Eileen Hunt <[email protected]> The Garden on Sunset (8150 W Sunset Bl New MixedUse Project) 7 messages Eileen Hunt <[email protected]> Fri, Aug 2, 2013 at 8:39 AM To: Jeannie Shen <[email protected]> Hi Jeannie, I just signed the MOU with Hirsch/Green Transportation Consulting, Inc. for a new mixeduse project at 8150 W Sunset Blvd. Back in April they were discussing this project with Tommy, Western District and the Pedestrian group. The project is in CD 4. That means Hollywood/Wilshire District, right? The project is proposing to change the southwest corner of Sunset & Crescent Heights. Currently, the eastbound right turn lane on Sunset is separated from the main roadway by a median island. They would like to move the rightturn lane back to the main roadway and incorporate the island into the intersection. Attached is the conceptual site plan which was included in the MOU and following you'll see Brian Gallagher's comments on the previous conceptual design. Previously, the conceptual site plan did not include a valet dropoff on Crescent Heights. The total net project trips are: 1,055 daily, 220 AM peak hour, 211 PM peak hour. The project will replace about 80,000 sf retail/commercial use with 111,000 sf retail/commercial uses and 249 apartments. Thanks for your time, Jeannie. Eileen Hunt, Transportation Engineering Associate II Metro Development Review City of Los Angeles Department of Transportation 100 S. Main St., 9th Flr. Los Angeles, CA 90012 2139728481 Forwarded message From: Brian Gallagher <[email protected]> Date: Tue, Apr 16, 2013 at 6:10 PM Subject: Fwd: FW: New Project PROJECT OPPORTUNITY ALERT!! To: Valerie Watson <[email protected]>, Pauline Chan <[email protected]>, Margot Ocanas <[email protected]> Cc: Rudy Guevara <[email protected]>, Tomas Carranza <[email protected]>, Selwyn Hollins <[email protected]> Valerie, Pauline, Margot ...... Please look at the attachment. There is a proposed project to remove a rightturn lane and relocate it onto the main roadway. This will allow us to connect a large median island to the rest of the block at the southwest corner. This is also a busy commercial area. I see that in addition to what is being proposed, it might be able to be made into a pedestrian area if they work with your group. Tomas, Rudy......... I like this project, but am concerned about the loss of capacity at the intersection by replacing a long, uncontrolled right turn lane with a shorter, signal controlled lane that will be blocked by a bus stop. I will support this project if the bus stop is relocated to the far side of the intersection, AND if we have the opportunity to add N/B LT phasing + E/B RT phasing at the signal, if determined to be justified by the District, so that the RT overlap phase could minimize the reduction of capacity. This intersection is heavily congested, and we need to try for at least capacity neutral projects if possible. Brian

Upload: others

Post on 15-Feb-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Eileen Hunt <[email protected]>

The Garden on Sunset (8150 W Sunset Bl ­ New Mixed­Use Project) 7 messages

Eileen Hunt <[email protected]> Fri, Aug 2, 2013 at 8:39 AMTo: Jeannie Shen <[email protected]>

Hi Jeannie,

I just signed the MOU with Hirsch/Green Transportation Consulting, Inc. for a new mixed­use project at 8150 W SunsetBlvd.  Back in April they were discussing this project with Tommy, Western District and the Pedestrian group.  Theproject is in CD 4.  That means Hollywood/Wilshire District, right?  

The project is proposing to change the southwest corner of Sunset & Crescent Heights.  Currently, the eastbound right­turn lane on Sunset is separated from the main roadway by a median island.  They would like to move the right­turn laneback to the main roadway and incorporate the island into the intersection.  Attached is the conceptual site plan whichwas included in the MOU and following you'll see Brian Gallagher's comments on the previous conceptual design. Previously, the conceptual site plan did not include a valet drop­off on Crescent Heights.

The total net project trips are: 1,055 daily, ­220 AM peak hour, 211 PM peak hour.  The project will replace about 80,000sf retail/commercial use with 111,000 sf retail/commercial uses and 249 apartments.

Thanks for your time, Jeannie.  Eileen Hunt, Transportation Engineering Associate II Metro Development ReviewCity of Los AngelesDepartment of Transportation100 S. Main St., 9th Flr.Los Angeles, CA 90012213­972­8481

­­­­­­­­­­ Forwarded message ­­­­­­­­­­From: Brian Gallagher <[email protected]> Date: Tue, Apr 16, 2013 at 6:10 PM Subject: Fwd: FW: New Project PROJECT OPPORTUNITY ALERT!! To: Valerie Watson <[email protected]>, Pauline Chan <[email protected]>, Margot Ocanas<[email protected]> Cc: Rudy Guevara <[email protected]>, Tomas Carranza <[email protected]>, Selwyn Hollins<[email protected]

Valerie, Pauline, Margot......

Please look at the attachment.  There is a proposed project to remove a right­turn lane and relocate it onto the mainroadway.  This will allow us to connect a large median island to the rest of the block at the southwest corner.   This isalso a busy commercial area.  I see that in addition to what is being proposed, it might be able to be made into apedestrian area if they work with your group.

Tomas, Rudy.........

I like this project, but am concerned about the loss of capacity at the intersection by replacing a long, uncontrolled rightturn lane with a shorter, signal controlled lane that will be blocked by a bus stop.  I will support this project if the busstop is relocated to the far side of the intersection, AND if we have the opportunity to add N/B LT phasing + E/B RTphasing at the signal, if determined to be justified by the District, so that the RT overlap phase could minimize thereduction of capacity.  This intersection is heavily congested, and we need to try for at least capacity neutral projects ifpossible.

Brian

Page 2: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

­­­­­­­­­­ Forwarded message ­­­­­­­­­­From: Rudy Guevara <[email protected]> Date: Tue, Apr 16, 2013 at 4:09 PM Subject: Fwd: FW: New Project To: Brian Gallagher <[email protected]

Brian,

What do you think about this conceptual improvement?  I need to give my comments but I am not convinced I like itbecause now the pedestrians will have a longer path across Sunset and also across Crescent heights to follow. what doyou think?

