TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR EVACUATION OF POWER FROM THE GENERATION PROJECTS 2015-2016 As on 30-NOV-2015 State/Agency Executing Asociated Trans. Works Associated Transmission Lines and Substations Voltage Level (KV) Ckm/ MVA Construction progress Status Month of Complet ion Remark TL(Nos) /Land Acq. (%) STC(No s)/Civil Work (%) TE(Nos )/Recp. Materia l(%) STG(Ck m)/Erec tion (%) 2. 1. 4. 5. 6. 7. 8. 9. 12. 13. Original Target Date 10. Revised Target Date 11. Ckts (S/C) & (D/C) 3. Adhunik Power TPP (Mahadev Prasad TPP) (2x270 MW), PS,Jhk, APCL.U1-11/12(C),U2-3/13 (C), Commissioned. 7/12 1 400 Adhunik - Jamshedupur (PG) (Padampur) 1 JUL-12 JUL-12 1. D/C ADHUNIK Remark: Agartala (AGTP) (4x21 MW), PS NEEPCO, Tripura, 132 AGTP - Agartala line 1. D/C TSECL 132 AGTP - Kumarghat line 2. S/C TSECL Remark: Akaltara (Naiyara) TPP, (4x600 MW),PS,Chg,WP(KSK), U1-8/13(C),U2-08/14 (C),U3-1/16,U4-4/16, U5-7/16, U6-1/17, Ready for Commissioning 06/15. 105 400 KSK Mahanadi (Warda Power) - Champa Pooling Station 164 164 164 105 JUN-15 JUN-15 1. 2xD/C KSK LTD. Commissioned 04/15. (Interim) 71 400 LILO of both ckt, of Raigarh - Raipur at Akaltara TPP 118 118 118 71 APR-15 APR-15 2. 2xD/C KSK LTD. Remark: Alaknanda HEP (6x50 MW), PS, UK, Badrinath, U1,U2,U3,U4,U5,U6,, . 220 Alaknanda HEP - Joshimath 1. D/C GMR Survey work is in progress in the alternative route proposed by M//s cobra.The go ahead was issued through this alternate route on dated 24/12/2014.detailed surey of 189 Km completed.Forest case preparation in progress and profile potting in progress 304 400 Sringar - Kashipur DEC-18 2. D/C PTCUL Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 1 of 67

Upload: tranlien

Post on 06-Mar-2018

266 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOREVACUATION OF POWER FROM THE GENERATION PROJECTS 2015-2016

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Adhunik Power TPP (Mahadev Prasad TPP) (2x270 MW), PS,Jhk, APCL.U1-11/12(C),U2-3/13 (C),

Commissioned. 7/121400Adhunik - Jamshedupur (PG) (Padampur) 1 JUL-12JUL-121. D/CADHUNIK

Remark:

Agartala (AGTP) (4x21 MW), PS NEEPCO, Tripura,

132AGTP - Agartala line1. D/CTSECL

132AGTP - Kumarghat line2. S/CTSECL

Remark:

Akaltara (Naiyara) TPP, (4x600 MW),PS,Chg,WP(KSK), U1-8/13(C),U2-08/14 (C),U3-1/16,U4-4/16, U5-7/16, U6-1/17,

Ready for Commissioning 06/15.105400KSK Mahanadi (Warda Power) - ChampaPooling Station

164 164 164 105 JUN-15JUN-151. 2xD/CKSK LTD.

Commissioned 04/15. (Interim)71400LILO of both ckt, of Raigarh - Raipur atAkaltara TPP

118 118 118 71 APR-15APR-152. 2xD/CKSK LTD.

Remark:

Alaknanda HEP (6x50 MW), PS, UK, Badrinath, U1,U2,U3,U4,U5,U6,,

.220Alaknanda HEP - Joshimath1. D/CGMR

Survey work is in progress in the alternative route proposed byM//s cobra.The go ahead was issued through this alternate routeon dated 24/12/2014.detailed surey of 189 Km completed.Forestcase preparation in progress and profile potting in progress

304400Sringar - Kashipur DEC-182. D/CPTCUL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 1 of67

Page 2: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark: Construction yet to be taken up.

Amravati, TPS,-Phase-I (2x270 MW),U1-3/13(C),U2-6/13,U3-1/15 (C) ,U4-3/15 (C),U5-3/15 (C), Phase-II,(5x270),

Commissioned 10/12.14400LILO of Koradi -Akola at Amravati 22 22 22 14 OCT-12OCT-121. D/CIBPL

Commissioned 03/15.207400Amravati - Akola (Bableshwar) - I 279 279 279 207 MAR-15MAR-152. D/CIBPL

Remark:

Anpara C (2X600 MW),PS,UP,LANCO,U1&2-11/11(C),

Work completed. 6/10.400Extn. of Bus from Anpara B to Anpara C. JUN-10JUN-101. D/CLEPP

Line charged at 400 kV Oct'111765Shiffting of 765 kV Anpara- Unnao atUnnao

3 3 3 1 OCT-11OCT-112. S/CUPPTCL

Commissioned 3/12.1765Shifting of Anpara B-Unnao terminationpoint from Anpara B to Anpara C sw. yard.

6 6 6 1 MAR-12MAR-123. S/CUPPTCL

Commissioned 3/12.1000765/400Unnao 100 100 100 100 MAR-12MAR-124. UPPTCL

Remark:

Anpara-D TPP (2x500 MW),SS,UP,UPRVUNL, U6-6/15 (C),U7-6/14,

Contract of the firm M/s Maharashtra Power TransmissionStructures Ltd. has been terminated on 20.05.2014 and LOI issuedon 30.12.14 by SE, Mirzapur for the balance work. Work inprogress.

10400Anpara B-Anpara D 23 23 21 6 OCT-151. D/CUPPTCL

Commissioned 06/14.3765Anpara C - Anpara D 11 11 11 3 JUN-14JAN-12 JUN-142. S/CUPPTCL

1.Apnara D - Jhusi section.(a) Forest clearanceb. Reserved forest area2 Railway xing3. Power line xing4. Foundationb. Jhunsi - Unnao section

416765Anpara D - Unnao 1215 1039 989 300 JAN-12 DEC-153. S/CUPPTCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 2 of67

Page 3: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

1. forest clearance2. Railway xing3. Power line xingCommissioned 06/14.1000765/400Anpara D. S/S 100 100 100 100 JUN-14JUN-144. UPPTCL

Remark:

Anuppur TPP Ph-I, (2x600 MW),PS,MP,Moser Baer Power MP, U1-4/15 (C),U2-2/15 (C),

Commissioned 11/12.16220LILO of Amarkantak - Korba at Anooppur 18 18 18 16 NOV-12NOV-121. D/CMPPTCL

Commissioned in Dec'13.31400Jabalpur Pooling Station - Jabalpur (HighCapacity) line

45 45 45 31 DEC-13DEC-132. D/CPGCIL

Commissioned 08/14.492400Anuppur (Moser Baer) - Jabalpur PoolingStation

600 600 600 492 AUG-14AUG-143. D/CPGCIL

Remark:

Avantha (Jhabua Power) (2x600 MW), PS,Seoni,MP, BHEL, U1-03/14 (C),

Commissioned 05/15.131400Jhabua Power TPS - Jabalpur PoolingStation.

207 207 207 131 MAY-15MAY-151. D/CJHAPL

Remark:

Avantha Bhandar TPS, (2x600 MW), PS,Chhattisgarh,Korba West Power Comany Limited U1-3/14(C),,

There are RoW issues involved at 8 locations.42400Avantha Bhandar TPS (Korba West) -Raigarh (Kotra)

64 64 60 22 NOV-151. D/CKWPCL

Interim arrangement.10400LILO of on Ckt of Raigarh - Raipur atAvantha Bhandar (Korba west ) TPS

22 22 22 10 DEC-132. D/CKWPCL

Remark:

Babandh - (Dhenkanal) TPS , (2x660 MW), PS Orissa, Lanco Infratech U1-3/14,U2-7/14,,

Work yet to start.48400Babandh TPP - Angul Pooling Station 72 DEC-161. D/CLEPP

Remark:

Baglihar-II HEP (3x150MW) SS,J&K, JKPDC, U1-9/15,U2-10/15,U3- 11/15,

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 3 of67

Page 4: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Progress at 2 locations have been affected due to severe RoWissue and matter in court for one location.

12400LILO of one ckt of Kishanpur - New wanpohat Baglihar HEP

17 4 1 JAN-161. D/CJKPDD

Remark:

Bairasul HEP, NHPC,

Work yet to stared.80220Bairasuil HEP - Sarna1. D/CPGCIL

Remark:

Balco TPS PS,Chg,Sterlite,U1-6/15 (C),U2-4/13,U3-2/14,(4x300 MW, 4x67.5 (CPP) ) 4x67.5 (C),

Stage-I Clearance is awaited.46400Balco - Dharamjaygar Pooling Station 72 72 70 42 OCT-151. D/CBALCO

commissioned 3/12 (Interim)35400LILO of one ckt of Korba - Birsinghpur atBalco

35 MAR-12JUN-122. D/CBALCO

Remark:

Bandakhar TPP, (300 MW), PS,Chg, MCC&PL, U1-6/15 (C),

Commissioned 06/14.6400LILO of ACBIL-Baraari (Bilaspur) PS atBandakhar (Maruti Clean Coal)

14 14 14 6 JUN-14JUN-141. D/CMCCPL

Remark:

Banswara Super Critical TPS (2x660 MW), SS,Raj, U1 & U2 -2016/2017,

360400Banswara TPS- Chittorgarh MAR-171. D/CRVPNL

320400Banswara TPS- Udaipur MAR-172. D/CRVPNL

Commissioned 11/14.315400/220Chitorgarh S/S 100 100 100 100 NOV-14NOV-143. RVPNL

2x315400/220Jodhpur (New) S/S4. RVPNL

Remark:

Banswara and Pratpgarh Wind Project,

W.O. to M/s Hythro Power on turnkey has been cancelled , furtherorder yet to be placed.

160220Banswara (Switching Station) - Pratapgarh 313 MAR-161. D/CRVPNL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 4 of67

Page 5: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

240220Pratapgarh- Chittorgarh 407 183 46 JAN-162. D/CRVPNL

100220/132Pratapgarh (Upgradation) 100 85 90 59 DEC-153. RVPNL

Remark:

Bara TPP (3x660MW),PS,UP,PPGCL,U1-9/15,U2-9/15,U3-9/15 (C),

Karchana gantry not finalised80400Bara - Karchana 124 FEB-161. D/CSEUPPTCL

186400Mainpuri - Aligarh 219 215 204 24 FEB-162. D/CSEUPPTCL

Commissioned 03/15.65400Bara - Meza line 83 83 83 65 MAR-15MAR-153. D/CUPPTCL

Commissioned 03/15.1400LILO of Panki - Obra at Rewa Road 2 2 2 1 MAR-15MAR-154. D/CUPPTCL

Commissioned 03/15.68400Rewa Road - Meza line 91 91 91 68 MAR-15MAR-155. D/CUPPTCL

3 locations are under hold since long due to land allocated forwomen PAC camp in line corridor at Mainpuri. Matter has beentaken up with DM Mainpuri.Approx 3.8 km route of each line passing through proposed refineryof BPCL near Bara. Matter is pending with High Power committeeas per directives of High Courte Allahabad.

375765Mainpuri - Bara Ckt-I 889 609 318 FEB-166. S/CSEUPPTCL

3 locations are under hold since long due to land allocated forwomen PAC camp in line corridor at Mainpuri. Matter has beentaken up with DM Mainpuri.Approx 3.8 km route of each line passing through proposed refineryof BPCL near Bara. Matter is pending with High Power committeeas per directives of High Courte Allahabad.

750765Mainpuri - Bara Ckt-II 899 830 721 125 FEB-167. S/CSEUPPTCL

Remark:

Baradarha TPP (2x600 MW), PS,D.B.P.C.L, Dist.. Jangir Champa ,Chhattisgarh,U1-8/13, U2-2/14,

Commissioned 08/14.36400DB Power (Baradarha) - Raigarh (Kotra)Pooling Station

54 54 54 36 AUG-14AUG-141. D/CDBPCL

Line completed. (Interim)30400LILO of Raigarh - Raipur (3rd Ckt) atBaradhara TPP ( Interim arrangement)

44 44 44 30 MAY-132. D/CDBPCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 5 of67

Page 6: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

Barauni TPS Extn (2x250 + 150 MW), Bihar, BSPGCL,

Work yet to start.200220Barauni TPS Exte. - Hazipur 350 JUN-16 JUN-161. D/CBSEB

work yet to be awarded220LILO of Both Ckt of Purnea - Begusarai atBTPS Extn

2. D/CBSEB

4220LILO of Both ckt of Biharsharif - Begusaraiat BTPS Extn.

9 5 2 AUG-153. D/CBSEB

Award under process.300220/132Barauni (TPS ) (ICT)4. BSEB

Remark:

Barethi Super Critical TPP (6x660 MW), CS, MP, NTPC, U1 & U6,

765Barethi - Etawah1. D/CPGCIL

Remark:

Barh STPP -Stage-I (3x660 MW), Stage-2 (2x660 MW), CS, Bihar, U1-1/17,U2-6/17,U3-3/18,U4-11/13(C),U5-3/15 (C),

Commissioned 06/10.488400Barh-Balia (Quad) 645 645 645 488 JUN-10SEP-09 JUN-101. D/CPGCIL

Commissioned 05/15.698400Barh-II - Gorakhpur 944 944 944 698 MAY-15AUG-14 MAY-152. D/CPGCIL

Commissioned 6/121250±500Balia & Bhiwadi convertor Stn. (Pole-II) 100 100 100 100 JUN-12JUN-123. PGCIL

Remark:

Barkhera TPP (2x45 MW), PS,UP, Bajaj,,

Line energized on 26.05.14. Barkhera-pilibhit Section,I ckt.Energised on10.02.12.II ckt. On 14.2.12

132Barkhera (Bajaj) - Dohna 203 203 203 129 MAR-151. D/CUPPTCL

132Bayas - Dohna2. D/CUPPTCL

132Bayas - Pilibhit3. D/CUPPTCL

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 6 of67

Page 7: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Bela TPP (1x270 MW),PS,Maha,IEPL,U1-3/13(C),

The progress of Koradi-Wardha line is slow . Forest clearenceawaited.

50400LILO of Koradi II- Wardh(PG) at Bela TPP 75 75 75 50 DEC-151. D/CIEPL

Completed (Interim).3400LILO of Mouda - Wardha at Bela 2 2 2 NOV-122. D/CIEPL

Remark:

Bellary TPP (3X500 MW),SS,KAR,KPCL,U1-12/07(C),U2-6/14,U3-11/14,

Commissioned 3/12313400BTPS- Hiriyur 440 440 440 313 MAR-12DEC-08 MAR-121. D/CKPTCL

Commissioned 6/082400LILO of RTPS - Guttur at BTPS. 3 3 3 2 JUN-08JUN-082. D/CKPTCL

Remark:

Bhasmay HEP (3x17MW),PS,Sikkim,Gati Infra,U1,2&3-2017-18,

.220LILO of one circuit of Rongnichu - Randpoat Bhasmay

APR-131. S/CGATI

Remark:

Bhavanagar Padva (2x250MW),SS,Guj,BHEL,U1-11/14,U2-2/15,

WIP188220BECL (Padva) - Botad line 292 138 87 MAR-161. D/CGETCO

Commissioned 03/14.82220BECL (Padva)- Sagapara line 139 139 139 83 MAR-14MAR-142. D/CGETCO

Commissioned 06/13.56220LILO of Savarkundla - Vartej at BECL(Padva)

97 97 97 56 JUN-13JUN-133. D/CGETCO

Remark:

Bhavanapaddu TPP, (4x660MW),PS, AP,East cost Energy, U1-10/15,U2-3/16.,

.400Bhavanapaddu TPP - Sri Kakulam1. D/C

400LILO of Gazuwaka - Behrampure atBhavanapaddu TPP

2. D/C

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 7 of67

Page 8: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Bhawani Barrage HEP -II & III (4x15 MW), SS,TN, TANGEDCO, BB-II (U1-8/13 (C ),U2-9/13(C), BB-III (U1-12/12 (C),U2-9/13(C),

Energised on 23.08.12.15110BKB-II - Common Point line 30 30 30 15 AUG-12AUG-121. D/CTANTRANS

Energised on 13.08.12.6110BKB-III - Common point line. 13 13 13 6 AUG-12AUG-122. D/CTANTRANS

Energised on 06/115110LILO of BKB-I - SP Budur at BKB-II line 10 10 10 5 JUN-11JUN-113. D/CTANTRANS

Commissioned 09/13.4110LILO of Mettupalayam - Irumborai line atBKB-II

12 12 12 4 SEP-12SEP-134. D/CTANTRANS

Energised on 23.08.12.2110BKB-II Common point - Pallipalayam line 7 7 7 2 AUG-12AUG-125. S/CTANTRANS

Energised on 23.08.12.9110BKB-II Common point - Thirucengode line 40 40 40 9 AUG-12AUG-126. S/CTANTRANS

Energised 6/1222110BKB-III Common point - BKB-II line 69 69 69 22 JUN-12JUN-127. S/CTANTRANS

Energised on 13.08.12.10110BKB-III Common point - Nallur line 36 36 36 10 AUG-12AUG-128. S/CTANTRANS

Remark:

Bhognipur TPP Ph-I (2x660 MW),Ph- II(2x660 MW) ,PS,UP,Lanco Infratech,Northen Region,

.765Bhognipur - Orai (PG)1. 2xS/CUPPTCL

.765Bhognipur - Gatampur2. S/CUPPTCL

765Bhognipur - Jawarharpur3. S/CUPPTCL

765Bhognipur - Moradabad/Rampur4. S/CUPPTCL

Remark:

