transport committee agenda (2/2) feb 13

Upload: ben-ross

Post on 04-Apr-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    1/173

    Note: The reports contained within this agenda are for consideration and should not be construed as Council policyunless and until adopted. Should Members require further information relating to any reports, please contactthe relevant manager, Chairperson or Deputy Chairperson.

    I hereby give notice that an ordinary meeting of the Transport Committee will be held on:

    Date:Time:Meeting Room:Venue:

    Wednesday, 13 February 20132.00 pmReception LoungeAuckland Town Hall301-305 Queen StreetAuckland

    Transport CommitteeOPEN AGENDA

    MEMBERSHIP

    Chairperson Cr Mike LeeDeputy Chairperson Cr Hon Chris Fletcher, QSO

    Mr James BrownCr Dr Cathy CaseyCr Sandra Coney, QSO

    Cr Des MorrisonCr Richard Northey, ONZMCr Dick QuaxCr Sharon Stewart, QSMCr Wayne WalkerCr Penny WebsterMr Glenn WilcoxCr George Wood, CNZM

    Ex-Officio His Worship the Mayor, Len Brown, JPDeputy Mayor, Penny Hulse

    Independent MaoriStatutory Board Alternate

    Chairperson, Independent Maori StatutoryBoard, Mr David Taipari

    (Quorum 7 members)

    Desiree TukutamaDemocracy Advisor

    8 February 2013

    Contact Telephone: (09) 307 7576Email: [email protected]: www.aucklandcouncil.govt.nz

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    2/173

    TERMS OF REFERENCE

    The Transport Committee will have responsibility for:

    Input into the Auckland Plan in relation to transport issues and aspirations; Advocating on behalf of Auckland to develop and enhance transport and connectivity for

    the region; and Prepare and recommend Regional Land Transport Strategy to the Governing Body and

    provide input on behalf of the Governing Body to the Auckland Regional TransportProgramme.

    Relevant legislation includes but is not limited to:

    Local Government (Auckland Council) Act 2009;Resource Management Act 1991;Land Transport Act 1998; andLand Transport Management Act 2003.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    3/173

    Transport Committee

    13 February 2013

    Page 3

    TABLE OF CONTENTS

    ITEM PAGE

    1 Apologies 5

    2 Declaration of Interest 5

    3 Confirmation of Minutes 5

    4 Petitions 5

    5 Public Input 5

    5.1 Auckland Harbour Bridge Pathway 5

    5.2 Heart of the City - Wider Liveability Benefits the Pathway Steering

    Group Project Delivers 6

    6 Local Board Input 6

    7 Extraordinary Business 6

    8 Notices of Motion 7

    9 Auckland Harbour Bridge Pathway Project Update 9

    10 Transport Update 87

    11 Resolutions from 4th October 2012 Orakei Local Board: Auckland

    Transport Update Orakei Local Board: October 2012 175

    12 Correspondence 185

    13 Consideration of Extraordinary Items

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    4/173

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    5/173

    Transport Committee

    13 February 2013

    Page 5

    1 Apologies

    At the close of the agenda no apologies had been received.

    2 Declaration of Interest

    Members are reminded of the need to be vigilant to stand aside from decision makingwhen a conflict arises between their role as a member and any private or other externalinterest they might have.

    3 Confirmation of Minutes

    That the minutes of the Transport Committee held on Wednesday, 5 December 2012, beconfirmed as a true and correct record.

    4 Petitions

    At the close of the agenda no requests for petitions had been received.

    5 Public Input

    Standing Order 3.21 provides for Public Input. Applications to speak must be made to theCommittee Secretary, in writing, no later than two (2) working days prior to the meetingand must include the subject matter. The meeting Chairperson has the discretion todecline any application that does not meet the requirements of Standing Orders. Amaximum of thirty (30) minutes is allocated to the period for public input with five (5)minutes speaking time for each speaker.

    5.1 Auckland Harbour Bridge Pathway

    Purpose

    1. The purpose of the report is to give an update to the Transport Committee onthe Auckland Harbour Bridge Pathway project.

    Executive Summary

    2. Mr Bevan Woodward, Auckland Harbour Bridge Pathway Trust, will give apresentation to the Transport Committee on the Auckland Harbour BridgePathway project.

    Recommendations

    That the Transport Committee:

    a) Receives the Auckland Harbour Bridge Pathway presentation.

    b) Thanks Mr Bevan Woodward, Auckland Harbour Bridge Pathway Trust for hispresentation.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    6/173

    Transport Committee

    13 February 2013

    Page 6

    5.2 Heart of the City - Wider Liveability Benefits the Pathway Steering GroupProject Delivers

    Purpose

    1. The purpose of the report is to present to the Transport Committee, the widerliveability benefits that the Pathway Steering Group project delivers.

    Executive Summary

    2. Mr Alex Swney, Heart of the City, will speak to the Transport Committee onthe wider liveability benefits that the Pathway Steering Group projectdelivers.

    Recommendations

    That the Transport Committee:

    a) Receives the Heart of the City Wider Liveability Benefits the PathwaySteering Group Project Delivers, deputation.

    b) Thanks Mr Alex Swney, Heart of the City, for his deputation.

    6 Local Board Input

    Standing Order 3.22 provides for Local Board Input. The Chairperson (or nominee of thatChairperson) is entitled to speak for up to five (5) minutes during this time. TheChairperson of the Local Board (or nominee of that Chairperson) shall wherever practical,give two (2) days notice of their wish to speak. The meeting Chairperson has thediscretion to decline any application that does not meet the requirements of StandingOrders.

    This right is in addition to the right under Standing Order 3.9.14 to speak to matters on theagenda.