­­­­­­­­­­ Forwarded message ­­­­­­­­­­From: Aaron Green <[email protected]> Date: Tue, Apr 16, 2013 at 3:40 PM Subject: FW: New Project To: [email protected], Rudy Guevara <[email protected]>, Tim Conger <[email protected]> Cc: Ron Hirsch <[email protected]

Hi Guys,

 

As you have previously discussed with Ron, we are currently working on a project that is located south of SunsetBoulevard between Crescent Heights Boulevard and Havenhurst Drive.  This project presents an opportunity that webelieve will not only benefit the project’s access on Crescent Heights Boulevard, but will clean up the intersecĕon ofSunset Boulevard and Crescent Heights Boulevard by removing the sweeping right‐turn “cut‐through” lane(eastbound to southbound) that is stop‐sign controlled at its intersecĕon with Crescent Heights Boulevard, locatedapproximately 130‐feet south of Sunset Boulevard.

 

I have aĥached a graphic illustraĕng the conceptual design for the reconfiguraĕon of this intersecĕon and we lookforward to meeĕng with you on Monday to further discuss the possibiliĕes of pursuing this idea.

 

If you have any quesĕon prior to Monday’s meeĕng, please do not hesitate to contact either Ron or myself.

 

Thanks,

Aaron Green

Hirsch/Green Transportation Consulting, Inc.

13333 Ventura Boulevard, Suite 204

Sherman Oaks, California  91423

(v)  818.325.0530 x­202

Page 3: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

(f)  818­325­0534

[email protected]

www.hgtraffic.com

 

Site Plan from Sunset­Crescent Heights MOU ­ 7­15­2013.pdf1400K

Jeannie Shen <[email protected]> Fri, Aug 2, 2013 at 9:32 AMTo: Eileen Hunt <[email protected]>

Hi Eileen,Since this is now CD4, HW will need to review.  Do you happen to have the ped group comments?  If not, I alreadyemailed them. I have passed this to Roy for comment as well, but I do agree with Brian. Also, I don't like the valet zone on Crescentheights especially if it queues and blocks the curb lane, it will be down to one lane and EB right turn won't be able to turnand SB curb lane will be blocked creating gridlock at this intersection which already bad.

Jeannie Shen Transportation Engineer Hollywood­Wilshire District6501 Fountain AveLos Angeles, CA  90028 Tel: (323)957­6843 Fax: (323)957­4576Email:  [email protected] Mail Stop 726

On Fri, Aug 2, 2013 at 8:39 AM, Eileen Hunt <[email protected]> wrote: Hi Jeannie, I just signed the MOU with Hirsch/Green Transportation Consulting, Inc. for a new mixed­use project at 8150 WSunset Blvd.  Back in April they were discussing this project with Tommy, Western District and the Pedestrian group. The project is in CD 4.  That means Hollywood/Wilshire District, right?   The project is proposing to change the southwest corner of Sunset & Crescent Heights.  Currently, the eastboundright­turn lane on Sunset is separated from the main roadway by a median island.  They would like to move the right­turn lane back to the main roadway and incorporate the island into the intersection.  Attached is the conceptual siteplan which was included in the MOU and following you'll see Brian Gallagher's comments on the previous conceptualdesign.  Previously, the conceptual site plan did not include a valet drop­off on Crescent Heights. The total net project trips are: 1,055 daily, ­220 AM peak hour, 211 PM peak hour.  The project will replace about80,000 sf retail/commercial use with 111,000 sf retail/commercial uses and 249 apartments. Thanks for your time, Jeannie.   Eileen Hunt, Transportation Engineering Associate II Metro Development Review City of Los Angeles Department of Transportation100 S. Main St., 9th Flr.Los Angeles, CA 90012 213­972­8481  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Brian Gallagher <[email protected]

Page 4: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Date: Tue, Apr 16, 2013 at 6:10 PM Subject: Fwd: FW: New Project PROJECT OPPORTUNITY ALERT!! To: Valerie Watson <[email protected]>, Pauline Chan <[email protected]>, Margot Ocanas<[email protected]> Cc: Rudy Guevara <[email protected]>, Tomas Carranza <[email protected]>, Selwyn Hollins<[email protected]>   Valerie, Pauline, Margot...... Please look at the attachment.  There is a proposed project to remove a right­turn lane and relocate it onto the mainroadway.  This will allow us to connect a large median island to the rest of the block at the southwest corner.   This isalso a busy commercial area.  I see that in addition to what is being proposed, it might be able to be made into apedestrian area if they work with your group. Tomas, Rudy......... I like this project, but am concerned about the loss of capacity at the intersection by replacing a long, uncontrolledright turn lane with a shorter, signal controlled lane that will be blocked by a bus stop.  I will support this project if thebus stop is relocated to the far side of the intersection, AND if we have the opportunity to add N/B LT phasing + E/BRT phasing at the signal, if determined to be justified by the District, so that the RT overlap phase could minimize thereduction of capacity.  This intersection is heavily congested, and we need to try for at least capacity neutral projectsif possible. Brian ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Rudy Guevara <[email protected]> Date: Tue, Apr 16, 2013 at 4:09 PM Subject: Fwd: FW: New Project To: Brian Gallagher <[email protected]>   Brian,  What do you think about this conceptual improvement?  I need to give my comments but I am not convinced I like itbecause now the pedestrians will have a longer path across Sunset and also across Crescent heights to follow. whatdo you think?  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Aaron Green <[email protected]> Date: Tue, Apr 16, 2013 at 3:40 PM Subject: FW: New Project To: [email protected], Rudy Guevara <[email protected]>, Tim Conger <[email protected]> Cc: Ron Hirsch <[email protected]>   

Hi Guys,

 

As you have previously discussed with Ron, we are currently working on a project that is located south of SunsetBoulevard between Crescent Heights Boulevard and Havenhurst Drive.  This project presents an opportunity thatwe believe will not only benefit the project’s access on Crescent Heights Boulevard, but will clean up theintersecĕon of Sunset Boulevard and Crescent Heights Boulevard by removing the sweeping right‐turn “cut‐through” lane (eastbound to southbound) that is stop‐sign controlled at its intersecĕon with Crescent HeightsBoulevard, located approximately 130‐feet south of Sunset Boulevard.

