Business Development Director

HP

Timothy Chua

HP Performance Optimized DataCenter (POD)

for Scalable Computing Solutions

3

Agenda

• Datacentre challenges

• Modular datacentres and the need for HP POD

• Site Requirements & Services

• Real Installations

4

Existing Datacentre Environment

• Datacentre challenges

• Power, cooling and space capacity limiting IT

• Expansion bound by datacentre build times

• More energy efficiency needed

• Increasing energy costs

• Conventional datacentre infrastructure

incapable of max density

• Increased pressure on

capital expense

• Capacity forecast multiplier

• Pay as you grow enables

capex postponement

5 5

6

Why HP POD?

7

HP POD Addresses datacentre challenges

Lower construction &

acquisition costs

Reduced construction &

deployment time

Reduced

operating expenses

Higher

equipment density

Modular

Up to 45% less

than brick & mortar

POD avail 6 weeks U.S.

12 weeks worldwide

Energy efficient:

PUE ratio as low as 1.25

Up to avg 27kW/rack

(max 34kW)

Pay as you grow

8

HP POD Key Features

Class-leading, industry-standard and flexible 22 x 50U, 19” full-depth industry-standard

racks support HP, Dell, IBM, Sun, Cisco, etc.

Best-in-class density Support for 3,520 compute nodes,

12,000 LFF drives, or any combination

Built-in redundancy

Pre-configured and tested

Energy efficient PUE ratio <1.25 (1.07 excluding chiller)

Full lifecycle support

9

Customer Case Studies

HPC

Computer aided

design

• Quick

deployment

• IT dense

• Energy efficient

Datacentre Expansion

• Telco / ISP

− Rapid growth

− Blade support

Cloud as a Service

Software company / ISP

• Elastic

• Rapid growth

• Energy efficient

Private Cloud

• Business

• Government

− Scalable

− Repeatable

− Agile

10

Interior View

Standard 50U racks

Hot aisle with rear access

through doors in the container

Serviceable high efficiency

heat exchangers

(HEX) from HP MCS

36” cold aisle

can run at >90F

Facilities

management on

exterior of cold

aisle

Serviceable high

efficiency,

variable speed

blowers from HP

MCS

11

Customer Site Requirements

• Level surface capable of supporting POD’s weight • System utilities

• Cooling water • Domestic water for humidifier • Drain • Power

• Connections to central facility • BMS • Security system • Convenience outlet power • Site networking

• Environmental considerations • Consider installing an awning or other minimal physical structure to

aid in serviceability and security • Lightning protection • Grounding

• Operating temperature • ~-30C to 55C

12

POD vs. New Brick and Mortar

Advantages

Tier I

Brick & Mortar 600KW

Tier I

40’ POD ($1.3M ILP) 600KW

kW per Rack 12 30

# racks 50 22 or 10

IT floorspace 2000 320

Watts / sq ft 300 1891

kW cooling 270 103

Aux kW 150 42

Total kW 1020 745

Annual MWhr 8997 7076

PUE 1.7 1.24

Total CapEx 2,000,000 1,300,000

•~6x savings in footprint

• >60% less cooling power

• >25% less power consumption

• >35% less CAPEX

• >60% less annual OpEx

13

HP POD Services Services for the complete lifecycle of your POD

Solution

• Data centre integration and planning o Critical Facilities Services delivered by EYP MCF

• Tailored factory express POD o Build, integrate test and ship

• Onsite implementation

o Deployment, commissioning, acceptance testing

• Ongoing maintenance and support

o Options include proactive and critical service named services account team

VERB IT at Wyong, NSW

15

Verb IT – Managed Services – Data Centre outsourcing and hosting. Built on

HP POD and Blade Technology.

Offer DC capacity and

service

Oriented compute power

Establishing a Managed

Services business

Scalability, Efficiency and

business continuity issues

Reliability and availability of

IT systems and solutions

HP POD

EYP Implementation

Services

HP Finance

HP Blade & Storage

product

Microsoft Hyper V

Business needs HP solution Customer benefits

• Better end-to-end visibility

of processes

• Scalability issues have

been addressed

• Efficiency & Productivity

gains

• Improved storage

capabilities

• High reliability and

availability of systems

• IT as a Service

16

17

18

19

20

Hewlett Packard Houston Texas

Site 1

Real HP POD Installations

21

Original Location –

Shipping/Receiving

22

3MW Tier1 Capacity –

Under Construction

23

3MW Capacity – up 7 POD Support

Telecom Company Northern California

25

POD1

POD2

PowerHouse1

PowerHouse2 Chiller Skid

1A and 1B

Chiller Skid

2A and 2B

Site Transformer

760 kW Critical Load –

Parking lot to Data centre in 16 weeks

26

POD1 – Fully Integrated before shipment

27

POD2 – Fully Integrated before shipment

Hosted Cloud POD Houston, Texas

29

450 kW Critical Load

30

880 Servers pre-installed in 2 weeks

Manufacturer France

32

600 kW

Critical Load

33

HPC Configuration – Pre-Integrated

Oakland, California

35

20’ POD Installation (MEP by Customer)

20’ POD

Chiller

GenSet UPS

Summary

37

HP POD – The complete solution

Technology HP POD & CI portfolio

+ Design EYP customization service

+ Deployment HP Services

+ Finance HP Financial Services

+ Servers & Storage HP Blades and SL servers

= HP Perfomance Optimised Datacentre

39

SILVER SPONSOR

40

• Company Information • ICANN accredited registrar

since 2000

• Fastest growing B2B

Domain Name Reseller

Network in Asia Pacific

• What We Offer • Widest selection of Asian

ccTLDs at rock-bottom

prices

• Other Services: 1EPP, SEO,

CNNIC Internet Keywords

webnic www.webnic.cc

• Your shortcut to the Registries –

eliminate the need for separate

accreditation processes from different

registries!

Our New Plugins

Parallels Partnership

Our Partners

• 8 Years and counting!

• More than 2000 Resellers around the

globe with over 1000 resellers with us

for more than 5 years

We are celebrating our 10th

anniversary!

Break