TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR EVACUATION OF POWER FROM THE GENERATION PROJECTS 2020-21 28-February-2021 Associated Transmission Lines and Substations STG(C km)/Er ection State/Agen cy Executing Asociated Trans. TE(Nos)/ Recp.Ma teria Voltage Level (KV) TL(Nos)/ Land Acq. (%) STC(Nos )/Civil Work Revised Target Date Original Target Date Remark (Status of all statutory clearences particularly forest clearence and ROW problem, if any needs to be mentioned here.) Ckts (S/C) & (D/C) Construction progress Status Ckm/ MVA Month of Completio n 6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13. Adhunik Power TPP (Mahadev Prasad TPP) (2x270 MW), PS,Jhk, APCL.U1-11/12(C),U2-3/13 (C) Commissioned. 7/12 ADHUNIK JUL-12 D/C 1 1 400 1 Adhunik - Jamshedupur (PG) (Padampur) JUL-12 Remark: Agartala (AGTP) (4x21 MW), PS NEEPCO, Tripura,ST-I, 08/16 (C),ST-2,3/15(C) TSECL D/C 1 132 AGTP - Agartala line TSECL S/C 2 132 AGTP - Kumarghat line Remark: Agrartala Gas Turbine Combinedd Cycle Extension Plant Stg-1 (25.5MW) commissioned on 23.08.2015. Akaltara(Naiyara) TPP (6x600 MW), Chg, KSK, U1-8/13(c),U2-8/14(c),U3-12/17,U4-3/18,U5-9/18,U6-12/18 Ready for Commissioning 06/15. 164 JUN-15 2xD/C 1 164 164 105 400 105 KSK Mahanadi (Warda Power) - Champa Pooling Station JUN-15 Commissioned 04/15. (Interim) 118 APR-15 2xD/C 2 118 118 71 400 71 LILO of both ckt, of Raigarh - Raipur at Akaltara TPP APR-15 Remark: Alaknanda HEP (6x50 MW), PS, UK, Badrinath, Project dropped GMR D/C 1 220 Alaknanda HEP - Joshimath Remark: Generation project has been dropped. Amravati, TPS,(5x270+5x270), Phase-II-uncertain Commissioned 03/15. IBPL 279 MAR-15 D/C 1 279 279 207 400 207 Amravati - Akola (Bableshwar) - I MAR-15 Commissioned 10/12. IBPL 22 OCT-12 D/C 2 22 22 14 400 14 LILO of Koradi -Akola at Amravati OCT-12 Remark: Anpara C (2X600 MW),PS,UP,LANCO,U1&2-11/11(C) Commissioned 3/12. UPPTCL 6 MAR-12 S/C 1 6 6 1 765 1 Shifting of Anpara B-Unnao termination point from Anpara B to Anpara C sw. yard. MAR-12 Line charged at 400 kV Oct'11 UPPTCL 3 OCT-11 S/C 2 3 3 1 765 1 Shiffting of 765 kV Anpara- Unnao at Unnao OCT-11 Work completed. 6/10. LEPP JUN-10 D/C 3 400 Extn. of Bus from Anpara B to Anpara C. JUN-10 Commissioned 3/12. UPPTCL 100 MAR-12 4 100 100 1000 765/400 100 Unnao MAR-12 Remark: Anpara-D TPP (2x500 MW),SS,UP,UPRVUNL, U6-6/15 (C),U7-3/16 (C) Commissioned 06/14. UPPTCL 11 JUN-14 S/C 1 JAN-12 11 11 3 765 3 Anpara C - Anpara D JUN-14 Work in progress. All works likely to be completed by March, 21 UPPTCL 1225 MAR-21 S/C 2 APR-19 1224 1225 416 765 419 Anpara D - Unnao Commissioned 03/16. UPPTCL 23 MAR-16 D/C 3 23 23 5 400 5 Anpara B-Anpara D (Ckt-I) MAR-16 TL: Total Location 51 Page 1 of STG: Stringing Completed STC: Stubs Cast Legends TE: Towers Erected Report generated through 10.43.20 AM Friday 12 March 2021

Upload: others

Post on 15-Mar-2022

27 views

Category:

Documents


0 download

TRANSCRIPT

TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR EVACUATION OFPOWER FROM THE GENERATION PROJECTS 2020-21

28-February-2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Adhunik Power TPP (Mahadev Prasad TPP) (2x270 MW), PS,Jhk, APCL.U1-11/12(C),U2-3/13 (C)

Commissioned. 7/12ADHUNIK JUL-12D/C1 1400 1Adhunik - Jamshedupur (PG)(Padampur)

JUL-12

Remark:

Agartala (AGTP) (4x21 MW), PS NEEPCO, Tripura,ST-I, 08/16 (C),ST-2,3/15(C)

TSECL D/C1 132AGTP - Agartala line

TSECL S/C2 132AGTP - Kumarghat line

Remark: Agrartala Gas Turbine Combinedd Cycle Extension Plant Stg-1 (25.5MW) commissioned on 23.08.2015.

Akaltara(Naiyara) TPP (6x600 MW), Chg, KSK, U1-8/13(c),U2-8/14(c),U3-12/17,U4-3/18,U5-9/18,U6-12/18

Ready for Commissioning 06/15.164 JUN-152xD/C1 164164105400 105KSK Mahanadi (Warda Power) -Champa Pooling Station

JUN-15

Commissioned 04/15. (Interim)118 APR-152xD/C2 11811871400 71LILO of both ckt, of Raigarh -Raipur at Akaltara TPP

APR-15

Remark:

Alaknanda HEP (6x50 MW), PS, UK, Badrinath, Project dropped

GMR D/C1 220Alaknanda HEP - Joshimath

Remark: Generation project has been dropped.

Amravati, TPS,(5x270+5x270), Phase-II-uncertain

Commissioned 03/15.IBPL 279 MAR-15D/C1 279279207400 207Amravati - Akola (Bableshwar) -I

MAR-15

Commissioned 10/12.IBPL 22 OCT-12D/C2 222214400 14LILO of Koradi -Akola atAmravati

OCT-12

Remark:

Anpara C (2X600 MW),PS,UP,LANCO,U1&2-11/11(C)

Commissioned 3/12.UPPTCL 6 MAR-12S/C1 661765 1Shifting of Anpara B-Unnaotermination point from Anpara Bto Anpara C sw. yard.

MAR-12

Line charged at 400 kV Oct'11UPPTCL 3 OCT-11S/C2 331765 1Shiffting of 765 kV Anpara-Unnao at Unnao

OCT-11

Work completed. 6/10.LEPP JUN-10D/C3 400Extn. of Bus from Anpara B toAnpara C.

JUN-10

Commissioned 3/12.UPPTCL 100 MAR-124 1001001000765/400 100Unnao MAR-12

Remark:

Anpara-D TPP (2x500 MW),SS,UP,UPRVUNL, U6-6/15 (C),U7-3/16 (C)

Commissioned 06/14.UPPTCL 11 JUN-14S/C1 JAN-1211113765 3Anpara C - Anpara D JUN-14

Work in progress. All works likely to becompleted by March, 21

UPPTCL 1225 MAR-21S/C2 APR-1912241225416765 419Anpara D - Unnao

Commissioned 03/16.UPPTCL 23 MAR-16D/C3 23235400 5Anpara B-Anpara D (Ckt-I) MAR-16

TL: Total Location 51Page 1 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 06/14.UPPTCL 100 JUN-144 1001001000765/400 100Anpara D. S/S JUN-14

Remark:

Anuppur TPP Ph-I, (2x600 MW),PS,MP,Moser Baer Power MP, U1-4/15 (C),U2-2/15 (C)

Commissioned 11/12.MPPTCL 18 NOV-12D/C1 181816220 16LILO of Amarkantak - Korba atAnooppur

NOV-12

Commissioned 08/14.PGCIL 600 AUG-14D/C2 600600492400 492Anuppur (Moser Baer) - JabalpurPooling Station

AUG-14

Commissioned in Dec'13.PGCIL 45 DEC-13D/C3 454531400 31Jabalpur Pooling Station -Jabalpur (High Capacity) line

DEC-13

Remark:

Avantha Bhandar TPS, (2x600 MW), PS,Chhattisgarh,Korba West Power Comany Limited U1-3/14(C),

Commissioned 05/2016 (Late Reported)KWPCL 64 DEC-16D/C1 646437400 37Avantha Bhandar TPS (KorbaWest) - Raigarh (Kotra)

DEC-16

Interim arrangement.KWPCL 22 DEC-13D/C2 222210400 10LILO of on Ckt of Raigarh -Raipur at Avantha Bhandar(Korba west ) TPS

Remark:

Avantha (Jhabua Power) (2x600 MW), PS,Seoni,MP, BHEL, U1-03/14 (C)

Commissioned 05/15.JHAPL 207 MAY-15D/C1 207207131400 131Jhabua Power TPS - JabalpurPooling Station.

MAY-15

Remark:

Babandh - (Dhenkanal) TPS , (2x660 MW), PS Orissa, Lanco Infratech U1-7/18,U2-1/19

Work yet to start.LEPP 0 DEC-16D/C1 07248400 0Babandh TPP - Angul PoolingStation

Remark:

Baghliar-II HEP (3x150MW) SS,J&K, JKPDC, U1-9/15 (C),U2-9/15(C),U3- 10/15 (C)

Ready for Commissioning 05/18.JKPDD 16 MAY-18D/C1 16168400 8LILO of one ckt. of Kishanpur -New wanpoh at Baglihar HEP

MAY-18

Remark:

Bajoli Holi HEP(3x60=180 MW), HP, GMR-BHHPPL, U1-U3 (03/20)

Work in ProgressHPPTCL 13 APR-21D/C1 OCT-18011470400 0Lahal-Chamera

Work in ProgressHPPTCL 37 JUN-20D/C2 JUL-20185936220 0Bajoli Holi HEP - Lahal GISS

Commissioned 11/20.HPPTCL 100 DEC-203 JAN-18100100630400/220 100Lahal S/S NOV-20

Remark:

Balco TPS PS,Chg,Sterlite,U1-6/15 (C),U2-3/16 (C),U3-2/14,(4x300 MW, 4x67.5 (CPP) ) 4x67.5 (C)

Commissioned 06/2016 (Late Reported).BALCO 72 DEC-16D/C1 707246400 46Balco - Dharamjaygar PoolingStation

DEC-16

commissioned 3/12 (Interim)BALCO JUN-12D/C2 35400 35LILO of one ckt of Korba -Birsinghpur at Balco

MAR-12

Remark:

Bandakhar TPP, (300 MW), PS,Chg, MCC&PL, U1-6/15 (C)

TL: Total Location 51Page 2 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 06/14.MCCPL 14 JUN-14D/C1 14146400 6LILO of ACBIL-Baraari (Bilaspur)PS at Bandakhar (Maruti CleanCoal)

JUN-14

Remark:

Banswara and Pratpgarh Wind Project

Commissioned 06/2017.RVPNL 421 JUL-17D/C1 421421181220 181Nimbahera - Pratapgarh (Part ofPratapgarh -Chittorgarh line)

JUN-17

Commissioned 06/2017.RVPNL 100 JUN-172 10010060220/132 100Pratapgarh (Upgradation)(160-100)

JUN-17

Remark:

Banswara Super Critical TPS (2x660 MW), SS,Raj, U1 & U2 -2016/2017

Commissioned 10/18.RVPNL 100 OCT-181 100100315400/220 100Jodhpur s/s (New) OCT-18

Commissioned 11/14.RVPNL 100 NOV-142 100100315400/220 100Chitorgarh S/S NOV-14

Remark:

Baradarha TPP (2x600 MW), PS,D.B.P.C.L, Dist.. Jangir Champa ,Chhattisgarh,U1-8/13, U2-2/14

Commissioned 08/14.DBPCL 54 AUG-14D/C1 545436400 36DB Power (Baradarha) - Raigarh(Kotra) Pooling Station

AUG-14

Line completed. (Interim)DBPCL 44 MAY-13D/C2 444430400 30LILO of Raigarh - Raipur (3rdCkt) at Baradhara TPP ( Interimarrangement)

Remark:

Bara TPP (3x660MW),PS,UP,PPGCL,U1-12/15(C),U2-9/16(C),U3-9/15 (C)

Karchana gantry not finalised. The projectis at stand still pending of a time extensionrequested to UPPTCL in June 2015

SEUPPTC 0 JUN-16D/C1 012480400 0Bara - Karchana

Commissioned 03/15.UPPTCL 2 MAR-15D/C2 221400 1LILO of Panki - Obra at RewaRoad

MAR-15

The project is at stand still pending of atime extension requested to UPPTCL inJune 2015

SEUPPTC 613 JUN-17S/C3 346889375765 0Mainpuri - Bara Ckt-I

Ckt-I commissioned 12/2016 and Ckt-IIReady for commissioning 12/2016

SEUPPTC 219 DEC-16D/C4 219219186400 186Mainpuri - Aligarh DEC-16

Ready for commissioning 12/2016SEUPPTC 135 DEC-172xD/C5 13513593400 93LILO of Orai - Mainpuri line atMainpuri

DEC-16

Ready for commissioning 12/2016SEUPPTC 899 DEC-16S/C6 899899377765 377Mainpuri - Bara Ckt-II DEC-16

Remark: Unit - II (660MW) commissioned on 06.09.2016.

Barauni TPS Extn (2x250, Bihar, BSPGCL,U8-12/17,U9-3/18(C)

Commissioned 10/2017 (Late Reported).BSPTCL 9 DEC-17D/C1 994220 4LILO of Both ckt. of Biharsharif -Begusarai at BTPS Extn.

DEC-17

Commissioned 06/18.BSPTCL 403 JUN-18D/C2 JUN-16403403214220 214Barauni TPS Exte. - Hazipur JUN-18

yet to be commissionedBSPTCL 903 90100300220/132 90Barauni (TPS ) (ICT)

Remark:

Barh STPP -Stage-I (3x660 MW), Stage-2 (2x660 MW), CS, Bihar, U4,5-11/13(C),U1-3/18,U2-09/18,U3-3/19

Commissioned 06/10.PGCIL 645 JUN-10D/C1 SEP-09645645488400 488Barh-Balia (Quad) JUN-10

TL: Total Location 51Page 3 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 05/15.PGCIL 944 MAY-15D/C2 AUG-14944944698400 698Barh-II - Gorakhpur MAY-15

Commissioned 6/12PGCIL 100 JUN-123 1001001250500 100Balia & Bhiwadi convertor Stn.(Pole-II)

JUN-12

Remark:

Barkhera TPP (2x45 MW), PS,UP, Bajaj,

Line energised on 13.09.2017.UPPTCL 203D/C1 203203132 129Barkhera (Bajaj) - Dohna

Remark:

Bela TPP (1x270 MW),PS,Maha,IEPL,U1-3/13(C)

Commissioned 12/15. (Only LILO Portion2x24.3 Ckm has been taken).

MSETCL 75 DEC-15D/C1 757549400 49LILO of Koradi II- Wardh(PG) atBela TPP

DEC-15

Completed (Interim)IEPL 2 NOV-12D/C2 220400 0LILO of Mouda - Wardha at Bela

Remark:

Bellary TPP (3X500 MW),SS,KAR,KPCL,U1-12/07(C),U2-6/14,U3-3/16 (C)

Commissioned 3/12KPTCL 440 MAR-12D/C1 DEC-08440440313400 313BTPS- Hiriyur MAR-12

Commissioned 6/08KPTCL 3 JUN-08D/C2 332400 2LILO of RTPS - Guttur at BTPS. JUN-08

Remark:

Bhadradri TPP (Manuguru) (4x270 MW),TSGENCO, U1-12/17,U2-2/18,U3-5/18,U4-8/18

Commissioned 02/19 (Late Reported).TSTRANS 313 DEC-19D/C1 MAR-17313313225400 225Julurupadu - Manuguru TPP NOV-19

Commissioned 12/2017(Late Reported)TSTRANS 306 OCT-17D/C2 MAR-17306306219400 219Julurupadu (QM) - Suryapet S/s JAN-18

Commissioned 07/18.TSTRANS 100 AUG-183 100100630400/220 100Julurupadu S/S JUL-18

TSTRANS4 0400400kV Suryapet Bay Extensions

Remark:

Bhasmey HEP (2x25.5 MW),PS,Sikkim,Gati Infra,U1,2&3 (2021-22)

Work yet to be awarded.GIPL MAY-182xS/C1 10220LILO of one circuit of Chujachen- Rangpo line at Bhasmay

Remark: Generation Projects stopped since Dec-16

Bhavanagar Padva (2x250MW),SS,Guj,BHEL,U1-6/16,U2-9/16

Commissioned 03/14.GETCO 139 MAR-14D/C1 13913983220 83BECL (Padva)- Sagapara line MAR-14

Commissioned 06/13.GETCO 97 JUN-13D/C2 979756220 56LILO of Savarkundla - Vartej atBECL (Padva)

JUN-13

Tender on website and last date is10.12.2018. (Risk & cost for Balance work).

GETCO 182 MAR-19D/C3 142292188220 34BECL (Padva) - Botad line

Remark:

Bhavanapaddu TPP, (2x660MW),PS, AP,East cost Energy, U1-12/17,U2-05/18

XYZ D/C1 44400Bhavanapaddu TPP - Srikakulam(PS)

Remark:

Bhawani Barrage HEP -II & III (4x15 MW), SS,TN, TANGEDCO, BB-II (U1-8/13 (C ),U2-9/13(C), BB-III (U1-12/12 (C),U2-9/13(C)

Energised on 23.08.12.TANTRAN 7 AUG-12S/C1 772110 2BKB-II Common point -Pallipalayam line

AUG-12

TL: Total Location 51Page 4 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Energised on 13.08.12.TANTRAN 36 AUG-12S/C2 363610110 10BKB-III Common point - Nallurline

AUG-12

Energised on 23.08.12.TANTRAN 40 AUG-12S/C3 40409110 9BKB-II Common point -Thirucengode line

AUG-12

Energised on 23.08.12.TANTRAN 30 AUG-12D/C4 303015110 15BKB-II - Common Point line AUG-12

Commissioned 09/13.TANTRAN 12 SEP-13D/C5 12124110 4LILO of Mettupalayam -Irumborai line at BKB-II

SEP-12

Energised on 06/11TANTRAN 10 JUN-11D/C6 10105110 5LILO of BKB-I - SP Budur at BKB-II line

JUN-11

Energised on 13.08.12.TANTRAN 13 AUG-12D/C7 13136110 6BKB-III - Common point line. AUG-12

Energised 6/12TANTRAN 69 JUN-12S/C8 696922110 22BKB-III Common point - BKB-IIline

JUN-12

Remark:

Bhusaval TPS (2x500 MW),SS,MAHA,MSPGCL,U4-3/12 (C),U5-3/12 (C)

Commissioed 11/11MSETCL 331 NOV-11D/C1 331331197220 197Bhusaval - II - Amalner NOV-11

Commissioned 12/11.MSTRANS 283 DEC-11D/C2 283283185400 185Bhusaval - II - Aurangabad DEC-11

Commissioned 4/10.MSETCL 26 APR-10D/C3 DEC-09262615400 15Bhusaval - II - existing Khadka APR-10

Commissioned 8/11.MSETCL 100 AUG-114 100100500400/220 100Bhusaval (ICT-I) S/S AUG-11

Commissioned 9/11.MSETCL 100 SEP-115 100100500400/220 100Bhusaval (ICT -II) S/S SEP-11

Remark:

Bijora Ghanmukh TPP (2x300MW), Maharashtra ,JPGPL, Uncertain

Not in STU Plan.MSETCL 0D/C1 000400JPGPL TPS Switchyard - WaroraPS (JPGPL-TBCB)

Remark:

Bina TPS (2x250 MW),PS,MP,Bina power,U1-8/12(C),U2-3/13(c )

Commissioned.JV(PG&JP JAN-15D/C1 400Termination of Ckt of above atBina (PG) & otuer ckt at Bina(MPTCL)

JAN-15

Commissioned 01/15.JV(PG&JP JAN-15D/C2 40400 40Bina TPS - Suitable location(along Bina (PG) - Bina(MPPTCL)

JAN-15

Remark:

Binjkote TPP (4x300 MW),PS,Chg,SKS Power, U1-4/17(c),U2-3/18(c), U3,4-unknown

Commissioned 05/15.SKS 93 MAY-15D/C1 939355400 55Binjkote - Raigarh (Kotra)Pooling Station

MAY-15

Remark:

Bokaro TPS

Commissioned 12/14.PGCIL 276 DEC-14D/C1 AUG-12276276200400 200Bokaro TPS Extn.- Koderma TPS DEC-14

Remark:

Bongaigaon TPS (3x250 MW),CS, Assam, NTPC, U1-6/15 (C),U2-3/17(C),U3-12/17

Kokrajhar to Bilashipara charged on24.06.16 and Bilashipara to Gauripurcharged on 14.06.2016

AEGCL 203 NOV-19S/C onD/C

1 SEP-1320320363132 63Kokrajhar - Bilashipara -Gauripur

TL: Total Location 51Page 5 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

commissioned 9/14AEGCL 195 SEP-14S/C2 19519565220 65BTPS-Agia-Sarusajai (2ndCircuit, Balance portion)

SEP-14

Line charged on 30.06.2016.AEGCL 39 JUN-16S/C onD/C

3 DEC-13393910132 10BTPS - Kokrajhar line

Commissioned 12/12.PGCIL 11 DEC-12D/C4 11116400 6Bongaigaon TPS - Bongaigaon DEC-12

Commissioned 08/19 (Late Reported).AEGCL 516 DEC-19D/C5 JUN-19516516324220 324Bongaigaon TPS - Rangia(Salakati)

NOV-19

Remark:

Budhil HEP (2x35 MW), PS, H.P., LANCO Green, U1-5/12(C),U2-5/12.(C)

Commissioned 3/12LEPP 62 MAR-12S/C onD/C

1 626240220 40Budhil -Chamera III MAR-12

Remark:

Butibori (2x300 MW) TPS Phase -II,PS,Maha,RPL,U1-8/12(C),U2-11/12

Commissioned 12/11.MSETCL DEC-11D/C1 1220 1Buttibori TPS -Buttibori-III DEC-11

Commissioned on 26.03.2013MSETCL 90 MAR-132 100100100220/132 90butibori III MAR-13

Remark:

Chamera-II HEP,CS,HP,

Commissioned 3/11.PGCIL 3 MAR-11S/C1 APR-10331400 1Chamera-II HEP (Part-I)-Chamera Pooling Station

MAR-11

Remark:

Chamera-III HEP (3x77 MW), CS,H.P.,NHPC, U1-6/12,( C) U2-6/12(C), U3-6/12 (C )

Commissioned 03/13.PGCIL 444 MAR-13D/C1 444444324400 324Chamera-II HEP - Jullandur line MAR-13

Commissioned 8/11PGCIL 46 AUG-11D/C2 464630220 30Chamera-III - Pooling StationNear Chamera-II HEP

AUG-11

Commisiioned 8/11.PGCIL 100 AUG-113 100100630400/220 100GIS Pooling Station nearChamera-II HEP

AUG-11

Remark:

Chandrapur TPS, (2x500 MW), SS, Maha, MSPGCL, U1 to 7 (C) U8-3/15 (C), U9-3/16 (C)

Commissioned 03/14.MSETCL 11 MAR-14S/C1 11114400 4Chandrapur switching Stn. -Chandrapur II S/S

MAR-14

Commissioned 4/13.MSETCL 11 SEP-13D/C2 11113400 3LILO of Chandrapur - Parli atChandrapur II

APR-13

Commissioned 01/13.MSETCL 223 JAN-13S/C3 22322376400 76Warora-Wardha(2nd Ckt) JAN-13

Commissioned 06/13.MSETCL 138 JUN-13D/C4 13713891400 91Chandrapur-II - Warora JUN-13

Priority Bay 410, 426, 408 (Tie Bay) and409 ,411, 412, 428, 429, 404, 405commissioned from 30.12.2013 to13.3.2014. In 400KV Switchyard- erectionof ICT-2 is balance. ICT-I (500 MVA)commissioned on 31-03-2018.