 

I have aĥached a graphic illustraĕng the conceptual design for the reconfiguraĕon of this intersecĕon and we lookforward to meeĕng with you on Monday to further discuss the possibiliĕes of pursuing this idea.

Page 5: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

 

If you have any quesĕon prior to Monday’s meeĕng, please do not hesitate to contact either Ron or myself.

 

Thanks,

Aaron Green

Hirsch/Green Transportation Consulting, Inc.

13333 Ventura Boulevard, Suite 204

Sherman Oaks, California  91423

(v)  818.325.0530 x­202

(f)  818­325­0534

[email protected]

www.hgtraffic.com

 

Jeannie Shen <[email protected]> Fri, Aug 2, 2013 at 10:04 AMTo: Eileen Hunt <[email protected]>

Hi Eileen,Do you have a count for SB RT ? 

­­­­­­­­­­ Forwarded message ­­­­­­­­­­From: Roy Kim <[email protected]> Date: Fri, Aug 2, 2013 at 9:54 AMSubject: Re: The Garden on Sunset (8150 W Sunset Bl ­ New Mixed­Use Project)To: Jeannie Shen <[email protected]

I generally agree.  Do they have the RT volume on the cut­thru lane?

Bus Stop should be relocated as Brian suggested.RT lane may need to longer depending on the capacity anaylsis.Should go with wider turning radius? Design issue.  

On Fri, Aug 2, 2013 at 9:13 AM, Jeannie Shen <[email protected]> wrote: Hi Roy, Do you agree with Brian's assessment?  I don't have a response from the Pedestrian Group. ­­Jeannie    

Page 6: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

On Fri, Aug 2, 2013 at 8:39 AM, Eileen Hunt <[email protected]> wrote: Hi Jeannie, I just signed the MOU with Hirsch/Green Transportation Consulting, Inc. for a new mixed­use project at 8150 WSunset Blvd.  Back in April they were discussing this project with Tommy, Western District and the Pedestriangroup.  The project is in CD 4.  That means Hollywood/Wilshire District, right?   The project is proposing to change the southwest corner of Sunset & Crescent Heights.  Currently, the eastboundright­turn lane on Sunset is separated from the main roadway by a median island.  They would like to move theright­turn lane back to the main roadway and incorporate the island into the intersection.  Attached is the conceptualsite plan which was included in the MOU and following you'll see Brian Gallagher's comments on the previousconceptual design.  Previously, the conceptual site plan did not include a valet drop­off on Crescent Heights. The total net project trips are: 1,055 daily, ­220 AM peak hour, 211 PM peak hour.  The project will replace about80,000 sf retail/commercial use with 111,000 sf retail/commercial uses and 249 apartments. Thanks for your time, Jeannie.   Eileen Hunt, Transportation Engineering Associate II Metro Development Review City of Los Angeles Department of Transportation100 S. Main St., 9th Flr.Los Angeles, CA 90012 213­972­8481  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Brian Gallagher <[email protected]> Date: Tue, Apr 16, 2013 at 6:10 PM Subject: Fwd: FW: New Project PROJECT OPPORTUNITY ALERT!! To: Valerie Watson <[email protected]>, Pauline Chan <[email protected]>, Margot Ocanas<[email protected]> Cc: Rudy Guevara <[email protected]>, Tomas Carranza <[email protected]>, Selwyn Hollins<[email protected]>   Valerie, Pauline, Margot...... Please look at the attachment.  There is a proposed project to remove a right­turn lane and relocate it onto the mainroadway.  This will allow us to connect a large median island to the rest of the block at the southwest corner.   Thisis also a busy commercial area.  I see that in addition to what is being proposed, it might be able to be made into apedestrian area if they work with your group. Tomas, Rudy......... I like this project, but am concerned about the loss of capacity at the intersection by replacing a long, uncontrolledright turn lane with a shorter, signal controlled lane that will be blocked by a bus stop.  I will support this project ifthe bus stop is relocated to the far side of the intersection, AND if we have the opportunity to add N/B LT phasing +E/B RT phasing at the signal, if determined to be justified by the District, so that the RT overlap phase couldminimize the reduction of capacity.  This intersection is heavily congested, and we need to try for at least capacityneutral projects if possible. Brian ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Rudy Guevara <[email protected]> Date: Tue, Apr 16, 2013 at 4:09 PM Subject: Fwd: FW: New ProjectTo: Brian Gallagher <[email protected]>   Brian,  What do you think about this conceptual improvement?  I need to give my comments but I am not convinced I likeit because now the pedestrians will have a longer path across Sunset and also across Crescent heights to follow.

Page 7: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

what do you think?  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Aaron Green <[email protected]>Date: Tue, Apr 16, 2013 at 3:40 PM Subject: FW: New ProjectTo: [email protected], Rudy Guevara <[email protected]>, Tim Conger <[email protected]> Cc: Ron Hirsch <[email protected]>  

Hi Guys,

 

As you have previously discussed with Ron, we are currently working on a project that is located south of SunsetBoulevard between Crescent Heights Boulevard and Havenhurst Drive.  This project presents an opportunity thatwe believe will not only benefit the project’s access on Crescent Heights Boulevard, but will clean up theintersecĕon of Sunset Boulevard and Crescent Heights Boulevard by removing the sweeping right‐turn “cut‐through” lane (eastbound to southbound) that is stop‐sign controlled at its intersecĕon with Crescent HeightsBoulevard, located approximately 130‐feet south of Sunset Boulevard.

 

I have aĥached a graphic illustraĕng the conceptual design for the reconfiguraĕon of this intersecĕon and welook forward to meeĕng with you on Monday to further discuss the possibiliĕes of pursuing this idea.

 

If you have any quesĕon prior to Monday’s meeĕng, please do not hesitate to contact either Ron or myself.