Bhusaval TPS (2x500 MW),SS,MAHA,MSPGCL,U4-3/12 (C),U5-3/12 (C),

Commissioed 11/11197220Bhusaval - II - Amalner 331 331 331 197 NOV-11NOV-111. D/CMSETCL

Commissioned 12/11.185400Bhusaval - II - Aurangabad 283 283 283 185 DEC-11DEC-112. D/CMSETCL

Commissioned 4/10.15400Bhusaval - II - existing Khadka 26 26 26 15 APR-10DEC-09 APR-103. D/CMSETCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 8 of67

Page 9: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 9/11.500400/220Bhusaval (ICT -II) S/S 100 100 100 100 SEP-11SEP-114. MSETCL

Commissioned 8/11.500400/220Bhusaval (ICT-I) S/S 100 100 100 100 AUG-11AUG-115. MSETCL

Remark:

Bilhaur (2x660 MW),PS,UP, NTPC,,

400Bilhaur - Kanpur (PG)1. D/CUPPTCL

765LILO of Bhognipur - Mbd at Bilhaur2. D/CUPPTCL

.765LILO of Unnao - Mainpur at Bilhaur3. D/CUPPTCL

765Bilhaur - Sandila4. S/CUPPTCL

Remark:

Bina TPS (2x250 MW),PS,MP,Bina power,U1-8/12(C),U2-3/13(c ),

Commissioned 01/15.40400Bina TPS - Suitable location (along Bina(PG) - Bina (MPPTCL)

40 JAN-15JAN-151. D/CJV(PG&JP)

Commissioned.400Termination of Ckt of above at Bina (PG) &otuer ckt at Bina (MPTCL)

JAN-15JAN-152. D/CJV(PG&JP)

Remark:

Binjkote TPP (4x300 MW),PS,Chg,SKS Power, U1-6/14,U2-9/14,U3-3/15, U4-6/15,

Commissioned 05/15.55400Binjkote - Raigarh (Kotra) Pooling Station 93 93 93 55 MAY-15MAY-151. D/CSKS

Interim arrangement removed.400LILO of one ckt of Raigarh - Raipur atBinjkote TPP

2. D/CSKS

Remark:

Bokaro TPS,

Commissioned 12/14.200400Bokaro TPS Extn.- Koderma TPS 276 276 276 200 DEC-14AUG-12 DEC-141. D/CPGCIL

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 9 of67

Page 10: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Bongaigaon TPS (3x250 MW),CS, Assam, NTPC, U1-6/15 (C),U2-6/16,U3-3/17,

1. Delay due to re alignment of line such as proposed airport atBTAD area, 800 kV line of PGCIL, ROW, Local Problem etc. areattributing to the delay. Now there is almost settlement of RoW andcompensation related issues, the Erection work is going onsmoothly. How ever in Mushalpur areas (Baksa) District there hasbeen serious law and order issues and construction work is carriedout by deploying Security personnel.

327220Bongaigaon TPS - Rangia (Salakati) 517 494 452 77 JAN-13 JUN-161. D/CAEGCL

Commissioned 12/12.6400Bongaigaon TPS - Bongaigaon 11 11 11 6 DEC-12DEC-122. D/CPGCIL

commissioned 9/1465220BTPS-Agia-Sarusajai (2nd Circuit, Balanceportion)

195 195 195 65 SEP-14SEP-143. S/CAEGCL

Frequent Bandhs in BTAD area, forest clearance received, RoW atLoc 21,22 in forest area etc. are making the project slipped.

10132BTPS - Kokrajhar line 39 37 28 5 DEC-13 JAN-164. S/C onD/C

AEGCL

Work in progress. Clearance and RoW63132Kokrajhar - Bilashipara - Gauripur 203 199 121 22 SEP-13 FEB-165. S/C onD/C

AEGCL

Remark:

Budhil HEP (2x35 MW), PS, H.P., LANCO Green, U1-5/12(C),U2-5/12.(C),

Commissioned 3/1240220Budhil -Chamera III 62 62 62 40 MAR-12MAR-121. S/C onD/C

LEPP

Remark:

Butibori (2x300 MW) TPS Phase -II,PS,Maha,RPL,U1-8/12(C),U2-11/12,

Commissioned on 26.03.2013100220/132butibori III 100 90 100 90 MAR-13MAR-131. MSETCL

Commissioned 12/11.1220Buttibori TPS -Buttibori-III 1 DEC-11DEC-112. D/CMSETCL

Remark:

Chamera-II HEP,CS,HP,,

Commissioned 3/11.1400Chamera-II HEP (Part-I)- Chamera 3 3 3 1 MAR-11APR-10 MAR-111. S/CPGCIL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 10 of67

Page 11: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Pooling Station

Remark:

Chamera-III HEP (3x77 MW), CS,H.P.,NHPC, U1-6/12,( C) U2-6/12(C), U3-6/12 (C ),

Commissioned 03/13.324400Chamera-II HEP - Jullandur line 444 444 444 324 MAR-13MAR-131. D/CPGCIL

Commissioned 8/1130220Chamera-III - Pooling Station NearChamera-II HEP

46 46 46 30 AUG-11AUG-112. D/CPGCIL

Commisiioned 8/11.630400/220GIS Pooling Station near Chamera-II HEP 100 100 100 100 AUG-11AUG-113. PGCIL

Remark:

Chandrapur TPS, (2x500 MW), SS, Maha, MSPGCL, U1 to 7 (C) U8-3/15 (C), U9-1/14,

Commissioned 4/13.3400LILO of Chandrapur - Parli at Chandrapur II 11 11 11 3 APR-13SEP-131. D/CMSETCL

Commissioned 03/14.4400Chandrapur switching Stn. - Chandrapur IIS/S

11 11 11 4 MAR-14MAR-142. S/CMSETCL

Priority Bay 410, 426, 408 (Tie Bay) and 409 ,411, 412, 428, 429,404, 405 commissioned from 30.12.2013 to 13.3.2014

500400/220Chandrapur-II 100 85.62 96 72 MAR-163. MSETCL

Commissioned 06/13.91400Chandrapur-II - Warora 138 138 137 91 JUN-13JUN-134. D/CMSETCL

Commissioned 01/13.76400Warora-Wardha(2nd Ckt) 223 223 223 76 JAN-13JAN-135. S/CMSETCL

Remark:

Chango Yangthang (140 MW), PS,Distt, Spiti,HP,M/s Malana Power (MPCL),

220Chango Yangthang - Ka Dogri PoolingStation

1. D/CMPCL

.400Ka Dogri - Jangi Pooling Station2. D/CMPCL

Remark:

Chhabra Super Critical TPS (2x660 MW), SS , RRVUNL, Rajasthan U1 & U2,

Commissioned 01/15.179400Chhabra TPS - Anta (Baran) 244 244 244 179 JAN-15JAN-151. D/CRVPNL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 11 of67

Page 12: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

Chhabra TPP Extn. (2x250 MW) SS,Raj, RRVUNL, U3-9/13(C),U4-6/14 (C),

Commissioned 4/10342400Chhabra TPS -Hindaun 803 803 803 342 APR-10APR-101. S/CRVPNL

Commissioned 8/11.101220Chhabra TPS - Jhalawar 329 329 329 101 AUG-11AUG-112. S/CRVPNL

Remark:

Chitrangi TPP Ph-I (6x660 MW), Ph-II (3x660 MW),SS,MP,Ph-I,U1-9/13,U2-12/13,U3-3/14,U4-6/14,U5-9/14,U6-12/14, Ph-II,U1-3/15,U2-6/15,U3-9/19,

.765Chitrangi TPS - Vindhyachal PoolingStation

1. D/C

Remark:

Chujachen HEP (2x49.5 MW)PS,Sikkim,GIL,U1-4/13(C),U2-4/13 (C).,

Commissioned 04/13. (Interim arrangement)47132LILO of Melli - Gantok at Chuzachen (LILOpoint at namthang)

91 91 91 47 APR-131. D/CGATI

Line commissioned.132Chujachen HEP - Rangpo PS2. D/CGATI

Remark:

Chutak-HEP (4x11 MW), CS, J&K, NHPC, U1-11/12( C), U2- 11/12( C), U3- 11/12(C), U4-1/13(C),

Commissioned.566Chutak HEP-Gramthong -II 29 29 29 5 SEP-121. S/CJKPDD

Commissioned.1066Chutak HEP-Kargil-I 55 55 55 10 OCT-122. S/CJKPDD

Commissioned.2766Gramthong -II - Sankoo 154 154 154 27 SEP-143. S/CJKPDD

Commissioned2366Khangral - Mulbek -II 117 117 117 23 SEP-144. S/CJKPDD

Commissioned.2866Mulbek-II - Kargil -I 124 124 124 28 SEP-145. S/CJKPDD

Commissioned.6066/11Gramthong S/S 100 100 100 100 SEP-126. JKPDD

Commissioned.6066/11Kargil S/S 100 100 100 100 SEP-127. JKPDD

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 12 of67

Page 13: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned.6066/11Khangral (Bodhkharbu) 100 100 100 100 SEP-148. JKPDD

Commissioned.6066/11Mulbeck 100 100 100 100 SEP-159. JKPDD

Commissioned.6066/11Sankoo S/S 100 100 100 100 SEP-1410. JKPDD

Remark:

Cosmos Sponge TPS, (1x350 MW), PS,Chh,CSPL,U1-6/13,

.400CSPL TPS - Raigarh Pooling Station (NearKotra)

1. D/C

Remark:

DGEN TPS (3x400MW), Torrent Power Ltd, Gujarat,

Work awarded to M/s Instalaciones. Inabemsa. Spian on May2014. Route changed after survey observations.

400DGEN - Vadodara1. D/CTOR. POW.

.400DGEN TPS - Bharuch/Dahej PoolingStation

2. D/CTOR. POW.

Work awarded to M/s Instalaciones. Inabemsa. Spian on May2014. Route changed after survey observations.

220Navseri - Bhasten3. D/CTOR. POW.

.1500765/400Bharuch/Dahej4. TOR. POW.

Remark:

Dada Dhuni wale TPP, Khandwa (2x800 MW) SS,MP, U1-7/15,1U2-12/16,

80400Dada Dhuniwale TPP - Moondi PoolingPoint

1. D/CMPPTCL

630400/220Badnawar (2x315)2. MPPTCL

.630400/220Handia S/S3. MPPTCL

Remark:

Dahanu Solar (40 MW), PS,Tehsil Pokaran, Distt, Jaisalmer,Raj,M/s Dahanu Solar Power Pvt. Ltd.,

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 13 of67

Page 14: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

.132Dahanu - Degchu GSS1. D/CRVPNL

Remark:

Damodaram Sanjeevaiah(Krishnapatnam) TPP, (2x800MW) SS,AP, APPDCL, U1-9/14, U2-9/14,

Commissioned 02/15.196400Bonapally - Chittoor (Quad) 281 281 281 196 FEB-15FEB-151. D/CAPTRANSC

Commissioned 11/12.72400Krishnapatnam TPS - Nellore. 112 112 112 72 NOV-12NOV-122. D/CAPTRANSC

Commissioned 07/15.180400Krishnapatnam TPS- Chittoor(Balance) 180 JUL-15JUL-153. D/CAPTRANSC

Remark:

Derang TPP (2x600MW) PS, Orissa, JIPL, U1-5/14 (C), U2-1/15 (C),

Commissioned 08/14.154400Derang - Angul Pooling Station 231 231 231 154 AUG-14AUG-141. MC+D/CJPL

Remark:

Dhariwal TPS (2x300 MW), PS, Maharashtra, DIPL, U1-11/13(C),U2-5/14 (C),

Commissioned 09/13.10400Dhariwal TPS -Channdrapur II (1st Ckt) 29 29 29 10 SEP-13SEP-131. S/CDIPL

Commissioned 08/14.31400LILO of one ckt of Bhadravati (PG) - Parli atDhariwal

51 51 51 31 AUG-14AUG-142. D/CDIPL

Remark:

Dharmpura TPP (4x300 MW), Jain Energy, P.S,,

.400Jain Energy TPS - Dharamjaygarh KorbaPooling station

1. D/CJAIN ETL

Remark:

Dhuvaran CCPP-III,360 MW,SS ,GSECL,

Work in Progress.60220LILO of Karmsad -Vartej at Dhuvaran 152 143 94 18 DEC-151. D/CGETCO

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 14 of67

Page 15: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Dikchu HEP (3x32MW)PS,Sikkim,SKPPPL,U1,2&3-2017-18,

.132Dikchu - Gangtok1. D/CSIKKIM

132Dikchu - Mangan2. D/CSIKKIM

Remark:

Dopaha TPP (3x660 MW), SS, UP, U1,U2,U3,

.765Dopaha - Anpara1. D/CUPPTCL

765Dopaha - Ghazipur2. D/CUPPTCL

765Dopaha - Varanasi / Jaunpur3. D/CUPPTCL

765Meja - Bargarh4. D/CUPPTCL

Remark:

Durgapur (DPL) Extn. (250 MW), SS,WB, U8-3/14 (C),

Existing line.400DPL - Bidhan nagar MAR-121. D/CDPL

Remark:

Durgapur TPS (2x500 MW),CS,WB,DVC,U1-7/11(C),U2-3/1 (C),

Commissioned 07/13.138400Durgapur STPS - Raghunathpur 208 208 208 138 JUL-13MAY-10 JUL-131. D/CDVC

Commissioned 3/11.7400LILO of Durgapur-Jamshedpur (PG) atDurgapur STPS

14 14 14 7 JAN-11MAY-09 MAR-112. D/CDVC

Commissioned 4/12.276400Durgapur-Jamshedpur (Part Line) 519 469 451 276 APR-12APR-123. D/CPGCIL

Remark:

Dwarkesh Energy Ltd TPP (2x660 MW) PS, Khandwa, MP,,

765Dwarkesh Energy TPP - Indore1. D/C

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 15 of67

Page 16: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

EMCO Warora TPP (2x300 MW), PS,Maha,GMR, U1-2/13 (C),U2-8/13(C),

Commissioned 01/13.80400EMCO - Bhadrawathi (PG) 96 96 96 80 JAN-13JAN-131. D/CGMR

Remark:

Ellora TPP (4x660 MW), PS,Maha,EPML, U1,U2,U3,U4,

765Ellora TPP - Seoni1. D/C

Remark:

GEPL Ph -1 (2x60 MW ), U1-60 MW,9/12 (C) & Ph-2 (2x270 MW) TPS,PS,Maha,GEPL,U2-4/12(C),

Commissioned 9/1420220GEPL -MIDC S/S 20 SEP-14SEP-141. D/CGEPL

.400LILO of one ckt of Bhadrawati -Parli atGEPL TPS

2. D/CGEPL

Remark:

Ghatampur TPP (3x660 MW), CS, UP, JVN,UPRVUNL,,

.765Ghatampur - Moradabad / Rampur1. 2xS/CUPPTCL

400Ghatampur - Kanpur (PG)2. D/CUPPTCL

Remark:

Ghazipur (2x660 MW), PS, UP, BEL Spun,,

Commissioned 09/14.59220Ghazipur - Rasra 186 186 186 59 SEP-14FEB-11 SEP-141. S/CUPPTCL

400LILO of Anpara - Mau at Ghazipur2. D/CUPPTCL

Work not Started.400LILO of Sarnath - Azamgarh at Varanasi /Jaunpur

3. D/CUPPTCL

400Varanasi / Jaunpur - Gorakhpur4. D/CUPPTCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 16 of67

Page 17: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

400Varanasi/Jaunpur - Aurai5. D/CUPPTCL

400Varanasi/Jaunpur - Azamgarh6. D/CUPPTCL

765Varanasi/Jaunpur - Meja7. D/CUPPTCL

400Ghazipur - Varanasi / Jaunpur8. S/CUPPTCL

Remark:

Goindwal Sahib (2x270MW), PS,Punjab,GVK, U1-6/13,U2-8/13,

Work is in progress.80220Goindwal Sahib - Bottianwala 201 152 123 JUN-161. D/CPSTCL

Work in progress.55220Goindwal Sahib - Chola Sahib 92 92 92 55 JAN-162. D/CPSTCL

Commissioned 8/1238220Goindwal Sahib - Sultanpur Lodhi 60 60 60 38 AUG-12AUG-123. D/CPSTCL

Remark:

Gongri HEP (2x72 MW), PS, Arp, Dirang Energy, U1&U2,

220Gongri - Dinchang Pooling Station1. D/CDEPL

Remark:

Harduaganj TPS (2x250 MW),SS,UP,UPRVUNL,U8-9/11(C),U9-5/12(C),

Commissioned 11/14.99220Harduaganj - Jahangirabad 151 151 151 99 NOV-14AUG-09 NOV-141. D/CUPPTCL

Remark:

Hazaira CCPP (351 MW),SS,GUJ,GSECL,,GT+ST-2/12(c ),

W I P/Row problems111220Hazaira (GSEC) - Mota 182 107 94 20 MAR-161. D/CGETCO

Commissioned 9/11.125220Hazaira (GSEC)-Kosamba 211 211 211 125 SEP-11APR-11 SEP-112. D/CGETCO

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 17 of67

Page 18: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Hindustan Electricity GCL TPP (1x350+3x379 MW), PS, Maha, U1-3/14, U2, & U3,

110400HEGCL TPP - Pune (AIS) (PG)1. D/C

400LILO of Lonikhand - Kalwa at HEGCL TPP2. D/C

Remark:

Ind Barath TPP (2x350MW),PS,Orissa,Barath, U1-1/15, U2-3/15,

Progress of line has been affected due to severe ROW issue asland owner are demanding hefty amount for crop/landcompensation.