    At the close of the agenda no requests for local board input had been received.

    7 Extraordinary Business

    Section 46A(7) of the Local Government Official Information and Meetings Act 1987 (asamended) states:

    An item that is not on the agenda for a meeting may be dealt with at that meeting if -

    (a) The local authority by resolution so decides; and

    (b) The presiding member explains at the meeting, at a time when it is open to thepublic, -

    (i) The reason why the item is not on the agenda; and

    (ii) The reason why the discussion of the item cannot be delayed until asubsequent meeting.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    7/173

    Transport Committee

    13 February 2013

    Page 7

    Section 46A(7A) of the Local Government Official Information and Meetings Act 1987 (asamended) states:

    Where an item is not on the agenda for a meeting, -

    (a) That item may be discussed at that meeting if -

    (i) That item is a minor matter relating to the general business of the localauthority; and

    (ii) the presiding member explains at the beginning of the meeting, at a timewhen it is open to the public, that the item will be discussed at the meeting;but

    (b) no resolution, decision or recommendation may be made in respect of that itemexcept to refer that item to a subsequent meeting of the local authority for furtherdiscussion.

    8 Notices of Motion

    At the close of the agenda no requests for notices of motion had been received.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    8/173

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    9/173

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 9

    Auckland Harbour Bridge Pathway Project Update

    File No.: CP2012/24488

    Purpose1. The purpose of this report is to update the Transport Committee on the Auckland Harbour

    Bridge Pathway project (SkyPath) and provide guidance for consideration by the Strategyand Finance Committee.

    Executive Summary2. The SkyPath has been previously reported to the Transport Committee. The following

    progress has been made on the project since the last update in August 2011:

    The AHB Pathway Trust (the Trust) has developed a lighter structure by using aluminiumin the central span;

    Auckland Transport (AT) has undertaken a review of the SkyPaths business case andreferred it back to the Council to consider funding sources;

    A range of capital costs for the project has been identified between $28 and $41 million.There is still uncertainty about the capital costs, however for the purpose of the financialanalysis in this report a cost of $31 million has been assumed (as outlined in paragraphk) in Attachment A);

    Update of information in the Trusts business case and public private partnership (PPP)proposal;

    Comparison of the SkyPath to the rest of the transport and cycling and walkingprogramme;

    Quantification of the Councils contribution to the SkyPath; and

    Initial identification of project risks (outlined below in paragraph 20).

    3. This report is seeking the Transport Committees consideration of the following items:

    Support for provision of a walk and cycle way across the Auckland Harbour Bridge (AHB)in the short term or wait for provision once an Additional Waitemat Harbour Crossing(AWHC) is in place;

    Referral for consideration by the Strategy and Finance Committee of Councilscontribution (in the form of part underwrite and assuming obligations at the end of thePPP period) to the proposed PPP arrangement;

    Recognition of the relative priority of a Council contribution to this project, compared tothe rest of the transport programme; and

    Recognition of the relative priority of this project, in terms of timing and sequencing ofother walking and cycling projects.

    4. This report proposes that the Transport Committee refers the SkyPath to the Strategy andFinance Committee for consideration of the financial and procurement aspects of the project.

    RecommendationsThat the Transport Committee:

    a) Receives this report on the Auckland Harbour Bridge Pathway Project Update.

    b) Supports in principle the provision of a shared walk and cycle way across the HarbourBridge rather than wait for provision once an Additional Waitemat Harbour Crossing is inplace subject to financial feasibility analysis.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    10/173

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 10

    c) Acknowledges the significant transport benefits (as well as recreational and tourismbenefits) the SkyPath would bring to the Auckland region in terms of completing a missinglink in the Auckland Cycle Network and walking network, which would be further enhancedby the completion of the Northern Linkage/Shoal Bay.

    d) Acknowledges the timing of the SkyPath, in the short term, would take advantage ofWaterfront Aucklands planned waterfront cycleway and walkway from Westhaven Marina

    to Daldy Street, and planned improvements by Auckland Transport to the local streets inNorthcote as part of its Safe Schools Programme.

    e) Requests the New Zealand Transport Agency and Auckland Transport to consider theShoal Bay proposal as part of the investigation of the Northern Link between Northcote andAkoranga to provide improved walking and cycling connections to the northern end of theproposed SkyPath.

    f) Recommends that a report should be prepared with further information for the Strategy andFinance Committee to consider funding sources and the Councils contributions (in the formof part underwrite and assumption of obligations at the end of the public private partnershipperiod) to the SkyPath. This further information would include:

    - Procurement arrangements: fully contested or the proposed negotiated public privatepartnership;

    - Detailed risk assessment;

    - Comparison of a public private partnership arrangement with traditional procurementprocess to determine best value for money; and

    - Assessment of the project against the Councils Significance and Public PrivatePartnership Policies.

    g) Recognises that while the benefits of the SkyPath are significant, any Council contributionto the project should come from the Councils transport funding allocation to AucklandTransport, rather than disrupt Auckland Transports ability to deliver the walking and cycling

    programme which obtains New Zealand Transport Agency subsidies.

    DiscussionBackground

    5. The Auckland Harbour Bridge (AHB) does not currently have any walking and cyclingaccess over it. This missing connection is a critical gap in Aucklands Cycling Network(ACN). Past investigations have considered how to provide walking and cycling access overthe AHB but no plans have been progressed.

    6. The AHB clip-on lanes were strengthened by the New Zealand Transport Agency (NZTA)in 2010. This work has considerably extended the life span of the clip-on lanes and

    consequently the NZTA expects the AHB and clip-on lanes to have an indefinite service life(e.g. the next 100 years) providing heavy freight movements are transferred to a newcrossing at a certain load trigger point. However, not all of the strengthening necessary for apathway to be attached to the AHB occurred at this time.