 

Thanks,

Aaron Green

Hirsch/Green Transportation Consulting, Inc.

13333 Ventura Boulevard, Suite 204

Sherman Oaks, California  91423

(v)  818.325.0530 x­202

(f)  818­325­0534

[email protected]

www.hgtraffic.com

 

 

Page 8: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Eileen Hunt <[email protected]> Fri, Aug 2, 2013 at 10:22 AMTo: Jeannie Shen <[email protected]>

Hi Jeannie,

Don't have anything in writing from the ped group.  I think Tommy had talked to Pauline about it.  

I'll ask Ron for the counts.

Eileen Hunt, Transportation Engineering Associate II Metro Development ReviewCity of Los AngelesDepartment of Transportation100 S. Main St., 9th Flr.Los Angeles, CA 90012213­972­8481

On Fri, Aug 2, 2013 at 10:04 AM, Jeannie Shen <[email protected]> wrote: Hi Eileen, Do you have a count for SB RT ?   ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Roy Kim <[email protected]> Date: Fri, Aug 2, 2013 at 9:54 AM Subject: Re: The Garden on Sunset (8150 W Sunset Bl ­ New Mixed­Use Project) To: Jeannie Shen <[email protected]>   I generally agree.  Do they have the RT volume on the cut­thru lane? Bus Stop should be relocated as Brian suggested.RT lane may need to longer depending on the capacity anaylsis.Should go with wider turning radius? Design issue.    On Fri, Aug 2, 2013 at 9:13 AM, Jeannie Shen <[email protected]> wrote: Hi Roy, Do you agree with Brian's assessment?  I don't have a response from the Pedestrian Group. ­­Jeannie    On Fri, Aug 2, 2013 at 8:39 AM, Eileen Hunt <[email protected]> wrote: Hi Jeannie, I just signed the MOU with Hirsch/Green Transportation Consulting, Inc. for a new mixed­use project at 8150 WSunset Blvd.  Back in April they were discussing this project with Tommy, Western District and the Pedestriangroup.  The project is in CD 4.  That means Hollywood/Wilshire District, right?   The project is proposing to change the southwest corner of Sunset & Crescent Heights.  Currently, the eastboundright­turn lane on Sunset is separated from the main roadway by a median island.  They would like to move theright­turn lane back to the main roadway and incorporate the island into the intersection.  Attached is theconceptual site plan which was included in the MOU and following you'll see Brian Gallagher's comments on theprevious conceptual design.  Previously, the conceptual site plan did not include a valet drop­off on CrescentHeights. The total net project trips are: 1,055 daily, ­220 AM peak hour, 211 PM peak hour.  The project will replace about80,000 sf retail/commercial use with 111,000 sf retail/commercial uses and 249 apartments. Thanks for your time, Jeannie.   

Page 9: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Eileen Hunt, Transportation Engineering Associate II Metro Development Review City of Los Angeles Department of Transportation100 S. Main St., 9th Flr.Los Angeles, CA 90012 213­972­8481  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Brian Gallagher <[email protected]> Date: Tue, Apr 16, 2013 at 6:10 PM Subject: Fwd: FW: New Project PROJECT OPPORTUNITY ALERT!! To: Valerie Watson <[email protected]>, Pauline Chan <[email protected]>, Margot Ocanas<[email protected]> Cc: Rudy Guevara <[email protected]>, Tomas Carranza <[email protected]>, Selwyn Hollins<[email protected]>   Valerie, Pauline, Margot...... Please look at the attachment.  There is a proposed project to remove a right­turn lane and relocate it onto themain roadway.  This will allow us to connect a large median island to the rest of the block at the southwest corner.  This is also a busy commercial area.  I see that in addition to what is being proposed, it might be able to bemade into a pedestrian area if they work with your group. Tomas, Rudy......... I like this project, but am concerned about the loss of capacity at the intersection by replacing a long,uncontrolled right turn lane with a shorter, signal controlled lane that will be blocked by a bus stop.  I will supportthis project if the bus stop is relocated to the far side of the intersection, AND if we have the opportunity to addN/B LT phasing + E/B RT phasing at the signal, if determined to be justified by the District, so that the RT overlapphase could minimize the reduction of capacity.  This intersection is heavily congested, and we need to try for atleast capacity neutral projects if possible. Brian ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Rudy Guevara <[email protected]> Date: Tue, Apr 16, 2013 at 4:09 PM Subject: Fwd: FW: New Project To: Brian Gallagher <[email protected]>   Brian,  What do you think about this conceptual improvement?  I need to give my comments but I am not convinced Ilike it because now the pedestrians will have a longer path across Sunset and also across Crescent heights tofollow. what do you think?  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Aaron Green <[email protected]> Date: Tue, Apr 16, 2013 at 3:40 PM Subject: FW: New Project To: [email protected], Rudy Guevara <[email protected]>, Tim Conger <[email protected]> Cc: Ron Hirsch <[email protected]>   

Hi Guys,

 

As you have previously discussed with Ron, we are currently working on a project that is located south ofSunset Boulevard between Crescent Heights Boulevard and Havenhurst Drive.  This project presents an

Page 10: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

opportunity that we believe will not only benefit the project’s access on Crescent Heights Boulevard, but willclean up the intersecĕon of Sunset Boulevard and Crescent Heights Boulevard by removing the sweeping right‐turn “cut‐through” lane (eastbound to southbound) that is stop‐sign controlled at its intersecĕon with CrescentHeights Boulevard, located approximately 130‐feet south of Sunset Boulevard.

 

I have aĥached a graphic illustraĕng the conceptual design for the reconfiguraĕon of this intersecĕon and welook forward to meeĕng with you on Monday to further discuss the possibiliĕes of pursuing this idea.

 

If you have any quesĕon prior to Monday’s meeĕng, please do not hesitate to contact either Ron or myself.

 

Thanks,

Aaron Green

Hirsch/Green Transportation Consulting, Inc.