84400Ind Barath - Jharsuguda pooling Station 125 120 117 60 NOV-151. D/CIBPIL

47400LILO of Rouekila - Raigarh at Ind Barath 72 72 72 47 JUN-152. D/CIBPIL

Remark:

Ind Barath Tamil Nadu TPP, (660MW) U1-7/13,

.400LILO of Tuticorin - Madurai at Ind BarathTPP (madras)

1. D/C

Remark:

JSW Ratnagiri TPP (4x300 MW) ,PS,MAHA,JSW Energy ,U1-8/10(C),U2-12/10(C),U3-5/11(C),U4-10/11(C),

Commissioned 10/11.219400Jaigad - karad. 300 300 300 218 SEP-11OCT-111. D/CJSWEL

Ckt 1 commissioned 7/10 & ckt 2 commissioned 8/10.110400Jaigad - New Koyna 160 160 160 110 AUG-10MAY-10 AUG-102. D/CJSWEL

Remark:

Jal Churk (4x60 MW), PS,UP, M/S Jal ,,

Commissioned 01/14.13220Churk - Robertsganj 13 JAN-14JAN-141. D/CUPPTCL

Remark:

Jallipa - Kapurdi TPP (8x135 MW),PS,RAJ, Raj West Power,U1-10/09(C),U2-7/10(C),U3&U4-11/11(C),U5-2/13(C),

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 18 of67

Page 19: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 8/105220LILO of Giral - Barmer Ckt 1 at Raj WestLTPS.

10 10 10 5 AUG-08AUG-081. D/CRVPNL

1 ckt Commissioned 5/1030400Rajwest- Barmer 44 44 44 30 MAY-10APR-10 MAY-102. D/CRVPNL

Commissioned 5/10417400Rajwest- Jodhpur 560 560 560 417 MAY-10APR-09 MAY-103. D/CRVPNL

Commisisoned 3/1283220Raj West-Dhorimana 283 283 283 83 MAR-12MAR-124. S/CRVPNL

Remark:

Jawaharpur TPP, (3x660 MW), PS,UP, Jawaharpur Vidyut Utpadan Nigam Ltd..,

765Jawaharpur - G Noida1. D/CUPPTCL

765Jawaharpur - Agra (UP)2. D/CUPPTCL

765Jawarpur - Mainpuri3. D/CUPPTCL

220LILO Mainpuri (PG) - Harduaganj at Jwrpur4. D/CUPPTCL

400LILO of Mainpur (765) Aligarh (400) atJwrpur

5. D/CUPPTCL

220LILO of Mainpur - Etah at Jwrpur6. D/CUPPTCL

.400LILO of Panki - Muradnagar at Jwrpur7. D/CUPPTCL

Remark:

Jhajjar Mahatama Gandhi (CLP) (2x660 MW), PS, U1-1/12(C),U2-4/12(C),

Commissioned 05/13.25220Deepalpur-Barhi 95 95 95 25 MAY-13MAY-131. D/CHVPNL

Commissioned 2/12.40400Jhajjar -Dhanonda 64 64 64 64 FEB-12FEB-122. D/CHVPNL

Commissioned 2/12.70400Jhajjar - Kabulpur 95 95 95 95 FEB-12FEB-123. D/CHVPNL

Commissioned 09/1346220Kabalpur - Badhan 97 97 97 46 SEP-13SEP-134. D/CHVPNL

Commissoned 2/12.133400Kabulpur-Deepalpur FEB-12FEB-125. D/CHVPNL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 19 of67

Page 20: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 10/11.10400LILO of Jhajjar (APCPL) - Daultabad line atMG Jhajjar (CLP)

23 23 23 10 OCT-11OCT-116. D/CHVPNL

commissioned 2/12.2400LILO of abdullapur-Bawana at deepalpur 3 3 3 2 FEB-12FEB-127. D/CHVPNL

Commissioned 11/13.47220LLIO of Bahadurgarh- Rohtak at Kabulpur 94 94 94 47 NOV-13NOV-138. D/CHVPNL

Due to dismal progress of contractor the firm has been blacklisted.The work was re-awarded in January 2015 with schedulecompletion period of one year. Work in progress.

42220Deepalpur-Sonepat HSIIDC Rai 113 101 28 MAY-13 JAN-169. M/CHVPNL

Commissioned 2/12.2x100220/132Deepalpur S/S 100 100 100 100 FEB-12FEB-1210. HVPNL

Commissioned 2/12.2x315400/220Deepalpur S/S 100 100 100 FEB-12FEB-1211. HVPNL

Commissioned 2/12.2x100220/132Kabulpur S/S 100 100 100 100 FEB-12FEB-1212. HVPNL

Commissioned 2/12.2x315400/220Kabulpur S/S 100 100 100 100 FEB-12FEB-1213. HVPNL

Remark:

Jhajjar TPS (Indira Gandhi ) TPS (3x500 MW),CS,HR,ACPCL,U1- (C),U2-(C),U3-12/12,

1st cket commissioned 9/10 & 2nd ckt in 11/10.132400Jhajjar - Mundka 186 186 186 132 NOV-10MAR-10 NOV-101. D/CAPCPL

Commissioned 2/12.136400Jhajjar - Daultabad 175 175 175 136 FEB-12FEB-122. D/CHVPNL

Commissioned 3/11.160220/66Mundka (1st ICT) 100 100 100 MAR-11MAR-113. DTL

Commissioned 9/12.160220/66Mundka (2nd ICT) 100 100 100 100 SEP-12SEP-124. DTL

1st Trans. Commissioned 9/10.2nd trf 3/11.

630400/220Mundka (2x315) S/S MAR-11MAR-115. DTL

Commissioned 12/103x315400/220Daultabad S/S DEC-10DEC-106. HVPNL

Remark:

Jharsuguda (Sterlite TPP),PS, Ori,Sterlite, U1-12/10(C), U2-10/10(C),U3-8/11(C),U4-6/12 (c),

Ist ckt commissioned, 2nd ckt commissioned 8/10.9220Sterlite TPP - Sterlite captive plant D/C 9 AUG-10AUG-101. 2xD/CSEL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 20 of67

Page 21: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 03/14. (Interim arrangement).60400LILO of Rourkela - Raigarh at Sterlite TPP (2nd LILO)

92 92 92 60 MAR-14MAR-142. D/CSEL

Commissioned 2/11. (Interim arrangement).49400LILO of Rourkela - Raigarh at Sterlite TPP(Existing line)

85 85 85 49 FEB-10FEB-113. D/CSEL

Construction of line yet to be started from LILO Point to JhasugdaS/S.

400Sterlite TPP - Jharsuguda4. 2xD/CSEL

Remark:

Jorethang Loop HEP (2x48MW)PS,Sikkim,DANS,U1-9/15, U2-10/15.,

220 kv line from Jorethang switchyard to interconnection point hasbeen completed as in interim arrangement.

20220Jorethang HEP - New Melli 35 35 35 20 AUG-151. S/CDEPL

Remark:

Kaiga APP (220 MW),CS,KAR,NPCIL,U4-11/10(C),

Ready for Commissioning 09/15.420400Mysore - Kozhikode 614 614 614 420 SEP-15DEC-07 SEP-151. D/CPGCIL

Commissioned 03/08310400Narendra - Davangere 422 422 422 310 MAR-08MAR-082. D/CPGCIL

Commissioned 03/08315400/220Hirriyur (Extn.) S/S 100 100 100 100 MAR-08MAR-083. PGCIL

Commissioned 10/15.630400/220Kozhikode S/Stn. (2x315) 100 100 100 100 OCT-15DEC-07 OCT-154. PGCIL

Remark:

Kakatiya TPP Extn (2x600 MW) SS,TCTL, APGENCO, U1-5/10 (C),U2-5/14,

Commissioned 09/13.262400Bhoopalapally (Kakatiya) - Gajwel 363 363 363 262 SEP-13SEP-131. D/CAPTRANSC

Remark:

Kalisindh TPS (2x600 MW), SS,Raj,RRVUNL, U1-5/14 (C),U2-6/15 (C),

Commissioned 4/12.19220Kalisindh-Jhalawar line 35 35 35 19 APR-12APR-121. D/CRVPNL

Commissioned 03/14.159400Kalisndh TPS - Anta (Baran) PoolingStation (Quad)

220 220 220 159 MAR-14MAR-142. D/CRVPNL

(i)Work order withdrawn from M/s. GET and placed to M/s86400Phagi GSS (Jaipur) - Heerpura 128 124 115 47 SEP-12 MAR-163. D/CRVPNL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 21 of67

Page 22: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Varsana Ispat on 02.02.15.(ii) One no. NHAI crossing approval awaited.(i)Work order withdrawn from M/s. GET and placed to M/s VarsanaIspat on 02.02.15.(ii)Two nos. NHAI crossing & one no. railway crossung approvalawaited.

210400Phagi(Jaipur south-765 kV)-Ajmer line 283 257 184 SEP-12 MAR-164. D/CRVPNL

Commissioned 03/14.212765Anta - Phagi (Jaipur South Ckt-1) 586 586 586 212 MAR-14MAR-145. S/CRVPNL

Charged at 400 kV 01/14.214765Anta - Phagi (Jaipur South Ckt-2)(Chargedat 400 kV)

570 570 570 214 JAN-14JAN-146. S/CRVPNL

1.Delay is on the part of contractor(M/s Jyoti). B/W completed.100% equipment erected. Erection work of 1x315 MVA transformeris u/p.2. Associated line "400kV Ajmer-Deedwana" (on PPP mode) linework completed by M/s GMR. M/s GMR is to charge this line.NRLDC charging code awaited. Related works at 400kV GSSAjmer in respect of line completed (RVPN Scope).

315400/220Ajmer S/S 100 95 100 98 DEC-157. RVPNL

Commissioned 02/15.3000765/400Anta (Distt. Banra) Pooling Station 100 100 100 100 FEB-15FEB-158. RVPNL

Commissioned 02/15.3000765/400Phagi (jaipur South ) (2x1500 ) S/S 100 100 100 100 FEB-15FEB-159. RVPNL

Remark:

Kalpakkam PBR (500 MW),

Commissioned 3/12.213230Kalpakkam - Arni 213 MAR-12MAR-121. D/CPGCIL

Commissioned 8/12.160230Kalpakkam PFBR-Kanchepurram 306 306 306 160 AUG-12AUG-122. D/CPGCIL

Line commissioned in Nov'1172230Kalpakkam PFBR-Sirucheri 140 140 140 72 NOV-11NOV-113. D/CPGCIL

Remark:

Kamalanga TPP (3x350MW),PS,GMR, Orissa, U1-3/13(C),U2-9/13(C),U3-9/13,

Commissioned 12/14.60400Kamalanga (GMR) - Angul pooling station 103 103 103 60 DEC-14DEC-141. D/CGMR

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 22 of67

Page 23: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

For start up power,work completed 5/12.1400LILO of Talchar -Meramundli at KamalangaTPP

3 3 3 1 MAY-122. D/CGMR

Remark:

Kameng HEP,(4x150 MW) SS,ArP,U1-U4: 2016-17,

ATS slowed-down to the extent possible to match with Gen. ofKameng. Gen. proj. delayed. (expected in 2016-17).

110400Kameng - Balipara 149 136 102 AUG-13 DEC-161. D/CPGCIL

Remark:

Karcham Shongtong HEP ( 4x250 MW)PS, HP, JKHCL, U1-5/11(C), U2-6/11( C), U3-9/11 (C), U4,9/11 (C).,

Commissioned. 7/12432400Karcham Wangtoo-Abdullapur 518 518 518 432 JUL-12JUL-121. D/CJV(PG&JP)

Commissioned 3/11.291400Abdullapur - Sonepat 403 395 385 230 MAR-11SEP-11 MAR-112. D/CPGCIL

18400Shongtong Karcham HEP - Wangtoo(Quad)

3. D/CHPPTCL

630400/220Wangtoo (GIS) S/S4. HPPTCL

Remark:

Karchana TPP (2x660MW),,

400Karchanna - Rewa Road Allahabad1. D/C

Remark:

Kasaipalli TPP (2x135 MW),PS,Cha,ACB,U1- 12/11(C),U2-6/12(C),

Commissioned. 7/12112400Kasaipalli TPP -Bharai (Sipat) Poolingstation

181 181 181 112 JUL-12JUL-121. D/CACB

Commissioned 11/11.6400LILO of Korba - Bhatapara at Kasaipalli 6 NOV-11NOV-112. D/CACB

Remark:

Kashang-I,II & III (1x65+2x65MW),SS,HP,U1 -3/16,U2 & 3 -2017-18,

out of 2 ckt, one ckt completed and charged on 7/2011.3 gangs working

78220Kashang - Bhaba 100 100 100 62 OCT-15 DEC-151. D/CHPPTCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 23 of67

Page 24: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Jhangi Pooling Station yet to be awarded.220Kashang - Jangi Pooling Station2. D/CHPPTCL

Remark:

Kawai Super Critical TPS (2x660 MW),Raj, PS,Adani , Unit 1-5/13 (C),U2-12/13 (C),

Commissioned 01/14.101400Kawai - Anta (Baran) 136 136 136 101 JAN-14JAN-141. D/CRVPNL

Commissioned 12/12.16400Chhabra TPS-Kawai SCTPS 46 46 46 16 DEC-12DEC-122. S/CRVPNL

Remark:

Khaperkheda (500 MW),SS,MAHA,MSPGCL,U1-8/11(C),

Commissioned 3/12.12220Khaperkheda TPS - Khaperkheda(Existing)

19 19 19 12 MAR-12MAR-121. 2xD/CMSETCL

Commissioned 11/93400LILO of Koradi - Chandrapur atKhaperkheda TPS.

8 8 8 3 NOV-09NOV-092. D/CMSETCL

Commissioned 12/11.1000400/220Khaperkheda S/S (2x500) 100 100 100 100 DEC-11DEC-113. MSETCL

Remark:

Khargone Super Critical TPP(2x660 MW),CS,MP,NTPC,

400Khargone TPP-Indore DEC-151. D/CPGCIL

Remark: Status Not Reported.

Khurja (2x660 MW), PS, UP, THDC,,

4.4LILO of Agra - Muradnagar at Kurja1. D/CUPPTCL

1.The remaining work is held up due to DFCC work and therestoration work is progress on 09 no. tower.

400LILO of Aligarh - Sikandarabad 258 254 254 166 DEC-152. D/CUPPTCL

765LILO of Mainpuri - Gr Noida at Khurja3. D/CUPPTCL

765Khurja - Hapur4. S/CUPPTCL

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 24 of67

Page 25: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Kishanganga HEP (3x110MW) CS, J&K, NHPC, U1,2 & 3- 11/16,

Award for tower pkgs. placed in march 2015. Engg. & survey underprogress.

206220Kishanganga - Amargarh 132 7 MAR-18 JUL-171. D/CPGCIL

Works under progress.78220Kishanganga - Wagoora 336 17 MAR-18 MAR-182. D/CPGCIL

Remark:

Koderma TPS 2x500 MW,CS,JHA,DVC,U1-7/11 (C),U2-2/13 (C),

Commissioned 8/1032132LILO of Barhi-Koderma at Koderma S/S 66 66 66 32 AUG-10AUG-101. D/CDVC

Commissioned 5/11.222400Koderma-Biharshariff (Quad) 294 294 294 222 MAY-11APR-10 MAY-112. D/CPGCIL

Remark:

Koldam HEP (4x200 MW),CS,HP,NTPC, U3-4/15 (C), U4-6/15,

Commissioned 03/10.93400Koldam - Nalagarh 127 127 127 93 MAR-10MAR-101. D/CPGCIL

Commissioned 09/14.301400Koldam - Ludhinana (JV Portion) 423 423 423 301 SEP-14SEP-08 SEP-142. D/CPKTCL

Remark:

Koradi TPP Expn. (3x660 MW), SS,Maha, MSPGCL, U8-3/15 (C) ,U9-5/15 ,U10-9/15,

Forest: 16.9392 Ha (Wardha :3.85 & Nagpur:13.0892 )In-Principal approval received on dt: 04.03.14. Permission for treecutting and work commencement letter received from CCF, Nagpurvide letter no: 3831 Dt: 09.10.15Compliance for Stage-I submitted and final approval awaited.ROW: 2 locations (Loc. No. 30/0, 16/0) Closed for order onDt:01.10.15. Order yet to be received.National Highway (NH-69) crossing: Reminder letter given to NHAIregarding approval of long pending cases vide no:3162Dt:26.08.15.

239400Koradi TPS - Wardha 336 336 336 231 APR-11 MAR-161. D/CMSETCL

Forest area involved 4.122 Ha.In-principal approval received on Dt: 11.09.15.Permission for tree falling and work commencement letter

29220Koradi TPS-New Khaparhkeda 72 71 70 22 DEC-13 MAR-162. D/CMSETCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 25 of67

Page 26: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

awaited from CCF, Nagpur.ROW: Work stopped. Police protection required.