MSETCL 97 AUG-175 96100500400/220 85Chandrapur-II (Addl.) MAR-18

Remark:

Chango Yangthang (140 MW), PS, Spiti,HP, MPCL, Project dropped

MPCL D/C1 220Chango Yangthang - Ka DogriPooling Station

TL: Total Location 51Page 6 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

MPCL D/C2 400Ka Dogri - Jangi Pooling Station

Remark: Project has been dropped from generation program.

Chanju-I HEP (3x12 MW) on Ravi river, SS HPPTCL, IA Energy, U1,2-2/17(C), U3-9/17

Completed.HPPTCL 1D/C1 111132 1LILO of one ckt Kurthala - Bathriat Nakrot Pooling Station

MAR-17

commissioned.HPPTCL 29 MAY-16D/C2 273012132 10Chanju - Nakrot line

Remark:

Chhabra TPP Extn. (2x250 MW) SS,Raj, RRVUNL, U3-9/13(C),U4-6/14 (C)

Commissioned 8/11.RVPNL 329 AUG-11S/C1 329329101220 101Chhabra TPS - Jhalawar AUG-11

Commissioned 4/10RVPNL 803 APR-10S/C2 803803342400 342Chhabra TPS -Hindaun APR-10

Remark:

Chhabra TPS-II(2x660),SS,RRVUNL,Rajasthan, U5-4/17(c),U6-12/18

Commissioned 01/15.RVPNL 244 JAN-15D/C1 244244179400 179Chhabra TPS - Anta (Baran) JAN-15

Remark:

Chitrangi TPP Ph-I (6x660 MW), Ph-II (3x660 MW),SS,MP,Ph-I,U1-9/13,U2-12/13,U3-3/14,U4-6/14,U5-9/14,U6-12/14, Ph-II,U1-3/15,U2-6/15,U3-9/19

XYZ D/C1 765Chitrangi TPS - VindhyachalPooling Station

Remark:

Chujachen HEP (2x49.5 MW)PS,Sikkim,GIL,U1-4/13(C),U2-4/13 (C).

Line commissioned.GISL D/C1 132Chujachen HEP - Rangpo PS MAR-17

Commissioned 04/13. (Interimarrangement)

GISL 91 APR-13D/C2 919147132 47LILO of Melli - Gantok atChuzachen (LILO point atnamthang)

MAR-17

Remark:

Chutak-HEP (4x11 MW), CS, J&K, NHPC, U1-11/12( C), U2- 11/12( C), U3- 11/12(C), U4-1/13(C)

Commissioned.JKPDD 154 SEP-14S/C1 1541542766 27Gramthong -II - Sankoo MAR-17

Commissioned.JKPDD 55 OCT-12S/C2 55551066 10Chutak HEP-Kargil-I MAR-17

CommissionedJKPDD 117 SEP-14S/C3 1171172366 23Khangral - Mulbek -II MAR-17

Commissioned.JKPDD 124 SEP-14S/C4 1241242866 28Mulbek-II - Kargil -I MAR-17

Commissioned.JKPDD 29 SEP-12S/C5 2929566 5Chutak HEP-Gramthong -II MAR-17

Commissioned.JKPDD 100 SEP-146 1001006066/11 100Khangral (Bodhkharbu)

Commissioned.JKPDD 100 SEP-147 1001006066/11 100Sankoo S/S

Commissioned.JKPDD 100 SEP-158 1001006066/11 100Mulbeck

Commissioned.JKPDD 100 SEP-129 1001006066/11 100Gramthong S/S

Commissioned.JKPDD 100 SEP-1210 1001006066/11 100Kargil S/S

Remark:

Common System Associated with Costal Energen Private Ltd and Ind-Barath Power Ltd. (LTOA) Gen. Proj. in Tuticorin area Part - B..

Commissioned 11/2016.PGCIL 1000 NOV-16D/C1 SEP-1410001000731765 731Tuticorin Pooling Station -Salem Pooling Station

NOV-16

TL: Total Location 51Page 7 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Ready for commissioning 08/15.PGCIL 165 AUG-15D/C2 SEP-14165165120400 120Salem Pooling Station - Salem AUG-15

Commissioned 10/18.PGCIL 644 OCT-18S/C3 SEP-14644644243765 243Salem PS - Madhugiri PS line OCT-18

Remark:

Cosmos Sponge TPS, (1x350 MW), PS,Chh,CSPL,U1-6/13

XYZ D/C1 400CSPL TPS - Raigarh PoolingStation (Near Kotra)

Remark:

Cuddalore TPP (2x600 MW), PVT, IL&FS, SS, Tamil Nadu, U1-9/15 (C) U2-05/16

Commissioned 01/15. (Late reported.)ITPCL 138 JAN-15D/C1 13813895400 95Cuddalore - Naggapattinam AUG-16

Remark:

Dada Dhuni wale TPP, Khandwa (2x800 MW) SS,MP, U1-7/15,1U2-12/16

MPPTCL D/C1 80400Dada Dhuniwale TPP - MoondiPooling Point

MPPTCL 02 00630400/220 0Handia S/S

Commissioned 03/19.MPPTCL 100 MAR-193 MAR-19100100315400/220 100Badnawar (New) s/s MAR-19

Remark:

Damaracherla TPP (2*600+4*800), TSGenco, Telangana

TSTRANS D/C1 SEP-18310400Damaracherla TPP - Jangaon

TSTRANS D/C2 SEP-18280400Damacherla TPP - Dindi

TSTRANS D/C3 SEP-18310400Damaracherla TPP -Maheswaram (TS)

TSTRANS D/C4 SEP-18300400Damacherla TPP - Choutuppal

Remark:

Damodaram Sanjeevaiah(Krishnapatnam) TPP, (2x800MW) SS,AP, APPDCL, U1-9/14 (C), U2-3/15 (C)

Commissioned 02/15.APTRANS 281 FEB-15D/C1 281281196400 196Bonapally - Chittoor (Quad) FEB-15

Commissioned 11/12.APTRANS 112 NOV-12D/C2 11211272400 72Krishnapatnam TPS - Nellore. NOV-12

Commissioned 07/15.APTRANS JUL-15D/C3 180400 180Krishnapatnam TPS- Chittoor(Balance)

JUL-15

Remark:

Darlipalli TPS(2x800), Odissa, NTPC, U1-02/18, U2-08/18

Ready for Commissioning 04/2017PGCIL 61 APR-17D/C1 616141765 41Darlipalli TPS - Jharsuguda(Sundergarh) PS line

APR-17

Remark:

Derang TPP (2x600MW) PS, Orissa, JIPL, U1-5/14 (C), U2-1/15 (C)

Commissioned 08/14.JPL 231 AUG-14MC+D/C

1 231231154400 154Derang - Angul Pooling Station AUG-14

Remark:

DGEN TPS (3x400MW), Torrent Power Ltd, Gujarat

Work awarded to M/s Instalaciones.Inabemsa. Spian on May 2014. Routechanged after survey observations.

TOR. D/C1 220Navseri - Bhasten (DGEN TL -TBCB)

TL: Total Location 51Page 8 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

TOR. D/C2 400DGEN TPS - Bharuch/DahejPooling Station

Work awarded to M/s Instalaciones.Inabemsa. Spian on May 2014. Routechanged after survey observations.

TOR. D/C3 400DGEN - Vadodara (DGEN TL -TBCB)

TOR. 04 001500765/400 0Bharuch/Dahej

Remark:

Dhariwal TPS (2x300 MW), PS, Maharashtra, DIPL, U1-11/13(C),U2-5/14 (C)

Commissioned 09/13.DIL 29 SEP-13S/C1 292910400 10Dhariwal TPS -Channdrapur II(1st Ckt)

SEP-13

Commissioned 08/14.DIL 51 AUG-14D/C2 515131400 31LILO of one ckt of Bhadravati(PG) - Parli at Dhariwal

AUG-14

Remark:

Dharmpura TPP (4x300 MW), Jain Energy, P.S,

JAIN ETL MAR-17D/C1 400Jain Energy TPS -Dharamjaygarh Korba Poolingstation

Remark:

Dikchu HEP (2x48MW)PS,Sikkim,SKPPL,U1,U2-4/17(C)

PGCONSU MAR-19D/C1 DEC-189642132(Sikkim) Dikchu Pool - Parbingline

Completed.SIKKIM 2 FEB-17D/C2 1221400 1LILO of Teesta III - Rangpo 400kv line at Dikchu (Interimconnectivity)

PGCONSU SEP-18D/C3 DEC-1850220(Sikkim) Dikchu Pool - Rangpo(Samardong) (twin)

PGCONSU JUN-19D/C4 DEC-1846220(Sikkim) Dikchu Pool - Singhik

Yet to awardSIKKIM 0D/C5 00132Dikchu HEP - Dikchu Pool

PGCONSU 0 MAY-196 DEC-180100132/33/11 0(Sikkim) Dikchu pool (new) S/S

Remark:

Durgapur (DPL) Extn. (250 MW), SS,WB, U8-3/14 (C)

Existing line.DPL D/C1 400DPL - Bidhan nagar MAR-12

Remark:

Durgapur TPS (2x500 MW),CS,WB,DVC,U1-7/11(C),U2-3/1 (C)

Commissioned 07/13.DVC 208 JUL-13D/C1 MAY-10208208138400 138Durgapur STPS - Raghunathpur JUL-13

Commissioned 4/12.PGCIL 469 APR-12D/C2 451519276400 276Durgapur-Jamshedpur (PartLine)

APR-12

Commissioned 3/11.DVC 14 MAR-11D/C3 MAY-0914147400 7LILO of Durgapur-Jamshedpur(PG) at Durgapur STPS

JAN-11

Remark:

Dwarkesh Energy Ltd TPP (2x660 MW) PS, Khandwa, MP,

XYZ D/C1 765Dwarkesh Energy TPP - Indore

Remark:

TL: Total Location 51Page 9 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.EMCO Warora TPP (2x300 MW), PS,Maha,GMR, U1-2/13 (C),U2-8/13(C)

Commissioned 01/13.GMR 96 JAN-13D/C1 969680400 80EMCO - Bhadrawathi (PG) JAN-13

Remark:

Ennore TPP, Ennore Exp, N Chennai-III(2X660, 660, 800),TG,TANGENDCO,U1-3/20,U2-4/19;U1-9/21;U1-9/18

Work is under progress.TANTRAN 14 JUN-21D/C1 SEP-18141724400 7Ennore SEZ - North ChennaiPooling Station

Work is under progress.TANTRAN 8 JUN-21D/C2 SEP-188924400ETPS exp. - North ChennaiPooling Station

Work is under progress.TANTRAN 46 JUN-21D/C3 APR-19345624400 10ETPS exp.- Ennore SEZ

Work under progress. 765 KV side isexpected to be completed by 31.03.21 for400 KV side EOT extended upto 30.06.21

TANTRAN 90 JUN-214 MAR-21901003000765/400 80North Chennai PS (GIS)

Remark:

Gadarwara STPS-I (2x800 MW), NTPC, U1-1/18,U2-07/18

Commissioned 05/17.PGCIL 271 MAY-17D/C1 NOV-17271271187765 187Gadarwara - Jabalpor Pool line(Balance Portion from LILO ofSeoni - Bina to Jabalpur) (PWTL-TBCB)

MAY-17

Commissioned 05/18.PGCIL 269 MAY-18D/C2 NOV-17269269196400 196LILO of Wardha - Parli at WaroraPS (PWTL-TBCB)

MAY-18

Ready for Commissioning 06/18.PGCIL 837 JUN-18D/C3 NOV-17837837627765 616Gadarwara - Warora PS (PWTL-TBCB)

JUN-18

commissioned 11/2016 (Late Reported)PGCIL 43 JAN-17D/C4 434316765 16LILO of existing Seoni-Bina atGadarwara STPP

JAN-17

Commissioned 06/18.PGCIL 100 JUN-185 NOV-171001003000765/400 100Warora PS (PWTL-TBCB) JUN-18

Remark: SPV/BPC - Powergrid Warora Transmission Ltd / REC

Gadarwara STPS-II (2x800 MW), NTPC (Part-B) (TBCB)

Commissioned 04/18.PGCIL 311 APR-18D/C1 JAN-18311311236765 236Parli - Solapur (PPTL - TBCB) APR-18

Ready for Commissioning 2/11.PGCIL 15 FEB-11D/C2 JUL-10151510400 10Parli (MSETCL) - Parli (PG) FEB-11

Commissioned 06/18.PGCIL 920 JUN-18D/C3 JAN-18920920694765 694Warora PS - Parli (PPTL-TBCB) JUN-18

Commissioned 04/18.PGCIL 100 APR-184 JAN-181001003000765/400 100Parli (New) S/s (PPTL -TBCB) APR-18

Remark: SPV/BPC - Powergrid Parli Transmission Ltd / REC

GAMA CCPP (225 MW), M/s GAMA Infraprojects Ltd., UK, Module-1:4/16(C)

XYZ D/C1 3220LILO of Mahuakheraganj-Kashipur line at GAMA CCPP

Remark:

GEPL Ph -1 (2x60 MW ), U1-60 MW,9/12 (C) & Ph-2 (2x270 MW) TPS,PS,Maha,GEPL,U2-4/12(C)

Commissioned 9/14GEPL SEP-14D/C1 20220 20GEPL -MIDC S/S SEP-14

GEPL D/C2 400LILO of one ckt of Bhadrawati -Parli at GEPL TPS

Remark:

Ghatampur TPP (3x660 MW), UP, NLC JV, U1-02/22, U2-08/23, U3-02/23

To be deletedUPPTCL 0S/C1 000765Agra (UP) - Greater Noida (UP)

TL: Total Location 51Page 10 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

To be deletedUPPTCL 0S/C2 000765Ghatampur TPS - Hapur

To be deletedUPPTCL 0D/C3 000400Ghatampur TPS - Kanpur (PG)line

To be deletedUPPTCL 0S/C4 000765Ghatampur TPS - Agra (UP)

NUPDL scope.UPPTCL 05 00600400/132 0ICT at Ghatampur (3x200 MVA)s/s

Work in progress.Being constructed inTBCB mode.

UPPTCL 06 01003000765/400 0ICT at Ghatampur (2x1500MVA) s/s

Remark:

Ghazipur (2x660 MW), PS, UP, BEL Spun,

Commissioned 09/14.UPPTCL 186 SEP-14S/C1 FEB-1118618659220 59Ghazipur - Rasra SEP-14

Remark:

Goindwal Sahib (2x270MW), PS,Punjab,GVK, U1-2/16(C),U2-3/16 (C)

Ready for Commissioning 12/15.PSTCL 92 DEC-15D/C1 929255220 55Goindwal Sahib - Chola Sahib DEC-15

Ready for Commissioning 09/18(Commissioning held up due to treecutting).

PSTCL 203 SEP-18D/C2 203203129220 129Goindwal Sahib - Bottianwala SEP-18

Commissioned 8/12PSTCL 60 AUG-12D/C3 606038220 38Goindwal Sahib - SultanpurLodhi

AUG-12

Remark:

Gongri HEP (2x72 MW), PS, Arp, Dirang Energy, U1&U2 (2022-23)

DEPL D/C1 220Gongri - Dinchang PoolingStation

Remark:

Gorgi TPP (2x660MW), MP, DB Power Ltd. , Uncertain

MPPTCL D/C1 0400DBTPS - Vindhyachal PS (Quad)line

Remark:

Green Energy Corridor - I Intrastate

WIP.GETCO 2 JUL-191 JUL-191100300220/132 0Wankaner S/S (Dist. Rajkot)(GEC-I)

Remark:

Haldia TPP (2x300 MW) SS, WB, IPC(H)L. U1 - 07/16, U2 - 11/16

Under planning stage by WBSETCL.ISPAT D/C1 180220Haldia TPP - Egra

Commissioned 03/17 (Late Reported).IPCHL 15 MAY-17D/C2 15155220 5Haldia TPP (IPCL) - New Haldia(WBSETCL)

MAY-17

Remark:

Harduaganj TPS (2x250 MW),SS,UP,UPRVUNL,U8-9/11(C),U9-5/12(C)

Commissioned 11/14.UPPTCL 151 NOV-14D/C1 AUG-0915115199220 99Harduaganj - Jahangirabad NOV-14

Remark:

Harduaganj TPS Exp-II (1x660MW), UP, UPRVUNL , U-6/19

TL: Total Location 51Page 11 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Progress of OPGW stringing work on mainAligarh- Sikandrabad line completed.

UPPTCL 84 MAR-21D/C1 848450400 61LILO of one Ckt Aligarh-Sikandrabad at Harduaganj TPSLine

UPRVUNL SCOPE. Energised in Jan-19UPPTCL 0 MAR-202 0100630400/220 0ICT at Harduaganj Extn

Remark:

Hazaira CCPP (351 MW),SS,GUJ,GSECL,,GT+ST-2/12(c )

Inter connection of Utran-Kosamba chargedunder stop gap arrangement (Kosamba-Mota & Utran-Mota) on 16.06.2018 as persystem requirement.

GETCO 111 JUN-19D/C1 96182111220 42Hazaira (GSEC) - Mota

Commissioned 9/11.GETCO 211 SEP-11D/C2 APR-11211211125220 125Hazaira (GSEC)-Kosamba SEP-11

Remark:

Hindustan Electricity GCL TPP (1x350+3x379 MW), PS, Maha, U1-3/14, U2, & U3

XYZ D/C1 110400HEGCL TPP - Pune (AIS) (PG)

XYZ D/C2 400LILO of Lonikhand - Kalwa atHEGCL TPP

Remark:

Ind Barath TPP (Utkal)(2x350MW),PS,Orissa,Barath, U1-2/16(C), U2-11/17

Commissioned 06/2017 (Late Reported).IBPIL 125 OCT-17D/C1 125125124400 124Ind - Barath (Power Plant(Shahjbahal) - Jharsuguda(Sundargarh)line

OCT-17

IBPIL 72 JUN-15D/C2 727247400 47LILO of Rouekila - Raigarh at IndBarath

Remark:

Jal Churk (4x60 MW), PS,UP, M/S Jal ,

Commissioned 01/14.UPPTCL JAN-14D/C1 13220 13Churk - Robertsganj JAN-14

Remark:

Jallipa-Kapurdi TPP(8x135MW),PS,RAJ, RW Power, U1 to U8: Comm from 10/09(c) to 2/13(c)

1 ckt Commissioned 5/10RVPNL 44 MAY-10D/C1 APR-10444430400 30Rajwest- Barmer MAY-10

Commissioned 8/10RVPNL 10 AUG-08D/C2 10105220 5LILO of Giral - Barmer Ckt 1 atRaj West LTPS.