13333 Ventura Boulevard, Suite 204

Sherman Oaks, California  91423

(v)  818.325.0530 x­202

(f)  818­325­0534

[email protected]

www.hgtraffic.com

 

   

Eileen Hunt <[email protected]> Fri, Aug 2, 2013 at 2:28 PMTo: Jeannie Shen <[email protected]>

Hi Jeannie,

Attached is the volume counts for Sunset & Crescent Heights.  I asked Ron Hirsch if they had ped counts, but theydon't. 

­Eileen

Eileen Hunt, Transportation Engineering Associate II Metro Development ReviewCity of Los AngelesDepartment of Transportation100 S. Main St., 9th Flr.

Page 11: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Los Angeles, CA 90012213­972­8481

On Fri, Aug 2, 2013 at 10:04 AM, Jeannie Shen <[email protected]> wrote: Hi Eileen, Do you have a count for SB RT ?   ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Roy Kim <[email protected]> Date: Fri, Aug 2, 2013 at 9:54 AM Subject: Re: The Garden on Sunset (8150 W Sunset Bl ­ New Mixed­Use Project) To: Jeannie Shen <[email protected]>   I generally agree.  Do they have the RT volume on the cut­thru lane? Bus Stop should be relocated as Brian suggested.RT lane may need to longer depending on the capacity anaylsis.Should go with wider turning radius? Design issue.    On Fri, Aug 2, 2013 at 9:13 AM, Jeannie Shen <[email protected]> wrote: Hi Roy, Do you agree with Brian's assessment?  I don't have a response from the Pedestrian Group. ­­Jeannie    On Fri, Aug 2, 2013 at 8:39 AM, Eileen Hunt <[email protected]> wrote: Hi Jeannie, I just signed the MOU with Hirsch/Green Transportation Consulting, Inc. for a new mixed­use project at 8150 WSunset Blvd.  Back in April they were discussing this project with Tommy, Western District and the Pedestriangroup.  The project is in CD 4.  That means Hollywood/Wilshire District, right?   The project is proposing to change the southwest corner of Sunset & Crescent Heights.  Currently, the eastboundright­turn lane on Sunset is separated from the main roadway by a median island.  They would like to move theright­turn lane back to the main roadway and incorporate the island into the intersection.  Attached is theconceptual site plan which was included in the MOU and following you'll see Brian Gallagher's comments on theprevious conceptual design.  Previously, the conceptual site plan did not include a valet drop­off on CrescentHeights. The total net project trips are: 1,055 daily, ­220 AM peak hour, 211 PM peak hour.  The project will replace about80,000 sf retail/commercial use with 111,000 sf retail/commercial uses and 249 apartments. Thanks for your time, Jeannie.   Eileen Hunt, Transportation Engineering Associate II Metro Development Review City of Los Angeles Department of Transportation100 S. Main St., 9th Flr.Los Angeles, CA 90012 213­972­8481  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Brian Gallagher <[email protected]> Date: Tue, Apr 16, 2013 at 6:10 PM Subject: Fwd: FW: New Project PROJECT OPPORTUNITY ALERT!! To: Valerie Watson <[email protected]>, Pauline Chan <[email protected]>, Margot Ocanas<[email protected]> Cc: Rudy Guevara <[email protected]>, Tomas Carranza <[email protected]>, Selwyn Hollins

Page 12: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

<[email protected]>   Valerie, Pauline, Margot...... Please look at the attachment.  There is a proposed project to remove a right­turn lane and relocate it onto themain roadway.  This will allow us to connect a large median island to the rest of the block at the southwest corner.  This is also a busy commercial area.  I see that in addition to what is being proposed, it might be able to bemade into a pedestrian area if they work with your group. Tomas, Rudy......... I like this project, but am concerned about the loss of capacity at the intersection by replacing a long,uncontrolled right turn lane with a shorter, signal controlled lane that will be blocked by a bus stop.  I will supportthis project if the bus stop is relocated to the far side of the intersection, AND if we have the opportunity to addN/B LT phasing + E/B RT phasing at the signal, if determined to be justified by the District, so that the RT overlapphase could minimize the reduction of capacity.  This intersection is heavily congested, and we need to try for atleast capacity neutral projects if possible. Brian ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Rudy Guevara <[email protected]> Date: Tue, Apr 16, 2013 at 4:09 PM Subject: Fwd: FW: New Project To: Brian Gallagher <[email protected]>   Brian,  What do you think about this conceptual improvement?  I need to give my comments but I am not convinced Ilike it because now the pedestrians will have a longer path across Sunset and also across Crescent heights tofollow. what do you think?  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Aaron Green <[email protected]> Date: Tue, Apr 16, 2013 at 3:40 PM Subject: FW: New Project To: [email protected], Rudy Guevara <[email protected]>, Tim Conger <[email protected]> Cc: Ron Hirsch <[email protected]>   

Hi Guys,

 

As you have previously discussed with Ron, we are currently working on a project that is located south ofSunset Boulevard between Crescent Heights Boulevard and Havenhurst Drive.  This project presents anopportunity that we believe will not only benefit the project’s access on Crescent Heights Boulevard, but willclean up the intersecĕon of Sunset Boulevard and Crescent Heights Boulevard by removing the sweeping right‐turn “cut‐through” lane (eastbound to southbound) that is stop‐sign controlled at its intersecĕon with CrescentHeights Boulevard, located approximately 130‐feet south of Sunset Boulevard.

 

I have aĥached a graphic illustraĕng the conceptual design for the reconfiguraĕon of this intersecĕon and welook forward to meeĕng with you on Monday to further discuss the possibiliĕes of pursuing this idea.

 

If you have any quesĕon prior to Monday’s meeĕng, please do not hesitate to contact either Ron or myself.

Page 13: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

 

Thanks,

Aaron Green

Hirsch/Green Transportation Consulting, Inc.

13333 Ventura Boulevard, Suite 204

Sherman Oaks, California  91423

(v)  818.325.0530 x­202

(f)  818­325­0534

[email protected]

www.hgtraffic.com

 

   

Loc 4 sunset_crescent hts.pdf16K

Jeannie Shen <[email protected]> Fri, Aug 2, 2013 at 2:39 PMTo: Eileen Hunt <[email protected]>

Thanks Eileen.