Remark:

Korba (E) (2x250 MW), SS, Chg, U2-7/12 (C),

Commissioned 08/14.153220Korba -Vishrampur 505 505 505 153 AUG-14MAR-12 AUG-141. S/CCSPTCL

Charged on 22.8.2014160220/132Bishrampur S/S 100 100 100 100 DEC-12 JUN-142. CSPTCL

Remark:

Korba (W) (1x500 MW),SS,Cha,CSEB,U5-3/13(C),

Commissioned 12/12.447400Korba (W)-Bhilai (khedamara) 640 640 640 447 DEC-12DEC-121. D/CCSPTCL

Commissioned 9/12.47400LILO Korba (West)-Bhilai at Raipur(CSPTCL)

70 70 70 47 SEP-12MAR-10 SEP-122. D/CCSPTCL

Charged on 31.3.2014315400/220Raipur (2nd Trf.) 100 100 100 100 DEC-133. CSPTCL

Remark:

Koteshwar HEP (4x100 MW),CS,UK, THDC,U3-1/12,U4-3/12.,

Commissioned 6/11.13765LILO of Tehri - Meerut at Tehri PoolingPoint (to be charged at 400 KV)

59 59 59 13 JUN-11JUN-08 JUN-111. 2xD/CPGCIL

Commissioned 3/11.5400Koteshwar -Tehri Pooling Point 9 9 9 5 APR-11JUN-08 MAR-112. D/CPGCIL

Remark:

Kudgi STPS (3x800 MW),CS, NTPC, U1-3/16, U2-6/16, U3-9/16.,

Ready for Commissioning 08/15.36400Kudgi STPS - Narendra 46 46 46 36 AUG-15FEB-15 AUG-151. 2xD/CKTCL

The villagers are not allowing for any construction work at therespective locations and asking for huge compensation.Matter is brought to the notice of District Administration. Theselocations are nearer to 400/220 kV POWERGRID Bidadisubstation. Being terminating point, no alternatives available

186400Madhugiri - Bidadi 256 229 216 50 DEC-15 DEC-152. D/CKTCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 26 of67

Page 27: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

for re-routing the line.

758765Narendra (New) - Madhugiri 870 800 789 470 DEC-15 DEC-153. D/CKTCL

Remark:

Kundankulam - APP (2x1000 MW),CS,TN,APCIL, U1-12/14 (C),,

G.O issued by govt. of Kerela dated on 19.08.14 recommandingadditional compensation by land owner. Work to start afterassessment of compensation & payment by state Govt./KSEB.Revised G.O. issued on Jan'15. Recently GO issued on 30.07.15 inwhich compensation is to be done on land value, to be finalised byconcerned DC. DC yet to initiate action.

297400Edamon (KSEB) - Muvattupuzha (PG) 438 159 105 29 NOV-08 DEC-161. D/CPGCIL

Commissioned 03/09.145400Kudankulam-Tirunelveli (Quad) 1st. 199 199 199 145 MAR-09MAR-092. D/CPGCIL

Commissioned 03/09.160400Kudankulam-Tirunelveli (Quad) 2nd. 213 213 213 160 MAR-09MAR-093. D/CPGCIL

Commissioned 4/08.213400LILO of Madurai - Trivandrum at Tirunelveli2 X D/C

300 300 300 213 APR-08APR-084. D/CPGCIL

Line commissioned in Nov'11.157400Muvattupuzha (PG) - North Trichur (PG) 224 224 224 157 NOV-11NOV-115. D/CPGCIL

Commissioned 03/09.533400Tirunelveli - Udumaplet 730 730 730 533 MAR-09MAR-096. D/CPGCIL

Commissioned 03/10.327400Tirunelveli - Edamon 235 235 235 327 MAR-10MAR-107. M/CPGCIL

ICT-II commissioned in Nov'11.1x315400/220Muvattapuzha s/s (2 nd ICT) 100 100 100 100 NOV-11NOV-118. PGCIL

ICT-I Commissioned 4/08, ICT-II Commissioned 11/08.630400/220Tirunelveli S/S 100 100 100 100 NOV-08APR-089. PGCIL

Commissioned 6/09.315400/220Trivandrum 100 100 100 100 JUN-09JUN-0910. PGCIL

Commissioned 3/09315400/200Udumalpet (PG) Ext. 100 100 100 100 MAR-09MAR-0911. PGCIL

Remark:

Lakhwar (300 MW) & Vyasi (120 MW),SS,UK,UJVNL - 2018-19,

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 27 of67

Page 28: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

DPR prepared. DPR submission to funding agency is in progress.146220Almora-Pithoragarh JUN-161. D/CPTCUL

Construction of line as per Connectivity Schedule of Generators inYamuna Valley.

94220Arakot -Mori and LILO of Arakot -Mori atHanol Tuni

MAR-182. D/CPTCUL

Construction of line as per Connectivity Schedule of Generatiors inYamuna Valley.

52220Devsari-Karanprayag NOV-173. D/CPTCUL

Construction of line as per Connectivity Schedule of Generators inYamuna Valley.

76220Jakhol -Sankri -Mori and LILO of Jakhol -Sankri -Mori at Natwar Mori

MAR-184. D/CPTCUL

Construction of line as per Schedule of construction of Langrasu.16220LILO of Nandprayag -Karanprayag atLangrasu

NOV-175. D/CPTCUL

LoA is to be issued.10220LILO of Roshnabad -Puhana atPirankaliyar S/S

DEC-166. D/CPTCUL

Tender has been floated.70220LILO of Vyasi HEP - Dehradun at Dehradun(PG) S/S

APR-167. D/CPTCUL

Construction of line as per Connectivity Schedule of Generators inYamuna Valley.

200220Mori -Dehradun MAR-188. D/CPTCUL

Remark:

Lalitpur Ph-I (3x660MW), Ph-II (3x660 MW )PS,UP,BHL, U1-06/15 (C),U2-1/15,U3-3/15,

WIP.142400Agra(UP) - Agra (South) 190 164 105 AUG-16 MAY-161. D/CUPPTCL

WIP.64400LILO of Agra - Muradnagar at Mathura 88 60 9 AUG-16 MAR-162. D/CUPPTCL

WIP.68400LILO of existing Agra (UP) - Agra (PG) atAgra (UP)

100 58 27 AUG-16 MAY-163. D/CUPPTCL

WIP.158400LILO of existing Agra (UP) - Muradnagar atAgra (UP)

212 116 60 AUG-16 MAY-164. D/CUPPTCL

Commissioned 04/15.19220Lalitpur - Lalitpur TPS (Ckt-II) 19 APR-15APR-155. D/CUPPTCL

Commissioned 03/15.19220Lalitpur TPS - Lalitpur TPS S/S (Ckt-I) 57 57 57 19 MAR-15MAR-156. D/CUPPTCL

Commissioned 06/14.185220Lalitpur TPS - Jhansi 301 301 301 185 JUN-14JUN-147. D/CUPPTCL

WIP.142400Agra (UP) - Mathura line 388 265 195 AUG-16 MAR-168. S/CUPPTCL

Foundation, Erection & Stringing WIP.332765Lalitpur TPS - Agra (UP) Ckt-I 955 763 518 19 AUG-16 MAR-169. S/CUPPTCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 28 of67

Page 29: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

FDN, Ere, Stringing work in progress.334765Lalitpur TPS - Agra (UP) Ckt-II 889 737 588 6 AUG-16 MAR-1610. S/CUPPTCL

600400/132Agra (South) S/S 100 15 AUG-16 MAY-1611. UPPTCL

3000765/400Agra (UP) S/S 100 30 AUG-16 MAY-1612. UPPTCL

Remark:

Lanco Amarkantak TPS -II, (2x660 MW), PS,Chg,LPT, U3 -5/14,U4-9/14,

.95400Lanco Amarkantak - Champa PoolingStation

158 96 12 APR-161. D/CLEPP

Remark:

Lanco Vidarbha (Dhenkanal )TPS (2x660 MW), PS,,LIL, U1-9/14,U2-1/15,

15765LILO of Seoni - Wardha at Lanco VidarbhaTPS

16 DEC-131. D/CLEPP

Remark:

Lata Tapovan (3x57 MW),CS,UK,NTPC- 2019-20,

Contract has been awarded on 06.05.11 to M/s TATA Project Ltd.,contract effective date is 14.10.11 and GMVN has not given thepermission to cross the Auli Ropeway, hence crossing byunderground cable is proposed at Joshimath. Land sliding zonebeing encountered at village Malli Tangri and Talli Tangri thesurvey and forest case yet to be completed. Forest Case of 51.3Hect. is under preparation. Total Progress 6%.

40220Joshimath - Kunwari Pass (Pipalkoti) JUN-181. D/CPTCUL

Regarding Forest land Transfer proposal nodal officer Dehradunraised queries vide letter no 3042 dated 01-06-2013. Reply of thesame is being done. Total progress 13%

24220Lata Tapovan- Joshimath 36 DEC-152. D/CPTCUL

Contract has been awarded on 06.05.11 to M/s TATA Project Ltd.contract effective date is 03.09.11 Forest case prepared for 43.694Hect. and submitted to DFO Joshimath/ DM Chamoli. NOC from04 Nos. village panchyat Naurakh

40400Vishnugad - Kuwari Pass (Pipalkoti) 62 DEC-153. D/CPTCUL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 29 of67

Page 30: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Agthalla, Tangri Talli and Tangri Malli is pending. Matter is beingpursued GOU/District Administration.

Remark:

Loharinagpala (NTPC),CS,UK,NTPC,Unit-14/15.,

The work at Loharinagpala HEP stopped as per GOI order.180400Loharinagpala-Koteshwar line1. D/CPTCUL

The work at Pala Maneri HEP stopped as per GOI order.10400LILO of Loharinagpala - Koteshwar at Pala- Maneri

2. D/CPTCUL

Remark:

Lower Jurala HEP (6x40MW) SS,TCTL,TSGENCO,U1&2 ready for commissioning in Sept, 15,U3-10/15,U4-11/15,U5&6 -5/2016,

Commissioned 12/13.9220LILO of Veltoor -Jurala at Lower JuralaHEP

17 17 17 9 DEC-13DEC-131. D/CAPTRANSC

Erection of 2 towers for Krishna river crossing are balance andcasting of pile foundation is under progress.

22220Lower Jurala HEP - Upper Jurala 36 34 34 21 OCT-152. D/CTSTRANSC

Remark:

Mahan TPP Ph-1(2x600 MW),PS, MP,ESSAR Power TCL, U1-2/13 (c), U2-11/13,

Commissioned 3/13.208400Gandhar-Hazira 287 287 287 208 MAR-13MAR-131. D/CEPTCL

Commissioned 3/12. (Interim)44400LILO of Viindhyachal -Korba line at MahanS/S

67 67 67 44 MAR-13MAR-122. D/CEPTCL

Contractor is remobilising and work is getting started.670400Mahan -Sipat 942 938 909 394 JUN-153. D/CEPTCL

commissioned in March 2013. Reported in July 2015.2x500400/220Hazira S/S 100 100 100 100 JUL-15JUL-154. EPTCL

Remark:

Maheshwar HEP (10x40 MW),PS,MP,SMHPCL,U1-12/12,U2-1/13,U3-2/13. 2016-17,

Commissioned 5/10.54220Maheshwar - Nimrani 90 90 90 54 MAY-10APR-09 MAY-101. D/CMPPTCL

Commissioned 2/12.115220Maheshwar - Pithampur 195 195 195 115 FEB-12FEB-122. D/CMPPTCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 30 of67

Page 31: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

Maithon RBTPP (2x525 MW),PS,JHA,DVC-JV TATA ,U1-6/11(C),U2-3/12 (C),

Commissioned 12/11.376400Maithon (RB) - Ranchi 534 534 534 376 DEC-11DEC-111. D/CPGCIL

Commissioned 09/1062400Maithon RB - Maithon (PG) 94 94 94 62 SEP-10APR-10 SEP-102. D/CPGCIL

Remark:

Maitrishi Usha TPP (Corporate Power) (Chandwa) (Abhijit) (4x270MW), U1-7/13,U2-11/13,U3 -1/14, U2-3/14.,

6400Corporate TPP - Jharkhand Pooling Station 11 DEC-121. D/CCPL

.216400Latehar - Namkum 320 293 274 132 DEC-122. D/CCPL

Remark:

Malana - II HEP (2x50 MW)PS,HP,EPPL,U1-8/11(C),U2-8/11(C),,

Commissioned 9/11.2220LILO of Allain Duhangan- Nalagarh atChhaur

4 4 4 2 SEP-11SEP-09 SEP-111. D/CEPCL

Commissioned 9/11.36132Malana - II HEP - Chhaur. 51 51 51 36 SEP-11SEP-112. D/CEPCL

Commissioned 9/114x42.5132/220Chhaur SEP-11SEP-113. EPCL

Remark:

Malibrahmini (2x525MW),PS,Orissa, MPL.,

There is no such project under OPTCL. May be deleted62400Malibrahmani - Angul 108 100 80 20 MAR-161. D/COPTCL

Remark:

Malwa TPP, Shree Singhaji TPP, Ph-I (2x600 MW),Ph-II (2x600 MW), SS,MP,MPPGCL, U1-11/13(C), U2-10/14 (C),

Commissioned 11/14.225400Chhegaon - Julwania 340 340 340 225 NOV-14NOV-141. D/CMPPTCL

Commissioned 02/13105400Malwa TPP - Chhegaon 158 158 158 105 FEB-13FEB-132. D/CMPPTCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 31 of67

Page 32: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 11/13.272400Malwa TPP - Pithampur 397 397 397 268 NOV-13NOV-133. D/CMPPTCL

Commisioned 3/1295220Malwa TPP - Chhegaon 160 160 160 95 MAR-12MAR-124. D/CMPPTCL

Commissioned 03/14.128400Pithampur-Indore 193 193 193 128 MAR-14MAR-145. D/CMPPTCL

Commissioned 12/12.315400/220Chhegaon S/S 100 100 100 100 DEC-12DEC-126. MPPTCL

Commissioned 4/13.630400/220Pithampur S/S 100 100 100 100 APR-13APR-137. MPPTCL

Commissioned 09/13.6220LILO of both ckts of Nimrani-Julwania atJulwania

9 9 9 5 SEP-13SEP-138. D/CMPPTCL

Commissioned 11/14.630400/220Julwania S/S 100 100 100 100 NOV-14NOV-149. MPPTCL

Remark:

Marwa TPP (2x500 MW) SS,Chg,CSPGCL U1-3/14 (C), U2 -1/15,

Commissioned 1/13. (Loc 39 to 51 charged on 7.11.12)28220Marwa - Banari (Start up power) 55 55 55 28 JAN-13JAN-131. D/CCSPTCL

Commissioned 05/15.116400LILO of One ckt of Korba (W) - Khedamaraat Marwa

161 161 161 116 MAY-15MAR-13 MAY-152. D/CCSPTCL

Commissioned 06/13.281400Marwa - Raipur (Raitha) 379 379 379 281 JUN-13JUN-133. D/CCSPTCL

Remark:

Mauda TPS (500 MW),Phase-II (2x660 MW) CS, Maha, NTPC, U1-4/12 (C), U2-3/13(C),U3-7/16,U4-1/17,

Commisisoned 05/12124400Mauda - Wardha (2nd Ckt) MAY-12MAY-121. S/CPGCIL

Commissioned 3/12.124400Mauda - Wardha line (Quad)(Ckt-1) 345 345 345 124 MAR-12MAR-122. S/CPGCIL

Remark:

Meja TPP Ph-I (2x660 MW), Ph-II (2x660 MW),SS (Jonit Venture,UPPCL & NTPC), U1-7/16,U2-12/16,

Completed.64400Meja - Bara 83 83 83 64 FEB-161. D/CSEUPPTCL

Work yet to be awarded.400Allahabad (PG) - Rewa Road (Allahabad)2. D/CUPPTCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 32 of67

Page 33: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

Mettur TPS Stage III (600 MW), SS,TN,U1-10/12(C),

MTPS III- Malco energised 2/11 for start up power.3230LILO of MTPS -Malco at MTPS Stage III 9 9 9 3 FEB-11FEB-111. D/CTANTRANS

Commissioned 01/13.220400MTPS St.III - Arasur 325 325 325 220 JAN-13JAN-132. D/CTANTRANS

Dharmapuri 400 KV SS has been sanctioned. Hence, work will betaken up according to that BP.

200400MTPS St.III - Singarpet JUN-163. D/CTANTRANS

Commissioned 3/123230MTPS Stage-III - Gobi 8 8 8 3 MAR-12MAR-124. S/CTANTRANS

Remark:

Monarchak CCPP (101 MW), CS,Tripura, NEEPCO, GT - 3/15 (C), ST - 2/15.,

Work in progress.42132Monarchak - Surajmani Nagar 150 49 38 6 MAR-151. D/CTSECL

Completed 9/133132Surajmani Nagar - Rabindra nagar 13 13 13 3 SEP-132. D/CTSECL

Remark:

Moti Khavdi (500 MW), PS,Guj,RPL,U1,

.400Moti Khavdi TPP - Jam Nagar1. D/CRPTL

Remark:

Mundra TPP Ph. III (3x660 MW),PS,Guj, Adani, U1-11/11 (C),U2-3/12(C), U3-3/12(C),

Commissioned 3/121980±500+/- 500 kV Mundra - Bipole Mohindergarh 2693 2693 2693 1980 MAR-12MAR-121. BIPOLEAPL

Commissioned. 7/12100400Mohindergarh HVDC - Bhiwani 139 139 139 100 JUL-12APR-11 JUL-122. D/CAPL

Commissioned. 7/1210400Mohindergarh HVDC- Mohindergarh HVPNl(Dhanonda)

15 15 15 10 JUL-12APR-11 JUL-123. D/CAPL

Commissioned 1/13.146400Daultabad -Dhanonda 219 219 219 146 JAN-13JAN-134. D/CHVPNL

Commissioned 4/12315400/220Dhanoda (Mohindergarh) 100 100 100 100 APR-12APR-125. HVPNL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 33 of67

Page 34: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

Mundra TPP Ph.II (2x660 MW) ,PS,GUJ,Adani ,U1-12/10(C),U2-7/11(C),

WIP/Severe RoW Issue664400Mundra (Adani) - Zerda line 1 997 453 275 JUN-161. D/CGETCO

WLine terminated at 400kV Varsana S/s (2x80.26kM) on31.03.2015 under stop gap arrangement. W I P (Severe RoWproblems)

664400Mundra (Adani) - Zerda line 2 956 956 950 595 DEC-152. D/CGETCO

Remark:

Mundra UMPP (5x800 MW),PS,GUJ,TATA,U1-2/12(C),U2-7/12(C),U3-10/12 (C),U4 -1/13(C) , U5-3/13(C),

Commissioned 9/11.566400Bachchau - Ranchodpura 755 755 755 566 SEP-11SEP-111. D/CPGCIL

Commissioned 8/11198400Mundra - Bachchau 285 285 285 198 AUG-11AUG-112. D/CPGCIL

Commissioned 02/12.244400Mundra - Limbdi 863 863 863 244 FEB-12FEB-123. D/CPGCIL

Commissioned 12/12.358400Mundra - Jetpur (Balance portion) 918 918 918 358 DEC-12DEC-124. S/CPGCIL

Commissioned 8/12.314400Mundra - Jetpur (Part line) 424 424 424 314 AUG-12AUG-125. S/CPGCIL

192 Ckm part line commissioned 11/11.384400Mundra -Limbdi ( part Line) 192 NOV-11NOV-116. S/CPGCIL

Remark:

Mundra UMPP WR system Strengething,

Commissioned 5/12.217220LILO of Halvad-Morbi I at Bhachau 315 315 315 217 MAY-12MAY-121. D/CGETCO

Commissioned 5/12.216220LILO of Halvad-Morbi II at Bhachau 333 333 333 216 MAY-12MAY-122. D/CGETCO

Commisisoned 7/12204400Gandhar - Navsari 288 288 288 204 JUL-12JUL-123. D/CPGCIL

Commisisoned 7/12.82220LILO of both ckts of Kawas-Navsari atNavsari.