AUG-08

Commisisoned 3/12RVPNL 283 MAR-12S/C3 28328383220 83Raj West-Dhorimana MAR-12

Commissioned 5/10RVPNL 560 MAY-10D/C4 APR-09560560417400 417Rajwest- Jodhpur MAY-10

Remark:

Jawaharpur TPP, (3x660 MW), Uttar Pradesh, JVUNL, 2020-21

JAWAHAR D/C1 400Jawaharpur TPP - yet to bedecided

Being constructed in TBCB mode by PGCIL.Work in progress.

UPPTCL 47 MAR-21D/C2 474720400 13LILO Agra(South)-Fahtehabad(Agra) at Firozabad

Being constructed in TBCB mode by PGCIL.Work in progress.

UPPTCL 66 MAR-21S/C3 666630765 22LILO of Mainpuri - G Noida atJawaharpur TPS

Being constructed in TBCB mode by PGCIL.Work in progress.

UPPTCL 202 MAR-21D/C4 20220480400 60Jawahapur TPS-Firozabad Line

TL: Total Location 51Page 12 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 07/19.UPPTCL 49 AUG-19S/C5 494922220 22LILO of Mainpuri- Sikandrarao atJawarharpur TPS

JUL-19

Remark:

Jegurupadu extesion project (Phase II) GVK Group) 220 MW U (C)

Commissioned in FY 2008-09.GVKP&IL MAR-09D/C1 14400 14Jegurupadu - Vemagiri line MAR-09

Remark:

Jhajjar Mahatama Gandhi (CLP) (2x660 MW), PS, U1-1/12(C),U2-4/12(C)

Ready for commissioning 02/2016 (LateReported)

HVPNL 101 DEC-16M/C1 MAY-1310110141220 41Deepalpur-Sonepat HSIIDC Rai (terminated at Rajiv Gandhi s/s)

DEC-16

Commissioned 2/12.HVPNL 95 FEB-12D/C2 959570400 95Jhajjar - Kabulpur FEB-12

Commissioned 10/11.HVPNL 23 OCT-11D/C3 232310400 10LILO of Jhajjar (APCPL) -Daultabad line at MG Jhajjar(CLP)

OCT-11

Commissioned 11/13.HVPNL 94 NOV-13D/C4 949447220 47LLIO of Bahadurgarh- Rohtak atKabulpur

NOV-13

Commissioned 05/13.HVPNL 95 MAY-13D/C5 959525220 25Deepalpur-Barhi MAY-13

Commissioned 2/12.HVPNL 64 FEB-12D/C6 646440400 64Jhajjar -Dhanonda FEB-12

Commissoned 2/12.HVPNL FEB-12D/C7 133400Kabulpur-Deepalpur FEB-12

commissioned 2/12.HVPNL 3 FEB-12D/C8 332400 2LILO of abdullapur-Bawana atdeepalpur

FEB-12

Commissioned 09/13HVPNL 97 SEP-13D/C9 979746220 46Kabalpur - Badhan SEP-13

Commissioned 2/12.HVPNL 100 FEB-1210 100100200220/132 100Kabulpur S/S FEB-12

Commissioned 2/12.HVPNL 100 FEB-1211 100100630400/220 0Deepalpur S/S FEB-12

Commissioned 2/12.HVPNL 100 FEB-1212 100100630400/220 100Kabulpur S/S FEB-12

Commissioned 2/12.HVPNL 100 FEB-1213 100100200220/132 100Deepalpur S/S FEB-12

Remark:

Jhajjar TPS (Indira Gandhi ) TPS (3x500 MW),CS,HR,ACPCL,U1- (C),U2-(C),U3-12/12

Commissioned 2/12.HVPNL 175 FEB-12D/C1 175175136400 136Jhajjar - Daultabad FEB-12

1st cket commissioned 9/10 & 2nd ckt in11/10.

APCPL 186 NOV-10D/C2 MAR-10186186132400 132Jhajjar - Mundka NOV-10

Commissioned 3/11.DTL 100 MAR-113 100100160220/66Mundka (1st ICT) MAR-11

1st Trans. Commissioned 9/10. 2nd trf3/11.

DTL 0 MAR-114 00630400/220Mundka (2x315) S/S MAR-11

Commissioned 12/10HVPNL 0 DEC-105 00945400/220Daultabad S/S DEC-10

Commissioned 9/12.DTL 100 SEP-126 100100160220/66 100Mundka (2nd ICT) SEP-12

Remark:

Jharsuguda (Sterlite TPP),PS, Ori,Sterlite, U1-12/10(C), U2-10/10(C),U3-8/11(C),U4-6/12 (c)

Commissioned 2/11. (Interimarrangement).

SEL 85 FEB-11D/C1 858549400 49LILO of Rourkela - Raigarh atSterlite TPP (Existing line)

FEB-10

Ist ckt commissioned, 2nd cktcommissioned 8/10.

SEL AUG-102xD/C2 9220 9Sterlite TPP - Sterlite captiveplant D/C

AUG-10

TL: Total Location 51Page 13 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 03/14. (Interimarrangement).

SEL 92 MAR-14D/C3 929260400 60LILO of Rourkela - Raigarh atSterlite TPP ( 2nd LILO)

MAR-14

Transmission work not started yet. SEL willapproach CEA for approval of continuingthe LILO-II.

SEL 0D/C4 NOV-160040400Sterlite TPP - Jharsuguda (LILO-IIto Jharsuguda)

Commissioned 10/2017SEL 64 OCT-17D/C5 NOV-16646441400 47Sterlite TPP (Vedanta)-Jharsuguda (Sundergarh)(Balance portion from LILO-Ipoint to Jharsuguda)

OCT-17

Remark:

Jorethang Loop HEP (2x48MW)PS,Sikkim,DANS,U1-9/15 (C), U2-9/15 (C).

Commissioned 11/2016.(Interim connectionremoved- LILO on one ckt of New Melli -Rangpo D/C tr. Line at Jorethang ).

DEPL 35 NOV-16D/C1 353520220 20Jorethang HEP - New Melli NOV-16

Remark:

JSW Ratnagiri TPP (4x300 MW) ,PS,MAHA,JSW Energy ,U1-8/10(C),U2-12/10(C),U3-5/11(C),U4-10/11(C)

Ckt 1 commissioned 7/10 & ckt 2commissioned 8/10.

JSWEL 160 AUG-10D/C1 MAY-10160160110400 110Jaigad - New Koyna AUG-10

Commissioned 10/11.JSWEL 300 OCT-11D/C2 300300219400 218Jaigad - karad. SEP-11

Remark:

Kaiga APP (220 MW),CS,KAR,NPCIL,U4-11/10(C)

Commissioned 03/08PGCIL 422 MAR-08D/C1 422422310400 310Narendra - Davangere MAR-08

Ready for Commissioning 09/15.PGCIL 614 SEP-15D/C2 DEC-07614614420400 420Mysore - Kozhikode SEP-15

Commissioned 03/08PGCIL 100 MAR-083 100100315400/220 100Hirriyur (Extn.) S/S MAR-08

Commissioned 10/15.PGCIL 100 OCT-154 DEC-07100100630400/220 100Kozhikode S/Stn. (2x315) OCT-15

Remark:

Kakatiya TPP Extn (2x600 MW) SS,TCTL, APGENCO, U1-5/10 (C),U2-12/15 (C)

Commissioned 09/13.APTRANS 363 SEP-13D/C1 363363262400 262Bhoopalapally (Kakatiya) -Gajwel

SEP-13

Remark:

Kalisindh TPS (2x600 MW), SS,Raj,RRVUNL, U1-5/14 (C),U2-6/15 (C)

Commissioned 03/18.RVPNL 284 MAR-18D/C1 SEP-12284284106400 106Phagi (Jaipur south-765 kV)-Ajmer (Ckt. - I)

MAR-18

Commissioned 03/14.RVPNL 586 MAR-14S/C2 586586212765 212Anta - Phagi (Jaipur South Ckt-1) MAR-14

Charged at 400 kV 01/14.RVPNL 570 JAN-14S/C3 570570214765 214Anta - Phagi (Jaipur South Ckt-2)(Charged at 400 kV)

JAN-14

Commissioned 4/12.RVPNL 35 APR-12D/C4 353519220 19Kalisindh-Jhalawar line APR-12

Commissioned 11/2016 (Reported Late)RVPNL 126 DEC-16D/C5 SEP-12126126104400 104Phagi GSS (Jaipur) - Heerpuraline

DEC-16

Commissioned 03/14.RVPNL 220 MAR-14D/C6 220220159400 159Kalisndh TPS - Anta (Baran)Pooling Station (Quad)

MAR-14

Commissioned 01/16.RVPNL 100 JAN-167 100100315400/220 100Ajmer S/S JAN-16

Commissioned 02/15.RVPNL 100 FEB-158 1001003000765/400 100Phagi (jaipur South ) (2x1500 )S/S

FEB-15

TL: Total Location 51Page 14 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 02/15.RVPNL 100 FEB-159 1001003000765/400 100Anta (Distt. Banra) PoolingStation

FEB-15

Remark:

Kalpakkam PFBR (Bhavini) (500 MW)

Commissioned 8/12.PGCIL 306 AUG-12D/C1 306306160230 160Kalpakkam PFBR-Kanchepurram AUG-12

Commissioned 3/12.PGCIL MAR-12D/C2 213230 213Kalpakkam - Arni MAR-12

Line commissioned in Nov'11PGCIL 140 NOV-11D/C3 14014072230 72Kalpakkam PFBR-Sirucheri NOV-11

Remark:

Kamalanga TPP (3x350MW),PS,GMR, Orissa, U1-3/13(C),U2-9/13(C),U3-9/13

Commissioned 12/14.GMR 103 DEC-14D/C1 10310360400 60Kamalanga (GMR) - Angulpooling station

DEC-14

For start up power,work completed 5/12.GMR 3 MAY-12D/C2 331400 1LILO of Talchar -Meramundli atKamalanga TPP

Remark:

Kameng HEP,(4x150 MW) SS,ArP, NEEPCO,U1-4 (02/22)

Commissioned 03/18.PGCIL 151 MAR-18D/C1 AUG-13151151114400 114Kameng - Balipara line MAR-18

Remark:

Karcham Wangtoo HEP ( 4x250 MW)PS, HP, JKHCL, U1-5/11(C), U2-6/11( C), U3-9/11 (C), U4,9/11 (C).

Commissioned 3/11.PGCIL 395 MAR-11D/C1 SEP-11385403291400 230Abdullapur - Sonepat MAR-11

Commissioned. 7/12JV(PG&JP 518 JUL-12D/C2 518518432400 432Karcham Wangtoo-Abdullapur JUL-12

Remark:

Kasaipalli TPP (2x135 MW),PS,Cha,ACB,U1- 12/11(C),U2-6/12(C)

Commissioned 11/11.ACB NOV-11D/C1 6400 6LILO of Korba - Bhatapara atKasaipalli

NOV-11

Commissioned. 7/12ACB 181 JUL-12D/C2 181181112400 112Kasaipalli TPP -Bharai (Sipat)Pooling station

JUL-12

Remark:

Kashang-I,II & III HEP (1x65+2x65MW) on Satluj river,SS,HP,U1 -10/16 (C),U2-8/16 (C),U1-01/17 (C)

power of kashang and other generatingprojects in vicinity was planned to bepooled at Jangi pooling station, since othergenerating projects have withdrawn LTAtherefore the construction of Jangi poolingstation has been dropped for the timebeing.

HPPTCL 0D/C1 00220Kashang - Jangi Pooling Station

Commissioned 04/16.HPPTCL 100 APR-16D/C2 OCT-1510010039220 39Kashang - Bhaba (2nd Ckt) APR-16

Remark:

Kashipur CCPP (225+225 MW) (Gas),SEPL, UK, Mod-1:11/16(C)

PTCUL SEP-14D/C1 34220Kashipur - Mahuakheraganj JUL-14

Remark:

Kawai Super Critical TPS (2x660 MW),Raj, PS,Adani , Unit 1-5/13 (C),U2-12/13 (C)

Commissioned 12/12.RVPNL 46 DEC-12S/C1 464616400 16Chhabra TPS-Kawai SCTPS DEC-12

TL: Total Location 51Page 15 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 01/14.RVPNL 136 JAN-14D/C2 136136101400 101Kawai - Anta (Baran) JAN-14

Commissioned 09/2016 (Late Reported)RVPNL 100 APR-173 1001001500765/400 100Anta GSS (ICT-3) APR-17

Remark:

Khaperkheda (500 MW),SS,MAHA,MSPGCL,U1-8/11(C)

Commissioned 11/9MSETCL 8 NOV-09D/C1 883400 3LILO of Koradi - Chandrapur atKhaperkheda TPS.

NOV-09

Commissioned 3/12.MSETCL 19 MAR-122xD/C2 191912220 12Khaperkheda TPS -Khaperkheda (Existing)

MAR-12

Commissioned 12/11.MSETCL 100 DEC-113 1001001000400/220 100Khaperkheda S/S (2x500) DEC-11

Remark:

Khargone Super Critical TPP(2x660 MW),CS,MP,NTPC,U1-3/19,U2-9/19 (TBCB)

1. Forest proposal for diverted route wasdiscussed and recommended in the RECmeeting held on 11.02.2021 and Stage-Iclearance is awaited. 2. Approval for Sec-164 (diverted route) from CEA is awaited 3.A meeting was held on 12-02-2021 by theCommittee being constituted by Ministry ofPower under the chairmanship of Member(Power Systems), CEA and as directed byCommittee, KTL had submitted theUndertaking on 17-02-2021 and the NOCwas granted by Irrigation Dept on 23-02-2021

SGL 476 JUN-21D/C1 MAY-20475492379765 350Khandwa Pool - Dhule (KTL -TBCB)

Commissioned 03/20SGL 243 MAR-20D/C2 JUL-19243243180765 180Khandwa Pool - Indore (KTL -TBCB)

MAR-20

Commissioned 02/2018.SGL 21 FEB-18D/C3 FEB-18212114400 14LILO of one ckt. of Khandwa -Rajgarh at Khargone TPP (KTL -TBCB)

FEB-18

Commissioned 03/20SGL 66 MAR-20D/C4 JUL-19666650400 50Khargone TPP - Khandwa Pool(Q) (KTL - TBCB)

MAR-20

Commissioned 03/20SGL 100 MAR-205 JUL-191001003000765/400 100Khandwa PS (KTL - TBCB) MAR-20

Remark: Khargone Transmission Limited (SGL)

Kishanganga HEP (3x110MW) CS, J&K, NHPC, U1-3/18(C),2 & 3-03/18(C)

Commissioned 02/2018.PGCIL 150 FEB-18D/C1 JUL-1715015085220 85Kishanganga - Amargarh line FEB-18

Commissioned 07/19.PGCIL 252 AUG-19D/C2 MAR-18252252232220 232Kishanganga - Wagoora line JUL-19

Remark:

Koderma TPS 2x500 MW,CS,JHA,DVC,U1-7/11 (C),U2-2/13 (C)

Commissioned 5/11.PGCIL 294 MAY-11D/C1 APR-10294294222400 222Koderma-Biharshariff (Quad) MAY-11

Commissioned 8/10DVC 66 AUG-10D/C2 666632132 32LILO of Barhi-Koderma atKoderma S/S

AUG-10

Remark:

Koldam HEP (4x200 MW),CS,HP,NTPC, U3-4/15 (C), U4-6/15 (C)

Commissioned 09/14.PKTCL 423 SEP-14D/C1 SEP-08423423301400 301Koldam - Ludhinana (JV Portion) SEP-14

TL: Total Location 51Page 16 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 03/10.PGCIL 127 MAR-10D/C2 12712793400 93Koldam - Nalagarh MAR-10

Remark:

Koradi TPP Expn. (3x660 MW), SS,Maha, MSPGCL, U8-3/15 (C) ,U9-3/16 (C),U10-6/16

Commissioned 03/16.MSETCL 72 MAR-16D/C1 DEC-13727228220 28Koradi TPS-New Khaparhkeda MAR-16

Commissioned 12/2016MSETCL 111 DEC-16D/C2 11111138400 38Koradi-II - Koradi-III (Ckt-I) DEC-16

Commissioned 01/16.. (97 Ckm hadalready been taken as commissioned inMay 2015.)

MSETCL 336 JAN-16D/C3 APR-11336336144400 144Koradi TPS - Wardha JAN-16

Remark:

Korba (E) (2x250 MW), SS, Chg, U2-7/12 (C)

Commissioned 08/14.CSPTCL 505 AUG-14S/C1 MAR-12505505153220 153Korba -Vishrampur AUG-14

Remark:

Korba (W) (1x500 MW),SS,Cha,CSEB,U5-3/13(C)

Commissioned 9/12.CSPTCL 70 SEP-12D/C1 MAR-10707047400 47LILO Korba (West)-Bhilai atRaipur (CSPTCL)

SEP-12

Commissioned 12/12.CSPTCL 640 DEC-12D/C2 640640447400 447Korba (W)-Bhilai (khedamara) DEC-12

Commissioned 03/13 & 03/14. (ReportedLate)

CSPTCL 100 MAR-143 100100630400/220 100Raipur S/S (ICT I & II.) MAR-16

Remark:

Koteshwar HEP (4x100 MW),CS,UK, THDC,U3-1/12,U4-3/12.

Commissioned 6/11.PGCIL 59 JUN-112xD/C1 JUN-08595913765 13LILO of Tehri - Meerut at TehriPooling Point (to be charged at400 KV)

JUN-11

Commissioned 3/11.PGCIL 9 MAR-11D/C2 JUN-08995400 5Koteshwar -Tehri Pooling Point APR-11

Remark:

Kothagudem TPS St-VII (1x800), TPGenco, U12-07/18

Ready for Commissioning 02/18.TSTRANS 119 FEB-18D/C1 MAR-1711911978400 78Julurupadu - KTPS (Stage-VII) FEB-18

Commissioned 06/19.TSTRANS 489 JUL-19D/C2 SEP-18489489349400 349Julurupadu - Jangaon JUN-19

TSTRANS3 SEP-170400Julurupadu 2nos 400kV bay

Commissioned 05/19.TSTRANS 100 MAY-194 AUG-18100100500400/220 100Jangaon s/s (3x500) (ICT-I) MAY-19

Remark:

Koyna Left Bank PSS (2x40MW), Maharashtra, WRD Maharashtra

Commissioned 02/2017MSETCL 170 FEB-17S/C onD/C

1 17017044220 44Koyna PSS - Karad(Loc. 8 - 144)line

FEB-17

Remark: Current expenditure on the project has already reached to original administrative approved cost level hence expenditure on the project is stopped and is presently stalled since year 2015.

Kudgi TPS-I (3x800), NTPC Ltd., U1-12/16(C),U2-3/17(C),U3-11/17

Work is under progress.KPTCL 224 FEB-19D/C1 OCT-19141267159220 4Kudagi - Vajramatti line

Commissioned 12/2017.KPTCL 99 DEC-17M/C2 JUN-17999980220 80LILO of B.Bagewadi - Bijapurline at Kudgi 400kV STPP

DEC-17

Ready for Commissioning 09/16.KTCL 867 SEP-16D/C3 DEC-15867867758765 758Narendra (New) - Madhugiri(KTL - TBCB)

SEP-16

TL: Total Location 51Page 17 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Ready for Commissioning 08/15.KTCL 46 AUG-152xD/C4 FEB-15464636400 36Kudgi STPS - Narendra (KTL -TBCB)

AUG-15

Commissioned 08/16.KTCL 256 AUG-16D/C5 DEC-15256256185400 185Madhugiri - Bidadi (KTL - TBCB) AUG-16

Remark: Transmission System required for evacuation of power from Kudgi TPS (3x800 MW in Phase-I) of NTPC Ltd. (TBCB) SPV/BPC - Kudgi Transmission Company Ltd. / REC

Kundah Pumped storage HEP (4x125MW), TN, TANTRANSCO, U1,U2,U3 & U4 (03/23)

Tender in process for reach 1 & 2. Tenderto be floated for reach 3

TANTRAN 0S/C1 02380230KPSHEP - Parali lines on M/Ctowers

The existing LILO of KPSHEP - Kundah PH-III, 230 kv D/C line to Parali 400/230 kV S/S. And utilizing the existing 230kV corridorupto Parli.

TANTRAN 0D/C2 000230LILO of KPSHEP - Kundah PH-IIIat Parali (400/230 kV S/S)

Parali - Karamadai 400 kV D/C line is to runon D/C tower up to location no. 57 (Hillyterrain area) and subsequently on 400 kVM/C tower (with four circuits) uptoKaramadai 400/230 kV S/S (S/S (in Plainsarea ), which will also accommodateexisting Parali-Karamadai 400 kV D/C lineutilizing the corridor of existing Kundah PH-II-ARasur 230 kV S/C line. the lines willhave HTLS conductor.

TANTRAN 0D/C3 000400Parali - Karamadai line

Tender opened and technical bidevaluation is under process.

TANTRAN 0 MAR-224 01001000400/230 0Establishment of 400/230 kVS/S ICTs at Parali (near existingKundah PH-III

Remark:

Kundankulam - APP Transmission System - PGCIL

Commissioned 03/10.PGCIL 235 MAR-10M/C1 235235327400 327Tirunelveli - Edamon MAR-10

Commissioned 03/09.PGCIL 199 MAR-09D/C2 199199145400 145Kudankulam-Tirunelveli (Quad)1st.

MAR-09

Commissioned 03/09.PGCIL 730 MAR-09D/C3 730730533400 533Tirunelveli - Udumaplet MAR-09

Line commissioned in Nov'11.PGCIL 224 NOV-11D/C4 224224157400 157Muvattupuzha (PG) - NorthTrichur (PG)

NOV-11

Commissioned 09/19.PGCIL 447 OCT-19D/C5 SEP-19447447149400 149Edamon (KSEB) - Muvattupuzha(PG) Quad) line (1st Ckt.)

