underpinning of lining

Protective / technical refuges

rock mass improvement

Arch invert

Lowering of track

Lowering of the invert

Local widening of profile

Drainage vault

New drainage system + inspection manholes

Drainage invert

Repair of joints/ (shotcrete shells)

Waterproofing vault

SBB

Tunnel Renewal + Safety @ SBBTypical renewal + upgrading works ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 13

Page 14: Tunnel Renewal + Safety @ SBB - ITA-AITES

3.8%

46.5%

12.2%

26.8%

44.6%

23.0%

39.5%

3.7%A

B

C

D

A

B

C

D

(< 100 m)

(> 3‘000 m)

(> 1‘000 m)

(< 1‘000 m)

Number of tunnels

Risk categories in tunnels:

Risk analysis:

Length of tunnel + Frequency of trains

Length of tunnels

Tunnel Renewal + Safety @ SBBImproving tunnel Safety ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 14

Page 15: Tunnel Renewal + Safety @ SBB - ITA-AITES

Legend

Tunnels with self-rescue measures SRM

Renewal existing illumination

AA

GE

BN

ZUE

SG

BS

LS

SH

YV FRI

NE

CF

BI

DMT

SO

OL

BR

LB

RK

W

ZG

GD

BG

RH

BU

SMG

LO

SIO

IO

TH

CH

PF

RUET

BCT

PONT

ORBEPAY

MRT

KZ

GMM

MOUTA

LY

LTH

HWIL

KF

WH

MR

SUHR

ZF

LST

KLW

ZOER

TW

BUE

LSG

WIL

GSS

WZ

EW

LIN

WA

UZ

GOE

EF

STG

SM

VI

ZERM

KR

MX

PAL

BUL

BUER

WE

BD

TG

EGL

KB

WAH

SCBG

LN

BDF

ZOL

TR

GLO

POR

SCB

LOC

VAL

ZB

Frasne

LEN

DOMO

INS

RW

VV

TAV

KA

FLE

LF

ROM

OEN

SS

MA

BOU

PT

DAY

BRA

SP

SEU

HI

BAEW BMA

SLG

NW

LFG

HO

BW

REI

LPN

HA

GI

VER

FLM

CD

WLARCH

CTM

HB

SPK

LBIN

WI

NG

NIE

RA

WO BGW

WUERRS

SA

LZ

LG

BEL

REIK

PUI

Haf

OT

GEAP

VAREMEN

CHI

GAL

Arcisate

STAO

MICL

Tunnels to be equipped with SRM (GBT: 2016, CBT 2018)

Gotthard

Freggio

Prato

Travi

Pianotondo

Paradiso

Naxberg

Wattinger

Bristen

Stutzeck-Axenberg

Fronalp

ÖlbergFin de Lance

Luzerner-Stadttunnel

Zimmerberg

Albis

Ricken

Kerenzerberg

Rosenberg

Grauholz

Burgdorfer

Vingelz

La Raisse

St-Aubin-Sauges

Vauderence

Cornallaz

St-Jean

St-Maurice

Adler

Hauenstein-Basistunnel

Aarau I + II

Bözberg

Heitersberg

Kreuzliberg

Hagenholz

Flughafen

Käferberg

EngeUlmberg

Wipkinger

Hirschengraben

Zürichberg

Riesbach

Pfaffensprung

Zürich - Thalwil

Mont d‘Or

Mont d‘Or (underresponsibility SNCF)

ThunstettenStamml. + NBS

Leggistein

Oenzberg

Emmequerung

Langenthal

MurgenthalWolfacher N + S

Gishübel

Aegerten

Rüdtlingen

Simplon I + II

De Loges

Weinberg (N)

GBT (N)

CBT (N)

Kannenfeld

Axenberg

CEVA (N)

Tunnel renewing + safety @ SBBTunnel safety: Tunnels with SRM ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 15

Page 16: Tunnel Renewal + Safety @ SBB - ITA-AITES

Self rescue measures in 62 new or existing tunnels (150 from 252 km) (Simplon: +2x 20 km)

Tunnel Renewal + Safety @ SBBUpgrading Tunnel Safety ITA-Cosuf Rome 22.06.2012

Elements:

Tunnel lightning incl. Alarming

Walkway and handrail

Signalization (escape signs)

Improvement visibility of existing cross-passages / escape possibilities.