145 145 145 82 JUL-12JUL-124. D/CPGCIL

Contigrncy arrangement to connect Navsari-Boisar with Vapi-NaviMumbai line by passing forest area to form Vapi-Navsari line (212Ckm) commissioned in Mar'13.For balance

432400Navsari - Boisor 599 483 452 290 OCT-12 JUN-165. D/CPGCIL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 34 of67

Page 35: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

portion, forest clearance awaited. Critical. Severe ROW problembeing faced.Contract terminated 01 out of 02 nos due to unsatisfactoryperformanc and fresh tender being taken up.The pkg. has beenbifurcated into two pkgs.. 01 pkg. award in Dec'14 & 2nd pkg.awarded in Feb'15.Remaning 01 pkg. also terminated in Aug'15due to poor performance & fresh tender is being taken up.

7001200Wardha - Aurangabad (on 1200 kV) 961 875 678 196 OCT-12 DEC-166. D/CPGCIL

Commissioned 01/14.630400/220Aurangabad S/S 100 100 100 100 JAN-14JAN-147. PGCIL

Commissioned.630400/220Bachchau S/S 100 100 100 100 AUG-11AUG-118. PGCIL

Commisisoned 7/12630400/220Navsari GIS 100 100 100 100 JUL-12JUL-129. PGCIL

Commissioned 02/12.2x1500765/400Wardha 100 100 100 100 FEB-12FEB-1210. PGCIL

commissioned 3/12.1500765/400Wardha 3rdTrf 100 100 100 100 MAR-12MAR-1211. PGCIL

Commissioned 04/14.118400Aurangabad (PG)-Aurangabad (MSETCL) 118 APR-14OCT-12 APR-1412. D/CPGCIL

Commissioned 01/14.102400Shifting of Ankola -Aurangabad (MSETCL)to Aurangabad (PG)

102 JAN-14JAN-1413. D/CPGCIL

Remark:

Mutiara (Melamaruthur) (Coastal Energen) TPP (2x600 MW),PS,CEPL,U1-12/14 (C),U2-3/15,

commissioned 3/12. (Interim arrangement).52400LILO of Madurai - Tuticorin at CostalEnergen

52 MAR-12MAR-121. D/CCEPL

The total length of line is 38 KM and line will be extended from 22ckm is completed of Mudrai - Tuticorin LILO line.

76400Mutiara TPP - Tuticorin Pooling Station 32 32 32 22 DEC-152. D/CCEPL

Ready for commissioning 08/15.120400Salem Pooling Station - Salem 165 165 165 120 AUG-15SEP-14 AUG-153. D/CPGCIL

Contractual issue.739765Tuticorin Pooling Station - Salem PoolingStation

1000 995 675 145 SEP-14 JUN-164. D/CPGCIL

Severe ROW being faced in Karnataka. Critical.244765Salem Pooling Station - Madhugiri PoolingStation line

645 605 564 97 SEP-14 MAR-165. S/CPGCIL

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 35 of67

Page 36: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Muzaffarpur TPP Exp, Kanti-II (2x195MW) CS, Bihar, JV-NTPC U3-03/15 (C), U4-3/15,

Commissioned 09/14.68220Kanti - Darbhanga (2nd Ckt) 68 SEP-14SEP-141. S/CBSEB

Severe ROW issues.101220Kanti - Gopalganj (2nd Ckt.) MAR-162. S/CBSEB

Remark:

Myntdu (Leshka) HEP (3x42 MW),SS,Meg,MeECL, U1&U2-3/13,U3-3/13 (C),

Charged at 33 kV.52132Leshka Myntu - Khliehriat 85 85 85 52 JUL-10JUL-101. D/CMeECL

Remark:

NCC Power Project Ltd, Super-critical TPP (2x660 MW),PS,AP,Nellore, U1-3/16, U2-8/16,

.400NCC Power TPP - Nellore Pooling Station(PG)

1. D/C

Remark:

NSL TPP (2x660 MW), PS, Orrisa, NPPL,,

Project Authority intimated that PGCIL yet to award construction ofwork.

46400NSL TPP - Angul1. D/CNSLNPPL

Remark:

Nabi Nagar TPP (4x250 MW), CS,Bihar, NTPC, U1-11/13,U2-4/14,U3-5/14,U4-8/14,

Commissioned 05/12.164400Nabinagar - Sasaram line (Twin lapwing) 216 216 216 164 MAY-12MAY-121. D/CPGCIL

Remark:

Nagarujana Sagar TR HEP ( 2x25 MW),SS,AP,APGENCO,Unit-1 & 2 - 2015/16,

Commissioned 11/082220LILO of VTS - Tallapally line atRentachintala

2 NOV-08NOV-081. D/CAPTRANSC

Commissioned 3/13.17132Rentachintala - Macherla S/S 58 58 58 15 MAR-132. S/CAPTRANSC

Commissioned 08/14.16132Rentachintala - Nagarjuna Sagar Plant 34 34 34 16 AUG-143. S/CAPTRANSC

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 36 of67

Page 37: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 11/082x100220/132Rentachintala S/S 100 100 100 100 NOV-08NOV-084. APTRANSC

Remark:

Namrup CCGT (100 MW),SS, Assam,GT/ST,

Railway Crossing & Gantry is not ready at Namrup GSS.145220Namrup - Mariani 448 448 448 145 DEC-13 JAN-161. S/C onD/C

AEGCL

Remark:

Nasik (5x270 MW) TPS, PS, Maharashtra, India Bulls, U1-2/14 (C),U2-7/14,U3-11/14,U4-1/15,U5 - 3/15,,

Commissioned 03/14.57400Nasik-Bableshwar (1st Ckt) 152 152 152 57 MAR-14MAR-141. D/CIBPL

Ready for commissioning 08/15.57400Nasik - Bobleshwar (2nd Ckt) 152 152 152 57 AUG-15AUG-152. D/CIBPL

Work yet to be started by MSETCL.400Nasik TPP - Nasik (MSETCL) MAR-153. D/CMSETCL

Remark:

Navbharat TPP Ph-1 (2x525 MW), PS,Chh, U1&2,

.400Navbharat TPP - Angul P.S. (PG)1. D/CEPTCL

Remark:

Nawapura TPP (TRN ) (2x300 MW), Chhattisgarh Pvt. Sector , TRN Energy Pvt. Ltd. U1-6/14, U2,

Line under construction.30400TRN TPP - Raighar (near Tamnar) PoolingStation

JUN-151. D/C

Remark:

New Umtru HEP (2x20 MW),SS,Meg,MeECL,Unit - 1 & 2 - 2016-17.,

No issues of forest clearance. Survey works completed. Re-surveydone due to construction of a new building in the corridor of theapproved profile survey & due to crossing of the 132kV D/C Killing-EPIP-II line. Material procurement is under process. Inspection ofcolumn & beams done on 31.03.2015.

6132New Umtru HEP - Norbong (EPIP-II) 9 MAR-161. D/CMeECL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 37 of67

Page 38: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

No issues of forest clearance. Survey works completed. Re-surveydone due to construction of a new building in the corridor of theapproved profile survey & due to crossing of the 132kV D/C Killing-EPIP-II line. Material procurement is under process. Inspection ofcolumn & beams done on 31.03.2015.

132New Umtru - Umtru HEP MAR-162. S/CMeECL

Remark:

Neyveli TPS-II Exp. (2x250MW) CS,TN, NLC, U1-1/12(C),U2-1/15 (C),

Commissioned 08/093400Neyveli (Exp-II) - Neyveli TS-II 17 17 17 3 AUG-09AUG-091. 2xS/CNLC

Commissioned 08/09.398400Neyveli TS-II - Pugalur 576 576 576 398 AUG-09AUG-092. D/CNLC

Remark:

Nigri TPP (2x660 MW), PS,MP, JPVL, U1-8/14 (C),U2-2/15 (C),

.400LILO of one ckt of Vindhychal - Satna atNigrie

1. D/CMPPTCL

400Nigri TPP - Satna2. D/CMPPTCL

Remark:

Nilachal TPP,(3x350MW), PS,Orissa, KVK U1-1/14,U2-8/15,U3-12/15,

Work yet to Start.16400LILO of Mendasal - Baripada at NilanchalTPP

JUN-161. D/CKVK

Remark:

Nimoo Bazgo (NHPC) (3x15 MW),CS,J & K,NHPC,U1-11/13(C),U2-10/13(C),U3-10/13(C).,

Commissioned.3166Alachi - Khalsi S/S 140 140 140 31 JUN-141. S/CJKPDD

Rerouting of line and ganglas s/s droped. Leh Army S/S shall beconnected with Leh S/S.

966Ganglas - Leh Army base 46 22 SEP-152. S/CJKPDD

Slow progress.5166Kharu S/S - Himya S/S 242 239 204 36 SEP-143. S/CJKPDD

Commissioned.2566Leh (C.P.) - Kharu S/S 107 107 107 25 SEP-144. S/CJKPDD

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 38 of67

Page 39: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 12/12.766Leh (C.P.) - Leh S/S 39 39 39 7 DEC-12DEC-125. S/CJKPDD

Rerouting of line and ganglas s/s droped. Leh Army S/S shall beconnected with Leh S/S.

1066Leh III - Ganglas 53 29 8 2 SEP-156. S/CJKPDD

Commissioned 11/12.466Nimoo Bazgo HEP - Alachi 13 13 13 4 NOV-11NOV-127. S/CJKPDD

Commissioned 09/12.1766Nimoo S/S - Alachi S/S 77 77 77 17 SEP-12SEP-128. S/CJKPDD

Commissioned 03/12.3166Nimoo S/S- Leh S/S 152 152 152 31 MAR-12MAR-129. S/CJKPDD

Commissioned 11/12.6.366/11Alchi. S/S 100 100 100 100 NOV-1210. JKPDD

6066/11Himya 100 30 JUL-1311. JKPDD

Commissioned6066/11Khalsi 100 100 100 100 JUL-1312. JKPDD

Commissioned6066/11Kharu 100 100 100 100 DEC-1313. JKPDD

Commissioned 12/12.2x6.366/11Leh 100 100 100 100 DEC-1214. JKPDD

Commissioned.6066/11Nimoo S/S 100 100 100 100 JUL-1315. JKPDD

Remark:

North Chennai TPS St.II (2x600 MW),SS,TN,U1-9/13(C),U2-3/13 (C).,

Commissioned 01/14.98400Alamathy -Sunguvarchatram (1st Ckt) 161 161 161 98 JAN-14JUN-10 JAN-141. D/CTANTRANS

Commissioned 11/10.2230LILO of NCTPS- Mosur at NCTPS Stage II(for startup power)

2 2 2 2 NOV-10DEC-10 NOV-102. D/CTANTRANS

Commissioned 01/13.136400NCTPS St.II- Alamathy 400 kV S/S 114 114 114 136 JAN-13JAN-133. M/CTANTRANS

Commissioned 03/14.100400Alamathy -Sunguvarchatram (2nd Ckt) 100 MAR-14MAR-144. D/CTANTRANS

Remark:

Orissa UMPP (Bedabahal, Orissa), (5x800MW),(Orissa Integrated Power Ltd. (OPIL),

.765Orrisa UMPP - Jharsuguda Pooling Station1. D/C

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 39 of67

Page 40: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

Painampuram TPP (2x660MW),PS,AP,Thermal power tech Development Corp (India) ltd.,U1-2/15 (C),U2-12/14,

Commissioned 08/13.65400Thermal Powertech - Nellore PoolingStation

92 92 92 65 AUG-13AUG-131. D/CPGCIL

Remark:

Palatana CCGT (2x363.3 MW),PS,Tri,OTPC, Module 1 (GT-10/12,ST-10/12), Module 2 - 11/14 (C),

Commissioned 9/12.4220LILO of Agia - Sarusajai line at KukurmaraS/S

8 8 8 4 SEP-12SEP-121. D/CAEGCL

Commissioned 01/15.7400LILO of Palatana - Bongaigaon at AzaraS/S

14 14 14 7 JAN-15JAN-152. D/CAEGCL

Commissioned 03/15.201400Azara - Bongaigaon 442 442 442 201 MAR-15DEC-14 MAR-153. D/CNETC

Commissioned 8/12495400Palatana -Silchar 680 680 680 495 AUG-12AUG-124. D/CNETC

Commissioned.428400Silchar - Byrnihat 590 590 590 428 FEB-13FEB-135. D/CNETC

Commissioned 03/13.1400LILO of Kaithalguri - Misa line at Mariani(New) (Charged at 220KV)

4 4 4 1 MAR-13MAR-136. D/CPGCIL

Package under re-tendering.30132LILO of Aizwol (PG) - Zemabawk at Melriat(PG)

45 DEC-12 JUN-167. D/CPGCIL

Commissioned 03/13.1132LILO of Loktak - Imphal at Imphal (New)line

5 5 5 1 DEC-12 MAR-138. D/CPGCIL

Ready for Commissioning 06/15.97220Mariani (New) - Mokikchung (PG) 163 163 163 97 JUN-15DEC-12 JUN-159. D/CPGCIL

Stage-I forest clearance awaited.package under re-tendering.12132Melriat (New) - Sihmui line 30 DEC-12 JUN-1610. D/CPGCIL

Line commissioned in Jul'15.2132Mokokchung (PG) - Mokokchung(Nagaland) line

11 11 11 2 DEC-12 JUL-1511. D/CPGCIL

Commissioned 6/1274400Palatana - Surajmaninagar line (Charged at132 KV)

118 118 118 74 JUN-12JUN-1212. D/CPGCIL

Commissioned 4/12.38132Silchar - Badarpur (PG) line. 69 69 69 38 APR-12APR-1213. D/CPGCIL

Line test charged in Jun'12.50132Silchar - Hailakandi (Contingencyarrangement)

65 65 65 39 JUN-1214. D/CPGCIL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 40 of67

Page 41: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 03/15.334400Silchar - Imphal (New) line (to be chargedat 132KV)

479 479 479 334 MAR-15DEC-12 MAR-1515. D/CPGCIL

Major portion of line in forest. severe ROW in vicinity of Aizwl towndue to stiff resistance from influential local owner. package underre-tendering.

286400Silchar - Melriat (New) line (charged at132KV)

436 366 211 101 DEC-12 JUN-1616. D/CPGCIL

Commissioned 07/15.254400Silchar - Purba Kanchan Bari line (chargedat 132KV)

373 373 373 254 JUL-15DEC-12 JUL-1517. D/CPGCIL

Line commissioned in Mar'12.2132Silchar - Srikona line 7 7 7 2 MAR-12MAR-1218. D/CPGCIL

Completed 9/1318132Surajmani Nagar - Agartala 79 Tilla GridS/S

71 71 71 18 SEP-1319. D/CTSECL

Fund proposed in World Bank.6132Surajmani Nagar - Badarghat MAR-1520. D/CTSECL

Commissioned 08/12.36132Surajmani Nagar - Budhujngnagar 63 63 63 36 AUG-12AUG-1221. D/CTSECL

3.598 KM line in forest land for which TSECL will apply for forestclearance. LOA issued

20132Surajmani Nagar - Rokhia 80 32 5 DEC-1422. D/CTSECL

Proposed under NEC.50132Surajmani Nagar - Udaipur 50 JUN-1523. D/CTSECL

Fund not yet tied up. Proposed under World Bank Financing/SPA/NEC.

260400Surajmani nagar-P.K.Bari MAR-1524. D/CTSECL

Line test charged on 21.08.2011.12132Udaipur - Palatana 41 41 413 12 AUG-11AUG-1125. D/CTSECL

No issues of forest clearance and no court cases. Work is underprogress.

17132Killing (Byrnihat)-EPIP-I 19 19 19 9 DEC-1526. M/CMeECL

5132LILO of Zemabawk - W.Phaileng atSihhmui

DEC-1327. S/CP&ED Mizo

Check survey done. Profile drawing approved.5132Kukurmara - Azara line 24 DEC-11 MAR-1628. S/C onD/C

AEGCL

Project has been abandoned25132Kukurmara - Boko line 162 DEC-1429. S/C onD/C

AEGCL

Readiness of up stream & down stream system beingimplementated by Arunachal Pradesh Govt. Critical forcommissioning of line.