    7. For a number of years, the Trust (a team of private individuals with professional skills) hasbeen championing for a pathway across the AHB. The Trust has developed the SkyPathto complete the missing link for walking and cycling access across the AHB which isproposed through a private funding scenario.

    8. The Trust has previously made deputations to the Transport Committee on this project on3 May 2011 and 15 August 2011. At the 15 August 2011 meeting, the Transport Committeeresolved:

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    11/173

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 11

    b) That the Transport Committee recognises that providing walking and cycling on

    the Auckland Harbour Bridge as a strategically important project.

    d) That the Transport Committee requests Auckland Transport to:

    i. identify appropriate resourcing and budget for a financial contribution for

    further investigation to an Auckland Harbour Bridge Pathway project, for

    consideration in the half-yearly review and the next Long Term Plan;ii. conduct more detailed investigations with New Zealand Transport Agency into

    design, procurement and financial arrangements, including an assessment of

    risks, in relation to the proposed Auckland Harbour Bridge Pathway;

    iii. write to the Board of New Zealand Transport Agency to consider funding

    support to continue investigations into an Auckland Harbour Bridge Pathway;

    iv. write to the Board of New Zealand Transport Agency to consider funding

    support for an Auckland Harbour Bridge Pathway project from the state

    highway fund, to reflect New Zealand Transport Agencys responsibilities to

    provide for walking and cycling alongside state highways; and

    v. ensure costings are subject to a competitive price process.e) That Auckland Transports further investigations into the Auckland Harbour

    Bridge Pathway be reported back to the appropriate Council Committee for

    consideration as part of the draft Long Term Plan process.

    f) That the Transport Committee support Councils ongoing role in coordinating the

    Auckland Harbour Bridge Technical Steering Group, as well as involvement in

    investigating financing aspects of the AHB Pathway.

    The Project

    9. Such a connection over the AHB could provide significant benefits, including opportunities

    for active travel and recreation, as well as being a draw-card for tourists. However, thisproject has faced a number of challenges, including funding and structural engineering.Under conventional funding arrangements, using public money, it is unlikely that this projectcould be achieved within the next 20 years or until an Additional Waitemat HarbourCrossing (AWHC) frees up space on the existing AHB.

    10. The NZTA is custodian of the AHB. Uncertainties around timing and funding of an AWHChave led NZTA to put plans for an alternative walking and cycling facility as part of the nextharbour crossing on hold in favour of SkyPath. Through the evaluation of the Trustsconcept design, the NZTA has found that the SkyPath is considered to be a feasibleengineering solution. However, NZTA has advised that it is not in a position to fund theSkyPath due to budget constraints and its cycling and walking forward programme already

    being in place. NZTAs internal processes require a fully contested public privatepartnership (PPP), joint Ministerial approval and compliance with the Better Business Caseprocess. The NZTA have advised that the costs involved with this would likely be prohibitivefor a project of this small scale.

    11. If the Council were funding all or part of this project in a conventional way, it would affectexisting budgets (potentially the AT walking and cycling budget which attracts a NZTAsubsidy) and existing programmes which have strong community expectation that they willproceed. Therefore, the use of an alternative funding option is being considered and this isconsistent with the Auckland Plan requirement to investigate alternative funding options fortransport projects. The PPP proposal depends on a toll being paid directly by cycling andwalking users.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    12/173

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 12

    Walk and Cycle Connections

    12. The SkyPath would easily connect into the existing cycling and walking network and futureproposals. At the southern end, the SkyPath would connect into Waterfront Aucklandswaterfront cycleway and walkway from Westhaven to Daldy Street. The initial phase of thiscycleway and walkway will be constructed in later 2013. The SkyPath may also connectwith Platform 2 of the Westhaven Marina Village at a later date. Waterfront Auckland has

    indicated that it is willing to work together to achieve a seamless integration. At the northernend, the SkyPath would connect onto the local street network in Northcote which isconsidered safe for cyclists. The Auckland Cycle Network (ACN) identifies these routes ascycle connectors (blue) or cycle feeders (green) as shown the map below. In addition,AT plans to undertake improvements to some of these roads in the near future as part of itsSafe Schools Programme. The two most direct routes to central Takapuna from theSkyPath entrance are 6 to 6.8km away.

    Costs, Revenue and Funding

    13. Attachment A provides detailed information about costs and revenue.

    14. AT contracted Ernst & Young to undertake a review of the SkyPaths business case. This

    has clarified capital costs and likely revenue. This report (dated 2 November 2012) and theassociated AT Board Paper are in Attachment B. The AT Board resolved to refer the projectback to the Council to consider funding sources.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    13/173

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 13

    15. The Ernst & Young report included a Northern Linkage within their estimate of the projectscapital costs. This refers to the development of a cycleway and walkway alongside theNorthern Motorway between Northcote and Akoranga. Council staff advise that the NorthernLinkage is a separate project which should not be included in the costings for the SkyPath.The Northern Link is included in the NZTAs National Land Transport Programme 2012-2015as probable and shown as a Cycle Highway in the ACN. However, based on current

    budgets, it is unlikely to be funded in that period. While it is not necessary for the NorthernLink to proceed in order for the SkyPath to be constructed, it would increase patronagenumbers and provide a more direct connection to Akoranga (and consequently Takapuna).The NZTA has indicated that if the SkyPath were to go ahead, then there is a strongerlikelihood that the Northern Link project would proceed. The recent proposal from theKaipatiki and Devonport-Takapuna Local Boards and Reset Urban Design for RetrievingShoal Bay Waterfront would also influence the location/design of any link in this area. Werethe SkyPath to go ahead, the NZTA and AT would investigate a preferred alignment for animproved walking and cycling connection between the northern end of the SkyPath andAkoranga.

