The Meadowbank and Meliadine Experience “Mining and Exploring North of 60” RBC Capital Markets North of 60 Conference April 30, 2013 Toronto Louise Grondin SVP Environment and Sustainable Development Agnico Eagle Mines Limited Jean Robitaille SVP Technical Services and Project Development Agnico Eagle Mines Limited

Upload: agnico-eagle-mines

Post on 16-May-2015

195 views

Category:

Business


0 download

TRANSCRIPT

Page 1: The meadowbank experience  lessons learned about gold

agnicoeagle.com

The Meadowbank and Meliadine Experience

“Mining and Exploring North of 60”

RBC Capital Markets North of 60 Conference April 30, 2013 Toronto

Louise Grondin SVP Environment and Sustainable Development Agnico Eagle Mines Limited

Jean Robitaille SVP Technical Services and Project Development Agnico Eagle Mines Limited

Page 2: The meadowbank experience  lessons learned about gold

agnicoeagle.com

FORWARD LOOKING STATEMENTS

The information in this document has been prepared as at April 30, 2013. Certain statements contained in this document constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking information under the provisions of Canadian provincial securities laws. When used in this document, the words “anticipate”, “expect”, “estimate”, “forecast”, “will”, “planned”, and similar expressions are intended to identify forward-looking statements or information.

Such statements include without limitation: statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future reserves, resources, mineral production, optimization efforts and sales; estimates of mine life; estimates of future internal rates of return, mining costs, cash costs, minesite costs and other expenses; estimates of future capital expenditures and other cash needs, and expectations as to the funding thereof; statements and information as to the projected development of certain ore deposits, including estimates of exploration, development and production and other capital costs, and estimates of the timing of such exploration, development and production or decisions with respect to such exploration, development and production; estimates of reserves and resources, and statements and information regarding anticipated future exploration; the anticipated timing of events with respect to the Company’s mine sites and statements and information regarding the sufficiency of the Company’s cash resources. Such statements and information reflect the Company’s views as at the date of this document and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on such statements and information. Many factors, known and unknown could cause the actual results to be materially different from those expressed or implied by such forward looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production, capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development programs; mining risks; community protests; risks associated with foreign operations; governmental and environmental regulation; the volatility of the Company’s stock price; and risks associated with the Company’s byproduct metal derivative strategies. For a more detailed discussion of such risks and other factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements contained in this document, see the Company’s Annual Report on Form 20-F for the year ended December 31, 2012, as well as the Company’s other filings with the Canadian Securities Administrators and the U.S. Securities and Exchange Commission. The Company does not intend, and does not assume any obligation, to update these forward-looking statements and information. Alain Blackburn, a Qualified Person and the Company’s Senior Vice-President, Exploration, reviewed the technical information disclosed herein. For a detailed breakdown of the Company’s reserve and resource position see the February 13, 2013 press release on the Company’s website. That press release also lists the Qualified Persons for each project.

2

Page 3: The meadowbank experience  lessons learned about gold

agnicoeagle.com

NOTES TO INVESTORS

Note Regarding the Use of Non-GAAP Financial Measures

This document presents estimates of future “total cash cost per ounce” and “minesite cost per tonne” that are not recognized measures under United States generally accepted accounting principles (“US GAAP”). This data may not be comparable to data presented by other gold producers. These future estimates are based upon the total cash costs per ounce and minesite costs per tonne that the Company expects to incur to mine gold at the applicable projects and do not include production costs attributable to accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore not practicable to reconcile these forward-looking non-GAAP financial measures to the most comparable GAAP measure. A reconciliation of the Company’s total cash cost per ounce and minesite cost per tonne to the most comparable financial measures calculated and presented in accordance with US GAAP for the Company’s historical results of operations is set forth in the notes to the financial statements included in the Company’s Annual Information Form and Annual Report on Form 20-F, for the year ended December 31, 2012, as well as the Company’s other filings with the Canadian Securities Administrators and the SEC.