70132Pasighat - Roing line. 345 345 344 101 DEC-12 FEB-1630. S/C onD/C

PGCIL

Progress affected due to severe ROW problem.Critical60132Roing - Tezu line 244 212 180 31 APR-12 MAR-1631. S/C onD/C

PGCIL

Progress affecetd due to severe ROW problem.90132Tezu - Namsai line. 332 213 153 32 DEC-12 JUN-1632. S/C onD/C

PGCIL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 41 of67

Page 42: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

All testing and test charge completed. Awaiting the Mirza Azara132 kV line to be completed.

100220/132Kukumara S/S (2x50) 100 90 100 98 FEB-1533. AEGCL

Commissioned 05/15.630400/220Kukurmara (Azara) S/S 100 100 100 100 MAY-15SEP-11 MAY-1534. AEGCL

Commissioned 12/1150132/33Panchgram (Aug.) S/S 100 100 100 100 DEC-11DEC-1135. AEGCL

3X33.5132/33Yurembam (Aug.) S/S 100 MAR-1336. ED, Manipur

Ist transformer commissioned.315400/220Killing (Byrnihat) (Ist Trf.)S/S 100 100 100 100 FEB-13FEB-1337. MeECL

ICT-I (50MVA) commissioned in Mar'13 & ICT-II commissioned inApr'13.

2x50132/33Imphal S/S 100 100 100 100 APR-1338. PGCIL

Supply, civil works & erection under progress. Completionmatching with line.

2x50132/33Melriat S/S (Upgadable to 400 kV) 100 80 65 10 JUN-1639. PGCIL

Commissioned 07/15.30220/132Mokokchung (New) 100 100 100 100 JUL-15DEC-12 JUL-1540. PGCIL

Work under progress. Completion matching with associated lines.Critical.

2x15132/33Namsai S/S 100 62 100 20 JUN-1641. PGCIL

Work under progress. Completion matching with associated lines.Critical.

2x15132/33Roing S/S 100 90 100 85 FEB-1642. PGCIL

Commissioned 3/12.2x200400/220Silchar (New) 100 100 100 100 MAR-12MAR-1243. PGCIL

Work under progress. Completion matching with associated lines.Critical.

2x15132/33Tezu S/S 100 88 100 75 MAR-1644. PGCIL

Commissioned 12/122x50132/33Surajmaninagar S/S (Upgrdable to 400 kV) 100 100 100 100 DEC-12DEC-1245. TSECL

commissioned 3/139400LILO of Palatana - Bongaigaon at Killing(Byrnihat)

10 10 10 9 MAR-13MAR-1346. D/CMeECL

Commissioned 08/15.30220/132Mokokchung (ICT-II) 100 100 100 100 AUG-15AUG-1547. PGCIL

Remark:

Pallivasal HEP (2x30MW),SS,Kerala,KSEB, U1 & 2-2017-18,

ATS of Pallivasal Extension HEP. Work is yet to start.220LILO of Idukki-Udumalpet at Pallivasal HEP 5 MAR-161. D/CKSEB

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 42 of67

Page 43: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Panan HEP (4x75MW), PS, Sikkim, HHEPL, U1& U4,

220Panan HEP - Mangan1. 2xD/CHHEPL

Remark:

Parabati-II HEP (PGCIL & JP)CS,HP,NHPC,Unit-12/18,

Commissioned 9/14.76400Parbati -II- Koldam line -II 157 157 157 76 SEP-14SEP-141. S/CPKTCL

Commissioned 10/14.81400Parbati- II - Koldam line-I 173 173 173 81 OCT-14OCT-142. S/CPKTCL

Remark:

Parbati-III HEP (4x130 MW),CS,HP,NHPC,U1-6/14 (C),U2-2/14 (C),U3-3/14 (C),U4-5/14 (C),

Commissioned 07/2013.1400LILO of Parbati -II - Koldam at ParbatiPooling Point.

5 5 5 1 JUL-13JAN-10 JUL-131. D/CPGCIL

Commissioned 07/2013.4400LILO of Parbati -II - Parbati Pooling Point atParbati -III

7 7 7 4 JUL-13JUL-132. D/CPGCIL

Commissioned 07/2013.501400Parbati Pooling Point - Amritsar 668 668 668 501 JUL-13JUL-133. D/CPGCIL

Remark:

Pare HEP (2x55MW)CS,ARP,NEEPCO,U1-3/15, U2-3/16,

.132LILO of Ranganadi - Nirjuli at Pare HEP1. D/C

Remark:

Parichha Extn. TPS (2x250 MW),SS,UP,UPRVUNL,U5-5/12(C),U6-3/13 (C),

1. 01 no. Fdn gang, 01 no. Erec. Gang & 02 no. Str gangs areworking. 2. Another Er gang to be deployed by 21.11.15.3. TowerParts delievered. The proposed date of complition 15.01.16

67400LILO of 1st Ckt Bhogaon-Mainpuri atSirsaganj

111 107 50 10 DEC-151. D/CUPPTCL

Commissioned 01/14.259400Paricha - Mainpuri 2nd Ckt.) 402 402 402 259 JAN-14JAN-142. D/CUPPTCL

Commissioned 12/13.259400Parichha - Mainpuri (1st Ckt.) 301 301 301 259 DEC-13DEC-10 DEC-133. D/CUPPTCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 43 of67

Page 44: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 3/12210220Parichha - Banda 606 606 606 210 MAR-12MAR-124. S/CUPPTCL

Commissioned 3/11220Parichha - Bhauti MAR-10MAR-105. S/CUPPTCL

WIP.630400/220Orai S/S 100 74 88 51 DEC-156. UPPTCL

Remark:

Parli TPP Expn. (250 MW), SS,Maha,MSPGCL, U8-12/13,

.220LILO of both ckt Parli (GCR) - Beed at Parli1. D/CMSETCL

Commissioned 10/12.181220Parli TPS-Nanded (waghala) 300 300 300 181 OCT-12APR-11 OCT-122. M/CMSETCL

Remark:

Petronet LNG (3x395 MW), PS,Guj,PLNGL, U1,U2,U3,

.400PLNGL TPP - Vadodra1. D/C

Remark:

Phata Byung HEP (2x38 MW),PS, UK , Lanco, 2017-18,

8220Phata HEP-Baramwari (Rudrpur) 20 DEC-161. D/CLEPP

Forest approval granted on 02.04.2013.Tender scrappedretendering is under progress

182220Rudrapur(Brahmwani) - Ghansali-Srinagarline

248 DEC-162. D/CPTCUL

Substation layout work is in progress.Land has been cleared. M/s CGL has moved to the court for theissue

60220/132Ghansali (GIS) 100 MAR-173. PTCUL

Work in progress.total progress 89.5%

%

630400/220Srinagar S/S 100 85 92 85 DEC-12 DEC-154. PTCUL

Revised Drawings has been submitted by M/s Siemens and hasbeen approved.Total progress 4%.

100220/132Baramwari (GIS) DEC-165. PTCUL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 44 of67

Page 45: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

Pipalkoti HEP (THDC) ( Kuwari Pass ) (4x111 MW),SS,UK,PTCUL,U1,U2,U3, U4-12/19,

400Pipalkoti HEP - Pipalkoti (THDC) (KuwariPass)

1. D/CPGCIL

2x315400/220Pipalkot (THDC)2. PTCUL

Remark:

Pipavav CCPP(2x351MW),SS,Guj,GSECL,Block-1-2/14 (C), Block-2-3/13 (C).,

Severe ROW Problem.94220GPPC (Pipavav)- Dhokadva 152 152 152 70 MAR-12 OCT-151. D/CGETCO

Commissioned 8/1281220LILO of Savarkundla - Mahva (otha) atPipavav (GPPC) (line-2)

133 133 133 81 AUG-12APR-11 AUG-122. D/CGETCO

Commissioned 3/1291220LILO of Savarkundla - Mahva(otha) atPipavav (GPPC) (line-1)

149 149 149 91 MAR-12AUG-10 MAR-123. D/CGETCO

Commissioned 06/13.96220Otha (Mahuva) - Sagapara (Palitana) 161 161 161 96 JUN-13JUN-134. D/CGETCO

Remark:

Pragati CCGT Ph-III(4X250+2X250MW),SS,DEL,PPCL,GT1-10/10(C),GT2-2/11(C),GT3-6/12,(C)ST1-2/12(C),GT4-5/13(C),ST2-2/14 (C),

commissioned2x315400Extension of bus and connection with DTLSubstation

1. PRAGATI

Remark:

RAPP U-7&8,

Force Majeure event: Delay in forest clearance. Transmissionlicensee granted by CERC. Tariff adoption done by CERC.CERChas granted Liberty for extension of COD and additional tariff.TSPhas started the work. Project execution plan submitted to CEA &lead LTTC. Critical RoW Issues Dist. Kota & Jhalawar inRajasthanand Dist. Agar Malwa & Rajgarh in MadhyaPradesh.Change in Law: i.Central Excise duty has been increased12.36% to 12.5 % w.e.f 1st March 2015. ii.

310400RAPP - Shujalpur 521 521 521 402 FEB-16 DEC-151. D/CSGL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 45 of67

Page 46: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Service tax has been increased 12.36% to 14% w.e.f 1st June2015. iii.Custom duty has been changed due to Finance Act. iv.New Guidelines by MoP no.3/7/2015-Trans dated:15.10.2015 forpayment of additional Row compensation for tower base area andcorridor in addition to crop compensation. The same has beenintimated to all LTTCs. v. Increase in Chareges by West CentralRailway for Plan & Drawings,departmental supervision and SiteSurvey Charges and Power,Traffic Blockage Charges to be takenfrom Power Supply Company & Concern.

Remark:

RaghunathpurTPS (2x600 MW),CS,WB,DVC,U1-8/14 (C),U2-3/14,

Commissioned 3/11. (Interim arrangement)21400LILO of Maithon-Ranchi (PG) atRaghunathpur

33 33 33 21 MAR-11MAR-111. D/CDVC

Forest: Working clearance obtained in January 2013.PTCCclearance:issued on 18.2.14. Aviation clearance: Obtained.Slow progress due to non-availability of working gang due to fundcrunch of Contractor (M/s Jyoti Structures). Approval has beenarranged for payment to the sub-vendor directly to solve abovefund crisis of M/s JSL which has subsequently resumed work inSep 2015 for the balance portion.

311400Raghunathpur TPS -Ranchi (PG) 439 439 436 274 AUG-10 MAR-162. D/CDVC

Remark:

Raigarh TPP (REL) (2x300 MW), PS, Chh, U1-12/13,U2-7/15,

.400Raigarh TPS - Raigarh Pooling Station(Near Tamnar)

1. D/C

Remark:

Raikheda TPP (2x685 MW), PS,Chh, GMR, U1-2/15 (C), U2-11/14,

Commissioned in February 2014. Reported in July 2015.131400Raikheda (GMR) - Raipur Pooling Station 181 181 181 131 JUL-15JUL-151. D/CGMR

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 46 of67

Page 47: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Rajasthan New Solar and Wind Power Plant,

Commissioned 11/14.93220Aau-Baithwasia 155 155 155 93 NOV-14NOV-141. D/CRVPNL

50400Akal (1)- Jaisalmer -2 MAR-152. D/CRVPNL

480400Akal -Jodhpur (New) 650 230 148 MAR-173. D/CRVPNL

100220Badisid-Aau 196 196 160 54 MAR-164. D/CRVPNL

30220Badisid-Bap MAR-155. D/CRVPNL

280400Barmer-Bhinmal (PG) MAR-166. D/CRVPNL

1. Forest Clearance required at 22 locations at Indira Gandhi Canalcrossings in three districts.Distt. Jodhpur- Loc 4 nos, Area 3.204 ha. Distt. Jaisalmer- Loc 2nos, Area 1.631 ha. Distt. Bikaner- Loc 16 nos, Area 17.58 ha2. Clearance taken from DFO(Bikaner,Jaisalmer,Jodhpur) andCCF. Now pending at APCCF(FCA),Jaipur.3. Severe ROW issues- There is a court case by land owner at 2nos location in Distt. Bikaner, sought for diverson of line route.

379400Bhadla-Bikaner 512 492 476 230 MAR-167. D/CRVPNL

50220Bhadla-Kanasar 83 41 25 MAR-168. D/CRVPNL

420400Bikaner -Sikar (PG) MAR-179. D/CRVPNL

120220Chatrail-Ramgarh 146 145 140 40 MAR-1610. D/CRVPNL

30220Gajner -Kolayat MAR-1611. D/CRVPNL

260400Jaisalmer -2 -Barmer MAR-1612. D/CRVPNL

20220LILO of Kolayat -Bajju at Kolayat MAR-1613. D/CRVPNL

10220LILO of Aau -Phalodi at Aau MAR-1614. D/CRVPNL

20220LILO of Chandan- Pokaran at Pokaran MAR-1615. D/CRVPNL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 47 of67

Page 48: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

.320400LILO of Jodhpur -Merta at Pooling stationBadla

608 139 52 MAR-1616. D/CRVPNL

20220LILO of PS 1- Bajju at PS 1/Bajju MAR-1617. D/CRVPNL

1220LILO of both ckts Ramgarh GTPS -Dechuat Ramgarh

1 1 1 1 APR-1518. D/CRVPNL

20220LILO of both ckts Ramgarh GTPP -Dechuline at Pokaran

MAR-1619. D/CRVPNL

W.O. to M/s Megha Hyderabad.103400LILO of one ckt Raj west -Jodhpur atJodhpur (New)

138 138 138 102 MAR-1720. D/CRVPNL

40220PS 1 /Bajju -Bhadla 107 105 98 24 MAR-1621. D/CRVPNL

200400Ramgarh (Jaisalmer)-Akal (Jaisalmer ) 293 132 95 MAR-1622. D/CRVPNL

360400Ramgarh -Bhadla 440 368 181 23 MAR-1623. D/CRVPNL

25220Sirohi-Pindwara 106 64 MAR-1624. S/CRVPNL

Commissioned 05/15.160220/132Aau S/S 100 100 100 100 MAY-15MAY-1525. RVPNL

500400/220Akal (Aug.)26. RVPNL

160220/132Bajju S/S27. RVPNL

3x160220/132Bhadia Pooling Station28. RVPNL

945400/220Bhadia Pooling Station 100 65 65 5229. RVPNL

160220/132Chatrail S/S30. RVPNL

2x500400/220Jaisalmer -2 S/S31. RVPNL

1. Boundry wall(85%), structure, equipment, transformer foundationwork(90%) and control room(100%) work in progress. Electricwork yet to be started.

320220/132Kanasar S/S 80 30 2 MAR-1632. RVPNL

160220/132Kolayat S/S33. RVPNL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 48 of67

Page 49: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

100220/132Kuchera S/S 100 25 25 31 AUG-1534. RVPNL

160220/132Pokaran S/S35. RVPNL

3x160220/132Ramgarh S/S36. RVPNL

1.Revised NOA placed on dt.2.2.15. Date of commencement ofwork is yet to be decided.2. In ADB Projects the date of commencement is decided from dateof release of advance payment release. Payment of 10%advancement towards service part is yet to be released as the firmhas not claimed the same.

1500400/220Ramgarh S/S 100 100 85 53 MAR-1737. RVPNL

Remark:

Rajpura (NABA) TPP, (2x700MW) U1-1/13 (C) ,& U2-7/14 (C),

Commissioned 05/13.171400Rajpura - Dhuri 242 242 242 171 MAY-13MAY-131. D/CPSTCL

Commissioned 05/14.279400Rajpura Thermal - Nakodar 381 381 381 279 MAY-14MAY-142. D/CPSTCL

Commissioned 05/13.18400Rajpura Thermal - Rajpura 29 29 29 18 MAY-13MAY-133. D/CPSTCL

Work is in progress. 1x315 MVA Trf. likely to be commissioned by31.01.16 and 2nd 315 MVA by 31.03.16

1000400/220Rajpura S/S (2x500) 100 85 85 85 JAN-164. PSTCL

Remark:

Ramgarh CCPP Extn.-III, (110+50 MW), SS,Raj, RRVUNL, (GT-3/13(C),ST-5/14 (C),

Commissioned 12/14.202220Chandan - Dechu 322 322 322 202 DEC-14DEC-141. D/CRVPNL

Commissioned 9/12.71220Dechu - Phalodi 119 119 119 71 SEP-12SEP-122. D/CRVPNL

Commissioned 11/14.194220Ramgarh (GTPP) - Chandan 309 309 309 194 NOV-14NOV-143. D/CRVPNL

Remark:

Rampur HEP (6x68.67 MW),CS,HP,SJVNL,U1-2/14 (C),U2-2/14 (C),U3-3/14 (C), U4-6/14(C), U5-3/14 (C), U6 - 12/14(C),

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 49 of67

Page 50: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 02/14.5400LILO of Nathpa Jhakri - Nalagarh atRampur (Loop in portion)

12 12 12 5 FEB-14NOV-11 FEB-141. D/CPGCIL

Commissioned 8/11.66400LILO of Patiala - Hissar at Kaithal 90 90 90 66 AUG-11NOV-11 AUG-112. D/CPGCIL

Commissioned 9/11.156400Patiala - Ludhiana 217 217 217 156 SEP-11NOV-11 SEP-113. D/CPGCIL

Commissioned 10/14.2400LILO of Nathpa Jhakri - Nalagarh atRampur (2nd Ckt balance)

2 OCT-14OCT-144. D/CPGCIL

Remark:

Ranghit-IV HEP (3x40MW),PS,Sikkim,JPCL,U1,2,&3-2018-19,

220Rangit IV - New Melli line1. D/CJPCL

.220Routing of one circuit of Jorthong - NewMelli via Rangit - IV

DEC-132. D/CLEPP

Remark:

Rangit-II HEP (2x33MW)PS,Sikkim, SHPL,U1&2-,

220LILO of one ckt of Legship - New Melli atRangit-II

1. D/CSHPL

Remark:

Ratle HEP, (4x205+1x300 MW), PS, J&K, GVK, U-I to U-5 2019-20,

.400LILO of one circuit of Dulhasti - Kishenpurat Ratle HEP.