    16. There is a range of capital costs for the project (between $28 and $41 million) depending onthe inclusion of various items (as detailed under paragraph k) in Attachment A), and how theproject proceeds as a PPP. The analysis undertaken by Council staff, in discussion with ATand stakeholders, has determined that some of the additional costs identified in the Ernst &Young report may drop away based on the updated PPP proposal. Council staff advise thatthat the capital costs will be somewhere in between these figures and have assumed a costof $31 million subject to further financial analysis.

    17. The Trust has obtained an initial proposal to fund the construction of the SkyPath from thePIP Fund as equity partner to the Trust. This proposal is detailed below and in AttachmentC. In summary, under this proposal, the PIP Fund would cover the construction cost, theoperating and maintenance costs, and underwrite the most risky 25% of the revenue. Theless risky 75% of revenue would be underwritten by the Council (and others, e.g. communitytrusts), who in return would share in the revenue upside and the Council would own the

    SkyPath after the PPP period ends. The proposed revenue sharing diagram is included asFigure 5 in Attachment A. It is important to note, that the Council underwrite is only triggeredwhen the expected revenue does not meet the breakeven point.

    18. It is considered that a traditional PPP (i.e. fully contested, such as used for Wiri Mens Prisonor for Hobsonville Schools) is not appropriate for a project of this small scale. The fees setout in Figure 4 in Attachment A reflect a negotiated PPP, particularly given the expression ofinterest by the PIP Fund. A negotiated PPP is expected to significantly reduce thetransaction costs for both parties by reducing the contestability element, which is where thelarge transaction costs lie. One risk with a negotiated PPP is that the process can becomenon-transparent. However, this could be managed by using an independent third party toassist in making the process transparent (KPMG have offered their assistance in this

    capacity), and running contestable tender processes to secure contractors to build theSkyPath and complete service elements (i.e. maintenance or cleaning). The differencebetween a fully contested PPP and a negotiated PPP is discussed in more detail underparagraph q) in Attachment A, however it important to note that the Transport Committee isbeing asked for a recommendation to refer this project onto the Strategy and FinanceCommittee and is not being asked to make a decision on the preferred method ofprocurement. As part of the further work for the Strategy and Finance Committee, Councilstaff will investigate the different procurement models, as well as alternative funding options.

    Risks

    19. There are a number of potential risks associated with the project. A number of these arediscussed above and/or in Attachment A, such as the use of a transparent negotiated PPP

    arrangement and the Council underwriting some of the risk. Due diligence and professionaladvice would be required to evaluate and negotiate a PPP arrangement. The PIP Fundbelieves the project is worthy of its investment and is of moderate risk.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    14/173

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 14

    20. The Councils Risk Assurance team have undertaken an initial review of the project and arisk register is being developed. A risk assessment workshop with key stakeholders isscheduled to refine the draft risk register and develop contingency planning in order tomanage potential effects. Key risks include:

    Funding for operation costs;

    Funding for construction costs; Additional costs (note: contingency has been included in the business case to cover

    unexpected costs);

    Structural;

    Not obtaining, or delays in obtaining, resource consent for the SkyPath;

    Not all parties agreeing to the MoU or terms of agreement (including withdrawal of equitypartner);

    Withdrawal of the equity partner during the PPP period;

    Operational costs when ownership of SkyPath reverts to the Council;

    Procurement arrangements delivery value for money;

    Political risk;

    Legal authority for Council entering into a PPP arrangement; and

    Public acceptability of the toll.

    21. When determining the relatively of this project in terms of the transport programme, theTransport Committee should also recognise that the SkyPath would have importantrecreation and tourism benefits. The benefits of completing the missing cycling and walkinglink across the Waitemat Harbour are significant and would offer wide ranging benefits toAucklanders and tourists alike, which is a key differential of this project when compared withother projects included within the cycling and walking programme. Recreation and touristusers could amount to just over half of the expected total patronage. In considering sourcesof Council funding, consideration could be given to the extent funds are allocated from thetransport budget or other budgets.

    22. In conclusion, this agenda report seeks support from the Transport Committee to proceedwith a report to the Strategy and Finance Committee to consider funding sources and theCouncils contributions to this project for the following reasons:

    The SkyPath would complete a critical gap in the ACN and the walking network;

    The SkyPath is the only realistic solution available to provide walking and cycling overthe AHB and if this opportunity is not taken now, a walk and cycle connection across theWaitemat Harbour may not happen for a number of decades. Given the current funding

    difficulties, it is uncertain whether the AWHC will be built within the next 20 years. If theproposed PPP is in place by 2015, the business case indicates there would be sufficienttime to enable the tolls to pay off the capital investment over 20 years;

    The SkyPath would be well supported by the Waterfront Auckland waterfront cyclewayand walkway to the south, and by safe routes using the local street network to the north;

    The SkyPath would provide for commuter travel, as well as recreational and tourism use;and

    There is an expression of interest from the PIP Fund to provide a capital investmentupfront, which would mean no Council contribution to the capital costs of the project.This is significant because a public facility of this nature would normally require a 47%capital contribution from the Council. The contributions sought from Council relates to

    underwriting part of the revenue risk, assumption of operational costs at the end of thePPP, and staff time and professional advice to undertake further evaluation andnegotiation of a PPP arrangement.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    15/173

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 15

    Consideration

    Local Board Views

    23. The Trust has presented to or met with the relevant Local Boards including Waitemat,Kaipatiki, and Devonport-Takapuna Local Boards, which are supportive of this project.

