Overview Deliverables Who is using it? Development Process Current Status Summary
27/03/03 M. Gonzalez Berges / JCOP FW team 3
The Joint COntrols Project
Set up in 1998 as a collaboration between the four LHC experiments and CERN as equal partners
Project mandate:“To develop a common Framework and components for
detector control of the LHC experiments and to define the required long-term support.“
JCOP comprises many activities Evaluation of different technologies Main subprojects
Framework Detector Safety System (DSS) Gas Systems
And others
27/03/03 M. Gonzalez Berges / JCOP FW team 4
The JCOP Framework
Project established in May 2000 Use Architecture WG Framework Design Proposal as
starting point Aims
Reduce the development effort Reuse of components Hide complexity Help in the learning process
Facilitate the integration Reduce resources needed afterwards
Homogeneous control system Operation Maintenance
27/03/03 M. Gonzalez Berges / JCOP FW team 5
Approach Followed
Provide a higher layer of abstraction reduce knowledge of tools interface for non experts
Customize & Extend industrial components Modular/Extensible
core mix & match components
As intuitive as possible Global rather than local optimization
Not a complete control system!
27/03/03 M. Gonzalez Berges / JCOP FW team 6
Types of Users
Component Developer Extends the Framework
System Developer Develops a controls application using the Framework
System Integrator Puts together systems developed separately
End Users Domain Expert (e.g. gas, high voltage)
27/03/03 M. Gonzalez Berges / JCOP FW team 7
DCS Development
Architecture Working Group
ExperimentControl System
ExperimentFramework
Control SystemFramework
SCADA/FSMAnd other tools
FrameworkDesign
JCOP Framework Team
Experiment Team
Experiment Sub-detector Teams
Users
27/03/03 M. Gonzalez Berges / JCOP FW team 8
SCADA (PVSS)
JCOP FW (Supervisory)
Supervisory Application
FSM, DB, Web,etc.
Supervision
Front-end
PLC
UNICOS FWFE Application
Communication
PC (Windows, Linux)
Other Systems
Commercial Devices
Device DriverFE Application
OPC, PVSS Comms, DIM, DIPOPC, PVSS Comms, DIM, DIP
Architecture
27/03/03 M. Gonzalez Berges / JCOP FW team 9
Framework Deliverables
Guidelines document Devices Tools Libraries Examples Tutorial & training
27/03/03 M. Gonzalez Berges / JCOP FW team 10
Guidelines and Conventions
Guidelines to produce a coherent control system Look and feel
e.g. colours, fonts, layout Alarm classes Naming convention Exception handling File organization and so on
27/03/03 M. Gonzalez Berges / JCOP FW team 11
Devices
Representation of real-world device or logical entity Device consists of
Supervisory Data Point Type(s) Library Panels
Front-end object Commercial Custom made
27/03/03 M. Gonzalez Berges / JCOP FW team 12
Supported Devices
Generic Analog-Digital devices CAEN power supplies Wiener power supplies Wiener Fan Tray (crate control) PS and SPS machine data server ELMB Logical Node/View Device Support Extension
27/03/03 M. Gonzalez Berges / JCOP FW team 13
Tools (I)
Device Editor/Navigator Main interface to the Framework System management: installation, login, etc Configuration and operation of devices
Controls Hierarchy High level view and behaviour of experiment Includes Finite State Machines (based on SMI++) Provides predefined behaviour (partitioning rules)
External Alarm Handler Receive alarms in PVSS from a external system
Trending Simplify & extend PVSS trends Pages of predefined plots, templates, tree
27/03/03 M. Gonzalez Berges / JCOP FW team 14
Tools (II)
Generic External Handler To incorporate C++ code to panels and ctrl manager Easier to use than standard PVSS C++
Mass Configuration Initial release including creation and deletion Manipulation of device sets coming
Component Installation
27/03/03 M. Gonzalez Berges / JCOP FW team 15
Supervisory Application
Event Manager
Data Manager
OPC client OPC client OPC client
OPC serverOPC server OPC server
FW Custom FE
Device Editor Navigator
Controls Hierarchy
C/C++ code GEH
EAHExternal System
FW Custom FE
Devices
User specific FE
UserFrameworkPVSSCommercial
Equipment
OPC, DIM, PVSS comms
Framework Components
27/03/03 M. Gonzalez Berges / JCOP FW team 16
Other deliverables
Libraries Setting of address, alerts, archiving, etc List manipulation Exception handling
Examples Panels Buttons Scripts
Tutorial Use of several FW tools Available as a one day course from the CERN Training Service Can be run in our lab with real hardware or in user’s own lab with
simulator
27/03/03 M. Gonzalez Berges / JCOP FW team 17
Who is using it?
Fixed target experiments COMPASS HARP NA60
LHC experiments & testbeams ALICE / HMPID, TPC ATLAS / Muon Chambers, Inner Detectors integration CMS / Muon DT LHCb / Velo, Muon
Gamma Irradiation Facility (GIF) Experiments’ Gas Control Systems LHC Accelerator UNICOS Framework
Cryogenics Vacuum
27/03/03 M. Gonzalez Berges / JCOP FW team 18
Development Process
Driven by the Framework Working Group Meetings every two weeks Identify new components and set priorities (planning) Review requirements Review implementation proposals Forum for exchanging ideas Members
Representatives from each of the LHC experiments FW core team
Agreed development process Iterative, lightweight
Configuration Management
27/03/03 M. Gonzalez Berges / JCOP FW team 19
Short requirements doc
Implementation Proposal
Implementation
Test
Documentation
FW WG Review
FW WG Review
Development Process
Information Management
Configuration Management
27/03/03 M. Gonzalez Berges / JCOP FW team 20
Status
Three major releases since June 2001 Increasing functionality Incorporating feedback
Current work Simplification of the integration of new device types Configuration from an external database Data Storage and Retrieval
CASTOR Conditions Database
ISEG power supplies Access Control Scalability tests
27/03/03 M. Gonzalez Berges / JCOP FW team 21
Summary
Successful collaboration Development process
Framework WG Feedback from users
Deliverables in production Overhead of consultancy and support Useful feedback from users
Recent external JCOP Review Approach adopted was supported Framework identified as one of the key elements of JCOP Good support for common devices Databases an important issue to be followed
27/03/03 M. Gonzalez Berges / JCOP FW team 22
Pointers
JOint Controls Project http://cern.ch/itco/Projects-Services/JCOP
External JCOP Review http://cern.ch/itco/Projects-Services/JCOP/ExternalReview
JCOP Framework: http://cern.ch/itcobe/Projects/Framework