1. D/CPGCIL

400Kishenpur - Ratle, (Dulhasti- KishenpurSecond Ckt stringing extending up to RatleHP)

JUN-162. S/CPGCIL

Remark: Work yet to be award.

Reliable TPP (RTPL), (2x660 MW), PS, MP, RTPL,U1-6/16 (Tentative), U2-12/16 (Tentative),

.765Reliable TPP - Vindhyachal Pooling Station1. D/C

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 50 of67

Page 51: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Rewa TPP, Khandwa (2x800 MW), SS,MP,

180400Handia - Ashta(2nd stage)1. D/CMPPTCL

40220LILO of Handia - Barwaha at Handia2. D/CMPPTCL

.20400LILO of Khandwa (PGCIL) - Rajgarh atChhegaon

3. D/CMPPTCL

40220LILO of Ratlam - Badnagar at Badnawar4. D/CMPPTCL

Double entrypreviously as Nagda - Ujjain

150400Nagda - Ujjain line5. D/CMPPTCL

Remark:

Rongnichu HEP (2x48MW) PS,Sikkim, MBPCL,U1&2,

220Rongnichu - Rangpo Pooling Station1. D/CMBPCL

Remark:

Rosa TPP Extn Ph-II (2x300), PS, UP, Reliance, Northern Region, U3-12/11 (C), U4-3/12 (C),

Commissioned 3/1215400LILO of Lucknow - Bareilly atShahjahanpur

15 MAR-12MAR-121. D/CRPTL

Line completed OPGW stringing work held up due ROW at loc.326, Tree cutting is also required.

216220Rosa - Dohna 340 340 340 216 DEC-152. D/CUPPTCL

Commissioned in March 2012. reported in july 2015.(Line Chargedby passing Shahjehanpur S/S).

16400Rosa - Shahjehanpur (PG) 16 JUL-15JUL-153. D/CRPTL

Remark:

S V Power TPP (63 MW),PS,Cha,KVK,U1-12/11(C),,

Commissioned 11/11.12132LILO of Korba-Mopaka line at S.V. Power 12 NOV-11NOV-111. D/CSVPPL

Remark:

SJK Powergen TPP (2x660 MW),PS, MP GMR, U1-12/14,U2-6/14,

.107400SJK TPS - Jabalpur Pooling Station 339 330 292 591. D/C

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 51 of67

Page 52: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

Sagardighi TPP (2x300 MW) Phase-II (2x660 MW),SS,WB,WBPDCL,U1-12/07(C),U2-7/08(C), U3-7/14, U4-10/14,

Commissioned 4/11.255400Sagardighi - Parulia (PGCIL) 340 340 340 255 APR-11DEC-08 APR-111. S/C onD/C

WBSETCL

Remark:

Sainj HEP (2x50 MW),SS,HP,HPPCL,U1-3/16,U2-5/16,

Yet to award.400LILO of Parbati III - Parbati Pooling stationat Sainj

APR-141. D/CHPPTCL

Remark:

Salaya (Essar Power ) (2x600 MW),PS, Guj, Essar Power U1-2/12(C),U2-6/12 (C),

Commissioned 5/11.226400Vadinar (Essar)-Hadala 353 353 353 226 MAY-11NOV-09 MAY-111. D/CGETCO

W I P239400Vadinar(Essar)- Amreli (Balance) 365 309 256 113 NOV-09 JUN-152. D/CGETCO

Commissioned 01/14.117400Vadinar - Amreli (Part line) 294 294 294 117 JAN-14JAN-143. D/CGETCO

Severe ROW problem being encountered.09 fdn. 10 TE & 3.5 Kmstringing hold due to non-finalisation of gantry by Essar Power.

450400Essar Gujarat TPS - Bachau 605 596 593 424 FEB-14 DEC-154. D/CPGCIL

Remark:

Salaya Phase -II (3240MW),PS, Guj,,

Will be in line with generation project which is delayed350400Salaya (EPGCL generating station )-Halvad MAR-181. D/CGETCO

Remark:

Salora TPS (M/s Vandana Vidyut ) (2x135 MW),

Commissioned. 7/12. (Interim )6400LILO of one ckt Korba- Birsinghpur atVandana

6 JUL-12JUL-121. D/CVVL

Yet to start construction of 400 kV D/C line from Salora TPS -Dhranjaygarh (70 KM). Interim arrangement available. LOI

60400Salora TPS - Dharamjaigarh (Korba)(PGCIL) Pooling Station

84 MAR-172. D/CVVL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 52 of67

Page 53: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

has been issued to M/s EBPL Ventures Pvt. Ltd. , Bhilai. The line isexpected to be completed by March, 2017.

Remark:

Sandila TPP (2x660 MW), PS,UP,TPL,,

400Sandila TPP - ATS not defind1. D/CTOR. POW.

765LILO of Ghatampur - Mbd at Sandila2. D/CUPPTCL

400Sandila - Farrukhabad3. S/CUPPTCL

400Sandila - Lucknow Hardoi Road4. S/CUPPTCL

Remark: Status Not Reported (UP share 1188 MW)

Santaldih TPP (250 MW),SS,WB,WBPDCL,U6-6/11(C),

Commissioned 4/084220LILO of STPS - Arambagh at Bishnupur 11 11 11 4 APR-08APR-081. D/CWBSETCL

Commissioned 12/0780220LILO of Santaldih - Durgapur (I Ckt) atAsansol

152 152 152 80 DEC-07DEC-072. D/CWBSETCL

PGCIL is executing the work as a deposit work of WBPDCL.The work is stalled due to repeated theft. WBPDCL asked PGCILto take up with the present vendor for resumption of work or deploya new vendor by cancelling the existing contract.

224220Santaldhi TPS-Bishnupur 347 347 325 193 OCT-083. D/CWBSETCL

Remark:

Sasan UMPP (6x660 MW),PS,MP,Reliance,U1-5/14 (C),U2-12/13 (C),U3-5/13 (C),U4-3/14 (C),U5-8/14 (C),U6-3/15 (C),

Commissioned 03/13.1000765/400Bina (ICT-II) S/S 100 100 100 100 MAR-13MAR-131. PGCIL

Commissioned 3/12.13400LILO of both ckt Vindhyachal -Jabalpur atSasan

26 26 26 13 MAR-12MAR-122. 2xD/CPGCIL

Commissioned 01/13.1400Bina - Bina (MPPTCL) 6 6 6 1 JAN-13DEC-12 JAN-133. D/CPGCIL

Commisisoned 03/1250400Indore - Indore (MPPTL)(Partly) 139 139 139 98 MAR-12MAR-124. D/CPGCIL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 53 of67

Page 54: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 09/13.334765Fatehpur- Agra line-II 896 896 896 334 SEP-13DEC-12 SEP-135. S/CPGCIL

Commissioned 12/12.241765Sasan - Satna line -I 689 689 689 241 DEC-12DEC-12 DEC-126. S/CPGCIL

Commissioned 4/13.242765Sasan - Satna line -II 670 670 670 242 APR-13APR-137. S/CPGCIL

Commissioned 05/13.355765Sasaram - Fatehpur line-II 954 954 954 355 MAY-13MAY-138. S/CPGCIL

Line commissioned in Jan'12(charged at 400 KV)274765Satna - Bina line -I 738 738 738 274 JAN-12MAR-129. S/CPGCIL

Commissioned 6/12276765Satna - Bina line -II 737 737 737 276 JUN-12JUN-1210. S/CPGCIL

Commissioned 8/12.1000765/400Bina. S/S 100 100 100 100 AUG-12AUG-1211. PGCIL

Commissioned 03/13.2x1500765/400Gwalior 100 100 100 100 MAR-13MAR-1312. PGCIL

Commissioned 06/13.1500765/400Indore (1st Trf.) 100 100 100 100 JUN-13JUN-1313. PGCIL

ICT-I Commissioned 6/12.1000765/400Satna (1st ICT) 100 100 100 100 JUN-12JUN-1214. PGCIL

2nd Ckt Commissioned 06/13.50400Indore - Indore Ckt-II 139 139 139 50 JUN-13JUN-1315. D/CPGCIL

Commissioned 09/13.1500765/400Indore (2nd Trf.) 100 100 100 100 SEP-13SEP-1316. PGCIL

Commissioned 8/12.1000765/400Satna (2nd ICT) 100 100 100 100 AUG-12AUG-1217. PGCIL

Remark:

Satpura Ext TPS (250 MW),SS, MP,MPPGCL, U10-3/13 (C), U11-12/13(C),

Commissioned 03/15.482400Satpura - Ashta 651 651 651 482 MAR-15MAR-151. D/CKPTL

Commissioned 02/15.199220Ashta - Indore - II (Jetpura) 317 317 317 199 FEB-15FEB-152. S/C onD/C

MPPTCL

Commissioned 10/11160220/132Ashta (Add.) Trf. S/S 100 100 100 100 OCT-11OCT-113. MPPTCL

Commissioned 09/13.315400/220Ashta New S/S 100 100 100 100 SEP-13SEP-134. MPPTCL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 54 of67

Page 55: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 01/15.315400/220Ashta New (2nd Trf.) 100 100 100 100 JAN-15JAN-155. MPPTCL

Remark:

Shapoorji Pallonji,Kodinar,(2x660),PS,Guj, SPEPL. U1-5/15,U2-8/15,

Generation project is delayed so this evacuation line will be in linewith the generation project

220400Shapoorji Pallonji generating station MAR-161. D/CGETCO

Remark:

Sholapur TPP (2x660 MW),CS, Maha, TPL, U1 & U2,

Foundation commenced from Nov'15.22400Sholapur STPP - Sholapur line - II 35 8 MAR-17 MAR-171. D/CPGCIL

Ready for commissioning 04/15.22400Sholapur STPP - Sholapur line-I 35 35 35 22 APR-15OCT-15 APR-152. D/CPGCIL

Remark:

Sikka TPP Extn, (2x250 MW) SS, Gujarat, GSECL, U3 -3/15 (C),U4,

WIP. Case of 6 locations is pending in district court120220LILO of Jamnagar - Jetpur line-II at Sikka 187 170 162 43 MAR-161. D/CGETCO

Commissioned 08/15.157220Sikka - Moti Paneli line 259 259 259 157 AUG-15AUG-152. D/CGETCO

Remark:

Simhapuri PH-I,(150 MW),PS,U2-7/12(C),

Commissioned 3/1226400Simhapuri-Nellore 26 MAR-12MAR-121. S/CMEL

Remark:

Singareni Colleries Generation Project (2x 600 MW), Telangana,

Work awarded to L&T/KEC in 9/2015 with completion period of 15months.

298400Singareni - Nirmal 174 JUN-171. D/CTSTRANSC

Commissioned 11/15.325400Singareni TPS (Jaipur TPP) - Gajwel 459 459 459 325 NOV-15NOV-152. D/CTSTRANSC

Site handed over.630400/220630 MVA, 440/220 kV Nirmal S/S 100 JUN-173. TSTRANSC

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 55 of67

Page 56: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

Singhitarai TPP (2x600 MW),PS,Chg,, Athena Chhg Power Ltd.,U1-6/13,U2-11/13,

50400Athena Singhitarai - Raigarh PoolingStation (near Kotra)

75 75 73 40 SEP-151. D/C

Remark:

Singoli Bhatwari HEP (3x33MW)PS,UK,L&T,U1,2 &3,2017-18,

Construction of line as per Schedule of construction of Singoli HEPand to be constructed by L&T.

5220LILO of Baramwari - Srinagar at SingoliBhatwari

OCT-161. D/CPTCUL

Remark:

Sorang HEP (2x50 MW),PS,HP,HSPCL, U1- 9/15, U 2-9/15 2015-16,

Commissioned 10/15.7400LILO of one ckt Karcham wangto -Abdullapur at Sorang HEP

11 11 11 7 OCT-15OCT-151. D/CHSPPL

Remark:

Srinagar HEP, (4x82.5 MW),PS,UK,AHPC Ltd.,U1-4/15 (C) ,U2-6/15 (C), U3-4/15 (C)U4-6/15 (C),

28400Srinagar HEP - Sringar 400 kV S/S. 39 9 DEC-151. D/CPTCUL

Commissioned 11/14.7400LILO of Muzaffarnagar -Vishnuprayag atSrinagar

20 20 20 7 NOV-14NOV-142. D/CUPPTCL

Remark:

Subhansiri Lower (HEP) (8x250 MW) ,CS,ArP,NHPC,Unit 1 to 8 -2018-20,

Completion uncertain. Works stand still on a/c of localmdisturbance /agitation against big dam. Generation uncertain.

334400Lower Subhansiri - Biswanath Chariyali line-I

444 329 228 64 AUG-13 MAR-151. D/CPGCIL

Completion uncertaion.Works stand still on a/c of localdisturbancec /agitation against big dam. Gen. schedule uncertain.

340400Lower Subhansiri - Biswanath Chariyali line-II

465 327 196 35 AUG-13 MAR-162. D/CPGCIL

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 56 of67

Page 57: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Suratgarh Super Critical TPS (2x660 MW),SS, Raj,RRVUNL U7 & U8,

W.O. to M/s SPIC- SMO, case for diverting route due to air force isunder process.

480400Suratgarh TPS - Babai ( Jhunjhunu) 640 555 521 125 MAR-161. D/CRVPNL

340400Suratgarh TPS- Bikaner MAR-172. D/CRVPNL

Commissioned 11/15.172400Bikaner- Merta 465 465 465 172 NOV-15MAR-14 NOV-153. S/CRVPNL

630400/220Babai S/S 100 95 80 73 MAR-164. RVPNL

Remark:

Suzlon wind farm (100 MW), PS,Kutch, GETCO, U1-5/13,

.220Suzlon wind farm - Bhachau (PG)1. D/C

Remark:

Swara Kuddu HPPCL (3x37MW), U1-12/15, U2&3:2016-17,

Delay FAC approval pending for the lest three year. Stage -Iclearance in July 2015.

400LILO of one ckt of Nathpa Jhakri -Abdullapur at Swara Kuddu

MAR-17 JUL-161. D/CHPPTCL

Remark:

Swastik TPP, (25 MW), PS,Chg, ACB, U1-12/13,

Commissioned132LILO of Korba-Mopka at Swastic TPP 1321. D/CAPL

Remark:

System Strengthening,

Commissioned 09/15.23220LILO of Korattur - Koyambedu at Alamathy(Balance Portion)

23 SEP-15SEP-151. D/CTANTRANS

145220Teesta LDP - IV - New Jalpaiguri (NJP) 250 250 250 138 SEP-08 SEP-152. D/CWBSETCL

Remark:

Talwandi Sabo TPP (3x660MW),PS,Punjab, Sterlite, U1-6/14 (C),U2-7/14,U3-10/14,

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 57 of67

Page 58: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned 09/14.630400/220Mukatsar (2x315) 100 100 100 100 SEP-14JAN-13 SEP-141. PSTCL

Commissioned 04/14.315400/220Nakodar (1st Trf.) 100 100 100 100 APR-14APR-142. PSTCL

Commissioned 04/14.128400Moga- Nakodar 178 178 178 128 APR-14APR-143. D/CPSTCL

Commissioned 01/13. (Line energised on 21.8.12 but intimated inJan 2013)

175400Talwandi Sabo - Dhuri 250 250 250 175 JAN-13JAN-134. D/CPSTCL

Commissioned 03/13.204400Talwandi Sabo - Moga 287 287 287 204 MAR-13MAR-135. D/CPSTCL

Commissioned 09/14.201400Talwandi Sabo-Mukatsar 277 277 277 201 SEP-14SEP-146. D/CPSTCL

Remark:

Tamnar TPP (4x600 MW),PS,Chatt,JPL, U1-3/14 (C),U2-3/14 (C),U3-1/15 (C),U4-3/15 (C),

Commissioned 01/15.44400Tamnar TPP - Raigarh (Tamnar) PoolingStation

67 67 67 44 JAN-15JAN-151. 2xD/CJPL

Remark:

Tanda TPP (2x660 MW), CS,UP, NTPC,,

.460400Gonda - Shahjehanpur (PG)1. D/CUPPTCL

Work not Started.120400LILO of Azamgarh - Sultanpur at Tanda2. D/CUPPTCL

200400Tanda - Gonda3. D/CUPPTCL

Remark:

Tapovan Vishnugad HEP (4x130MW), CS,UK,NTPC,U1,2,3,&4 -12/18,

Investment approval pending.400LILO of Vishnu Prayag - Muzaffarnagar atTapovan Vishnugarh HEP

MAR-151. D/CPGCIL

Investment approval pending.400Tapovan Vishnugadh - Kunwari Pass MAR-172. D/CPGCIL

Retendering is under Process.184400Kuwari Pass (Pipalkoti)-Karanprayag -Srinagar

JUN-163. D/CPTCUL

Contract has been awarded on 06.05.11 to M/s TATA Project Ltd.contract effective date is 03.09.11 and will be

2400LILO of Muzaffarnagar - Vishnu Prayag atKuwari Pass (Pipalkoti)

6 DEC-154. D/CPTCUL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 58 of67

Page 59: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

taken after award of 400 KV Pipalkoti S/s. Total Progress 11%.

Remark:

Tashiding HEP (2x48.5MW)PS,Sikkim,Shiga Energy,U1&2, 2017-18,

20220Legship - New Malli 33 MAR-161. D/C

Detailed survey along the selected transmission line route hasbeen completed. Actions for land acquisition and obtaining variousclearances as well as finalizing the design consultant are inprogress. Prior approval from CEA for installation of overheadtransmission line has also been received.Land acquisition for thefirst 7 towers is completed and Tower foundation work was startedduring the month on 4 tower locations.