On Fri, Aug 2, 2013 at 2:28 PM, Eileen Hunt <[email protected]> wrote: Hi Jeannie, Attached is the volume counts for Sunset & Crescent Heights.  I asked Ron Hirsch if they had ped counts, but theydon't.  ­Eileen Eileen Hunt, Transportation Engineering Associate II Metro Development Review City of Los Angeles Department of Transportation100 S. Main St., 9th Flr.Los Angeles, CA 90012 213­972­8481   On Fri, Aug 2, 2013 at 10:04 AM, Jeannie Shen <[email protected]> wrote: 

Page 14: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Hi Eileen, Do you have a count for SB RT ?  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Roy Kim <[email protected]> Date: Fri, Aug 2, 2013 at 9:54 AM Subject: Re: The Garden on Sunset (8150 W Sunset Bl ­ New Mixed­Use Project) To: Jeannie Shen <[email protected]>   I generally agree.  Do they have the RT volume on the cut­thru lane? Bus Stop should be relocated as Brian suggested.RT lane may need to longer depending on the capacity anaylsis.Should go with wider turning radius? Design issue.    On Fri, Aug 2, 2013 at 9:13 AM, Jeannie Shen <[email protected]> wrote: Hi Roy, Do you agree with Brian's assessment?  I don't have a response from the Pedestrian Group. ­­Jeannie    On Fri, Aug 2, 2013 at 8:39 AM, Eileen Hunt <[email protected]> wrote: Hi Jeannie, I just signed the MOU with Hirsch/Green Transportation Consulting, Inc. for a new mixed­use project at 8150 WSunset Blvd.  Back in April they were discussing this project with Tommy, Western District and the Pedestriangroup.  The project is in CD 4.  That means Hollywood/Wilshire District, right?   The project is proposing to change the southwest corner of Sunset & Crescent Heights.  Currently, theeastbound right­turn lane on Sunset is separated from the main roadway by a median island.  They would liketo move the right­turn lane back to the main roadway and incorporate the island into the intersection.  Attachedis the conceptual site plan which was included in the MOU and following you'll see Brian Gallagher's commentson the previous conceptual design.  Previously, the conceptual site plan did not include a valet drop­off onCrescent Heights. The total net project trips are: 1,055 daily, ­220 AM peak hour, 211 PM peak hour.  The project will replaceabout 80,000 sf retail/commercial use with 111,000 sf retail/commercial uses and 249 apartments. Thanks for your time, Jeannie.   Eileen Hunt, Transportation Engineering Associate II Metro Development Review City of Los Angeles Department of Transportation100 S. Main St., 9th Flr.Los Angeles, CA 90012 213­972­8481  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Brian Gallagher <[email protected]> Date: Tue, Apr 16, 2013 at 6:10 PM Subject: Fwd: FW: New Project PROJECT OPPORTUNITY ALERT!! To: Valerie Watson <[email protected]>, Pauline Chan <[email protected]>, Margot Ocanas<[email protected]> Cc: Rudy Guevara <[email protected]>, Tomas Carranza <[email protected]>, Selwyn Hollins<[email protected]>   Valerie, Pauline, Margot...... 

Page 15: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Please look at the attachment.  There is a proposed project to remove a right­turn lane and relocate it onto themain roadway.  This will allow us to connect a large median island to the rest of the block at the southwestcorner.   This is also a busy commercial area.  I see that in addition to what is being proposed, it might be ableto be made into a pedestrian area if they work with your group. Tomas, Rudy......... I like this project, but am concerned about the loss of capacity at the intersection by replacing a long,uncontrolled right turn lane with a shorter, signal controlled lane that will be blocked by a bus stop.  I willsupport this project if the bus stop is relocated to the far side of the intersection, AND if we have theopportunity to add N/B LT phasing + E/B RT phasing at the signal, if determined to be justified by the District,so that the RT overlap phase could minimize the reduction of capacity.  This intersection is heavily congested,and we need to try for at least capacity neutral projects if possible. Brian ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Rudy Guevara <[email protected]> Date: Tue, Apr 16, 2013 at 4:09 PM Subject: Fwd: FW: New Project To: Brian Gallagher <[email protected]>   Brian,  What do you think about this conceptual improvement?  I need to give my comments but I am not convinced Ilike it because now the pedestrians will have a longer path across Sunset and also across Crescent heights tofollow. what do you think?  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Aaron Green <[email protected]> Date: Tue, Apr 16, 2013 at 3:40 PM Subject: FW: New Project To: [email protected], Rudy Guevara <[email protected]>, Tim Conger<[email protected]> Cc: Ron Hirsch <[email protected]>   

Hi Guys,

 

As you have previously discussed with Ron, we are currently working on a project that is located south ofSunset Boulevard between Crescent Heights Boulevard and Havenhurst Drive.  This project presents anopportunity that we believe will not only benefit the project’s access on Crescent Heights Boulevard, but willclean up the intersecĕon of Sunset Boulevard and Crescent Heights Boulevard by removing the sweepingright‐turn “cut‐through” lane (eastbound to southbound) that is stop‐sign controlled at its intersecĕon withCrescent Heights Boulevard, located approximately 130‐feet south of Sunset Boulevard.

 

I have aĥached a graphic illustraĕng the conceptual design for the reconfiguraĕon of this intersecĕon andwe look forward to meeĕng with you on Monday to further discuss the possibiliĕes of pursuing this idea.

 

If you have any quesĕon prior to Monday’s meeĕng, please do not hesitate to contact either Ron or myself.

 

Thanks,

Page 16: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Aaron Green

Hirsch/Green Transportation Consulting, Inc.