SEP-19

Commissioned 03/09.PGCIL 213 MAR-09D/C6 213213160400 160Kudankulam-Tirunelveli (Quad)2nd.

MAR-09

Commissioned 4/08.PGCIL 300 APR-08D/C7 300300213400 213LILO of Madurai - Trivandrum atTirunelveli 2 X D/C

APR-08

ICT-I Commissioned 4/08, ICT-IICommissioned 11/08.

PGCIL 100 APR-088 100100630400/220 100Tirunelveli S/S NOV-08

ICT-II commissioned in Nov'11.PGCIL 100 NOV-119 100100315400/220 100Muvattapuzha s/s (2 nd ICT) NOV-11

Commissioned 6/09.PGCIL 100 JUN-0910 100100315400/220 100Trivandrum JUN-09

Commissioned 3/09PGCIL 100 MAR-0911 100100315400/200 100Udumalpet (PG) Ext. MAR-09

Remark:

Lakhwar (300 MW) Yamuna river,UK,UJVNL - 2018-19

TL: Total Location 51Page 18 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Foundation Completed : 57Nos. Towererection : 52 Nos. Stringing :0.000 Kms

PTCUL 57 JUN-20D/C1 5211060220 0Lakhwar- Dehradun

NHPC D/C2 JAN-17220LILO of Lakhwar HEP-Muzaffarnagar at Vyasi HEP

Remark:

Lalitpur Ph-I (3x660MW), Ph-II (3x660 MW )PS,UP,BHL, U1-03/16 (C),U2-1/16(C),U3-04/16(C)

Commissioned 04/2017UPPTCL 119 APR-17D/C1 11911968220 68Maath (Mathura) -Chhata line APR-17

Commissioned 06/2017.UPPTCL 88 JUL-17D/C2 AUG-16888864400 64LILO of Agra - Muradnagar atMathura

JUN-17

Ready for commissioning 09/16.UPPTCL 955 SEP-16S/C3 AUG-16955955337765 337Lalitpur TPS - Agra (UP) Ckt-I SEP-16

Ready for commissioning 06/2017.UPPTCL 203 JUL-17D/C4 AUG-16203203139400 139Agra(UP) - Agra (South) JUN-17

Commissioned 09/16.UPPTCL 219 SEP-16D/C5 AUG-16219219156400 156LILO of 400 kV Agra (UP) -Muradnagar 400 kV S/C line atAgra (UP) 765/400 kV S/S

SEP-16

Commissioned 04/2017UPPTCL 382 APR-17S/C6 AUG-16382382142400 142Fatehabad (Agra (UP)) - Maath (Mathura) line

APR-17

Ready for Commissioning 09/16.UPPTCL 100 SEP-16D/C7 AUG-1610010073400 73LILO of one ckt of 400 kV Agra(UP) - Agra (PG) 400 kV D/C lineat Agra (UP) 765/400 kV S/S

SEP-16

Commissioned 04/2017UPPTCL 902 APR-17S/C8 AUG-16902902335765 335Lalitpur TPS - Fatehabad (Agra(UP)) Ckt-II

APR-17

Commissioned 04/2017UPPTCL 100 APR-179 AUG-16100100315400/220 100Maath (Mathura) s/s (ICT-1) APR-17

Commissioned 05/2017.UPPTCL 100 MAY-1710 100100315400/220 100Maath Mathura (New) (ICT-II) MAY-17

3x200 MVA, 400/132 KV ICTs energised on10/07/2017

UPPTCL 10011 AUG-16100100600400/132 100Agra (South) S/S JUN-17

Commissioned 09/16.UPPTCL 100 SEP-1612 AUG-161001001500765/400 100Agra (UP) S/S (ICT-I)(Fatehabad)

SEP-16

Commissioned 02/2017UPPTCL 100 FEB-1713 1001001500765/400 100Agra (UP) S/S (ICT-II)(Fatehabad)

FEB-17

Remark:

Lanco Amarkantak TPS -II, (2x660 MW), PS,Chg,LPT, U3 -11/18,U4-2/18

LEPP 96 JUN-16D/C1 1215895400 0Lanco Amarkantak - ChampaPooling Station

Remark:

Lanco Vidarbha (Dhenkanal )TPS (2x660 MW), PS,LIL, U1-12/18,U2-3/19

LEPP MAR-17D/C1 1615765LILO of Seoni - Wardha at LancoVidarbha TPS

Remark:

Lara STPP-I (2x800 MW), CS, Chh, NTPC, U1-3/18(c), U2-6/18

Ready for commissioning 06/17PGCIL 306 JUL-17D/C1 APR-17306306224400 224Lara STPS - Champa PoolingStation line (Q)

JUN-17

Commissioned 04/16.PGCIL 50 APR-16D/C2 APR-17505036400 36Lara STPS - Raigarh (Kotra) line APR-16

Remark:

Lata Tapovan (3x57 MW),CS,UK,NTPC- 2021-22

TL: Total Location 51Page 19 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Contract of transmission line has beenterminated on 23.01.2017 due to the stayorder of Hon'ble Supreme Court forConstruction of Lata Tapovan HEP(171MW)

PTCUL 0D/C1 03624220 0Lata Tapovan- Joshimath

Contract of transmission line has beenterminated on 23.01.2017 due to the stayorder of Hon'ble Supreme Court forConstruction of Lata Tapovan HEP(171MW)

PTCUL 0D/C2 0040220Joshimath - Kunwari Pass(Pipalkoti)

Remark: Contract has been terminated on 23.01.2017 as per the stay order of hon'ble Supreme Court for construction of HEP of Lata Tapovan after June 2013 natural disaster in Uttarakhand.Currently work is stalled

Loharinagpala (NTPC),CS,UK,NTPC,Unit-14/15.

The work at Pala Maneri HEP stopped asper GOI order.

PTCUL 0D/C1 0010400 0LILO of Loharinagpala -Koteshwar at Pala - Maneri

The work at Loharinagpala HEP stopped asper GOI order.

PTCUL 0D/C2 00180400 0Loharinagpala-Koteshwar line

Remark:

Lower Jurala HEP (6x40MW) SS,TCTL,TSGENCO,U1-10/15(C),U2-9/15(C),U3-1/16 (C),U4-11/15,U5-8/16 (C),U6-9/16(C).

Commissioned 12/13.APTRANS 17 DEC-13D/C1 17179220 9LILO of Veltoor -Jurala at LowerJurala HEP

DEC-13

Commissioned 05/16. (Late Reported).TSTRANS 36 MAY-16D/C2 363621220 21Lower Jurala HEP - Upper Jurala AUG-16

Remark:

Lower Kalnai (2x24MW),J&K, JKSPDC

JKPDD D/C1 6132Lower Kalnai - Thathri S/s(existing) line

Remark: Project is in initial stage of construction and recently works are stalled. Its commissioning can be assessed after restart of works.

Mahan TPP Ph-1(2x600 MW),PS, MP,ESSAR Power TCL, U1-2/13 (C), U2-9/17

Commissioned 09/18.EPTCL 942 SEP-18D/C1 942942673400 673Mahan -Sipat SEP-18

Commissioned 3/13.EPTCL 287 MAR-13D/C2 287287208400 208Gandhar-Hazira MAR-13

Commissioned 3/12. (Interim)EPTCL 67 MAR-12D/C3 676744400 44LILO of Viindhyachal -Korba lineat Mahan S/S

MAR-13

commissioned in March 2013. Reported inJuly 2015.

EPTCL 100 JUL-154 1001001000400/220 100Hazira S/S JUL-15

Remark:

Maheshwar HEP (10x40 MW),PS,MP,SMHPCL,U1 to U10 (2020-21)

Commissioned 2/12.MPPTCL 195 FEB-12D/C1 195195115220 115Maheshwar - Pithampur FEB-12

Commissioned 5/10.MPPTCL 90 MAY-10D/C2 APR-09909054220 54Maheshwar - Nimrani MAY-10

Remark:

Maithon RBTPP (2x525 MW),PS,JHA,DVC-JV TATA ,U1-6/11(C),U2-3/12 (C)

Commissioned 12/11.PGCIL 534 DEC-11D/C1 534534376400 376Maithon (RB) - Ranchi DEC-11

Commissioned 09/10PGCIL 94 SEP-10D/C2 APR-10949462400 62Maithon RB - Maithon (PG) SEP-10

Remark:

Malana - II HEP (2x50 MW)PS,HP,EPPL,U1-8/11(C),U2-8/11(C),

Commissioned 9/11.EPCL 4 SEP-11D/C1 SEP-09442220 2LILO of Allain Duhangan-Nalagarh at Chhaur

SEP-11

TL: Total Location 51Page 20 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 9/11.EPCL 51 SEP-11D/C2 515136132 36Malana - II HEP - Chhaur. SEP-11

Commissioned 9/11EPCL 0 SEP-113 0170230/132 0Chhaur SEP-11

Remark:

Malibrahmini (2x525MW),PS,Orissa, MPL,U1-3/18,U2-3/18

MPCL 100 JUL-16D/C1 8010862400 20Malibrahmani - Angul

Remark:

Malwa TPP(Shree Singaji), (2x600+2x660), SS,MP,MPPGCL, U1-11/13,U2-10/14,U3-07/18,U411/18

Commissioned 11/13.MPPTCL 397 NOV-13D/C1 397397272400 268Malwa TPP - Pithampur NOV-13

Commissioned 02/13MPPTCL 158 FEB-13D/C2 158158105400 105Malwa TPP - Chhegaon FEB-13

Commisioned 3/12MPPTCL 160 MAR-12D/C3 16016095220 95Malwa TPP - Chhegaon MAR-12

Commissioned 03/14.MPPTCL 193 MAR-14D/C4 193193128400 128Pithampur-Indore MAR-14

Commissioned 09/13.MPPTCL 9 SEP-13D/C5 996220 5LILO of both ckts of Nimrani-Julwania at Julwania

SEP-13

Commissioned 02/19.MPPTCL 203 FEB-19D/C6 20320371400 71Pithampur - Badnawar DCDS(Quad Moose ) line

FEB-19

Commissioned 11/14.MPPTCL 340 NOV-14D/C7 340340225400 225Chhegaon - Julwania NOV-14

Commissioned 02/19.MPPTCL 0 FEB-19D/C8 00281400 281Shri Singaji TPS - PithampurDCDS (QM) line

FEB-19

Commissioned 12/12.MPPTCL 100 DEC-129 100100315400/220 100Chhegaon S/S DEC-12

Commissioned 11/14.MPPTCL 100 NOV-1410 100100630400/220 100Julwania S/S NOV-14

Commissioned 4/13.MPPTCL 100 APR-1311 100100630400/220 100Pithampur S/S APR-13

Remark:

Mangaon CCPP(338 MW), PS, MH, PGPL, U1-2/13(C)

commissioned 03/16MSETCL 0D/C1 004220Mangaon CCPP(Vile)- Bhagad

Remark:

Marwa TPP (2x500 MW) SS,Chg,CSPGCL U1-3/14 (C), U2 -6/16

Commissioned 1/13. (Loc 39 to 51 chargedon 7.11.12)

CSPTCL 55 JAN-13D/C1 555528220 28Marwa - Banari (Start up power) JAN-13

Commissioned 06/13.CSPTCL 379 JUN-13D/C2 379379281400 281Marwa - Raipur (Raitha) JUN-13

Commissioned 05/15.CSPTCL 161 MAY-15D/C3 MAR-13161161116400 116LILO of One ckt of Korba (W) -Khedamara at Marwa

MAY-15

Remark:

Matrishri Usha TPP (Corporate Power) (4x270MW), U1-3/18,U2-3/19,U3,4-uncertain

CPL 293 AUG-16D/C1 274320216400 132Latehar - Namkum

CPL AUG-16D/C2 116400Corporate TPP - JharkhandPooling Station

Remark:

Mauda TPS (500 MW),Phase-II (2x660 MW) CS, Maha, NTPC, U1-4/12 (C), U2-3/13(C),U3-7/16,U4-03/17 (C)

Commissioned 3/12.PGCIL 345 MAR-12S/C1 345345124400 124Mauda - Wardha line (Quad)(Ckt-1)

MAR-12

TL: Total Location 51Page 21 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.20 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commisisoned 05/12PGCIL MAY-12S/C2 124400Mauda - Wardha (2nd Ckt) MAY-12

Remark:

Meja TPP Ph-I (2x660 MW)(UPPCL & NTPC), U1-3/18(C),U2-1/19

Ready for Commissioning 08/16.PGCIL 81 AUG-16D/C1 JUL-15818156400 56Meja - Allahabad line AUG-16

Commissioned 03/15.UPPTCL 91 MAR-15D/C2 919168400 68Rewa Road - Meza line MAR-15

Commissioned 03/15.UPPTCL 83 MAR-15D/C3 838365400 65Bara - Meza line MAR-15

Remark:

Mettur TPS Stage III (600 MW), SS,TN,U1-10/12(C)

MTPS III- Malco energised 2/11 for start uppower.

TANTRAN 9 FEB-11D/C1 993230 3LILO of MTPS -Malco at MTPSStage III

FEB-11

Commissioned 3/12TANTRAN 8 MAR-12S/C2 883230 3MTPS Stage-III - Gobi MAR-12

Commissioned 01/13.TANTRAN 325 JAN-13D/C3 325325220400 220MTPS St.III - Arasur JAN-13

Remark:

Monarchak CCPP (101 MW), CS,Tripura, NEEPCO, GT - 3/15 (C), ST - 1/16(C).

Completed 9/13TSECL 13 SEP-13D/C1 13133132 3Surajmani Nagar - Rabindranagar

MAR-17

RoW issues. TSECL has connected a portionof the said D/C line splitting the existingRokhia - Udaipur 132 KV S/C line nearMelaghar (12.178 Km distance fromMonarchak) thereby connecting Monarchakwith Rokhia and Udaipur sub-stations. Thesaid arrangement has already beencommissioned and is in operation w.e.fJanuary 2015 for evacuation of MonarchakPower.

TSECL 145 AUG-20D/C2 12815443132 15Monarchak - Surajmani Nagar

Remark:

Moti Khavdi (500 MW), PS,Guj,RPL,U1

RPTL D/C1 400Moti Khavdi TPP - Jam Nagar

Remark:

M/s Sembcorp Gayatri Power Ltd. (SGPL) (Formerly NCC Power Project Ltd.) Super-critical TPP (2x660 MW),PS,AP,Nellore, U1-11/16 (C), U2-11/16

Commissioned 03/16.PGCIL 101 MAR-16D/C1 FEB-1710110166400 66NCC gen Sw Yd. - Nellore PS line(Q)

MAR-16

Remark:

Mundra TPP & Mundra UMPP (3x660&5x800),PS,Guj, Adani & TATA, both project commissioned by 03/13(c)

Commissioned. 7/12APL 139 JUL-12D/C1 APR-11139139100400 100Mohindergarh HVDC - Bhiwani JUL-12

Commissioned. 7/12APL 15 JUL-12D/C2 APR-11151510400 10Mohindergarh HVDC-Mohindergarh HVPNl(Dhanonda)

JUL-12

Commissioned 1/13.HVPNL 219 JAN-13D/C3 219219146400 146Daultabad -Dhanonda JAN-13

Commissioned 3/12APL 2693 MAR-12BIPOLE4 269326931980500 1980+/- 500 kV Mundra - BipoleMohindergarh

MAR-12

Commissioned 4/12HVPNL 100 APR-125 100100315400/220 100Dhanoda (Mohindergarh) APR-12

TL: Total Location 51Page 22 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Mundra TPP Ph.II (2x660 MW) ,PS,GUJ,Adani ,U1-12/10(C),U2-7/11(C)

W I P / Severe RoW problemsGETCO 453 JUN-19D/C1 275997640400 0Mundra (Adani) - Zerda line 1

Commissioned 02/16. (One Circuit is viavarsana.)

GETCO 956 FEB-16D/C2 956956671400 671Mundra (Adani) - Zerda line 2 FEB-16

Remark:

Mundra UMPP WR system Strengething

Commissioned 5/12.GETCO 315 MAY-12D/C1 315315217220 217LILO of Halvad-Morbi I atBhachau

MAY-12

Severe ROW, which is being resolvedthrough the support of State Government.

PGCIL 961 MAR-21D/C2 OCT-129619616961200 691Wardha - Aurangabad (on 1200kV)

Commisisoned 7/12.PGCIL 145 JUL-12D/C3 14514582220 82LILO of both ckts of Kawas-Navsari at Navsari.

JUL-12

Commissioned 04/14.PGCIL APR-14D/C4 OCT-12118400 118Aurangabad (PG)-Aurangabad(MSETCL)

APR-14

Commissioned 12/2016. (Remainingportion was taken as commissioned asVapi-Navsari line in Mar'13)

PGCIL 567 DEC-16D/C5 OCT-12567567161400 161Navsari - Boisor line (Balanceportion )

DEC-16

Commissioned 01/14.PGCIL JAN-14D/C6 102400 102Shifting of Ankola -Aurangabad(MSETCL) to Aurangabad (PG)

JAN-14

Commissioned 5/12.GETCO 333 MAY-12D/C7 333333216220 216LILO of Halvad-Morbi II atBhachau

MAY-12

Commisisoned 7/12PGCIL 288 JUL-12D/C8 288288204400 204Gandhar - Navsari JUL-12

Remark:

Mutiara (Melamaruthur) (Coastal Energen) TPP (2x600 MW),PS,CEPL,U1-12/14 (C),U2-1/16(C)

Commissioned 10/2016CEPL 32 OCT-16D/C1 323224400 24Mutiara TPP(Coastal EnergenGen. Switchyard) - TuticorinPooling Station (Balanceportion)

OCT-16

commissioned 3/12. (Interim arrangement).CEPL MAR-12D/C2 52400 52LILO of Madurai - Tuticorin atCostal Energen

MAR-12

Remark:

Muzaffarpur TPP Exp, Kanti-II (2x195MW) CS, Bihar, JV-NTPC U3-03/15 (C), U4-3/17 (C)

Commissioned 09/14.BSPTCL SEP-14S/C1 68220 68Kanti - Darbhanga (2nd Ckt) SEP-14

Commissioned 03/16.BSPTCL MAR-16S/C2 101220 101Kanti - Gopalganj (2nd Ckt.) MAR-16

Remark:

Myntdu (Leshka) HEP (3x42 MW),SS,Meg,MeECL, U1&U2-3/13,U3-3/13 (C)

The Line was initially charged at 33 kVfrom 22.05.2010 and subsequently at 132kV on 25.11.2011.

MeECL 85 MAY-10D/C1 858553132 53Leshka Myntdu - Khliehriat MAY-10

Remark:

NABINAGAR -II STPS (3x660), CS, Bihar, NTPC, U1-1/18,U2-6/18,U3-12/18

Commissioned 07/19.PGCIL 392 AUG-19D/C1 JUN-19392392282400 282Nabinagar-II - Patna line (Q) JUL-19

Ready for Commissioning 02/18.PGCIL 245 FEB-18D/C2 245245184400 184Nabinagar-II - Gaya (Q) FEB-18

TL: Total Location 51Page 23 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Award placed in Mar'17. Engg. in progress.PGCIL 0 JUN-193 JUN-1901000400 0Bay Extn. at 765/400KV atPatna S/stn. for 400KV D/CNabinagar-II -Patna line (Q)

Remark: Associated Transmission System for NABINAGAR -II STPS (3 x 660) - PGCIL

Nabi Nagar TPP (4x250 MW), CS,Bihar, NTPC, U1-3/16(C),U2-3/17,U3-12/17,U4-05/18

Commissioned 05/12.PGCIL 216 MAY-12D/C1 216216164400 164Nabinagar - Sasaram line (Twinlapwing)

MAY-12

Remark:

Nagarjana Sagar TR HEP ( 2x25 MW),SS,AP,APGENCO,Unit-1&2-01/17(c)

Commissioned 08/14.APTRANS 34 AUG-14S/C1 343416132 16Rentachintala - NagarjunaSagar Plant

MAR-17

Commissioned 27.03.2013APTRANS 58 MAR-13S/C2 585817132 17Rentachintala - Macherla S/S MAR-17

Commissioned 11/08APTRANS 0 NOV-08D/C3 002220 2LILO of VTS - Tallapally line atRentachintala

NOV-08

Commissioned 11/08APTRANS 100 NOV-084 100100200220/132 100Rentachintala S/S NOV-08

Remark:

Naitwar Mori HEP (2x30 MW),CS,UK,SJVNL,U1&2 -12/21

Prelimnary route survey done.DPRprepared and tendering activities are yet tobe started.

PTCUL 0D/C1 00200220 0Mori -Dehradun

PTCUL 0D/C2 000220 0Naitwar Mori HEP - Mori SS

Remark:

Namrup CCGT (100 MW),SS, Assam,GT/ST,U1-10/17,U2-11/17

Commissioned 01/16.AEGCL 448 JAN-16S/C1 DEC-13448448145220 145Namrup - Mariani JAN-16

Remark:

Nasik (5x270 + 5x270) TPS, PS, Maha, India Bulls, ph-II- uncertain

Commissioned 03/14.IBPL 152 MAR-14D/C1 15215257400 57Nasik-Bableshwar (1st Ckt) MAR-14

Ready for commissioning 08/15.IBPL 152 AUG-15D/C2 15215257400 57Nasik - Bobleshwar (2nd Ckt) AUG-15

Remark:

Navapura TPP (TRN ) (2x300 MW), Chhattisgarh Pvt. Sector , TRN Energy Pvt. Ltd. U1-08/16 (C)

Commissioned 01/16.TRNE JAN-16D/C1 30400 30TRN (TPP) - Raigarh PS(Tamnar)

JAN-16

Remark: Unit-1 Commissioned on 14.08.2016.