Note Regarding Production Guidance

The gold production guidance is based on the Company’s mineral reserves but includes contingencies and assumes metal prices and foreign exchange rates that are different from those used in the reserve estimates. These factors and others mean that the gold production guidance presented in this disclosure does not reconcile exactly with the production models used to support these mineral reserves.

3

Page 4: The meadowbank experience  lessons learned about gold

agnicoeagle.com

AGENDA

• Introduction • History of AEM’s 1st venture in Nunavut • Why Meadowbank ? • Permitting in Nunavut • Meadowbank Mine: - Infrastructure - Geology - Challenges - Accomplishments - Meadowbank Today

• History of AEM’s 2nd venture in Nunavut • Meliadine Project: - Infrastructure

- History and Acquisition Rationale - Geology - Exploration - Current Status

• Summary 4

Page 5: The meadowbank experience  lessons learned about gold

agnicoeagle.com

INTRODUCTION

Agnico Eagle has a 100% interest in the Meadowbank gold mine and the Meliadine gold development project, both located in Nunavut.

H u d s o n B a y CHURCHILL

RANKIN INLET

YELLOWKNIFE

Railway Seasonal Shipping Scheduled Air Route

NUNAVUT TERRITORY • CANADA •

MEADOWBANK PROJECT

POLARIS MINE (closed)

NUNAVUT

BAKER LAKE

IQALUIT

RAGLAN MINE

DIAVIK DIAMONDS

LUPIN GOLD (closed)

NANISIVIK MINE (closed)

EKATI DIAMONDS

TAHERA DIAMONDS

5

Page 6: The meadowbank experience  lessons learned about gold

agnicoeagle.com

HISTORY OF AEM’S FIRST VENTURE IN NUNAVUT: MEADOWBANK

History & Permitting Milestones • 1987: First gold discovery • 1990-1992: AEM former 55% option (spent C$3.5 M) • 1997: Cumberland Resources acquires 100% for C$3.2M and 1.5M shares • 2005: Feasibility announced: 2.8 Moz P&P within 3.8 MI&I • 2006: Nunavut Impact Review Board recommends development of the project

and an Inuit Impact & Benefits Agreement (IIBA) is signed with Kivalliq Inuit Association

• 2007: Agnico Eagle acquires Cumberland for $750 million ($650 net of cash) • 2007 - 2010: Project construction – 8,500 tpd open pit and conventional mill with

initial capex of $710 million • 2010: Commercial production achieved March 1

6

Page 7: The meadowbank experience  lessons learned about gold

agnicoeagle.com

WHY MEADOWBANK?

Finland Kittila

Mexico Pinos Altos

Canada Toronto, HQ

Canada LaRonde, Goldex & Lapa

Canada Meadowbank

• Construction stage project with feasibility and permitting essentially complete

• Open pit operation, i.e. shorter time to production

• Synergy: could be operated from its base of operations in Val d’Or

• Forecasted to provide significant gold production starting in 2010

• Located in a politically stable, pro-mining jurisdiction

• Offered additional exploration potential in a new camp

U.S.A. Nevada

Strategic Rationale

7

Page 8: The meadowbank experience  lessons learned about gold

agnicoeagle.com

PERMITTING IN NUNAVUT - INUIT OWNED LAND

8

Inuit owned subsurface rights (35,000 km2 or less than 2% of Nunavut)

Inuit owned surface rights (350,000 km2 or 16% of Nunavut)

If claim on Inuit Owned Lands, agreements with Inuit Organisations will be required

Inuit Land Ownership

Nunavut 1.9 million km2

Page 9: The meadowbank experience  lessons learned about gold

agnicoeagle.com

INUIT ORGANIZATIONS

9

Sub-surface rights on Inuit Owned Lands are owned by Nunavut Tungavik Incorporated or NTI