Retrofit /

improvement

tunnel Safety

SBB • I• AT-IU • 22.06.2012 16

Page 17: Tunnel Renewal + Safety @ SBB - ITA-AITES

SBB • I• AT-IU • 22.06.2012 17

Tunnel Renewal + Safety @ SBBrescue shaft ITA-Cosuf Rome 22.06.2012

Example Zimmerberg Base Tunnel

Page 18: Tunnel Renewal + Safety @ SBB - ITA-AITES

Tunnel Renewal + Safety @ SBBrescue shaft ITA-Cosuf Rome 22.06.2012

Example of one rescue shaft at the Zimmerberg Base Tunnel near Zurich

H = 60 m

Stairs + “Alimak”-elevator for fire service + rescue teams

Enough «buffer space» for passengers

Overpressure ventilation to prevent a «chimney effect» SBB • I• AT-IU • 22.06.2012 18

Page 19: Tunnel Renewal + Safety @ SBB - ITA-AITES

Simplon Tunnel handrail with integrated LED light

Tunnel Renewal + Safety @ SBBUpgrading Tunnel Safety ITA-Cosuf Rome 22.06.2012

Zimmerberg Base Tunnel (9.5 km)- Improving Tunnel ligthning- better visibility of emergency exits

SBB • I• AT-IU • 22.06.2012 19

Page 20: Tunnel Renewal + Safety @ SBB - ITA-AITES

Tunnel Renewal + Safety @ SBBSimplon Tunnel - History ITA-Cosuf Rome 22.06.2012

Example Simplon Tunnel

SBB • I• AT-IU • 22.06.2012 20

Page 21: Tunnel Renewal + Safety @ SBB - ITA-AITES

Key-data I / History:

- 2 parallel tubes, each 19.8 km long. Cross-over in the middle of the tunnel

- 1906 Inaugration of the 1st tube incl. cross-over, 2. tube 1922

- From beginning on with electrical traction 3-Phase DC 3kV,later change to 1-Phase AC 15kV 16.7 Hz

Tunnel Renewal + Safety @ SBBSimplon Tunnel - History ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 21

Page 22: Tunnel Renewal + Safety @ SBB - ITA-AITES

Fire of freight train in south tube II, between km 15.3 and 16.0:

SBB

Tunnel Renewal + Safety @ SBBSimplon Tunnel – fire June 9, 2011 ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 22

Page 23: Tunnel Renewal + Safety @ SBB - ITA-AITES

Fire in south tube II, between km 15.3 and 16.0:

- Fire on freight train, due shortage no electrical power

- temperatures up to 800° C

- small damages on lining of brickwork in top of vault

- spalling between 2 – 20 cm at lining of rock stones

- cleaning lining + application of fire resistant mortar

SBB

Tunnel Renewal + Safety @ SBBSimplon Tunnel – fire June 9, 2011 ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 23

Page 24: Tunnel Renewal + Safety @ SBB - ITA-AITES

Renewal of tunnel drainage km 1 - 7

Upgrading 44 existing,3 new cross passages

Fire 09.06.2011, km 15.3 - 16

Electr. Intelocking block

- Self rescue measurements: (lightning +power supply, signalisation walkway + handrail),

- upgrading existing cross-passages between tubes I + II,

- Further: new switches, lowering of track, drainage, 132 KV + 50 Hz-power supply

Renewal of tunnel drainage km 10 - 16

Tunnel Renewal + Safety @ SBBSimplon Tunnel – upgrading Safety ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 24

- 4 new switches- lowering of invert:

tube I: L = 650 mtube II: L = 550 m

16 kV (50 Hz)new in situ cable block(in place of 4 kV)L = 19‘800 m

Conformity 132 kVnew in in situ cableblocks (16.7 Hz)2 x 19‘800 m

Self-Rescue measurements SRM (walkway, illumination, Handrail, escape signs.Transformation of 44 existing and 3 new cross-passages. 2 x 19‘800 m

Page 25: Tunnel Renewal + Safety @ SBB - ITA-AITES

Key data II:

- Distance between tunnel axis only 17 m!