13333 Ventura Boulevard, Suite 204

Sherman Oaks, California  91423

(v)  818.325.0530 x­202

(f)  818­325­0534

[email protected]

www.hgtraffic.com

 

   

 

Jeannie Shen <[email protected]> Mon, Aug 5, 2013 at 7:28 AMTo: Eileen Hunt <[email protected]>

Hi Eileen,Does the consultant have a count for the separated EB right turn? The count you provided is may be only at theintersection.­­Jeannie

On Fri, Aug 2, 2013 at 2:39 PM, Jeannie Shen <[email protected]> wrote: Thanks Eileen.    On Fri, Aug 2, 2013 at 2:28 PM, Eileen Hunt <[email protected]> wrote: Hi Jeannie, Attached is the volume counts for Sunset & Crescent Heights.  I asked Ron Hirsch if they had ped counts, but theydon't.  ­Eileen Eileen Hunt, Transportation Engineering Associate II Metro Development Review City of Los Angeles Department of Transportation100 S. Main St., 9th Flr.Los Angeles, CA 90012 213­972­8481   On Fri, Aug 2, 2013 at 10:04 AM, Jeannie Shen <[email protected]> wrote: 

Page 17: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Hi Eileen, Do you have a count for SB RT ?   ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Roy Kim <[email protected]> Date: Fri, Aug 2, 2013 at 9:54 AM Subject: Re: The Garden on Sunset (8150 W Sunset Bl ­ New Mixed­Use Project) To: Jeannie Shen <[email protected]>   I generally agree.  Do they have the RT volume on the cut­thru lane? Bus Stop should be relocated as Brian suggested.RT lane may need to longer depending on the capacity anaylsis.Should go with wider turning radius? Design issue.    On Fri, Aug 2, 2013 at 9:13 AM, Jeannie Shen <[email protected]> wrote: Hi Roy, Do you agree with Brian's assessment?  I don't have a response from the Pedestrian Group. ­­Jeannie    On Fri, Aug 2, 2013 at 8:39 AM, Eileen Hunt <[email protected]> wrote: Hi Jeannie, I just signed the MOU with Hirsch/Green Transportation Consulting, Inc. for a new mixed­use project at 8150W Sunset Blvd.  Back in April they were discussing this project with Tommy, Western District and thePedestrian group.  The project is in CD 4.  That means Hollywood/Wilshire District, right?   The project is proposing to change the southwest corner of Sunset & Crescent Heights.  Currently, theeastbound right­turn lane on Sunset is separated from the main roadway by a median island.  They would liketo move the right­turn lane back to the main roadway and incorporate the island into the intersection. Attached is the conceptual site plan which was included in the MOU and following you'll see BrianGallagher's comments on the previous conceptual design.  Previously, the conceptual site plan did notinclude a valet drop­off on Crescent Heights. The total net project trips are: 1,055 daily, ­220 AM peak hour, 211 PM peak hour.  The project will replaceabout 80,000 sf retail/commercial use with 111,000 sf retail/commercial uses and 249 apartments. Thanks for your time, Jeannie.   Eileen Hunt, Transportation Engineering Associate II Metro Development Review City of Los Angeles Department of Transportation100 S. Main St., 9th Flr.Los Angeles, CA 90012 213­972­8481  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Brian Gallagher <[email protected]> Date: Tue, Apr 16, 2013 at 6:10 PM Subject: Fwd: FW: New Project PROJECT OPPORTUNITY ALERT!! To: Valerie Watson <[email protected]>, Pauline Chan <[email protected]>, Margot Ocanas<[email protected]> Cc: Rudy Guevara <[email protected]>, Tomas Carranza <[email protected]>, SelwynHollins <[email protected]>   Valerie, Pauline, Margot...... 

Page 18: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Please look at the attachment.  There is a proposed project to remove a right­turn lane and relocate it ontothe main roadway.  This will allow us to connect a large median island to the rest of the block at thesouthwest corner.   This is also a busy commercial area.  I see that in addition to what is being proposed, itmight be able to be made into a pedestrian area if they work with your group. Tomas, Rudy......... I like this project, but am concerned about the loss of capacity at the intersection by replacing a long,uncontrolled right turn lane with a shorter, signal controlled lane that will be blocked by a bus stop.  I willsupport this project if the bus stop is relocated to the far side of the intersection, AND if we have theopportunity to add N/B LT phasing + E/B RT phasing at the signal, if determined to be justified by theDistrict, so that the RT overlap phase could minimize the reduction of capacity.  This intersection is heavilycongested, and we need to try for at least capacity neutral projects if possible. Brian ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Rudy Guevara <[email protected]> Date: Tue, Apr 16, 2013 at 4:09 PM Subject: Fwd: FW: New Project To: Brian Gallagher <[email protected]>   Brian,  What do you think about this conceptual improvement?  I need to give my comments but I am not convincedI like it because now the pedestrians will have a longer path across Sunset and also across Crescent heightsto follow. what do you think?  ­­­­­­­­­­ Forwarded message ­­­­­­­­­­ From: Aaron Green <[email protected]> Date: Tue, Apr 16, 2013 at 3:40 PM Subject: FW: New Project To: [email protected], Rudy Guevara <[email protected]>, Tim Conger<[email protected]> Cc: Ron Hirsch <[email protected]>   

Hi Guys,

 

As you have previously discussed with Ron, we are currently working on a project that is located south ofSunset Boulevard between Crescent Heights Boulevard and Havenhurst Drive.  This project presents anopportunity that we believe will not only benefit the project’s access on Crescent Heights Boulevard, butwill clean up the intersecĕon of Sunset Boulevard and Crescent Heights Boulevard by removing thesweeping right‐turn “cut‐through” lane (eastbound to southbound) that is stop‐sign controlled at itsintersecĕon with Crescent Heights Boulevard, located approximately 130‐feet south of Sunset Boulevard.

 

I have aĥached a graphic illustraĕng the conceptual design for the reconfiguraĕon of this intersecĕon andwe look forward to meeĕng with you on Monday to further discuss the possibiliĕes of pursuing this idea.

 

If you have any quesĕon prior to Monday’s meeĕng, please do not hesitate to contact either Ron ormyself.

 

Thanks,

Page 19: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

Aaron Green

Hirsch/Green Transportation Consulting, Inc.