    24. Representatives from the Trust presented to the Waitemat

    Local Board meeting in April2011. The Local Board passed the following resolutions (number WTM/2011/49):

    a) That Kirsten Shouler, Alex Swney and Barry Copeland, Auckland HarbourBridge Pathway members be thanked for their presentation to the Board

    regarding the Auckland Harbour Bridge Pathway project.

    b) That the Waitemata Local Board strongly supports the Governing Bodys

    directive to Auckland Transport for investigation on how best to progress

    work on a walking and cycling link across the Auckland Harbour Bridge.

    c) That the Waitemata Local Board seek from the Governing Body to commit

    budget to formally play a role in a partnership with the pathways steering

    group to promote the project to the NZTA.

    d) That the Transport West Portfolio holders report back to the earliest

    practical Board meeting how the Board can best progress the Auckland

    Harbour Bridge Pathways project proposals.

    Additionally, this Local Board included the AHB Pathway in its Local Board Plan 2012.

    25. Representatives from the Trust briefed the Kaipatiki Local Board members at a workshop inAugust 2011, as well as the Local Board passing the following resolutions (numberKT/2011/117) in May 2011:

    a) That the report and resolutions from the Transport Committee, regardingAuckland Harbour Bridge Pathway Technical Steering Group Report, be

    received.

    b) That the Kaipatiki Local Board strongly endorses and supports the concept

    of enabling walking and cycling access between the city and the North Shore

    via the Harbour Bridge.

    c) That the Auckland Harbour Bridge Pathway Technical Steering Group

    consults with the Kaipatiki Local Board for input during the preparation of

    the proposal.

    26. Representatives from the Trust presented to the Devonport-Takapuna Local Board in August2011 and passed resolution DT/2011/262 in support. This Local Board included the AHBPathway in its Local Board Plan 2012 by stating we believe developing a pathway acrossthe harbour bridge is an essential piece of infrastructure and will advocate on the

    communitys behalf to create a harbour bridge walkway and cycleway".

    27. These three Local Boards were updated on the project by staff via email on 17 January 2013and the Trust has updated interested Local Board members on 22 January 2013.

    Maori Impact Statement

    28. The impact of the SkyPath on significant sites to iwi is still to be understood. The Trustcontacted (via letter) each known iwi organisation with ties to the area outlining the proposalin 2011 and asked them to contact the Trust if they had any concerns. No response wasreceived. The Trust plans to undertake consultation with iwi as part of the resource consentphase of the project. In particular, it is understood there are sites of significance to NgatiWhatua o Orkei within Stokes Point Reserve near the Northcote exit. Further investigation

    and liaison with Ngati Whatua o Orkei will occur regarding this as part of the resourceconsent phase.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    16/173

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 16

    29. The SkyPath would be of benefit to Maori and provide for greater active transport use withinthe Auckland region, however it is noted that there is a low proportion of Maori living in theNorth Shore. The toll for commuters and local users would be small and equates to a similarfee if using public transport to cross the AHB.

    General

    30. The project has been discussed with the relevant Council (including the Mayors Office), AT,Waterfront Auckland, Auckland Tourism, Events and Economic Development and NZTAstaff members, along with representatives from key stakeholder groups such as Heart of theCity, Cycle Action Auckland and Walk Auckland. This most recently occurred at a multi-agency meeting on 18 December 2012. This report, and its recommendations, has beenprepared in response to the agreement reached at this meeting. These parties haveprovided input or been given the opportunity to review this report prior to it being finalised.AT staff have commented that the $31 million cost assumption may be understated andthere are some elements still to be resolved, and that care should be taken when makingdecisions based on costs that may change during the process.

    31. The SkyPath would be of benefit to all Aucklanders, however under conventional funding

    arrangements it is unlikely this project could be funded in the next 20 years or before anAWHC was in place. Therefore, the use of an alternative funding option needs to beconsidered, in line with the Auckland Plan requirement to investigate alternative fundingoptions for transport projects.

    32. The SkyPath is considered to be consistent with Section 10(2) of the Local Government Act2002, in relation to this stage of the investigation of the project.

    Implementation Issues33. Establishment of a PPP requires a commitment of resources to undertake negotiation and

    finalisation of a Memorandum of Understanding and legal agreements to form a joint venturearrangement (or similar) with the relevant parties, and on-going monitoring of the agreement.

    The timeframe for getting these agreements in place could run in parallel with work by theTrust to obtain the required approvals. The transfer of the SkyPath to the Council at the endof the PPP period would be subject to conditions about payment or condition of the asset,and this would form part of the legal agreement.

    34. The financial and resourcing implications of the SkyPath are:

    Due diligence and evaluation of the project;

    Staff time to coordinate the Memorandum of Understanding and legal arrangements, andlegal authority to enter into a PPP;

    Underwrite of part of the toll revenue (refer to paragraph n) in Appendix A for the financialimplications to Council); and

    Assuming responsibility for the SkyPath at the end of the PPP period (refer to paragraphp) in Appendix A for the financial implications to Council).

    35. The project needs to comply with the Councils Significance and PPP Policies. The purposeof these policies is to set out the Councils approach to determining the significance ofmatters on which they are making decisions (i.e. where a decision meets certain criteria, itwill automatically trigger a requirement to undertaken public consultation) and to set out thegeneral criteria the Council would use when determining if a PPP is an appropriateprocurement tool. The application of these policies to the SkyPath would be provided in areport to the Strategy and Finance Committee.