Navbharat TPP Ph-1 (2x525 MW), PS,Chh, U1&2

EPTCL D/C1 400Navbharat TPP - Angul P.S. (PG)

Remark:

New Umtru HEP (2x20 MW),SS,Meg,MeECL,U1-4/17(C), U2-6/17(C)

TL: Total Location 51Page 24 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

1. Date of award of contract is 05.02.2016.2. Schedule date of completion work05.05.2016. 3. The 132 kV line wascompleted on 11.11.2016 andcommissioned on 25.03.2017. 4. Delay wasdue to delay in supply of conductor for lineby the vendor and also that the New UmtruHEP was not ready as this line is an ATS ofthe New Umtru HEP. 5. No issues of forestclearance. 6. Line parameter: one circuitonly of the 132 kV D/C line - 0.14 ckm and132 kV S/C line - 0.36 ckm 7. The totalexpenditure incurred is Rs. 448.76 Lakhsand is inclusive of the cost of 132 kV NewUmtru HEP - Norbong -EPIP-II line.

MeECL 1 MAR-17S/C1 110132 0New Umtru - Umtru HEP

1. Date of award of contract is 05.02.2016.2. Schedule date of completion was05.05.2016. 3. The 132 kV line wascompleted on 11.11.2016 andcommissioned on 25.03.2017. 4. Delay wasdue to delay in supply of conductor for lineby the vendor and also that the New UmtruHEP was not ready as this line is an ATS ofthe New Umtru HEP. 5. No issues of forestclearance. 6. Line parameter: one circuitonly of the 132 kV D/C line - 0.14 ckm, 132kV S/C line - 1.07 ckm 7. The totalexpenditure incurred is Rs.471.87 Lakhsand is inclusive of 132 kV New Umtru -Umtru HEP line.

MeECL 7 MAR-17D/C2 771132 1New Umtru HEP - Norbong(EPIP-II)

Remark:

Neyveli New TPP (2x500MW),CS, Tamil Nadu, NLC,U1-04/18,U2-09/18

Line charged in Jul'20 by connecting to oneckt of LILO section of Pugalur -Kalivandapattu 400 kV D/C line nearAriyalur S/s (as bays by TANTRANCO onDeposit work Basis are expected by Apr'21).

PGCIL 213 APR-21D/C1 JUL-19213213156400 147New Neyveli TPP - Ariyalur(Villupuram)

Remark:

Neyveli TPS-II Exp. (2x250MW) CS,TN, NLC, U1-1/12(C),U2-1/15 (C)

Commissioned 08/09.NLC 576 AUG-09D/C1 576576398400 398Neyveli TS-II - Pugalur AUG-09

Commissioned 08/09NLC 17 AUG-092xS/C2 17173400 3Neyveli (Exp-II) - Neyveli TS-II AUG-09

Remark:

Nigri TPP (2x660 MW), PS,MP, JPVL, U1-8/14 (C),U2-2/15 (C)

MPPTCL D/C1 400LILO of one ckt of Vindhychal -Satna at Nigrie

Commissioned 08/2014 (Late Reported)JAL FEB-17D/C2 322400 322JP Nigri TPP - Satna (PG) FEB-17

Remark:

Nilanchal TPP,(3x350MW), PS,Orissa, KVK, uncertain

TL: Total Location 51Page 25 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Work yet to Start.KVK 0 JUN-16D/C1 0016400 0LILO of Mendasal - Baripada atNilanchal TPP

Remark:

Nimoo Bazgo (NHPC) (3x15 MW),CS,J & K,NHPC,U1-11/13(C),U2-10/13(C),U3-10/13(C).

Slow progress.JKPDD 239 DEC-16S/C1 2042425166 36Kharu S/S - Himya S/S

Commissioned 12/12.JKPDD 39 DEC-12S/C2 3939766 7Leh (C.P.) - Leh S/S DEC-12

Commissioned 03/12.JKPDD 152 MAR-12S/C3 1521523166 31Nimoo S/S- Leh S/S MAR-12

Commissioned 09/12.JKPDD 77 SEP-12S/C4 77771766 17Nimoo S/S - Alachi S/S SEP-12

Commissioned.JKPDD 140 JUN-14S/C5 1401403166 31Alachi - Khalsi S/S MAR-17

Rerouting of line and ganglas s/s droped.Leh Army S/S shall be connected with LehS/S.

JKPDD 29 DEC-16S/C6 8531066 2Leh III (Army base) - Leh

Commissioned.JKPDD 107 SEP-14S/C7 1071072566 25Leh (C.P.) - Kharu S/S MAR-17

Commissioned 11/12.JKPDD 13 NOV-12S/C8 1313466 4Nimoo Bazgo HEP - Alachi NOV-11

CommissionedJKPDD 100 JUL-139 1001006066/11 100Khalsi

Commissioned 11/12.JKPDD 100 NOV-1210 100100666/11 100Alchi. S/S

JKPDD 30 JUL-1311 01006066/11 0Himya

Commissioned.JKPDD 100 JUL-1312 1001006066/11 100Nimoo S/S

Commissioned 12/12.JKPDD 100 DEC-1213 1001001366/11 100Leh

CommissionedJKPDD 100 DEC-1314 1001006066/11 100Kharu

Remark:

North Chennai TPP Stage-III (1x800MW), TN, TANGEDCO, U1-09/20

Work under progress. RoW issues in 2Locations.

TANTRAN 17 MAR-21D/C1 15200765 8NCTPS Stage-III - North Chennai(PS) line

TANTRAN 0D/C2 000765Norht Chennai (PS) - Ariyalurline

TANTRAN 03 003000765/400 0North Chennai (PS) S/S

Work under progress.TANTRAN 95 JUN-214 901003000765/400 90Ariyalur s/s

Remark:

North Chennai TPS St.II (2x600 MW),SS,TN,U1-9/13(C),U2-3/13 (C).

Commissioned 01/14.TANTRAN 161 JAN-14D/C1 JUN-1016116198400 98Alamathy -Sunguvarchatram(1st Ckt)

JAN-14

Commissioned 03/14.TANTRAN MAR-14D/C2 100400 100Alamathy -Sunguvarchatram(2nd Ckt)

MAR-14

Commissioned 01/13.TANTRAN 114 JAN-13M/C3 114114136400 136NCTPS St.II- Alamathy 400 kVS/S

JAN-13

Commissioned 11/10.TANTRAN 2 NOV-10D/C4 DEC-10222230 2LILO of NCTPS- Mosur at NCTPSStage II (for startup power)

NOV-10

Remark:

North Karanpura (3x660MW), NTPC, Adani, U1-2/20,U2-8/20,U3-2/21

TL: Total Location 51Page 26 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

a) Covid-19: Project progress affected dueto COVID-19. b) Severe ROW affected thework.

APL 3 MAR-21D/C1 OCT-200104400 0LILO of both ckt. of Ranchi -Maithon-RB line at Dhanbad(NKTL-TBCB)

a) Covid-19: Project progress includingStatutory proposals affected due to COVID-19. b) Forest Clearance: Delay in receipt ofForest clearance, around 601 days (Since20-07-19) passed against 300 days anddelayed for reasons beyond control ofNKTL. The proposal has been accepted byNodal officer after 408 days i.e. on06.08.20 & presently proposal is pendingwith DFO for further processing. in meetingof 16-03-20, 16-10-20, 29-01-21 NKTLconveyed that, NKTL had stated that NKTLwill be able to complete the NK-G line in 12months from the date of forest clearance.Anticipating the Forest Clearance by Apr-21and Completion expected by Jul-22. CEA /MOP support is requested. c) GM-JJ LandNOC & FRA Certificate from DC office: GM-JJLand NOC and FRA certificate from therespective DC of Chatra and Lateharawaited. d) Also Proposal of the Bihar stateis pending with Nodal Office for furtherProcessing.

APL 133 JUN-22D/C2 SEP-19108286185400 22North Karanpura - Gaya line(NKTL - TBCB)

a) Covid-19: Project progress includingStatutory proposals affected due to COVID-19. b) Forest Clearance: Delay in receipt ofForest clearance, around 620 days (Since01-07-19) passed against 200 days anddelayed for reasons beyond control ofNKTL. Nodal office has recommended andsubmitted PART-IV to State Government on11-11-20. However, online proposal is stillpending at Nodal office.in meeting of 16-03-20, 16-10-20, 29-01-21 NKTL conveyedthat, NKTL will be able to complete the NK-C line in 9 months from the date of forestclearance. Anticipating the ForestClearance in Apr-21 and Completionexpected by Jan-22. CEA / MOP support isrequested. c) GM-JJ Land NOC & FRACertificate from DC office: GM-JJ Land NOCfrom commissioner, Palamu office and FRAcertificate from Latehar DC offices is stillawaited.

APL 52 JAN-22D/C3 JUN-20527350400 10North Karanpura - Chandwa(Jharkhand) PS line (NKTL -TBCB)

PGCIL M/C4 DEC-1838400LILO of Gaya-Chandwa(existing)at North Karanpura STPP(Interim)

TL: Total Location 51Page 27 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

a) Covid-19: Project progress includingStatutory proposals affected due to COVID-19. b) SDM, Dhanbad, vide letter dated16.12.2020, issued order for imposition ofsection 144 at 220 kV switchyard area atDhanbad substation due to land dispute.On account of this, construction activitiesat 220 kV Switchyard area is completley onhold since 16.12.2020. Work other than220kV Switchyard completed.

APL 86 APR-215 OCT-20921001000400/220 70Dhanbad s/s (NKTL-TBCB)

Remark: SPV/BPC - North Karanpura Transco Ltd / REC

NSL TPP (2x660 MW), PS, Orrisa, NPPL,

Project Authority intimated that PGCIL yetto award construction of work.

NSLNPPL 0D/C1 0046400 0NSL TPP - Angul

Remark:

Obra-C STPP (1x660MW), UP, UPRVUNL , 2021

Work in progress.UPPTCL 389 APR-21D/C1 353459400400 118Obra-C-Jaunpur Line

Being constructed in TBCB mode by M/sAdani Transmission Ltd. Work in progress..

UPPTCL 26 MAR-21S/C2 252840765 7LILO of Anpara D-Unnao line atObra

To be deletedUPPTCL 0 MAR-20D/C3 0030400LILO of one Ckt Obra C -Jaunpurat Obra

UPRVUNL SCOPE. To be commissionedbefore MARCH-21.

UPPTCL 0 MAR-214 01003000765/400 0ICT at Obra C s/s

Remark:

OPGC TPS-II(2X660)& other projects in Odisha, Ib Valley, U3-8/18,U4-10/18

Ready for commissioned 08/2017.SGL 152 AUG-17D/C1 JUL-17152152103400 103OPGC - Jharsuguda (OGP-IITL -TBCB)

AUG-17

Commissioned 12/18.SGL 782 JAN-19D/C2 AUG-19782782610765 610Jharsuguda (Sundargarh) -Raipur (OGP-IITL - TBCB)

DEC-18

Remark: SPV/BPPC - Orissa Generation Phase-II Transmission ltd. / PFC

Orissa UMPP (Bedabahal, Orissa), (5x800MW),(Orissa Integrated Power Ltd. (OPIL)

XYZ D/C1 765Orrisa UMPP - JharsugudaPooling Station

Remark:

Painampuram TPP (2x660MW),PS,AP,Thermal power tech Development Corp (India) ltd.,U1-2/15 (C),U2-9/15 (C)

Commissioned 08/13.PGCIL 92 AUG-13D/C1 929265400 65Thermal Powertech - NellorePooling Station

AUG-13

Remark:

Pakal Dul HEP (4x250MW), J&K, JKSPDC, U,U2,U3,U4 (2023-24)

work under planning stage.JKPDD 0 DEC-19D/C1 000400Kiru HEP - Kishtwar PoolingStation (Triple HLTS Conductor)

Work under planning stage.JKPDD 0 DEC-19D/C2 000400LILO of one Ckt. of Kiru HEP -Kishtwar PS at Kwar HEP andPakal Dul HEP

JKPDD3 0400Establishment of 400 kVswitching station at Kishtwar(GIS)

TL: Total Location 51Page 28 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Palatana CCGT (2x363.3),P S,Tri,OTPC, Module-1:1/13(c), Module 2 - 11/14 (C)

Commissioned 01/15.NETC JAN-15D/C1 159400 159Azara - Bongaigaon (2nd Ckt) JAN-15

Commissioned 01/15.AEGCL 14 JAN-15D/C2 14147400 7LILO of Palatana - Bongaigaonat Azara S/S

JAN-15

Commissioned 07/14.NETC JUL-14S/C3 42400 42Byrnihat - Azara (2nd Ckt) (Partof Silchar - Azara)

JUL-14

Commissioned 8/12NETC 680 AUG-12D/C4 680680495400 495Palatana -Silchar AUG-12

Commissioned.NETC 590 FEB-13D/C5 590590428400 428Silchar - Byrnihat FEB-13

commissioned 3/13MeECL 10 MAR-13D/C6 10109400 9LILO of Palatana - Bongaigaonat Killing (Byrnihat)

MAR-13

Commissioned 03/15.NETC 442 MAR-15D/C7 DEC-14442442201400 201Azara - Bongaigaon MAR-15

Ist transformer commissioned.MeECL 100 FEB-138 100100315400/220 100Killing (Byrnihat) (Ist Trf.)S/S FEB-13

Commissioned 05/15.AEGCL 100 MAY-159 SEP-11100100630400/220 100Kukurmara (Azara) S/S MAY-15

Commissioned 01/15 (Late Reported).AEGCL 100 DEC-1910 100100100220/132 100Kukumara S/S (2x50) NOV-19

Remark:

Panan HEP (4x75MW), PS, Sikkim, HHEPL, U1-U4-03/24

HHEPL 2xD/C1 220Panan HEP - Mangan

Remark: Civil works were awarded on 22.02.2014 but project could not be started because of non availability of NWLB clearance.It was concluded that since the matter is subjudice ,commissioning can be assessed after clearance from NWLB and approach road to dam site is available.

Panki TPS Extn. (1x660 MW), UP, URVUNL, U1-09/23

to be deletedUPPTCL 0D/C1 000400Panki TPS - Panki s/s

Remark:

Parbati-II HEP (4x200), (PGCIL & JP) CS, HP, NHPC, U1 - 4 (12/21)

Commissioned 10/14.PKTCL 173 OCT-14S/C1 17317381400 81Parbati- II - Koldam line-I OCT-14

Commissioned 9/14.PKTCL 157 SEP-14S/C2 15715776400 76Parbati -II- Koldam line -II SEP-14

Remark:

Parbati-III HEP (4x130 MW),CS,HP,NHPC,U1-6/14 (C),U2-2/14 (C),U3-3/14 (C),U4-5/14 (C)

Commissioned 07/2013.PGCIL 5 JUL-13D/C1 JAN-10551400 1LILO of Parbati -II - Koldam atParbati Pooling Point.

JUL-13

Commissioned 07/2013.PGCIL 668 JUL-13D/C2 668668501400 501Parbati Pooling Point - Amritsar JUL-13

Commissioned 07/2013.PGCIL 7 JUL-13D/C3 774400 4LILO of Parbati -II - ParbatiPooling Point at Parbati -III

JUL-13

Remark:

Pare HEP (2x55MW)CS,ARP,NEEPCO,U1,2-5/18(c)

Line work completed. a) RHEP Section:Charged on 06.07.2018. b) ItanagarSection: Charged on 07.07.2018.

12 MAR-18D/C1 12125132 5LILO of Ranganadi - Itanagar atPare HEP

Line work completed. Test charged on03.03.2018.

PGCIL 10 FEB-18D/C2 10103132 3LILO of Ranganadi - Nirjuli atPare HEP

Remark:

TL: Total Location 51Page 29 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Parichha Extn. TPS (2x250 MW),SS,UP,UPRVUNL,U5-5/12(C),U6-3/13 (C)

Commissioned 12/13.UPPTCL 301 DEC-13D/C1 DEC-10301301259400 259Parichha - Mainpuri (1st Ckt.) DEC-13

Commissioned 01/14.UPPTCL 402 JAN-14D/C2 402402259400 259Paricha - Mainpuri 2nd Ckt.) JAN-14

Commissioned 3/11UPPTCL MAR-10S/C3 220Parichha - Bhauti MAR-10

Commissioned 3/12UPPTCL 606 MAR-12S/C4 606606210220 210Parichha - Banda MAR-12

Commissioned 11/2017.UPPTCL 100 NOV-175 100100315400/220 100Orai (New) (ICT-II) NOV-17

Commissioned 11/2016UPPTCL 100 NOV-166 100100315400/220 100Orai S/S (new) (ICT-I) NOV-16

Remark:

Parli TPP Expn. (250 MW), SS,Maha,MSPGCL, U8-3/16(C)

Commissioned 10/12.MSETCL 300 OCT-12M/C1 APR-11300300181220 181Parli TPS-Nanded (waghala) OCT-12

Remark:

Parnai HEP (3x12.5),JKPDC,03/22

JKPDD D/C1 30132Parnai HEP - Parnai (JKPDD)

Remark:

Part ATS for RAPP U-7&8 in Rajasthan (TBCB)

Ready for Commissioning 06/16. (RTCL).SGL 521 JUN-16D/C1 FEB-16521521402400 402RAPP - Shujalpur line (RAPPTCL -TBCB)

JUN-16

Remark: SPV/BPC - RAPP Transmission Company Ltd. / PFC

Patratu STPP (3x800 MW), Th, JV of NTPC & JBVNL, U1-05/22, U2-09/22, U3-12/22

Project is being implemented by JUSNL.Tender is likely to be floated in Jul 20.Length of line is 8ckm.

JUSNL 0 MAR-22D/C1 000400Patratu New - Patratu line

Under PPP mode (TBCB) - TransmissionLicensee Regulation 2019 has been notifiedby Hon'ble JSERC. Tender will be floated byapproval from JSERC.

JUSNL 0 MAR-22D/C2 000400Chandil New - Chaibasa (PG)line

Under PPP mode (TBCB) - TransmissionLicensee Regulation 2019 has been notifiedby Hon'ble JSERC. Tender will be floated byapproval from JSERC.

JUSNL 0 MAR-22D/C3 000400Patratu New - Chandil New line

Under PPP mode (TBCB) - TransmissionLicensee Regulation 2019 has been notifiedby Hon'ble JSERC. Tender will be floated byapproval from JSERC.

JUSNL 0 MAR-22D/C4 000400Patratu New - Kodarma (JUSNL)line

Remark:

Petronet LNG (3x395 MW), PS,Guj,PLNGL, U1,U2,U3

XYZ D/C1 400PLNGL TPP - Vadodra

Remark:

Phata Byung HEP (2x38 MW),PS, UK, Lanco, U1 & U2

Commissioned 07/20.PTCUL 260 JUN-20D/C1 JUN-19260260150220 150Rudrapur (Brahmwari) -Ghansali (Srinagar) line

JUN-20

LEPP 0 DEC-16D/C2 0208220 0Phata HEP-Baramwari (Rudrpur)

TL: Total Location 51Page 30 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 07/16.PTCUL 100 JUL-163 DEC-12100100630400/220 100Srinagar S/S JUL-16

Due to uncertainity of Phatabyung HEP ofLANCO, Substation planning is in hold.

PTCUL 04 0100100220/132 0Baramwari (GIS)

contract terminated with M/S CGL due tonon performance.

PTCUL 05 010060220/132 0Ghansali (GIS)

Remark: All construction activities on project site is on hold since Jul'17 as EPC contractor has been reffered to National company law tribunal under IBC 2016. The project is likely to becommissioned within 2 years after the restart of works.

Pipalkoti HEP (Vishnugad Pipalkoti) (THDC) ( Kuwari Pass ) (4x111 MW),SS,UK,PTCUL,U1-4 (12/22)

Work has been awarded to Tata and routealignment & survey has been completed.Line is passing through forest land andforest proposal is under process.

PTCUL 0 SEP-19D/C1 SEP-19002400Pipalkoti HEP (THDC) - Pipalkoti(Kuwari Pass) SwitchingSubstation T/line

Substation land is inside the premises ofPipalkoti HEP. Construction of Substationshall be planned as per schedule ofPipalkoti HEP (THDC) after signing ofImplementation Agreement with PTCUL.

PTCUL 02 0010400 0Pipalkot (THDC) SwitchingSubstation

Remark:

Pipavav CCPP(2x351MW),SS,Guj,GSECL,Block-1-2/14 (C), Block-2-3/13 (C).

Commissioned 06/13.GETCO 161 JUN-13D/C1 16116196220 96Otha (Mahuva) - Sagapara(Palitana)

JUN-13

Commissioned 8/12GETCO 133 AUG-12D/C2 APR-1113313381220 81LILO of Savarkundla - Mahva(otha) at Pipavav (GPPC) (line-2)

AUG-12

Ready for Commissioning 07/16.GETCO 152 JUL-16D/C3 MAR-1215215294220 94GPPC (Pipavav)- Dhokadva JUL-16

Commissioned 3/12GETCO 149 MAR-12D/C4 AUG-1014914991220 91LILO of Savarkundla - Mahva(otha) at Pipavav (GPPC) (line-1)

MAR-12

Remark:

Polavaram HEP (12x80MW),SS,AP,PPA,U1-12

The scope of the work revised due to siteconstraints. 400kV QMDC Line from 400kVPolavaram SS to 400/22/11 kVGuddigudem SS is proposed in place ofearlier approved 400kV Polavaram-K.KotaQMDC Line.Tenders floated with revisedscope of work on 28.01.2019.Tendersfinalized and LOI placed on 29,04.2019 .Line survey works completed. Works will betaken up after finalization of award ofcontract of Polavaram Hydro ElectricProject by APGENCO.