- F Air = approx. 24 m2. vmax 140 km/h, High speed trains-Züge up to 160 km/h

- Existing cross passages every today 350 – 700 m. New max. 500 m

SBB

Tunnel Renewal + Safety @ SBBSimplon Tunnel – renewal+upgrading safety ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 25

Page 26: Tunnel Renewal + Safety @ SBB - ITA-AITES

Typical situation cross-passages every Ø 500 m :

- Upgrading 44 existing, construction of 3 new cross passages

- New doors and illuminated escape-signalisation + illumination

SBB

Tunnel Renewal + Safety @ SBBSimplon Tunnel – renewal+upgrading Safety ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 26

Page 27: Tunnel Renewal + Safety @ SBB - ITA-AITES

Upgrading cross passages

▪ Signalisation:

Light 24 h

Green colour

▪ Sliding doors

▪ Fire resistance

Orientation plan

New tunnels:

+ over pressure / ventilation

+ CCTV (video survey)

+ (Fire-water duct)

Tunnel Renewal + Safety @ SBBupgrading Tunnel Safety - Sempione ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 27

Page 28: Tunnel Renewal + Safety @ SBB - ITA-AITES

Simplon Tunnel handrail with integrated LED light

Tunnel Renewal + Safety @ SBBupgrading Tunnel Safety ITA-Cosuf Rome 22.06.2012

Simplon Tunnel upgraded cross-passages

SBB • I• AT-IU • 22.06.2012 28

Page 29: Tunnel Renewal + Safety @ SBB - ITA-AITES

Before replacement of 40 km cable duct replacement of approx. 20 km

drainage tubes with stronger, high quality PP tubes with larger .(150 cm2 inlets /m’)

SBB

Tunnel Renewal + Safety @ SBBSimplon Tunnel – renewal+upgrading Safety ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 29

Page 30: Tunnel Renewal + Safety @ SBB - ITA-AITES

Example Gotthard Base Tunnel

Tunnel Renewal + Safety @ SBBTunnel Safety Gotthard Base Tunnel ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 30

Page 31: Tunnel Renewal + Safety @ SBB - ITA-AITES

ATG

Ventilation

in rescue station (MFS)

in cross passages

Tunnel Renewal + Safety @ SBBTunnel Safety Gotthard Base Tunnel ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 31

Page 32: Tunnel Renewal + Safety @ SBB - ITA-AITES

ATG

Tunnel Renewal + Safety @ SBBTunnel Safety Gotthard Base Tunnel ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 32

Page 33: Tunnel Renewal + Safety @ SBB - ITA-AITES

ATG

Tunnel Renewal + Safety @ SBBother safety installations / vehicles ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 33

Other safety elements / installations @ SBB:

Hot axle detectors(usually approx. 2-3 km before main tunnel)

Chemical detectors

Offset load detectors

Fire fighting train«LRZ» 16 pcs,all ETCS L2 compatible

Page 34: Tunnel Renewal + Safety @ SBB - ITA-AITES

- SBB tunnels are for >150 years safe constructions

- Tunnel Safety (self rescue) upgrading @SBB for approx. 18 years

- Safety improvements in longer tunnels according to TSI – SRTtechnique and as simple as possible…

- Tunnels must be maintained to ensure safe operation

- SBB-network with very high use 100 – 300 trains / track!--> Access + maintenance / Renewal under heavy traffic difficult(closure of tracks / only in short work shifts)

- Handling of groundwater in tunnels very important for the lifetime (LCC) of tunnel structure + technical equipment Water must drain permanent without water-pressure

under the invert or behind the lining !

Tunnel Renewal + Safety @ SBBConclusions ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 34

Page 35: Tunnel Renewal + Safety @ SBB - ITA-AITES

Final word

Thank you for your attention

SBB • I• AT-IU • 22.06.2012 35

Page 36: Tunnel Renewal + Safety @ SBB - ITA-AITES

SBB • I• AT-IU • 14.09.2011 36

E X T R A

Page 37: Tunnel Renewal + Safety @ SBB - ITA-AITES

Cross-over:Strong salt-formation on the lining surface due evaporation-enrichment.Water can be aggressive for any metallic component

System

SBB SBB

SBB

Tunnel Renewal + Safety @ SBBSimplon Tunnel – 2012 – 2014, costs 160 Mio. CHF ITA-Cosuf Rome 22.06.2012

SBB • I• AT-IU • 22.06.2012 37

Page 38: Tunnel Renewal + Safety @ SBB - ITA-AITES

Tunnel Renewal + Safety @ SBB Tunnels du Mormont

Example Tunnels du Mormont

SBB • I• AT-IU • 22.06.2012 38

Page 39: Tunnel Renewal + Safety @ SBB - ITA-AITES

1855 Inaugration 2 Tunnels, L = 183 and 301 m,Line between Lausanne – Yverdon)

1925 Electrification 15 kV 16.7 Hz, ( incl. 1st lowering of the vault)

2008-10 Construction of the parallel tube, transformation existing 2-track tube into a 1-track tunnel.