14220Tashiding - Legship 212. D/C

Remark:

Teesta LD IV HEP (4x40 MW),CS,WB,NHPC,Unit 1-2:3/16, U3-4:6/16,

21220Teest LDP -III - Teesta LDP-IV 94 83 67 6 SEP-08 DEC-151. S/CWBSETCL

Remark:

Teesta Low Dam III (4x33 MW),CS,WB,NHPC, U1-1/13(C) ,(C) U2-1/13(C), U3-2/13(C), U4/13(C),

Commissioned 01/13.81220Teesta LD III-New Jalpaiguri 282 282 282 81 JAN-13DEC-09 JAN-131. S/CWBSETCL

Remark:

Teesta Stage -III (6x200 MW),PS,Sikkim,TUL,Unit- 2016-17,

GOKE Territorial Forest, MANJHA UCC Reserve Forest, GHUMSIMANA Reserve Forest (Darjeeling & Kurseong division) - " Inprinciple Approval (Stage-I)" has been accorded by MoEF, NewDelhi on 28.05.2013. (30 Towers, Total Area 47.4932 Ha.)Stage-II clearance for WB portion is pending. Kishanganj S/S

424400Teesta III - Kishanganj 571 393 371 160 MAR-161. D/CTUL

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 59 of67

Page 60: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

of PGCIL is expected to commission by Dec.15.

Remark:

Teesta VI HEP (4x125 MW), PS, M/S LANCO Urja, SIKKIM,U1-4 - 2018-19,

Detail survey completed section 164 approval received. Work yet tostarted.

25220Teesta VI HEP - Rangpo Pooling Station1. D/CLEPP

Remark:

Tehri PSP (THDC) (4x250 MW) U1-4: 5/18,

Award placed in Mar'15. Engg. in progress.1500765/400Meerut (Aug.) 100 OCT-171. PGCIL

Remark:

Thamminapatnam (Meenakshi) (2x150 MW ),PS,Ph-I,(U1-9/12,( C ) U2-4/13(C), Ph-II (U3-5/13,U4-8/13),

Commissioned 3/122400Meenakshi - Simhapuri 2 MAR-12MAR-121. D/CMEL

Commissioned 3/1226400Thamminapatnam (Meenakshi) -Nellore 26 MAR-12MAR-122. S/CMEL

Remark:

Thottiyar HEP (1x30+1x10MW)SS,Kerala, KSEB, U1, & 2 2017-18,

ATS of Thottiar HEP.May be deleted, as the work is not targeted in the Annual Plan of2015-16.

220LILO of Ldukki - Kozikode at Kodakpara1. D/CKSEB

ATS of Thottiar HEP. May be deleted, as the work is not targeted inthe Annual Plan of 2015-16.

220Thottiyar - Kodakpara MAR-172. D/CKSEB

Remark:

Tidong-I HEP (2x50MW)PS,HP,NSL,U1,&2, 2016-17,

Work yet to start220LILO of Kasang - Bhbaba at Tidong-I DEC-161. D/CHPPTCL

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 60 of67

Page 61: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Tilaiya UMPP,

765LILO of Tilaiya - Balia line at Gaya DEC-161. D/CPGCIL

Remark:

Tiroda TPP (Gondia ) PH-I (2x660 MW),PS,MAHA,ADANI,U1-9/12, (C),U2-11/12 ,PH II (3x660 MW) U1-6/13(C), U2- 8/13,U3-6/13,

218 Ckm Commissioned 8/12218400Tiroda TPP - Warora (2nd ckt) 587 587 587 218 AUG-12AUG-121. D/CAPL

Commissioned 3/13.218400Tiroda TPP -Warora (1st ckt) 587 587 587 218 MAR-13MAR-132. S/CAPL

Commissioned 03/13.500400/220Warora S/S 100 100 100 100 MAR-13SEP-12 MAR-133. MSETCL

765Aurangabad - III - Aurangabad (PG)4. 2xS/CPGCIL

Commissioned 02/14.61400Akola- I - Akola-II 90 90 90 61 FEB-14FEB-145. D/CAPL

Commissioned 02/14.361765Tiroda - Akola-II 1011 1011 1011 361 FEB-14FEB-146. S/CAPL

Commissioned 03/15.575765Tiroda - Koradi - Akola - Aurangabad lineckt-II

1582 1582 1582 575 MAR-15AUG-12 MAR-157. S/CAPL

Commissioned 02/14.1500765/400Akola -II S/S 100 100 100 100 FEB-14FEB-148. APL

Commissioned 03/15.3000765/400Koradi - III S/S 100 100 100 100 MAR-15MAR-159. APL

Commissioned 02/14.1500765/400Tiroda S/S 100 100 100 100 FEB-14FEB-1410. APL

Work in Progress.3000765/400Aurangabad - III S/S 100 88 80 67 MAR-1611. MSETCL

Remark:

Tori TPP (2x600 MW),PS,Jhh, Essar, U1-4/15,U2-8/15,

.400Tori - Jhharkhand Pooling Station1. D/CEPTCL

Remark:

Transmission System for Transfer of Power from Generation Project in SIKKIM to NR/WR Part-A,

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 61 of67

Page 62: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

19132LILO of Gangtok - Melli at Rangpo1. S/CPGCIL

Remark:

Transmission System for Transfer of Power from Generation Project in SIKKM to NR/WR Part-B,

Commissioned 11/14.7132LILO of Gangtok - Rangit at Rangpo 21 21 21 7 NOV-14 NOV-141. S/CPGCIL

Remark:

Transmission System of Phase-I Generation Projects in Orissa-Part-A,

Commissioned 05/13.44400LILO of Rourkela - Raigarh at JharsugudaPooling Stn. Ckt-II

120 120 120 44 MAY-13MAY-131. D/CPGCIL

Remark:

Tuirial HEP (2x30MW),CS,Miz,NEEPCO, U1 &2- 2016-17,

132LILO of Jiribam - Aizawl at Turial1. D/CPGCIL

132Turial HEP - Aizawl MAR-142. S/CP&ED Mizo

Remark:

Tuticorin TPS (JV) (2x500 MW), U1-3/14,U2-3/14,

Commissioned 01/12.304400Tuticorin JV - Madurai 423 423 423 304 JAN-12JAN-121. D/CPGCIL

Remark:

URI-II HEP (4x60 MW), CS,J&K,NHPC,U1-9/13(C),U2-11/13(C),U3-9/13(C),U4-2/14 (C),

Commissioned 08/11.11400URI I - URI II 32 32 32 11 AUG-11AUG-111. S/CPGCIL

Commissioned 12/11.105400URI II -Wagoora 288 288 288 105 DEC-11MAY-11 DEC-112. S/CPGCIL

Remark:

Uchpinda TPP, (4x360MW), PS,Chg, RKMPPL, U1-1/15,U2-9/15,U3-12/15,U4-3/16,

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 62 of67

Page 63: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Commissioned (Interim Arrangement)400LILO of Raigarh (Kotra) - Raipur atUchpinda (Interim Arrangement)

1. D/CRKMPPL

D/C portion of line is complete but the multi ckt portion of line isbalance.

57400Uchpinda - Raigarh line 88 88 87 41 JAN-162. D/CRKMPPL

Remark:

Udupi TPP (2x600 MW),PS,KAR,UPCL,U1-7/10(C),U2-4/11(C),

Commissioned 8/12358400Nandikur (UTPS) - Shantigrama (Hassan) 529 529 529 319 AUG-12AUG-121. D/CKPTCL

Commissioned 10/09. (For start up power)48220UTPS-Nandikur - Khemar (partly on Multi-ckt Multi - Voltage towers & partly on D/Ctowers)

919 91 91 48 OCT-09OCT-092. D/CKPTCL

Remark:

Uhl-III BVPCL HEP, (3x33.3MW),SS,HP, HPSEB,U1,2, & 3 -2016-17,

.132Uhl-III - Hamir Pur1. S/C onD/C

BVPCL

Remark: Status Not Reported.

Ukai Extn. (2x490 MW),PS,Guj,GSECL, U6-3/13(C),U7-3/13,

Commissioned 08/14.460400Kosamba-Chorania line 641 641 641 460 AUG-14JUL-11 AUG-141. D/CGETCO

Commissioned 03/13.178220Kosamba-Mobha line 300 300 300 178 MAR-13MAR-132. D/CGETCO

Commissioned 1/12.64400LILO of Asoj - Ukai at Kosamba 96 96 96 64 JAN-12JAN-123. D/CGETCO

Commissioned 03/13.145400UKai-Kosamba 215 215 215 145 MAR-13MAR-134. D/CGETCO

Remark:

Unchahar TPS (500 MW), PS,UP,NTPC,

Work under progress.60400Unchahar - Fatehpur 145 126 79 SEP-16 JUN-161. D/CPGCIL

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 63 of67

Page 64: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Utraula IIPP (2x45 MW),PS,UP,BAJAJ,U1-2/12 (C),U2-3/12(C),

Existing line.132Balrampur-Utraula line1. D/CBEPL

Remark:

Utraula TPP, (2x45 MW), PS, UP, Bajaj,

Charged on 31.10.1119132Balrampur - Utraula 56 56 56 191. S/CUPPTCL

Fdn WIP, Fdn ROW at loc. No. 32,under court case, next hearingon 01.12.15.

132Dumariaganj- - Utraula 114 109 107 32 DEC-152. S/CUPPTCL

Remark:

VallureTPS. (3x500 MW),CS,TN,NTPC,U1-2/12(C), U2-2/13(c), U3-2/14,

Commissioned 03/13.71400Vallure TPS - Melakottaiyur line 104 104 104 71 MAR-13MAR-131. D/CPGCIL

Commissioned 8/12.7400Vallur JV Project-NCTPS St.II 14 14 14 7 AUG-12MAR-11 AUG-122. D/CTANTRANS

Commissioned 7/11131400LILO of Alamathy - Sriperumbdur atVallure TPS

129 129 129 131 JUL-11JUL-10 JUL-113. D/C onM/C

PGCIL

Commissioned 03/14.42400Tiruvelam (PG) - Chitoor 59 59 59 42 MAR-14MAR-144. D/CPGCIL

Remark:

Vijayawada TPS (Extn. -IV),500 MW,SS,AP,APGENCO, -10/09 (C ),

Commissioned 02/13.147400Malkaram-Narsapur 209 209 209 147 FEB-13FEB-131. D/CAPTRANSC

Commissioned 02/13.149400Narsapur-Suryapet 199 199 199 149 FEB-13FEB-132. D/CAPTRANSC

Commissioned 02/13.226400Vijayawada TPS-Suryapeta 316 316 316 226 FEB-13JUN-11 FEB-133. D/CAPTRANSC

Commissioned 8/11.266220Vijayawada TPS-Tallapally 411 411 411 266 AUG-11JAN-11 AUG-114. D/CAPTRANSC

Commisioned 7/0924400LILO of Srisaliam -Nunaa at VijayawadaTPS

22 22 22 24 JUL-09JUL-095. M/CAPTRANSC

Remark:

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 64 of67

Page 65: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Vindhyachal-IV ,CS,MP,NTPC, U11-6/12(C) C), U12-3/13(C) Rihand - III,(1000MW each) Gen. U5- U6-11/13(C),

Commissioned 12/13.97400Bassi (PG)- Jaipur (RVPN) 765 KV line (Q) 138 138 138 97 DEC-13DEC-131. D/CPGCIL

Ready for Commissioning in 08/15.31765Rihand - Vindhyachal Pooling Station (2ndCkt)

91 91 91 31 AUG-15NOV-12 AUG-152. D/CPGCIL

Commissioned 12/12.12400Sasan - Vindhyachal Pooling station 18 18 18 12 DEC-12DEC-123. D/CPGCIL

Ready for commissioning 12/12.58400Vindhyachal-IV - Vindhyachal PoolingStation line (Q)

84 84 84 58 DEC-12DEC-124. D/CPGCIL

Commissioned 08/14.300765Satna - Gwalior line (60 Km D/C Portion)Ckt-II

782 782 782 300 AUG-14NOV-12 AUG-145. D/C+S/CPGCIL

Commissioned 03/15.271765Vindhyachal Pooling Station - Satna line (2Km D/C Portion) Ckt-I

586 586 586 271 MAR-15NOV-11 MAR-156. D/C+S/CPGCIL

Commissioned 08/15.305765Gwalior - Jaipur (Ckt 1) 834 834 834 305 AUG-15MAR-14 AUG-157. S/CPGCIL

Commissioned 06/14.31765Rihand - Vindhyachal Pooling Station (1stCkt)

91 91 91 31 JUN-14NOV-12 JUN-148. S/CPGCIL

Commissioned 12/1212765Sasan - Vindhyachal Pooling Station line 19 19 19 12 DEC-12NOV-12 DEC-129. S/CPGCIL

Commissioned 02/14.337765Satna - Gwalior line (Ckt-I) 901 901 901 337 FEB-14FEB-1410. S/CPGCIL

Commissioned 03/15.1500765/400Vindhyachal Pooling Station (ICT-I) 100 100 100 100 MAR-15NOV-12 MAR-1511. PGCIL

Commissioned 08/15.271765Vindhyachal Pooling Station - Satna Ckt-II 586 586 586 271 AUG-15AUG-1512. S/CPGCIL

Commissioned 08/15.1500765/400Vindhyachal Pooling Station (ICT-II) 100 100 100 100 AUG-15AUG-1513. PGCIL

Remark:

Visa Power TPP (2x600 MW) PS, Chh, VPL, U1 & U2,

Work is under Construction.26400Visa Power TPP - Raigarh Pooling Station 37 33 26 JUN-151. D/CVISA

Remark:

Vizag (Hinduja National Power) (2x520MW),PS,AP,U1 -3/14, U2-12/13,

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 65 of67

Page 66: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Due to standing crops and people are demanding hugcompensation than the compenasation fixed up by Revenueauthories and not allowing the works to be carried out in theirlocations. The frequent rains are also the reason for dlealy to takeup the line works.

212400Kamavarrapukota - Surypet(Kamavarrapukota - Chinnakorukondi)

248 142 111 35 SEP-15 MAR-161. D/CAPTRANSC

The works are getting delayed due to severe resistance fromfarmers and land Owners through their lands. These people aredemanding huge compensation that the compenasation fixed up byRevenue authories and not allowing the works to be carried out.Water logged areas, collasable soil, existing crops and frequentrains are also the reasons for delay to take up the line works.However, construction activity is being continued with the help ofRevenue and other conerned authorites.

712400Vizag TPP - KamavarapukotaKota 964 380 138 10 NOV-15 MAR-162. D/CAPTRANSC

Commissioned 07/15.14400Vizag TPP - Kalpaka 14 JUL-15JUL-153. D/CAPTRANSC

212400Kamavarrapukota - Surypet (Chinnakorukondi - Suryapet)

234 223 197 48 SEP-15 DEC-154. D/CTSTRANSC

462400Suryapet - Shankarpalli 656 626 553 240 NOV-155. D/CTSTRANSC

Works under progress.630400/220Kamavarapukota 100 30 40 MAR-16 MAR-166. APTRANSC

630400Shankarpally (Extn.)7. TSTRANSC

630400/220Suryapet S/S 100 98 100 85 MAR-15 DEC-158. TSTRANSC

Remark:

Wanakbori TPS, SS, Guj,GSECL, (C),

Yet to award28400LILO of Wanakbori -Soja line at Dehgam(PG) S/S

MAR-161. D/CGETCO

Yet to award280400Soja-Zerda MAR-162. D/CGETCO

Yet to award2400Wanakbori S/y -Wanakbori S/y (existing) APR-163. D/CGETCO

Yet to award200400Wanakbori TPS-Soja JUN-154. D/CGETCO

Legends

TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Page 66 of67

Page 67: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS ...cea.nic.in/reports/monthly/transmission/2015/ats-11.pdf · TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR

As on 30-NOV-2015

State/AgencyExecutingAsociated

Trans.Works

AssociatedTransmission

Lines and Substations

VoltageLevel(KV)

Ckm/MVA

Construction progress Status

Monthof

Completion

Remark

TL(Nos)/LandAcq.(%)

STC(Nos)/CivilWork(%)

TE(Nos)/Recp.Materia

l(%)

STG(Ckm)/Erection (%)

2. 1. 4. 5. 6. 7. 8. 9. 12. 13.

OriginalTargetDate

10.

RevisedTargetDate

11.

Ckts(S/C)

&(D/C)

3.

Remark:

Welspun Energy Annupur,( 2x660 MW), PS,Annupur,MB Power, U1-4/15(C),U2-3/15,

400Welspun Anuppur TPS - VindhyachalPooling Station

1. D/C

Remark:

Yermarus TPS (2 x 800 MW), Karnataka, KPCL,

Tender invited on 7.3.2015. Detailed survey under progress.400Bellary (PS) - C.N. Hally MAR-171. D/CKPTCL

Work under progress.437400Bellary (PS) - New Madhugiri (nearTumakur)

498 347 311 75 DEC-162. D/CKPTCL

LOI issued on 25-Aug-15.5400Bellary (TPS) - Bellary (PS) AUG-163. D/CKPTCL

Tender invited on 28.4.2015.20400JSW TPS - Bellary (PS) MAR-164. D/CKPTCL

Detailed survey under progress.400LILO of Both ckt of Nelamangala -Talaguppa at CN Halli

DEC-165. D/CKPTCL

Detailed survey under progress.400Termination of Nelamangala - Talaguppa atCN Halli

DEC-166. D/CKPTCL

LOI issued on 19-Oct-15. Work to be taken up.284400Yermarus TPS - Bellary Pooling Station7. D/CKPTCL

Estimate under preparation.400Yermarus TPS - Gulbarga DEC-158. D/CKPTCL

Land has been acquired.1000400/220Gulbarga S/S9. KPTCL

Remark:

Legends