Surface rights on Inuit Owned Lands are owned by the Regional Inuit Organization

Kitikmeok

Kivalliq

Qikiqktani

Meadowbank and Meliadine on Inuit Owned Lands in the Kivalliq region

Page 10: The meadowbank experience  lessons learned about gold

agnicoeagle.com

PERMITTING FOR EXPLORATION IN NUNAVUT

10

Federal Gov’t or Inuit Organization

EXPLORATION

Nunavut Water Board

Screening by Nunavut Impact Review Board

Exploration Lease Type B Water License

Approximately 6-12 months

Page 11: The meadowbank experience  lessons learned about gold

agnicoeagle.com

PERMITTING FOR MINING IN NUNAVUT – PROJECT CERTIFICATE

11

Construction and Operation

Nunavut Water Board (NWB) Assessment and Public Hearings

Screening by Nunavut Impact Review Board (NIRB)

Environmental Impact Assessment & Public

Hearings

Type A Water License

Approximately 3-4 years

Submit Project Description to Nunavut Impact Review Board with Application for Water Licence

Referred to NIRB Hearings Process

Inuit Impact Benefit Agreement (IIBA)

Mining Lease

Water Compensation Agreement

Agreements with Inuit Organizations

Surface Lease

Project Certificate

Approved land use permit conformity with Nunavut Planning Commission

Project Construction can start

Page 12: The meadowbank experience  lessons learned about gold

agnicoeagle.com

MEADOWBANK INFRASTRUCTURE : Air and water access

• Meadowbank supported from Val d’Or (air): - Mine staff - Technical Services - Administration

- Supplies

• Supplies shipped by barge (2-3 month shipping season )

12

Page 13: The meadowbank experience  lessons learned about gold

agnicoeagle.com Baker

BAKER LAKE

Whitehills Lake

AIRPORT

MEADOWBANK

Lake

0 10 Kilometres

Conventional Road

Bridge Crossing

MEADOWBANK INFRASTRUCTURE: Road

• All season access via a 102 km conventional gravel road

• Construction started winter 2007 and finished in 2008

13

Page 14: The meadowbank experience  lessons learned about gold

agnicoeagle.com

5.6 M litre Fuel Tank Pad

Crushing Plant

Airstrip Camp Facilities

MEADOWBANK PROJECT – APRIL 2007 Current Status - 2006 Site Construction

14

Page 15: The meadowbank experience  lessons learned about gold

agnicoeagle.com

MEADOWBANK PROJECT – 2012

Meadowbank Access

Portage Pit

Goose Pit

airstrip

15

Page 16: The meadowbank experience  lessons learned about gold

agnicoeagle.com

MEADOWBANK GEOLOGY

16

Page 17: The meadowbank experience  lessons learned about gold

agnicoeagle.com

Prior to Start Up • AEM had limited arctic experience • Logistics – limited shipping season, air transport issues • Fuel storage and management • Mining in a lake: dewatering dikes • Staffing – management team, training of Inuit workforce

After Start Up • Mining – blizzard and cold temperatures– temporary shutdowns and equipment

issues – mining in permafrost – dewater to mine • Process plant - challenges reaching 8,500 tpd capacity • Ore storage - frozen stockpiles • Dilution - narrow mining widths, ore zone angle and ore dispersion from

blasting • Turnover: 229 Inuit departures in 2011 (permanent and temporary) • Kitchen fire in 2011

MEADOWBANK CHALLENGES

17

Page 18: The meadowbank experience  lessons learned about gold

agnicoeagle.com

MEADOWBANK ACCOMPLISHMENTS

• Block model confirmed – locally better grade reconciliation

• June 2011 - Installed permanent secondary crusher, which allowed designed mill throughput of 8,500 tpd to be consistently exceeded (now >11,000 tpd)

• Feb. 2012 - New optimized mine plan which reduced ore and waste tonnes by 36%

• Now have a well trained Inuit and expat workforce with arctic experience, ~32% Inuit workforce

Q1 : 11,300 tpd

Secondary crusher increased throughput from 6,800 tpd in mid 2011 to 11,300 in Q1, 2013

18

Page 19: The meadowbank experience  lessons learned about gold

agnicoeagle.com

MEADOWBANK TODAY

• Record performance in 2012 • Expected to produce about 360,000

ozs at $985/oz in 2013. • 2012 reserve growth (at higher

grades) could have a positive impact on the current six year mine life

19

P&P GOLD RESERVES (million oz) 2.3

AVERAGE GOLD RESERVE GRADE (g/t)

2.8

Measured & Indicated resource (million oz) (10.3 M tonnes @ 2.49 g/t)

0.8

Inferred resource (million oz) (3.6 M tonnes @ 3.81 g/t) 0.4

2013 Sustaining capital (est.) $40

2013 exploration budget $4M

See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.