    36. Were the SkyPath to proceed, facilitation of progress of the project (until the project is

    formally established or given go ahead) could be undertaken by the Harbour EdgeDevelopment Steering Group. However, any governance or management decisions are yetto be made.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    17/173

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 17

    AttachmentsNo. Title Page

    A Detail About The Project 19

    B Auckland Transport Board Paper and Ernst & Young Report 25

    C PIP Fund Proposal Letter 85

    Signatories

    Authors Marguerite Pearson - Transport Planner

    Kevin Wright - Manager: Transport Strategy

    Authorisers Ree Anderson - Manager: Regional Strategy, Community & Cultural Policy

    Roger Blakeley - Chief Planning Officer

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    18/173

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    19/173

    AttachmentA

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 19

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    20/173

    AttachmentA

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 20

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    21/173

    AttachmentA

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 21

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    22/173

    AttachmentA

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 22

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    23/173

    AttachmentA

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 23

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    24/173

    AttachmentA

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 24

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    25/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 25

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    26/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 26

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    27/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 27

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    28/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 28

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    29/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 29

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    30/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 30

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    31/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 31

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    32/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 32

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    33/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 33

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    34/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 34

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    35/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 35

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    36/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 36

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    37/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 37

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    38/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 38

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    39/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 39

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    40/173

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    41/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 41

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    42/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 42

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    43/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 43

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    44/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 44

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    45/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 45

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    46/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 46

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    47/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 47

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    48/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 48

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    49/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 49

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    50/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 50

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    51/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 51

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    52/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 52

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    53/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 53

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    54/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 54

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    55/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 55

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    56/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 56

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    57/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 57

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    58/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 58

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    59/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 59

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    60/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 60

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    61/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 61

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    62/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 62

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    63/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 63

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    64/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 64

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    65/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 65

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    66/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 66

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    67/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 67

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    68/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 68

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    69/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 69

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    70/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 70

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    71/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 71

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    72/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 72

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    73/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 73

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    74/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 74

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    75/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 75

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    76/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 76

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    77/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 77

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    78/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 78

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    79/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 79

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    80/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 80

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    81/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 81

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    82/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 82

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    83/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 83

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    84/173

    AttachmentB

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 84

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    85/173

    AttachmentC

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 85

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    86/173

    AttachmentC

    Item9

    Transport Committee

    13 February 2013

    Auckland Harbour Bridge Pathway Project Update Page 86

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    87/173

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 87

    Transport Update

    File No.: CP2012/24703

    Purpose1. The purpose of this report is to update the Committee with key matters considered at the

    18 December 2012 Auckland Transport Board meeting.

    Executive Summary2. At its meeting on 18 December 2012, the Auckland Transport Board considered in its open

    agenda on a range of reports including:

    Business report on the activities for December; A report on public transport and cycling statistics for November 2012; A report by KiwiRail on the National Train Control Centre;

    A request for funding of double-tracking the north-facing connection to the Manukau railspur;

    Proposed bylaws about election signs and public safety and nuisance; and The Independent Technical Ports Study (this was presented to the 6 December 2012

    meeting of the Councils Regional Development and Operations Committee)

    3. In addition, the Auckland Transport Board considered the following items in its closedagenda:

    Property reports on compulsory land acquisitions and accommodation seismicassessment;

    Capital development reports on City Rail Link, Parnell Station and AMETI land use

    integration; and Operations reports about Auckland Integrated Fare System (AIFS), Rail Fare Evasion

    and Aotea Road seal extension (review of funding process).

    4. All open board papers are available on the Auckland Transport website at:http://www.aucklandtransport.govt.nz/about-us/board-members/Board-Meetings-Minutes/Pages/default.aspx

    RecommendationThat the Transport Committee:

    a) Requests that Auckland Transport respond to any feedback provided by the Committee inrelation to the December 2012 Board reports.

    DiscussionBusiness Report on activities

    5. Key highlights from the report on Operations include:

    The AT HOP card was launched on ferries on November 30. There are nowapproximately 43,000 AT HOP cards that have been sold, with 60% of those cards beingused at least once (as at November 30, 2012);

    Managing the transport impact of the installation of ducting for Transpowers NorthAuckland and Northland project, including the requirement to close westbound lanes of

    the Pakuranga Highway bridge between Waipuna Road and Ti Rakau Drive over theholiday period;

    A series of initiatives are being investigated to boost public transport patronage growthand redress the patronage tracking beneath Statement of Intent targets;

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    88/173

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 88

    A reconfiguration of the downtown ferry terminal has commenced to create an improvedcustomer environment and to open up a larger area to non-ferry users; and

    The new City Centre Parking Zone scheme has not been implemented and accompaniedby a marketing campaign. All signs and new restrictions were implemented prior toChristmas.

    6. Key highlights from the report on Infrastructure include: Monthly expenditure for November 2012 was $18.3 million, slightly below forecast. The

    current forecast year end spend it $253 million, around $10 million above the fiscalenvelope. However Auckland Transport expects the capital portfolio will be managed tothe fiscal envelope;

    Construction of works associated with Panmure Station, Ellerslie Panmure Highwaybridges and excavation to enable construction of the AMETI Link road have continued asparts of the AMETI project. Consent applications for the next stages of AMETI have beenprocessed and issues are being addressed to minimise the risk of appeals;

    The preferred scheme for Dominion Road was discussed at well attended public opendays in November. Funding applications for detailed design will be submitted to NZTA in

    early 2013; Papakura Station reconfiguration works are advancing and completion of the station is

    programmed for April 2013. The contract for the upgrade of Mt Albert station has beenawarded and works were carried out over the holiday rail shutdown period;

    Public consultation on the Federal Street shared space proposal noted that there is asignificant majority of respondents who support the proposals;

    Open days on the Mill Road upgrade project have been completed and feedback is nowbeing analysed;

    Construction of an upgrade to the Glenbrook-Kingseat intersection was planned to beginin January 2013; and

    Stage three of the Fort Street upgrade is underway, with sub-surface works complete andpaving having commenced.