APTRANS 0 AUG-20D/C1 AUG-1900140400Polavaram-Kamavarapukota(QM)

Remark: Work is in standstill condition as review of present contract is under progress

Pragati CCGT Ph-III(4X250+2X250MW),SS,DEL,PPCL,GT1-10/10(C),GT2-2/11(C),GT3-6/12,(C)ST1-2/12(C),GT4-5/13(C),ST2-2/14 (C)

commissionedPPCL 01 00630400 0Extension of bus and connectionwith DTL Substation

Remark:

Pulichintala HEP (4x30MW),SS,TelanganA,TSGENCO,U1- 9/16 (C), U2-9/16,U 3-9/17,U4-10/17

TL: Total Location 51Page 31 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Ready for commissioning 06/2017.TSTRANS 42 JUL-17D/C1 424224220 24LILO of Chillakallu S/S -Narketpally line at HuzurnagarS/S

JUN-17

Commissioned 10/2016 (Late Reported)TSTRANS 132 NOV-16D/C2 13213274220 74Pulichintala HEP - Huzurnagarline

NOV-16

TSTRANS 0 MAR-173 0100200220/132/33 0Huzumagar S/S

Remark:

RaghunathpurTPS (2x600 MW),CS,WB,DVC,U1-8/14 (C),U2-1/16(C).

Commissioned 08/2017(Late Reported).DVC 439 SEP-17D/C1 AUG-10439439311400 311Raghunathpur TPS -Ranchi (PG) SEP-17

Commissioned 3/11. (Interim arrangement)DVC 33 MAR-11D/C2 333321400 21LILO of Maithon-Ranchi (PG) atRaghunathpur

MAR-11

Remark:

Raikheda TPP (2x685 MW), PS,Chh, GMR, U1-2/15 (C), U2-3/16 (C),

Commissioned in February 2014. Reportedin July 2015.

GMR 181 JUL-15D/C1 181181131400 131Raikheda (GMR) - Raipur PoolingStation

JUL-15

Remark:

Rajasthan New Solar and Wind Power Plant

Commissioned 04/2017RVPNL 512 APR-17D/C1 512512379400 378Bhadla-Bikaner APR-17

Commissioned 04/16.RVPNL 138 APR-16D/C2 138138102400 102LILO of one ckt Raj west -Jodhpur at Jodhpur (New)

APR-16

Commissioned 12/17 (Late Reported).RVPNL 445 MAR-18D/C3 445445420400 420Bikaner -Sikar (PG) MAR-18

Commissioned 12/20.RVPNL 446 JAN-21D/C4 DEC-20446446160400 160Ramgarh - Bhadla line (Ckt-I) DEC-20

Commissioned 01/19.RVPNL 332 FEB-19D/C5 332332234400 234Jaisalmer -2 -Barmer line JAN-19

Ready for Commissioning 08/18.RVPNL 620 AUG-18D/C6 620620447400 447Akal -Jodhpur (New) AUG-18

Ready for commissioning 12/2016.RVPNL 1 DEC-16D/C7 111220 1LILO of both ckts Ramgarh GTPS-Dechu at Ramgarh

DEC-16

Commissioned 06/16.RVPNL 105 JUN-16D/C8 10510563220 63Bhadla-Kanasar JUN-16

Commissioned 02/19.RVPNL 80 FEB-19S/C9 808023220 23Sirohi-Pindwara line FEB-19

Ready for Commissioning 11/18.RVPNL 557 DEC-18D/C10 557557405400 405LILO of Jodhpur -Merta atPooling station Badla

NOV-18

Commissioned 05/19.RVPNL 399 MAY-19D/C11 399399288400 288Barmer-Bhinmal line MAY-19

Ready for Commissioning 12/2017.RVPNL 278 DEC-17D/C12 278278198400 198Ramgarh (Jaisalmer)-Akal(Jaisalmer )

DEC-17

Commissioned 11/14.RVPNL 155 NOV-14D/C13 15515593220 93Aau-Baithwasia NOV-14

Commissioned 04/16.RVPNL 196 APR-16D/C14 196196118220 118Aau - Badisid APR-16

Ready for Commissioning 08/16.RVPNL 146 AUG-16D/C15 14614690220 90Chatrail-Ramgarh AUG-16

Commissioned 12/15.RVPNL 100 DEC-1516 100100100220/132 100Kuchera S/S DEC-15

Commissioned 02/19.RVPNL 100 FEB-1917 100100500400/220 100Jaisalmer -2 S/S FEB-19

Commissioned 06/16.RVPNL 100 JUN-1618 100100160220/132 100Kanasar S/S JUN-16

Commissioned 05/15.RVPNL 100 MAY-1519 100100160220/132 100Aau S/S MAY-15

Remark:

TL: Total Location 51Page 32 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Rajpura (NABA) TPP, (2x700MW) U1-1/13 (C) ,& U2-7/14 (C)

Commissioned 05/13.PSTCL 242 MAY-13D/C1 242242171400 171Rajpura - Dhuri MAY-13

Commissioned 05/14.PSTCL 381 MAY-14D/C2 381381279400 279Rajpura Thermal - Nakodar MAY-14

Commissioned 05/13.PSTCL 29 MAY-13D/C3 292918400 18Rajpura Thermal - Rajpura MAY-13

Commissioned 03/2017PSTCL 100 MAR-174 DEC-16100100500400/220 100Rajpura (New) (2x500) (ICT-II) MAR-17

Commissioned 06/16.PSTCL 100 JUN-165 100100500400/220 100Rajpura (New) (2x500) (ICT-I) JUN-16

Remark:

Ramgarh CCPP Extn.-III, (110+50 MW), SS,Raj, RRVUNL, (GT-3/13(C),ST-5/14 (C)

Commissioned 11/14.RVPNL 309 NOV-14D/C1 309309194220 194Ramgarh (GTPP) - Chandan NOV-14

Commissioned 12/14.RVPNL 322 DEC-14D/C2 322322202220 202Chandan - Dechu DEC-14

Commissioned 9/12.RVPNL 119 SEP-12D/C3 11911971220 71Dechu - Phalodi SEP-12

Remark:

RAMMAM-III HEP (3x40 MW), NTPC, WBSTCL (02/22)

WBSETCL D/C1 APR-1920132LILO of 132 kV One Ckt ofRammam-II - NBU at Rammam -III HEP

WBSETCL D/C2 APR-19180132Rammam-III - New Jalpaiguri

Remark: Discussion going on with WB

Rampur HEP (6x68.67 MW),CS,HP,SJVNL,U1-2/14 (C),U2-2/14 (C),U3-3/14 (C), U4-6/14(C), U5-3/14 (C), U6 - 12/14(C)

Commissioned 10/14.PGCIL OCT-14D/C1 2400 2LILO of Nathpa Jhakri - Nalagarhat Rampur (2nd Ckt balance)

OCT-14

Commissioned 02/14.PGCIL 12 FEB-14D/C2 NOV-1112125400 5LILO of Nathpa Jhakri - Nalagarhat Rampur (Loop in portion)

FEB-14

Commissioned 9/11.PGCIL 217 SEP-11D/C3 NOV-11217217156400 156Patiala - Ludhiana SEP-11

Commissioned 8/11.PGCIL 90 AUG-11D/C4 NOV-11909066400 66LILO of Patiala - Hissar atKaithal

AUG-11

Remark:

Rangit-II HEP (2x33MW)PS,Sikkim, SHPL,U1&2 (2020-21)

SHPL D/C1 220LILO of one ckt of Legship - NewMelli at Rangit-II

Remark:

Rangit-IV HEP (3x40MW),PS,Sikkim,JPCL,U1,2&3

TL: Total Location 51Page 33 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Work of 220kV line has been awarded toM/s. Ashish Infratech and completionperiod is 8 months from start of work.Generation project will take about 2? yearsfor completion as against 8 months forcompletion of associated transmission line,there will be no mismatch for evacuation ofpower. It may also be mentioned that routesurvey of transmission line has beencompleted and design work of transmissionsystem including towers (15 nos.) has alsobeen completed. 220kV GIS bays at PGCILsubstation at New Melli have also beenawarded to M/s. PGCIL as deposit work.Line length is 3.3 KM. Associatedtransmission system comprises of 220kVGIS in PH building, 3.3 km long 220kV D/Cline from PH to PGCIL pooling station atNew Melli. Work for 220kV GIS substationat PH has been awarded to M/s. Siemensand GIS equipment has already beendelivered at site.

JPCL MAR-19D/C1 157220Rangit IV - New Melli line

Work in generation project is stopped forsince 2013.

LEPP MAR-19D/C2 220Routing of one circuit ofJorthong - New Melli via Rangit -IV

Remark: Work remain suspended since Oct'13 due to fund constraints. Project is likely to be commissioned within 30 months after restart of works

Ratija ( 1x50 MW) TPS,P.S.,Spectrum Coal & Power ltd.,Chh, U1-2/13(C)

Commissioned.SCPL D/C1 24132 24Ratija - Kasiapalli MAR-17

Remark:

Ratle HEP, (4x205+1x30 MW), PS, J&K, GVK, U-I - U-5 (2023-24)

PGCIL D/C1 400LILO of one circuit of Dulhasti -Kishenpur at Ratle HEP.

PGCIL 0S/C2 00400Kishenpur - Ratle, (Dulhasti-Kishenpur Second Ckt stringingextending up to Ratle HP)

Remark: Work yet to be award.

Rayalseema ( Stage-IV) (600 MW), SS,AP,BHEL,U6-08/17

Ready for commissioning 06/2017.APTRANS 321 JUL-17D/C1 MAY-15321321429400 429Rayalaseema TPP - Chittoor line JUN-17

Remark:

Reliable TPP (RTPL), (2x660 MW), PS, MP, RTPL,U1-6/16 (Tentative), U2-12/16 (Tentative)

XYZ D/C1 765Reliable TPP - VindhyachalPooling Station

Remark:

Rewa TPP, Khandwa (2x800 MW), SS,MP

MPPTCL D/C1 180400Handia - Ashta(2nd stage)

MPPTCL D/C2 40220LILO of Handia - Barwaha atHandia

TL: Total Location 51Page 34 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 02/21.MPPTCL 152 MAR-21DCDS3 SEP-2015215253400 53Nagda - Ujjain line (GEC-I) FEB-21

Remark:

Rongnichu HEP (2x48 MW) PS,Sikkim, MBPCL,U1 & U2 (10/20)

MBPC D/C1 220Rongnichu - Rangpo PoolingStation

Remark:

Rosa TPP Extn Ph-II (2x300), PS, UP, Reliance, Northern Region, U3-12/11 (C), U4-3/12 (C)

Commissioned 04/16. (Late Reported.)UPPTCL 340 APR-16D/C1 340340216220 216Roza - Dohna AUG-16

Commissioned 3/12RPTL MAR-12D/C2 15400 15LILO of Lucknow - Bareilly atShahjahanpur

MAR-12

Commissioned in March 2012. reported injuly 2015.(Line Charged by passingShahjehanpur S/S).

RPTL JUL-15D/C3 16400 16Rosa - Shahjehanpur (PG) JUL-15

Remark:

Sagardighi TPP (2x300 MW) Phase-II(2x660 MW),SS,WBPDCL U1-12/07(C),U2-7/08(C), U3-12/15(C), U4-12/16

Commissioned 4/11.WBSETCL 340 APR-11S/C onD/C

1 DEC-08340340255400 255Sagardighi - Parulia (PGCIL) APR-11

Commissioned 10/20.WBSETCL 154 NOV-20D/C2 DEC-1915415489400 89Sagardighi TPS - Gokarna line OCT-20

Remark:

Sainj HEP (2x50 MW) on Sainj river,SS,HP,HPPCL,U-08/17

Commissioned 04/17 (Late Reported).HPPTCL 1 MAR-18D/C1 111400 1LILO of Parbati - II HEP - Parbati-III Pooling station at Sainj

MAR-18

Remark:

Salaya (Essar Power ) (2x600 MW),PS, Guj, Essar Power U1-2/12(C),U2-6/12 (C)

Commissioned 5/11.GETCO 353 MAY-11D/C1 NOV-09353353226400 226Vadinar (Essar)-Hadala MAY-11

WIPGETCO 490 DEC-18D/C2 NOV-09447533180400 235Vadinar(Essar)- Amreli(Balance)

Ready for Commissioning 09/16. (Due todelay in Essar Generation Project & nonfinalization of gentry 6 ckm work is pendingbalance 446 ckm has been test charged.

PGCIL 606 SEP-16D/C3 FEB-14606606446400 446Essar Gujarat TPS - Bachau(Tripal)

SEP-16

Commissioned 01/14.GETCO 294 JAN-14D/C4 294294117400 117Vadinar - Amreli (Part line) JAN-14

Remark:

Salora TPS (M/s Vandana Vidyut ) (2x135 MW), U2- uncertain

Target Commissioning date will beprovided after approval/receipet of loanfrom lenders.

VVL MAR-17D/C1 8460400Salora TPS - Dharamjaigarh(Korba) (PGCIL) Pooling Station

Commissioned. 7/12. (Interim )VVL JUL-12D/C2 6400 6LILO of one ckt Korba-Birsinghpur at Vandana

JUL-12

Remark:

Sandila TPP (2x660 MW), PS,UP,TPL,

TOR. D/C1 400Sandila TPP - ATS not defind

Remark: Status Not Reported (UP share 1188 MW)

TL: Total Location 51Page 35 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Santaldih TPP (250 MW),SS,WB,WBPDCL,U6-6/11(C)

Commissioned 12/07WBSETCL 152 DEC-07D/C1 15215280220 80LILO of Santaldih - Durgapur (ICkt) at Asansol

DEC-07

Commissioned 4/08WBSETCL 11 APR-08D/C2 11114220 4LILO of STPS - Arambagh atBishnupur

APR-08

Remark:

Sasan UMPP (6x660 MW),PS,MP,Reliance,U1-5/14 (C),U2-12/13 (C),U3-5/13 (C),U4-3/14 (C),U5-8/14 (C),U6-3/15 (C)

Commissioned 05/13.PGCIL 954 MAY-13S/C1 954954355765 355Sasaram - Fatehpur line-II MAY-13

Commisisoned 03/12PGCIL 139 MAR-12D/C2 13913950400 98Indore - Indore (MPPTL)(Partly) MAR-12

Commissioned 01/13.PGCIL 6 JAN-13D/C3 DEC-12661400 1Bina - Bina (MPPTCL) JAN-13

Commissioned 12/12.PGCIL 689 DEC-12S/C4 DEC-12689689241765 241Sasan - Satna line -I DEC-12

Line commissioned in Jan'12(charged at400 KV)

PGCIL 738 MAR-12S/C5 738738274765 274Satna - Bina line -I JAN-12

Commissioned 3/12.PGCIL 26 MAR-122xD/C6 262613400 13LILO of both ckt Vindhyachal -Jabalpur at Sasan

MAR-12

Commissioned 4/13.PGCIL 670 APR-13S/C7 670670242765 242Sasan - Satna line -II APR-13

Commissioned 09/13.PGCIL 896 SEP-13S/C8 DEC-12896896334765 334Fatehpur- Agra line-II SEP-13

2nd Ckt Commissioned 06/13.PGCIL 139 JUN-13D/C9 13913950400 50Indore - Indore Ckt-II JUN-13

Commissioned 6/12PGCIL 737 JUN-12S/C10 737737276765 276Satna - Bina line -II JUN-12

Commissioned 03/13.PGCIL 100 MAR-1311 1001001000765/400 100Bina (ICT-II) S/S MAR-13

Commissioned 09/13.PGCIL 100 SEP-1312 1001001500765/400 100Indore (2nd Trf.) SEP-13

Commissioned 06/13.PGCIL 100 JUN-1313 1001001500765/400 100Indore (1st Trf.) JUN-13

ICT-I Commissioned 6/12.PGCIL 100 JUN-1214 1001001000765/400 100Satna (1st ICT) JUN-12

Commissioned 8/12.PGCIL 100 AUG-1215 1001001000765/400 100Satna (2nd ICT) AUG-12

Commissioned 8/12.PGCIL 100 AUG-1216 1001001000765/400 100Bina. S/S AUG-12

Commissioned 03/13.PGCIL 100 MAR-1317 1001003000765/400 100Gwalior MAR-13

Remark:

Satpura Ext TPS (250 MW),SS, MP,MPPGCL, U10-3/13 (C), U11-12/13(C)

Commissioned 03/15.KPTL 651 MAR-15D/C1 651651482400 482Satpura - Ashta MAR-15

Commissioned 02/15.MPPTCL 317 FEB-15S/C onD/C

2 317317199220 199Ashta - Indore - II (Jetpura) FEB-15

Commissioned 01/15.MPPTCL 100 JAN-153 100100315400/220 100Ashta New (2nd Trf.) JAN-15

Commissioned 09/13.MPPTCL 100 SEP-134 100100315400/220 100Ashta New S/S SEP-13

Commissioned 10/11MPPTCL 100 OCT-115 100100160220/132 100Ashta (Add.) Trf. S/S OCT-11

Remark:

Sawra Kuddu HPPCL (3x37MW), U1,U2,U3 (2019-20)

Commissioned 10/20.HPPTCL 15 NOV-20D/C1 JUN-1915153400 3LILO of both ckt. JhakriAbdullapur at (Gumma) PragatiNagar

OCT-20

Commissioned 11/20.HPPTCL 37 DEC-20D/C2 SEP-19373713220 13Snail -Hatkoti NOV-20

TL: Total Location 51Page 36 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Ready for Commissioning 08/18.HPPTCL 80 AUG-18D/C3 808052220 52Hatkoti - Gumma AUG-18

Commissioned 11/20.HPPTCL 100 DEC-204 100100315400/220 100Gumma S/S NOV-20

HPPTCL 05 000220 0Hatkoti Switching Station

Remark:

Shahpurkandi Dam(3x33+3x33+1x8), Punjab, Ravi river, PSPCL (06/22)

Amount not yet deposited by Punjab Statepower Corporation Limited

PSTCL 0D/C1 0018220 0LILO of 1ckt RSP - Sarna atShahpur Kandi PH-I and PH-II

Amount not yet deposited by Punjab Statepower Corporation Limited

PSTCL 0D/C2 0010220 0Shahpur Kandi PH-I - ShahpurKandi PH-II

Remark:

Shapoorji Pallonji,Kodinar,(2x660),PS,Guj, SPEPL. U1-5/15,U2-8/15

SPPCL D/C1 400SPEL - Pirana (PG)

SPPCL 330D/C2 292339107400 59Shapporji Pallonji TPS - Amreli

Generation not comingGETCO 0 DEC-16D/C3 00220400 0Shapoorji Pallonji generatingstation

Remark:

Shirpur TPP (2x150MW), Maharashtra, Shripur power, U1&2-11/17

Commissioned 01/2017 (Late Reported).MSETCL 0 OCT-17D/C1 0070220 70Shirpur Power Plant - Amalnerline

OCT-17

Remark:

Shongtong Karcham HEP (3x150 MW) on Satluj river, U1,U2&U3, (04/24)

The contract is to be awarded throughTBCB route and BPC is yet to placeRFQ/RFP.

HPPTCL 0D/C1 0018400Shongtong Karcham HEP -Wangtoo (Quad)

Commissioned 09/19 (Late Reported).HPPTCL 100 NOV-192 JUN-19100100630400/220 100Wangtoo (GIS) S/S OCT-19

Remark:

Sikka TPP Extn, (2x250 MW) SS, Gujarat, GSECL, U3 -3/15 (C),U4-9/15 (C)

Commissioned 03/18.GETCO 189 MAR-18D/C1 189189117220 117LILO of Jamnagar - Jetpur line-IIat Sikka

MAR-18

Commissioned 08/15.GETCO 259 AUG-15D/C2 259259157220 157Sikka - Moti Paneli line AUG-15

Remark:

Simhapuri PH-I,(150 MW),PS,U2-7/12(C)

Commissioned 3/12MAR-12S/C1 26400 26Simhapuri-Nellore MAR-12

Remark:

Singareni Colleries Generation Project (2x 600 MW), Telangana,U1-3/16 (C),U2-11/16(C)

Commissioned 11/15.TSTRANS 459 NOV-15D/C1 459459325400 325Singareni TPS (Jaipur TPP) -Gajwel

NOV-15

Remark:

Singhitarai TPP (2x600 MW),PS,Chg,, Athena Chhg Power Ltd.,U1,U2-uncertain

Commissioned 4/16 (Late Reported)ACPLT 75 MAY-16D/C1 757550400 50Athena Singhitarai - RaigarhPooling Station (near Kotra)

MAY-16

TL: Total Location 51Page 37 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Singoli Bhatwari HEP (3x33MW)PS,UK,L&T,U1,2,3 & 4 (03/20)

Work held up due to COVID-19.PTCUL 0 MAY-21D/C1 DEC-19005220 0LILO of Baramwari - Srinagar atSingoli Bhatwari

Remark:

SJK Powergen TPP (2x660 MW),PS, MP GMR, U1-12/14,U2-6/14

XYZ 330D/C1 292339107400 59SJK TPS - Jabalpur PoolingStation

Remark:

Solapur TPP (2x660 MW),CS, Maha, TPL, U1-4/17(c) & U2-10/18

Ready for commissioning 04/15.PGCIL 35 APR-15D/C1 OCT-15353522400 22Sholapur STPP - Sholapur line-I APR-15

Award placed in Jun'15. Work underprogress.