Approx. 250 trains / day + freight traffic to oil rafinery + cement factory.

SBB • I• AT-IU • 22.06.2012 39

Tunnel Renewal + Safety @ SBB Tunnels du Mormont

Page 40: Tunnel Renewal + Safety @ SBB - ITA-AITES

Construction phases and track closures for renewing of the old tunnel

Original state

SBB • I• AT-IU • 22.06.2012 40

Tunnel Renewal + Safety @ SBB Tunnels du Mormont

Page 41: Tunnel Renewal + Safety @ SBB - ITA-AITES

Construction parallel tube

SBB • I• AT-IU • 22.06.2012 41

Tunnel Renewal + Safety @ SBB Tunnels du Mormont

Construction phases and track closures for renewing of the old tunnel

Page 42: Tunnel Renewal + Safety @ SBB - ITA-AITES

Track change, transformation firsthelft in existing tunnel(freight traffic to local plant ensured)

SBB • I• AT-IU • 22.06.2012 42

Tunnel Renewal + Safety @ SBB Tunnels du Mormont

Construction phases and track closures for renewing of the old tunnel

Page 43: Tunnel Renewal + Safety @ SBB - ITA-AITES

SBB • I• AT-IU • 22.06.2012 43

Tunnel Renewal + Safety @ SBB Tunnels du Mormont

Construction phases and track closures for renewing of the old tunnel

transformation second helft in existing tunnel(freight traffic to local plant ensured)

Page 44: Tunnel Renewal + Safety @ SBB - ITA-AITES

Final state

SBB • I• AT-IU • 22.06.2012 44

Tunnel Renewal + Safety @ SBB Tunnels du Mormont

Construction phases and track closures for renewing of the old tunnel

Page 45: Tunnel Renewal + Safety @ SBB - ITA-AITES

Tunnel maintenance and renewal @ SBBTunnel inspection tools

All mapped items are assigned to an appropriate layer

The inspection map provides a clear image of the conditions of the tunnel

Comparing the results with former inspections drawings and/or scans allows to better assess the evolution rate of observed damages

Thermal data may help for detecting water infiltrations and/or cavities

SBB • I• AT-IU • 22.06.2012 45

Page 46: Tunnel Renewal + Safety @ SBB - ITA-AITES

2 Drainage Concepts for tunnels:

An intermediate concept can’t be allowed: «Let’s hope»e.g. injections to avoid water inflow could result in filling cavities and pipes of the existing drainage systems!

The drainage system should be maintained always in operation to ensure water drainage

Waterproof system

Under pressure, water in-come is not allowed due to a 360° waterproofing membrane

Umbrella systemwater ingress is regulated by the drainage system

Maintain the existing groundwater level – max height of water 60 – 90 m)

46

Tunnel maintenance and renewal @ SBB Drainage concept

SBB • I• AT-IU • 22.06.2012

Page 47: Tunnel Renewal + Safety @ SBB - ITA-AITES

Tunnel maintenance and renewal @ SBB Drainage Calcite deposits

SBB • I• AT-IU • 22.06.2012 47

drained concept water + contact to concrete = Risk of calcites in drainage

Calcites must be removed, otherwise tube loaded, then water flew blocked: water pressure!

Mechanically: regular, “stress” for pipesTrack Closure, costs

Physically: permanent,deposits are hindered, no / or few soft deposits.

Maintenance + costs drastically reduced

19th June 2009 3rd August 2009 24th Oct. 2011

Removing calcites

Hardness-stabilizing: Dosage-System, see: www.mcwegmueller.com

SBB SBB

Page 48: Tunnel Renewal + Safety @ SBB - ITA-AITES

Final word

Thank you for your attention

SBB • I• AT-IU • 22.06.2012 48