    7. Key highlights from the report on Strategy and Planning include:

    Submissions on the draft Regional Public Transport Plan have now closed with 696submissions received and 146 submitters noting a desire to present to the Hearing Panel.The Plan is scheduled to be adopted at the March 2013 Board meeting and will permitimplementing of the proposed public transport network; and

    Funding approval from NZTA for the first year financing payments for the EMU trains anddepot (approximately $19 million).

    8. Key highlights from the report on Special Projects include:

    Final design of the Electric Multiple Unit trains (EMUs) is progressing well withapproximately 90% of the design documents now submitted; Production of the first EMU vehicles is proceeding steadily with underframes and vehicle

    body sides under construction and on programme. Assembly of the first unit wasprogrammed to begin in January 2013;

    The City Centre Future Access Study (CCFAS) was released on December 14. Thefindings of the CCFAS were presented to the Governing Body by Auckland Transport inDecember 2012; and

    City Rail Link project optimisation, value engineering and work responding to Councilrequests for further information (as part of the route protection process) all continuedthroughout November and the notice of requirement was notified on January 25, 2013.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    89/173

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 89

    9. Extracts from the December business report are included as Attachment A to this report.

    Statistics Report for November 2012

    10. The Statistics Report focuses on public transport patronage, service performance andinitiatives throughout November 2012 as well as cycling monitoring. Key highlights include:

    Annual public transport boardings for the 12 months to November 2012 were 69,873,178.

    This is 1.1% higher than the 12 months to November 2011 but tracking below the2012/13 Statement of Intent target of 74,580,000 for the 12 months to June 2013. Asnoted in the business report, a series of initiatives are being investigated to boost publictransport patronage growth;

    Patronage during November 2012 was 5.2% lower than November 2011, with much ofthe decrease due to a 17.2% reduction in rail patronage. Northern Express bus patronagegrew by 1.2% but other bus patronage fell by 3.4% and ferry patronage fell by 1.3%.Auckland Transport considers that the introduction of the HOP Card on the rail systemhas contributed to the decline in rail patronage as trips are now recorded at the time theyare made rather than at the time tickets are sold. This effect will disappear from January2013 onwards;

    Train performance was measured at 84.1% punctuality and 97.9% service delivery.Trains are measured as punctual if they arrive at their destination within 5 minutes oftheir scheduled time. The Onehunga Line was the best performing line, with 95.1% ofservices being punctual, while the Southern Line performed the poorest, with 78.9% ofservices being punctual;

    Bus and ferry service performance are measured differently, with punctuality measured atthe beginning rather than the end of the trip. Performance statistics are also self-reported.All bus operators and most ferry operators reported extremely high punctuality (forexample Birkenhead Transport reported 99.95%) and reliability (whether the serviceoperated or not) results; and

    Cycling monitoring showed a 5.1% growth in cyclist movements in November 2012 whencompared to November 2011. Morning peak movements increased by 33.1% whencompared to November 2011.

    11. The Auckland Transport Statistics Report for October 2012 is included as Attachment B tothis report.

    KiwiRail report on National Train Control Centre

    12. This report is a response to an Auckland Transport request to identify and practical andaffordable path to give confidence that if the National Train Control Centre (NTCC)experiences a disruption, there is sufficient infrastructure in place to enable continuedoperation of the rail network. This issue was highlighted by a power outage in April 2012 atthe Wellington-based NTCC which caused significant disruption to the Auckland rail network.

    13. The report highlights the advantages of a centralised control model (particularly the depth ofstaff expertise) but notes that additional back-up facilities should be provided at anotherlocation in Wellington to ensure ongoing operations in the event of a site-specific event as

    well as an unstaffed facility in the Auckland area that can be used for national controlservices in the event of a catastrophic event in Wellington.

    14. Optimal sites and funding arrangements will be explored by KiwiRail, Auckland Transportand other interested parties throughout 2013.

    15. The KiwiRail report on National Train Control Centre is included as Attachment C to thisreport.

    Manukau Rail Spur Connection Funding

    16. This report is a request to the Auckland Transport Board for $3.6 million in funding to enablethe double-tracking of the connection between the Manukau Rail Line (which itself is double-tracked) and the North Island Main Trunk line. $2.6 million is available from the EMU depot

    contingency budget while the remaining $1.0 million will need to be included in the 2013/14capital works budget.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    90/173

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 90

    17. Network modelling has shown that that the double track connection from the Manukau RailLine to the mainline at Wiri is essential for the delivery of reliable 10 minute peak services.KiwiRail is currently undertaking track works in the Manukau Rail Line and Wiri Junctionarea to provide access from the main line to the new EMU depot. While double tracking theconnection is not needed until August 2014, significant cost savings can be achievedthrough alignment to KiwiRails existing construction programme with construction

    commencing in March 2013.18. Auckland Transport will seek a subsidy from NZTA for the connection, as a project

    necessary for delivery of a rail network capable of delivering robust and reliable 10 minutepeak services. The report states that Council approval will be required required to reallocatefunding within the 2012/13 capital programme and for inclusion in the 2013/14 programme.