Page 20: The meadowbank experience  lessons learned about gold

agnicoeagle.com

MELIADINE - PROJECT HISTORY

History & Permitting Milestones • 1972: First gold discovery reported by Rankin Nickel Syndicate at Tonic Lake

• 1989: Asamera & Comaplex Minerals find the Discovery deposit (4.4 g/t over 4.0m) and form a 50:50 JV

• 1993: Discovery of Tiriganiaq (17.2/ g/t over 1.1m), F Zone and Pump Zones

• 1994: Asamera sells its interest to Cumberland Resources

• 1995: WMC options the Meliadine West property

• 2003: Comaplex Minerals buys WMC 56% interest to own 78% of the property, Resource Capital Fund holds 50% interest in Meliadine East

• 2010: Comaplex acquires remaining interest in Meliadine East

• 2010: AEM acquires Comaplex in July for $668 million and gets 100% of the Meliadine property.

20

Page 21: The meadowbank experience  lessons learned about gold

agnicoeagle.com

MELIADINE INFRASTRUCTURE

• Similar concept to Meadowbank • Shorter road access (~24 km) to a

larger community (Rankin Inlet) • Airport can support larger aircraft • Slightly longer shipping season with

better port facility

21

Page 22: The meadowbank experience  lessons learned about gold

agnicoeagle.com

WHY MELIADINE?

• Better infrastructure than Meadowbank

• Large resource base with higher-grade UG component

• Successor operation to Meadowbank

• Management and workforce now well experienced with arctic operations

• AEM has built up strong relationships with the government and local suppliers in Nunavut

• Located in a politically stable, pro-mining jurisdiction

• 100% ownership of an 80 km long belt with significant exploration potential

Strategic Rationale

22

Page 23: The meadowbank experience  lessons learned about gold

agnicoeagle.com

MELIADINE GEOLOGY – 80 KM LONG BELT

23

Page 24: The meadowbank experience  lessons learned about gold

agnicoeagle.com

MELIADINE PROJECT – RESERVES & RESOURCES • 2012 exploration resulted in significant new

resources, primarily at the new Normeg deposit

• Normeg is about 100 metres from the main Tiriganiaq deposit

- could enhance overall project economics

P&P GOLD RESERVES (million oz) 3.0

AVERAGE GOLD RESERVE GRADE (g/t) 7.0

Indicated gold resource (million oz) (17.2 M tonnes @ 3.9 g/t) 2.2

Inferred gold resource (million oz) (14.8 M tonnes @ 6.2 g/t) 2.9

See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.

24

Page 25: The meadowbank experience  lessons learned about gold

agnicoeagle.com

2013 MELIADINE EXPLORATION PROGRAM

• $31 million exploration program for 2013

• Drilling restarted in March

• 9 rigs currently operating

• 90,000 m drilling planned - Conversion of existing resources

- Extension of known deposits

• Potential for the discovery of new zones like Normeg

• Portal cover will be installed this year to allow restart of exploration ramp

Portal

25

Page 26: The meadowbank experience  lessons learned about gold

agnicoeagle.com

MELIADINE PROJECT – CURRENT STATUS

• Road connected to camp in March - Final construction this summer

• Alternate energy study underway

- LNG and wind power

• Expect updated technical study in 2014

- Potential OP and UG operation

• Permitting activities are ongoing

- Project certificate expected in 2014

- Potential for first production in 2018

65m bridge span over Meliadine river

26

Page 27: The meadowbank experience  lessons learned about gold

agnicoeagle.com

agnicoeagle.com