PGCIL 60 SEP-172 MAR-17501000400 20Bay Extn. at 400/220KVSholapur S/stn.

SEP-17

Remark:

Sorang HEP (2x50 MW),PS,HP,HSPCL,U1 & U2 (03/20)

Commissioned 10/15.HSPPL 11 OCT-15D/C1 11117400 7LILO of one ckt Karcham wangto- Abdullapur at Sorang HEP

OCT-15

Remark:

Srinagar HEP, (4x82.5 MW),PS,UK,AHPC Ltd.,U1-4/15 (C) ,U2-6/15 (C), U3-4/15 (C)U4-6/15 (C)

Commissioned 07/16.PTCUL 39 JUL-16D/C1 393928400 28Srinagar HEP - Sringar 400 kVS/S.

JUL-16

Commissioned 11/14.UPPTCL 20 NOV-14D/C2 20207400 7LILO of Muzaffarnagar -Vishnuprayag at Srinagar

NOV-14

Remark:

Subansiri Lower (HEP) (8x250 MW) ,CS, ArP, NHPC, U1&2-12/19, U3&4 -06/20

Initially work was stalled on a/c of localdisturbance/ agitation against big dams.Contract was short closed as generationwas not coming. Now work for generationexpected to start with completion scheduleof May'23. Balance work of line awarded inDec'20. Stringing work reduced to 0 asdestringing to be done for previous strungconductor due to defect.

PGCIL 340 MAR-22D/C1 AUG-13237474335400 0Lower Subhansiri - BiswanathChariyali line -I

Initially work was stalled on a/c of localdisturbance/ agitation against big dams.Contract was short closed as generationwas not coming. Now work for generationexpected to start with completion scheduleof May'23. Balance work of line awarded inDec'20. Stringing work reduced to 0 asdestringing to be done for previous strungconductor due to defect.

PGCIL 335 MAR-22D/C2 AUG-13191507348400 0Lower Subhansiri - BiswanathChariyali line -II

Remark: The works of the project is stalled since Dec 2011 due to agitation by various pressure groups of Assam and the balance works are likely to be completed within four years afterresumption of works

Suratgarh Super Critical TPS (2x660 MW),SS, Raj,RRVUNL U7-11/17,U8-3/18

TL: Total Location 51Page 38 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Work order awarded to M/s Aster Chennai.02 nos. tower at Loc. 34/12 & 35/0 werecollapsed on dated 16.04.2019, Work hasbeen stalled wef 02.11.19. Matter is underthe jurisdiction of court.

RVPNL 676 MAR-21D/C1 APR-19676676480400 469Suratgarh TPS - Babai (Jhunjhunu)

Commissioned 11/15.RVPNL 465 NOV-15S/C2 MAR-14465465172400 172Bikaner- Merta NOV-15

Commissioned 07/18.APL 351 JUL-18D/C3 JUL-18351351279400 279Suratgarh TPS- Bikaner JUL-18

Commissioned 03/18.RVPNL 100 MAR-184 100100315400/220 100GSS Babai S/S MAR-18

Remark:

Suzlon wind farm (100 MW), PS,Kutch, GETCO, U1-5/13

XYZ D/C1 220Suzlon wind farm - Bhachau(PG)

Remark:

S V Power TPP (63 MW),PS,Cha,KVK,U1-12/11(C),

Commissioned 11/11.SVPPL NOV-11D/C1 12132 12LILO of Korba-Mopaka line at S.V. Power

NOV-11

Remark:

Swastik TPP, (25 MW), PS,Chg, ACB, U1-12/13

CommissionedAPL D/C1 132 132LILO of Korba-Mopka at SwasticTPP

MAR-17

Remark:

System Strengthening

Commissioned 11/18.PGCIL 451 DEC-18D/C1 DEC-12451451287400 287Silchar - Melriat (New) NOV-18

Line commissioned in Mar'12.PGCIL 7 MAR-12D/C2 772132 2Silchar - Srikona line MAR-12

Part line commissioned (35Ckm) throughcontingency in Jun'12. Balance linecommissioned in Nov'17.

PGCIL 110 NOV-17D/C3 11011060132 60Silchar - Hailakandi(Contingency arrangement)

Completed 9/13TSECL 71 SEP-13D/C4 717118132 18Surajmani Nagar - Agartala 79Tilla Grid S/S

MAR-17

Baramwari Srinagar 220 kV D/C line andLILO of this line at Singoli Bhatwari HEP arerequired for transfer of power from SingoliBhatwari HEP up to Srinagar poolingstation.But after the works of Phata Byung(2x38 MW) being severely affected due toflash floods in June, 2013 and all worksbeing stalled since July, 2017 due to Fundsconstraints with the developer , thisBaramwari switching station is not beingconstructed, therefore currently above lineis being constructed from 400kV S/sSrinagar to interconnection point of 99MWSingoli Bhatwari HEP.This line is of 150Ckm out of which 72 Ckm stringing havebeen completed. Also out of 220 towerlocations, 210 fdns have been completedand 182 towers have been erected

UKPCL 210 DEC-19D/C5 DEC-19182228180220 72Baramwari (GIS)-Srinagar S/S

TL: Total Location 51Page 39 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Approval from State Govt. obtainedPEDMIZO 0 DEC-13S/C6 005132 0LILO of Zemabawk - W.Phailengat Sihhmui

Ready for Commissioning 06/15.PGCIL 163 JUN-15D/C7 DEC-1216316397220 97Mariani (New) - Mokikchung(PG)

JUN-15

Line commissioned in Nov'18.PGCIL 17 NOV-18D/C8 DEC-12171730132 10LILO of Aizwol (PG) - Zemabawkat Melriat (PG)

Commissioned 08/12.TSECL 63 AUG-12D/C9 636336132 36Surajmani Nagar -Budhujngnagar

AUG-12

RoW issueTSECL 68 DEC-18D/C10 568020132 7Surajmani Nagar - Rokhia

Commissioned 02/19.TANTRAN 229 FEB-19D/C11 22922956230 56Kamudhi - Kavanoor Ckt-II FEB-19

Commissioned 03/13.PGCIL 5 MAR-13D/C12 DEC-12551132 1LILO of Loktak - Imphal atImphal (New) line

MAR-17

Work is under progress.TANTRAN 5 JUN-21D/C13 SEP-175518400ETPS to Tondiarpet point ATS

Line commissioned in Jun'17.PGCIL 244 JUN-17S/C onD/C

14 APR-1224424473132 72Roing - Tezu line

1. Date of award of contract is 18.03.2011.2. Schedule date of completion was18.03.2012. 3. The line was completed on11.02.2016 and commissioned on12.05.2017. 4. Delay was due to RoWissue, all of which have been resolved andalso due to delay in commissioning of SASat 400/220/132 kV Killing sub-station.

MeECL 19 MAY-17M/C15 191917132 22Killing (Byrnihat)-EPIP-I

Commissioned 09/15.TANTRAN SEP-15D/C16 23220 23LILO of Korattur - Koyambedu atAlamathy (Balance Portion)

SEP-15

Proposed under NEC.TSECL 0 JUN-15D/C17 05050132 0Surajmani Nagar - Udaipur

Commissioned 07/15.PGCIL 373 JUL-15D/C18 DEC-12373373254400 254Silchar - Purba Kanchan Bariline (charged at 132KV)

JUL-15

Commissioned 9/12.AEGCL 8 SEP-12D/C19 884220 4LILO of Agia - Sarusajai line atKukurmara S/S

SEP-12

Court case pending at Loc-19. Stringing ofRailway and Highway crossing left to bedone.

AEGCL 29 NOV-19S/C onD/C

20 DEC-1129295132 6Kukurmara - Azara line

Fund proposed in World Bank.TSECL 0 AUG-16D/C21 006132 0Surajmani Nagar - Badarghat

Line commissioned in Jun'17.PGCIL 347 JUN-17S/C onD/C

22 DEC-12347347102132 104Pasighat - Roing line.

Fund not yet tied up. Proposed under WorldBank Financing /SPA/NEC.

TSECL 0 MAR-17D/C23 00260400 0Surajmani nagar-P.K.Bari

Commissioned 03/15.PGCIL 479 MAR-15D/C24 DEC-12479479334400 334Silchar - Imphal (New) line (tobe charged at 132KV)

MAR-15

Line commissioned in Jul'18.PGCIL 332 JUL-18S/C onD/C

25 DEC-1233233296132 95Tezu - Namsai line.

Line test charged on 21.08.2011.TSECL 41 AUG-11D/C26 4134112132 12Udaipur - Palatana AUG-11

Commissioned 6/12PGCIL 118 JUN-12D/C27 11811874400 74Palatana - Surajmaninagar line(Charged at 132 KV)

JUN-12

Line commissioned in Jul'15.PGCIL 11 JUL-15D/C28 DEC-1211112132 2Mokokchung (PG) - Mokokchung(Nagaland) line

MAR-17

Commissioned 4/12.PGCIL 69 APR-12D/C29 696938132 38Silchar - Badarpur (PG) line. APR-12

TL: Total Location 51Page 40 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Line commissioned in Nov'18.PGCIL 20 NOV-18D/C30 DEC-12202012132 12Melriat (New) - Sihmui line

Commissioned 03/13.PGCIL 4 MAR-13D/C31 441400 1LILO of Kaithalguri - Misa line atMariani (New) (Charged at220KV)

MAR-13

Commissioned in Jun'17.PGCIL 100 JUN-1732 10010030132/33 100Roing S/S

Commissioned in Jul'18.PGCIL 100 JUN-1833 10010030132/33 100Namsai S/S

Commissioned 02/21.DVC 100 MAR-2134 JAN-21100100315400/220 100DSTPS ICT-II S/s FEB-21

ED, 0 MAR-1335 010090132/33 0Yurembam (Aug.) S/S

Commissioned 12/12TSECL 100 DEC-1236 100100100132/33 100Surajmaninagar S/S (Upgrdableto 400 kV)

DEC-12

Charged in Jun'17.PGCIL 100 JUN-1737 10010030132/33 100Tezu S/S

Commissioned 12/11AEGCL 100 DEC-1138 10010050132/33 100Panchgram (Aug.) S/S DEC-11

Commissioned 03/2017MSETCL 100 MAR-1739 10010050220/33 100Wathar (Addl.) MAR-17

Remark:

Talwandi Sabo TPP (3x660MW),PS,Punjab, Sterlite, U1-6/14 (C),U2-10/15 (C),U3-03/16 (C)

Commissioned 09/14.PSTCL 277 SEP-14D/C1 277277201400 201Talwandi Sabo-Mukatsar SEP-14

Commissioned 03/13.PSTCL 287 MAR-13D/C2 287287204400 204Talwandi Sabo - Moga MAR-13

Commissioned 01/13. (Line energised on21.8.12 but intimated in Jan 2013)

PSTCL 250 JAN-13D/C3 250250175400 175Talwandi Sabo - Dhuri JAN-13

Commissioned 04/14.PSTCL 178 APR-14D/C4 178178128400 128Moga- Nakodar APR-14

Commissioned 09/14.PSTCL 100 SEP-145 JAN-13100100630400/220 100Mukatsar (2x315) SEP-14

Commissioned 04/14.PSTCL 100 APR-146 100100315400/220 100Nakodar (1st Trf.) APR-14

Remark:

Tamnar TPP (4x600 MW),PS,Chatt,JPL, U1-3/14 (C),U2-3/14 (C),U3-1/15 (C),U4-3/15 (C)

Commissioned 01/15.JPL 67 JAN-152xD/C1 676744400 44Tamnar TPP - Raigarh (Tamnar)Pooling Station

JAN-15

Remark:

Tanda Extn. (2x660 MW), CS,UP, NTPC,U1-3/19,U2-7/19

The project was being developed underTBCB mode.

UPPTCL 296D/C1 140543460400 0Gonda - Shahjehanpur (PG)

Commissioned 02/19.UPPTCL 94 FEB-19D/C2 949442220 42Tanda (NTPC) - Tanda (New)line

FEB-19

Ready for Commissioning 03/19.UPPTCL 206 MAR-19D/C3 206206133400 133LILO of Azamgarh - Sultanpur atTanda TPS Extn.

MAR-19

TL: Total Location 51Page 41 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

"Work is standstill for more than a year dueto poor financial health of SEUPPTCL, thetransmission service provider, owned byM/s Isolux. The line is a part of TBCBproject awarded to M/s Isolux. UPPTCLrepresentative informed that GoUP isconsidering to take over transmissionproject and evaluation of completed workis under progress. Bids for valuers havebeen invited by M/s PFC. Valuation is underprogress. Final decision will be taken aftervaluation."

SEUPPTC 97 OCT-18S/C4 54241100400 0Tanda TPS Extn - Gonda

Work in progress.UPPTCL 137 MAY-21S/C5 OCT-1913713743400 44Tanda TPS Extn- Basti (Q)

Developed by M/s Isolux under TBCB S/s iscomplete and energised at 220 kV since2016

UPPTCL 1006 100100630400/220 100Gonda

Work in progress.UPPTCL 76 MAY-217 MAR-21961001400400/220 67Basti GIS

Both ICTs are energised in Mar-19.UPPTCL 1008 100100630400/220 100Tanda TPS

Remark:

Tangnu Romai-I HEP (2x22MW)PS,HP,U1 & U2 (2021-22)

Line is being constructed by HPPTCL underGreen Energy Corridor Scheme. Lineawarded.

HPPTCL 25 SEP-21D/C1 173724132Tangnu Romai-I HEP - 220/132kV Sunda S/S

Mentioned Line Length is in Km andStringing 29.8 Km has been done

HPPTCL 65 MAR-20D/C2 SEP-19616951220 30Sunda-Hatkoti

Substation is being constructed with fundssourced from ADB.

HPPTCL 0 DEC-203 DEC-2000200220/132 0Sunda S/S

Remark: Project work stopped due to fund issue.

Tapovan Vishnugad HEP (4x130MW), CS,UK,NTPC,U1-4 (12/20)

Contract awarded in 03 no. packages inSep 2017. Forest proposal had beensubmitted on dated 24.11.2018 forPackage-I, on dated 23/10/2018 forPackage-II and on dated 23/02/2019 forPackage-III. Stage-I clearance of forest casefor Package I, II and III is expected byOct'19, Oct'19 and Nov'19 resp.Construction work of line will be startedafter approval of stage-I clearance offorest.

PTCUL 45 DEC-21D/C1 0220184400 0Kuwari Pass (Pipalkoti)-Karanprayag -Srinagar(Khandukhal)

TL: Total Location 51Page 42 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Forest proposal has been submitted on10/06/2018. Forest proposal was discussedin 39th Regional Empowered Committee(REC) meeting held on 20.06.19. RECaccorded in principle approval for diversionof 61.479 Ha land subject to submission ofclear enumeration of total trees proposedto be felled and lopped separately. Treecounting is under process. Principleapproval of forest case is expected by Aug-2019commission schedule of line is Sep-2020.

PTCUL 7 DEC-21D/C2 04836400Tapovan Vishnugadh - KunwariPass (Pipalkoti)

Contract had been awarded to M/s Cobrabut due to poor financial condition ofcompany, M/s Cobra had abandoned theproject.Fresh tendering in process for theproject.

PTCUL 0 SEP-20D/C3 00362400 0Srinagar(Khandukhal)-Kashipur(Rampura)

Approval is pending in StandingCommittee, CEA. Construction ofTransmission line will be planned after dueapproval from competent authority.

PTCUL 0D/C4 002400LILO of Vishnu Prayag -Muzaffarnagar at TapovanVishnugarh HEP

Remark:

Tashiding HEP (2x48.5MW)PS,Sikkim,Shiga Energy,U1-11/17,U2-11/17

Commissioned 11/17 (Late Reported).SEPL 23 MAR-18D/C1 232317220 17Tashiding - Legship MAR-18

Commissioned 10/17 (Late Reported).SIKKIM 35 JUN-18D/C2 353520220 20Legship - New Malli JUN-18

PGCIL 03 00100220/132 0Legship S/S

Remark:

Teesta-III(6x200 MW),PS,Sikkim,TUL,U1to6- 2/17 (C)

Award placed in Dec'17. Major portion ofline is in forest (40 Ha- 12 km.), Foreststage-I approval received in Jan'19.Working permission received in Mar'19.Delay in tree enumeration & tree felling.Slow progress due to undulated hillyterrain, head loading of tower membersdue to non-availability of road,progressively making of approach road toreach the working site & local ROW. Workhas also been affected due to COVID-19pandemic.

PGCIL 34 APR-21D/C1 JUN-20333515400 6LILO OUT of Teesta-III -Kishanganj at Rangpo

Commissioned 03/16..(Late Reported).PGCIL 36 JUL-16MC+D/C

2 NOV-13363621400 21LILO IN of Both Ckt Teesta-III -Kishanganj at Rangpo

JUL-16

TL: Total Location 51Page 43 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Teesta III Rangpo (CKT-II) and Teesta III Dikchu (Ckt 1(a)) Lines are in commercialoperation from 16.01.2017 & 14.04.2017respectively. Dikchu- Rangpo (Ckt 1 (b)) isenergized on 30.06.2018 (i.e. trialoperation for 24 hours) and couldsuccessfully complete the trial operation on1st July 2018. 46.1 Kms line fromKishanganj Substation has beensuccessfully energized for antitheftpurpose. Re-Stringing works, in last span of290-291 is under progress and back charging would be extended stretch bystretch on completion of re-stringing. RoWand Forest issues faced in Darjeeling distt.

TUL 586 OCT-18D/C3 581590427400 392Teesta III - Kishanganj

Remark:

Teesta LD IV HEP (4x40 MW),CS,WB,NHPC,U1:03/16, U2:03/16(C), U3-7/16 (C),U4-8/16 (C)

Commissioned 02/16.WBSETCL 250 FEB-16D/C1 SEP-08250250145220 145Teesta LDP - IV - New Jalpaiguri(NJP)

FEB-16

Ready for Commissioning 09/18.WBSETCL 94 SEP-18S/C2 SEP-08949421220 21Teesta LDP -III - Teesta LDP-IV SEP-18

Remark: Unit-4 (40MW) commissioned on 11.08.2016.

Teesta Low Dam III (4x33 MW),CS,WB,NHPC, U1-1/13(C) ,(C) U2-1/13(C), U3-2/13(C), U4/13(C)

Commissioned 01/13.WBSETCL 282 JAN-13S/C1 DEC-0928228281220 81Teesta LD III-New Jalpaiguri JAN-13

Remark:

Teesta-VI HEP (4x125 MW), PS, M/S LANCO Urja, SIKKIM,U1-4 (2021-22)

Detail survey completed section 164approval received. Work yet to started.

LEPP D/C1 25220Teesta VI HEP - Rangpo PoolingStation

Remark:

Tehri PSS (THDC) (4x250 MW) U1-4 (06/22)

Commissioned 04/20.PGCIL 8 MAY-20S/C1 NOV-17881765 1Tehri Pooling Station - Meerut(Remaining part)

APR-20

Commissioned 01/21.PGCIL 38 FEB-21S/C2 NOV-17383813400 13Tehri Gen. - Tehri PoolingStation

JAN-21

Commissioned 04/20.PGCIL 100 MAY-203 MAR-181001002400765/400 100Tehri PS (GIS) (3 ICTs) APR-20

Commissioned 07/20.PGCIL 100 JUN-204 MAY-201001001500765/400 100Extn at Meerut substation JUN-20

Remark:

Telangana STPP (2x800 MW), Telangana, NTPC, U1-01/20, U2-01/20

Programmed to charged on March 2020TSTRANS 492 JAN-20D/C1 DEC-19492492360400 347Telangana STPP - Narsapur

works are under progress.TSTRANS 161 JAN-20D/C2 DEC-19161161110400 101Telangana STPP - Ramadugu

Remark:

Thamminapatnam (Meenakshi) (2x150, MW ),PS, Ph-II (U3-12/17,U4-3/18)

Commissioned 3/12MAR-12S/C1 26400 26Thamminapatnam (Meenakshi) -Nellore

MAR-12

Commissioned 3/12MAR-12D/C2 2400 2Meenakshi - Simhapuri MAR-12

TL: Total Location 51Page 44 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Tidong-I HEP (2x50MW)PS,HP,NSL,U1 & U2 (10/21)

St-I FC received, St-II under progressNSLNPPL 0 DEC-20D/C1 05732220LILO of Kasang - Bhbaba atTidong-I

Remark:

Tilaiya UMPP

PGCIL D/C1 765LILO of Tilaiya - Balia line atGaya

Remark:

Tiroda TPP (Gondia ) PH-I (2x660 MW),PS,MAHA,ADANI,U1-9/12, (C),U2-11/12 ,PH II (3x660 MW) U1-6/13(C), U2- 3/14(C),U3-9/14 (C)

Commissioned 03/15.APL 1582 MAR-15S/C1 AUG-1215821582575765 575Tiroda - Koradi - Akola -Aurangabad line ckt-II

MAR-15

Commissioned 3/13.APL 587 MAR-13S/C2 587587218400 218Tiroda TPP -Warora (1st ckt) MAR-13

PGCIL 2xS/C3 765Aurangabad - III - Aurangabad(PG)

Commissioned 02/14.APL 1011 FEB-14S/C4 10111011361765 361Tiroda - Akola-II FEB-14

Commissioned 02/14.APL 90 FEB-14D/C5 909061400 61Akola- I - Akola-II FEB-14

218 Ckm Commissioned 8/12APL 587 AUG-12D/C6 587587218400 218Tiroda TPP - Warora (2nd ckt) AUG-12

Commissioned 03/13.MSETCL 100 MAR-137 SEP-12100100500400/220 100Warora S/S MAR-13

Commissioned 02/14.APL 100 FEB-148 1001001500765/400 100Tiroda S/S FEB-14

Commissioned 03/15.APL 100 MAR-159 1001003000765/400 100Koradi - III S/S MAR-15

Commissioned 02/14.APL 100 FEB-1410 1001001500765/400 100Akola -II S/S FEB-14

Commissioned 03/16.MSETCL 100 MAR-1611 1001001500765/400 100Aurangabad - III (Ektuni) S/S(ICT-II)

MAR-16

Remark:

Tori TPP (2x600 MW),PS,Jhh, Essar, Uncertain

EPTCL D/C1 400Tori - Jhharkhand PoolingStation

Remark: Delay in grant of mega power project status, cancellation of coal block & non-availability tapering/long term coal linkage etc.