    19. The report relates to the north-facing connections of the Manukau Rail Line.

    20. The report on Manukau Rail Spur Connection Funding is included as Attachment D to thisreport.

    Election Signs Bylaw

    21. This report seeks the Auckland Transport Boards approval to undertake public consultation

    on a proposed bylaw to regulate the display of election signs across Auckland. The bylawproposes to provide a consistent set of controls for elections signs and an integrated systemof determining appropriate locations for election signs for parliamentary and local authorityelections.

    22. The controls in the proposed bylaw are largely similar to what is in the variety of legacybylaws. Initial consultation was undertaken with Local Board cluster workshops and aworking party of the Regulatory and Bylaws Committee of Council during October 2012.Members of the Councils Policies and Bylaws team have also assisted with thedevelopment of the proposed bylaw.

    23. The report on the Proposed Auckland Transport Election Signs Bylaw 2013 Consultation isavailable on the Auckland Transport website.

    Public Safety and Nuisance Bylaw

    24. This report seeks the Auckland Transport Boards approval to undertake public consultationon a proposed bylaw for public safety and nuisance. The proposed bylaw will regulateactivities which can be carried out on roads and in other public places in an endeavour toreduce risks to public safety and to avoid nuisance. The proposed bylaw is complementaryto a similar bylaw being prepared by Auckland Council for areas outside the transportsystem.

    25. Drafting of the proposed bylaw has been led by Council staff with input from AucklandTransport in areas with particular transport impact. Council and Auckland Transport haveundertaken initial consultation with political, internal and major stakeholders including the

    Regulatory and Bylaws Committee Working Party, all Local Boards, the Disability StrategicAdvisory Group, Council departments and a wide range of industry stakeholders.

    26. The report on the Proposed Auckland Transport Public Safety and Nuisance Bylaw 2013 isavailable on the Auckland Transport website.

    Consideration

    Local Board Views

    27. Local Boards are involved in Auckland Transports consultation on major transport projectsand planning processes.

    28. Local Boards were consulted in the preparation of the two proposed bylaws.

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    91/173

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 91

    Maori Impact Statement

    29. Active iwi engagement is taking place in relation to infrastructure projects such as theSouthwest Multi-Modal Airport Rapid Transit (SMART) study and AMETI. The updatedcapital works programme on Auckland Transports website provides indicative timings whenconsultation is occurring which enables the public and Maori to plan for upcomingconsultations.

    30. The Key Relationships Unit section of the Business Report outlines in more detail AucklandTransports Maori Engagement programme.

    General

    31. As this is an information item, no consultation has been done in the preparation of thisreport. This update refers to communications with stakeholders on major projects.

    32. Auckland Transport is responsible for taking legal advice in relation to its operations.

    Implementation Issues33. Auckland Transport is responsible for implementation of transport and the information in this

    report provides highlights of how Auckland Transport is dealing with current issues.

    Attachments

    No. Title Page

    A Extracts from December 2012 Business Report 93

    B November 2012 Statistics Report 133

    C KiwiRail report on National Train Control Centre 157

    D Manukau Rail Line Connection Report 171

    Signatories

    Authors Joshua Arbury - Principal Transport Planner

    Authorisers Ree Anderson - Manager Regional Strategy, Community & Cultural Policy

    Roger Blakeley - Chief Planning Officer

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    92/173

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    93/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 93

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    94/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 94

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    95/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 95

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    96/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 96

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    97/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 97

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    98/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 98

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    99/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 99

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    100/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 100

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    101/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 101

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    102/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 102

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    103/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 103

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    104/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 104

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    105/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 105

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    106/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 106

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    107/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 107

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    108/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 108

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    109/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 109

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    110/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 110

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    111/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 111

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    112/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 112

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    113/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 113

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    114/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 114

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    115/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 115

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    116/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 116

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    117/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 117

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    118/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 118

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    119/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 119

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    120/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 120

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    121/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 121

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    122/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 122

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    123/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 123

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    124/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 124

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    125/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 125

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    126/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 126

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    127/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 127

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    128/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 128

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    129/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 129

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    130/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 130

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    131/173

    AttachmentA

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 131

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    132/173

    AttachmentA

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 132

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    133/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 133

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    134/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 134

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    135/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 135

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    136/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 136

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    137/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 137

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    138/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 138

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    139/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 139

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    140/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 140

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    141/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 141

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    142/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 142

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    143/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 143

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    144/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 144

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    145/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 145

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    146/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 146

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    147/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 147

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    148/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 148

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    149/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 149

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    150/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 150

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    151/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 151

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    152/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 152

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    153/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 153

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    154/173

    AttachmentB

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 154

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    155/173

    AttachmentB

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 155

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    156/173

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    157/173

    AttachmentC

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 157

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    158/173

    AttachmentC

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 158

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    159/173

    AttachmentC

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 159

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    160/173

    AttachmentC

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 160

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    161/173

    AttachmentC

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 161

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    162/173

    AttachmentC

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 162

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    163/173

    AttachmentC

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 163

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    164/173

    AttachmentC

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 164

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    165/173

    AttachmentC

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 165

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    166/173

    AttachmentC

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 166

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    167/173

    AttachmentC

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 167

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    168/173

    AttachmentC

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 168

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    169/173

    AttachmentC

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 169

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    170/173

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    171/173

    AttachmentD

    Item1

    0

    Transport Committee

    13 February 2013

    Transport Update Page 171

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    172/173

    AttachmentD

    Item10

    Transport Committee

    13 February 2013

    Transport Update Page 172

  • 7/29/2019 Transport Committee Agenda (2/2) Feb 13

    173/173

    AttachmentD

    Item1

    0

    Transport Committee

    13 February 2013