Transmission system associated with IPPs of Nagapattinam / Cuddalore Area- Package A (TBCB)

Commissioned 01/19.PGCIL 575 FEB-19S/C1 DEC-15575575219765 219Salem - Madhugiri (PNMTL-TBCB)

JAN-19

Commissioned 10/2016.PGCIL 543 OCT-16D/C2 MAR-15543543406765 406Nagapattinam PS - Salem(PNMTL-TBCB)

OCT-16

Remark: SPV/BPC - Powergrid Nagapattinam Transmission Ltd. / PFC

Transmission System Associated with Mauda Stage-II (2x660MW) Gen. Proj. - PGCIL

Ready for Commissioning 08/16.PGCIL 479 AUG-16D/C1 MAY-16479479344400 344Khandwa - Indore line AUG-16

Ready for Commissioning 08/16.PGCIL 435 AUG-16D/C2 MAY-16435435338400 338Betul - Khandwa (Quad) line AUG-16

Commissioned 07/2017.PGCIL 551 JUL-17D/C3 MAY-16551551393400 393Mauda-II - Betul (Quad) line JUL-17

Remark:

Transmission System Associated with Mundra Ultra Mega Power Project - PGCIL

TL: Total Location 51Page 45 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 02/12.PGCIL 863 FEB-12D/C1 863863244400 244Mundra - Limbdi FEB-12

Commissioned 8/11PGCIL 285 AUG-11D/C2 285285198400 198Mundra - Bachchau AUG-11

Commissioned 8/12.PGCIL 424 AUG-12S/C3 424424314400 314Mundra - Jetpur (Part line) AUG-12

Commissioned 9/11.PGCIL 755 SEP-11D/C4 755755566400 566Bachchau - Ranchodpura SEP-11

Commissioned 12/12.PGCIL 918 DEC-12S/C5 918918358400 358Mundra - Jetpur (Balanceportion)

DEC-12

192 Ckm part line commissioned 11/11.PGCIL NOV-11S/C6 384400 192Mundra -Limbdi ( part Line) NOV-11

Commisisoned 7/12PGCIL 100 JUL-127 100100630400/220 100Navsari GIS JUL-12

Commissioned 02/12.PGCIL 100 FEB-128 1001003000765/400 100Wardha FEB-12

Commissioned.PGCIL 100 AUG-119 100100630400/220 100Bachchau S/S AUG-11

commissioned 3/12.PGCIL 100 MAR-1210 1001001500765/400 100Wardha 3rdTrf MAR-12

Remark:

Transmission System associated with Pallatana gas Based Power Project and Bongaigaon Thermal Power Station (BTPS) - PGCIL

Commissioned 08/15.PGCIL 100 AUG-151 10010030220/132 100Mokokchung (ICT-II) AUG-15

ICT-I (50MVA) commissioned in Mar'13 &ICT-II commissioned in Apr'13.

PGCIL 100 APR-132 100100100132/33 100Imphal S/S

Completed on 28.11.18.PGCIL 100 NOV-183 100100100132/33 100Melriat S/S (Upgadable to 400kV)

Commissioned 3/12.PGCIL 100 MAR-124 100100400400/220 100Silchar (New) MAR-12

Commissioned 07/15.PGCIL 100 JUL-155 DEC-1210010030220/132 100Mokokchung (New) JUL-15

Remark:

Transmission System for Transfer of Power from Generation Project in SIKKIM to NR/WR Part-A

PGCIL S/C1 19132LILO of Gangtok - Melli atRangpo

Remark:

Transmission System for Transfer of Power from Generation Project in SIKKM to NR/WR Part-B

Commissioned 11/14.PGCIL 21 NOV-14S/C1 NOV-1421217132 7LILO of Gangtok - Rangit atRangpo

MAR-17

Remark:

Transmission System for Ultra mega Solar Park in Rewa District, Madhya Pradesh - PGCIL

Ready for Commissioning 02/18.PGCIL 169 FEB-18D/C1 169169116400 116LILO of Vindhyachal - Jabalpurline (Q) (II Ckt.) at Rewa PS

FEB-18

Remark:

Transmission System of Phase-I Generation Projects in Orissa-Part-A

Commissioned 05/13.PGCIL 120 MAY-13D/C1 12012044400 44LILO of Rourkela - Raigarh atJharsuguda Pooling Stn. Ckt-II

MAY-13

Remark:

Transmission System strengthening in Western part of WR for IPP Generation Projects in Chhatisgsrh - part-D - PGCIL

Commissioned 01/14.PGCIL 100 JAN-141 100100630400/220 100Aurangabad S/S JAN-14

Remark:

TL: Total Location 51Page 46 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Tuirial HEP (2x30MW),CS,Miz,NEEPCO, U1-8/17(c),U2-11/17(c)

Line completed on Mar-17.PEDMIZO 85 FEB-17S/C1 858542132 42Tuirial HEP - Bawktlang(Kolasib) S/S

The 132KV Sihhmui substation wasconstructed by P&E, Govt. of Manipur andcompleted on 31.03.2016. Line hascompleted.

PEDMIZO 135 DEC-16D/C2 13513547132 47Bawktlang (Kolasib) S/S -Sihhmui S/S

Remark:

Tuticorin TPP (Ind Barath), (660MW),TN, U1-10/18

IBPIL D/C1 200400Ind Barath TPP - Tuticorin (PS)

Remark:

Tuticorin TPS (JV) (2x500 MW), U1-3/14,U2-7/15 (C)

Commissioned 01/12.PGCIL 423 JAN-12D/C1 423423304400 304Tuticorin JV - Madurai JAN-12

Remark:

Uchpinda TPP, (4x360MW), PS,Chg, RKMPPL, U1-10/15(C),U2-1/16(C),U3-9/17,U4-12/17

Commissioned 10/2016 (41.42 CKm on D/C& 11 CKm on M/C)

RKMPPL 88 OCT-16D/C1 888853400 53Uchpinda (RKM PowergenPrivate Ltd.) - Kotra s/s(Raigarh) line

OCT-16

Commissioned (Interim Arrangement). De-LILO activity completed.

RKMPPL 73D/C2 7373400 39LILO of Raigarh (Kotra) - Raipurat Uchpinda (InterimArrangement)

Remark:

Udangudi STPP Stage-I (2x660 MW), TN, TANGEDCO, U1-04/22, U2-07/22

TANTRAN 0D/C1 000400Udangundi - Virudhunagar (QMACSR Condutor) line

Check survey submitted and approved -38.809Km. Soil investigation Approved-77Loc.

TANTRAN 68D/C2 342000400Udangudi - Ottapidaram (QMACSR Conductor) line

Estimate approval under process.TANTRAN 0D/C3 01540400Udangudi - Samugarengapuram(QM ACSR Conductor) line

Remark:

Udupi TPP (2x600 MW),PS,KAR,UPCL,U1-7/10(C),U2-4/11(C)

Commissioned 10/09. (For start up power)KPTCL 91 OCT-09D/C1 9191948220 48UTPS-Nandikur - Khemar (partlyon Multi-ckt Multi - Voltagetowers & partly on D/C towers)

OCT-09

Commissioned 8/12KPTCL 529 AUG-12D/C2 529529358400 319Nandikur (UTPS) - Shantigrama(Hassan)

AUG-12

Remark:

Ugo-Sugen (382.5MW), PS, Guj, Torrent Energy, Module1: 1/13(c)

XYZ D/C1 1400LILO of Sugen TPS- Pirana atUno-Sugen GPP

Remark:

Uhl-III BVPCL HEP, (3x33.3MW),SS,HP, HPSEB,U1,2, & 3 (2019-20)

completed on Mar-14HPSEBL 0D/C1 0071132Uhl-III - Hamir Pur (By BVPCL)

TL: Total Location 51Page 47 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Ukai Extn. (2x490 MW),PS,Guj,GSECL, U6-3/13(C),U7-3/13

Commissioned 03/13.GETCO 300 MAR-13D/C1 300300178220 178Kosamba-Mobha line MAR-13

Commissioned 1/12.GETCO 96 JAN-12D/C2 969664400 64LILO of Asoj - Ukai at Kosamba JAN-12

Commissioned 03/13.GETCO 215 MAR-13D/C3 215215145400 145UKai-Kosamba MAR-13

Commissioned 08/14.GETCO 641 AUG-14D/C4 JUL-11641641460400 460Kosamba-Chorania line AUG-14

Remark:

Unchahar TPS (500 MW), PS,UP,NTPC, U6-03/17(C)

Ready for Commissioning 09/2016.PGCIL 145 SEP-16D/C1 SEP-16145145107400 107Unchahar - Fatehpur line (PUTL-TBCB)

SEP-16

Remark:

Uppur SCTPP, (2x800MW), Tamilnadu, TANGENDCO, U1-3/21,U2-9/21

Work in progress in all the 3 reachesawarded.

TANTRAN 219 SEP-21D/C1 MAR-21139724498765 8Virudhnagar - Coimbatore

Work under progress.TANTRAN 39 SEP-21D/C2 MAR-216205158400Virudhnagar - Kayathar

Tender to be floated.TANTRAN 0D/C3 MAR-2100204765Uppur SCTPP - Virudhunagar

Tender to be floated.TANTRAN 0D/C4 MAR-2100160400Virudhnagar - Thappagundu

Tender to be floated. Revised estimateunder preparation.

TANTRAN 0D/C5 MAR-2100114400Virudhnagar - Kamuthi

Work awarded. to M/s.Megha Engineeringand work compound wall and 765 & 400 KVstructure foundation work in pgs.

TANTRAN 22 MAR-236 MAR-2101003000765/400 0Virudhunagar

Remark:

URI-II HEP (4x60 MW), CS,J&K,NHPC,U1-9/13(C),U2-11/13(C),U3-9/13(C),U4-2/14 (C)

Commissioned 08/11.PGCIL 32 AUG-11S/C1 323211400 11URI I - URI II AUG-11

Commissioned 12/11.PGCIL 288 DEC-11S/C2 MAY-11288288105400 105URI II -Wagoora DEC-11

Remark:

Utraula IIPP (2x45 MW),PS,UP,BAJAJ,U1-2/12 (C),U2-3/12(C)

Existing line.BEPL D/C1 132Balrampur-Utraula line

Remark:

Utraula TPP, (2x45 MW), PS, UP, Bajaj

Line energised on 18.01.2019UPPTCL 114S/C1 114114132 40Dumariaganj- - Utraula

Remark:

VallureTPS. (3x500 MW),CS,TN,NTPC,U1-2/12(C), U2-2/13(c), U3-2/14

Commissioned 03/14.PGCIL 59 MAR-14D/C1 595942400 42Tiruvelam (PG) - Chitoor MAR-14

Commissioned 03/13.PGCIL 104 MAR-13D/C2 10410471400 71Vallure TPS - Melakottaiyur line MAR-13

Commissioned 7/11PGCIL 129 JUL-11D/C onM/C

3 JUL-10129129131400 131LILO of Alamathy -Sriperumbdur at Vallure TPS

JUL-11

Commissioned 8/12.TANTRAN 14 AUG-12D/C4 MAR-1114147400 7Vallur JV Project-NCTPS St.II AUG-12

Remark:

TL: Total Location 51Page 48 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Vijayawada TPS (Extn. -IV),500 MW,SS,AP,APGENCO, -10/09 (C )

Commisioned 7/09APTRANS 22 JUL-09M/C1 222224400 24LILO of Srisaliam -Nunaa atVijayawada TPS

JUL-09

Commissioned 02/13.APTRANS 316 FEB-13D/C2 JUN-11316316226400 226Vijayawada TPS-Suryapeta FEB-13

Commissioned 8/11.APTRANS 411 AUG-11D/C3 JAN-11411411266220 266Vijayawada TPS-Tallapally AUG-11

Commissioned 02/13.APTRANS 209 FEB-13D/C4 209209147400 147Malkaram-Narsapur FEB-13

Commissioned 02/13.APTRANS 199 FEB-13D/C5 199199149400 149Narsapur-Suryapet FEB-13

Remark:

Vindhyachal-IV ,CS,MP,NTPC, U11-6/12(C) C), U12-3/13(C), U13-08/15 (C) Rihand - III,(1000MW each) Gen. U5- U6-11/13(C)

Commissioned 08/14.PGCIL 782 AUG-14D/C+S/C

1 NOV-12782782300765 300Satna - Gwalior line (60 Km D/CPortion) Ckt-II

AUG-14

Commissioned 02/14.PGCIL 901 FEB-14S/C2 901901337765 337Satna - Gwalior line (Ckt-I) FEB-14

Commissioned 12/13.PGCIL 138 DEC-13D/C3 13813897400 97Bassi (PG)- Jaipur (RVPN) 765KV line (Q)

DEC-13

Ready for Commissioning in 08/15.PGCIL 91 AUG-15D/C4 NOV-12919131765 31Rihand - Vindhyachal PoolingStation (2nd Ckt)

AUG-15

Commissioned 12/12.PGCIL 18 DEC-12D/C5 181812400 12Sasan - Vindhyachal Poolingstation

DEC-12

Commissioned 12/12PGCIL 19 DEC-12S/C6 NOV-12191912765 12Sasan - Vindhyachal PoolingStation line

DEC-12

Commissioned 06/14.PGCIL 91 JUN-14S/C7 NOV-12919131765 31Rihand - Vindhyachal PoolingStation (1st Ckt)

JUN-14

Commissioned 08/15.PGCIL 586 AUG-15S/C8 586586271765 271Vindhyachal Pooling Station -Satna Ckt-II

AUG-15

Ready for commissioning 12/12.PGCIL 84 DEC-12D/C9 848458400 58Vindhyachal-IV - VindhyachalPooling Station line (Q)

DEC-12

Commissioned 08/15.PGCIL 834 AUG-15S/C10 MAR-14834834305765 305Gwalior - Jaipur (Ckt 1) AUG-15

Commissioned 03/15.PGCIL 586 MAR-15D/C+S/C

11 NOV-11586586271765 271Vindhyachal Pooling Station -Satna line (2 Km D/C Portion)Ckt-I

MAR-15

Commissioned 08/15.PGCIL 100 AUG-1512 1001001500765/400 100Vindhyachal Pooling Station(ICT-II)

AUG-15

Commissioned 03/15.PGCIL 100 MAR-1513 NOV-121001001500765/400 100Vindhyachal Pooling Station(ICT-I)

MAR-15

Remark:

Visa Power TPP (2x600 MW) PS, Chh, VPL, U1 & U2-uncertain

Work is under Construction.VISA 33 JUN-15D/C1 263726400 0Visa Power TPP - RaigarhPooling Station

Remark:

Vizag (Hinduja National Power) (2x520MW),PS,AP,U1-12/15 (C), U2-3/16 (C)

Commissioned 07/15.APTRANS JUL-15D/C1 14400 14Vizag TPP - Kalpaka JUL-15

Ready for Commissioning 10/2016TSTRANS 234 OCT-16D/C2 SEP-15234234170400 170Kamavarapukota - Surypet (Chinnakorukondi - Suryapet)

OCT-16

Ready for Commissioning 06/2017. (Earlierthe line was of 712 ckm now the length isrevised to 485 ckm ).

APTRANS 697 JUL-17D/C3 NOV-15697697486400 486Vizag TPP(HNPCL) -Kamavarapukota

JUN-17

TL: Total Location 51Page 49 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Ready for Commissioning 10/2016.APTRANS 242 OCT-16D/C4 SEP-15242242179400 179Kamavarapukota - Surypet(Kamavarrapukota -Chinnakorukondi)

OCT-16

Commissioned 05/14. for startup power.25 MAY-14D/C5 252515400 15Vizag ( Hinduja) TPP - Kalpaka

Commissioned 02/2017APTRANS 100 FEB-176 MAR-16100100315400/220 100Kamavarapukota s/s (ICT-1) FEB-17

Commissioned 03/2017APTRANS 100 MAR-177 MAR-16100100315400/220 100Kamavarapukota s/s (ICT-2) MAR-17

Commissioned 03/16.TSTRANS 100 MAR-168 MAR-15100100630400/220 100Suryapet S/S MAR-16

Commissioned 10/18.TSTRANS 100 OCT-189 100100500400/220 100Shankarpally OCT-18

Remark:

Vyasi HEP(2x60MW), Yamuna river,UK,UJVNL, (12/20)

Work held up due to COVID-20.PTCUL 56 JUN-21D/C1 JUN-215211071220 0LILO of Lakhwar- Dehradun atVyasi

Remark:

Wanakbori TPS(1x800), SS, Guj,GSECL,U8-10/18

Ready for Commissioning 03/18.GETCO 5 MAR-17D/C1 552400 2Wanakbori S/y -Wanakbori S/y(existing)

MAR-18

Commissioned 10/19.GETCO 24 NOV-19D/C2 242413400 13LILO of Wanakbori -Soja line atDehgam (PG) S/S

OCT-19

WIPGETCO 272 MAR-19D/C3 DEC-19271343212400 144Wanakbori TPS-Soja

WIP/Severe RoW issueGETCO 387 MAR-19D/C4 SEP-19381447266400 203Soja-Zerda Line

Remark:

Welspun Energy Annupur,( 2x660 MW), PS,Annupur,MB Power, U1-4/15(C),U2-3/15

XYZ D/C1 400Welspun Anuppur TPS -Vindhyachal Pooling Station

Remark:

Yadadri TPS (5x800 MW), Telangana, TSGENCO/BHEL, U1-09/22, U2-10/22, U3-05/23, u4-05/23, U5-09/23

TSTRANS D/C1 0400Yadadri TPP switchyard -Jangaon S/S

TSTRANS D/C2 0400Yadadri TPP switchyard -Damaracherla S/S

Excavation and foundation works are underprogress.

TSTRANS 100D/C3 02550400Yadadri TPP Switchyard -Choutuppal S/S

Excavation and Foundation works areunder progress.

TSTRANS 29D/C4 0480400LILO of existing 400kVKhammam - Mamidipally TMDCline - Choutuppal S/S

Excavation and foundation works are underprogress.

TSTRANS 100D/C5 02900400Yadadri TPP Switchyard - Dindis/s

TSTRANS 06 001500400/220 0Damaracherla S/S

220kV & 132kV Tower Foundation underprogress

TSTRANS 107 JUN-2051001500400/220/132

0Choutuppal S/S

Remark:

Yelanhanka CCPP (370MW), KPTL, Kar, U1-06/18

Commissioned on 14.09.2018.KPTCL 0 AUG-18D/C1 006220 12Yelanhanka(KPTCL)- Yelanhanka(PG)

TL: Total Location 51Page 50 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 10.43.21 AMFriday 12 March 2021

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 12/15 (Late Reported)KPTCL 3 MAY-18D/C2 331220 1Yelanhanka CCPP - Yelanhanka(KPTCL)

MAY-18

Remark:

Yermarus TPS (2 x 800 MW), Karnataka, KPCL, U1-3/16 (C), U2-6/16

DPR approved. To be tenderedKPTCL 0 MAR-18D/C1 00400Bellary (PS) - C.N. Hally

Ready for commissioning 06/2017.KPTCL 520 JUL-17D/C2 DEC-16520520450400 450Bellary (PS) - New Madhugiri(near Tumakur)

JUN-17

Detailed survey completed. Estimate isbeing prepared.

KPTCL MAR-18D/C3 400Yermarus TPS - Gulbarga

Ready for Commissioning 03/18.KPTCL 392 MAR-18D/C4 AUG-17392392285400 285Yermarus TPS - Bellary PoolingStation (BPS)

MAR-18

This work is not in planned works.KPTCL 0 MAR-18D/C5 005400Bellary (TPS) - Bellary (PS)

Not in planned work for FY 16-17KPTCL MAR-18D/C6 400LILO of Both ckt of Nelamangala- Talaguppa at CN Halli

Ready for commissioning 06/2017.JPL 39 JUL-17D/C7 393919400 19JSW TPS - Bellary (PS) JUN-17

Land is in pocession of KPTCL. Preliminarysurvey work of 400kV line is completed.Estimate to be prepared.

KPTCL 08 SEP-1901001000400/220 0Gulbarga S/S

Remark:

TL: Total Location 51Page 51 ofSTG: Stringing CompletedSTC: Stubs Cast