13333 Ventura Boulevard, Suite 204

Sherman Oaks, California  91423

(v)  818.325.0530 x­202

(f)  818­325­0534

[email protected]

www.hgtraffic.com

 

   

  

Page 20: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

PR

OJE

CT

S

IT

E LA

YO

UT

++

FIG

NO

SUNSET - CRESCENT HEIGHTS \ SITE-LAYOUT

++PAGENO

7/2/2013

N

Page 21: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

INTERSECTION TURNING MOVEMENT COUNT SUMMARY

CLIENT: HIRSCH GREEN TRANSPORTATION CONSULTING, INC. PROJECT: SUNSET / CRESCENT HEIGHTS MIXED-USE PROJECT

DATE: TUESDAY, APRIL 02, 2013

PERIOD: 07:00 AM TO 10:00 AM

INTERSECTION: N/S N. CRESCENT HEIGHTS BLVD.

E/W W. SUNSET BLVD.

FILE NUMBER: 4-AM

15 MINUTE 1 2 3 4 5 6 7 8 9 10 11 12

TOTALS SBRT SBTH SBLT WBRT WBTH WBLT NBRT NBTH NBLT EBRT EBTH EBLT

0700-0715 63 242 6 6 452 32 17 90 9 11 100 34

0715-0730 45 272 14 11 481 38 13 97 8 8 114 36

0730-0745 50 270 10 8 459 43 20 95 7 7 131 30

0745-0800 56 274 10 8 405 49 35 119 11 8 151 40

0800-0815 59 256 19 12 416 48 24 156 7 16 194 44

0815-0830 61 252 20 9 400 49 33 133 14 16 178 52

0830-0845 62 250 18 8 391 51 38 150 8 11 203 54

0845-0900 61 249 19 8 382 53 32 133 18 19 220 60

0900-0915 61 235 15 11 315 50 49 155 16 12 219 58

0915-0930 59 217 19 9 288 56 37 142 13 18 197 68

0930-0945 55 206 17 9 300 50 38 151 17 17 238 54

0945-1000 50 215 15 7 317 46 37 135 14 14 222 45

1 HOUR 1 2 3 4 5 6 7 8 9 10 11 12

TOTALS SBRT SBTH SBLT WBRT WBTH WBLT NBRT NBTH NBLT EBRT EBTH EBLT TOTALS

0700-0800 214 1058 40 33 1797 162 85 401 35 34 496 140 4495

0715-0815 210 1072 53 39 1761 178 92 467 33 39 590 150 4684

0730-0830 226 1052 59 37 1680 189 112 503 39 47 654 166 4764

0745-0845 238 1032 67 37 1612 197 130 558 40 51 726 190 4878

0800-0900 243 1007 76 37 1589 201 127 572 47 62 795 210 4966

0815-0915 245 986 72 36 1488 203 152 571 56 58 820 224 4911

0830-0930 243 951 71 36 1376 210 156 580 55 60 839 240 4817

0845-0945 236 907 70 37 1285 209 156 581 64 66 874 240 4725

0900-1000 225 873 66 36 1220 202 161 583 60 61 876 225 4588

243 1007 76

47 572 127

N. CRESCENT HEIGHTS BLVD.

37

1589

201

W. SUNSET BLVD.

A.M. PEAK HOUR0800-0900

210

795

62

THE TRAFFIC SOLUTION329 DIAMOND STREETARCADIA, CALIFORNIA 91006626.448.7978 PHONE626.448.2877 FAX

Page 22: The Garden on Sunset (8150 W Sunset Bl New …...Eileen Hunt  The Garden on Sunset (8150 W Sunset Bl New Mixed Use Project) 7 m es s ages Eileen Hunt

INTERSECTION TURNING MOVEMENT COUNT SUMMARY

CLIENT: HIRSCH GREEN TRANSPORTATION CONSULTING, INC. PROJECT: SUNSET / CRESCENT HEIGHTS MIXED-USE PROJECT

DATE: TUESDAY, APRIL 02, 2013

PERIOD: 04:00 PM TO 07:00 PM

INTERSECTION: N/S N. CRESCENT HEIGHTS BLVD.

E/W W. SUNSET BLVD.

FILE NUMBER: 4-PM

15 MINUTE 1 2 3 4 5 6 7 8 9 10 11 12

TOTALS SBRT SBTH SBLT WBRT WBTH WBLT NBRT NBTH NBLT EBRT EBTH EBLT

0400-0415 50 170 25 13 237 42 55 186 12 17 280 65

0415-0430 52 169 21 13 240 44 61 173 19 26 295 75

0430-0445 48 180 26 15 251 48 55 197 16 19 305 77

0445-0500 49 176 31 10 273 45 76 185 17 14 307 80

0500-0515 47 174 39 6 284 42 61 181 15 10 283 58

0515-0530 49 177 36 10 261 47 77 150 14 18 317 68

0530-0545 49 182 36 12 269 48 64 174 12 17 321 78

0545-0600 45 164 36 10 252 43 81 159 12 17 337 60

0600-0615 48 171 39 11 249 42 92 151 12 18 305 67

0615-0630 50 187 42 13 276 45 71 141 19 20 356 77

0630-0645 48 180 33 11 284 48 87 150 15 21 344 71

0645-0700 44 184 36 12 271 41 80 162 23 23 317 61

1 HOUR 1 2 3 4 5 6 7 8 9 10 11 12

TOTALS SBRT SBTH SBLT WBRT WBTH WBLT NBRT NBTH NBLT EBRT EBTH EBLT TOTALS

0400-0500 199 695 103 51 1001 179 247 741 64 76 1187 297 4840

0415-0515 196 699 117 44 1048 179 253 736 67 69 1190 290 4888

0430-0530 193 707 132 41 1069 182 269 713 62 61 1212 283 4924

0445-0545 194 709 142 38 1087 182 278 690 58 59 1228 284 4949

0500-0600 190 697 147 38 1066 180 283 664 53 62 1258 264 4902

0515-0615 191 694 147 43 1031 180 314 634 50 70 1280 273 4907

0530-0630 192 704 153 46 1046 178 308 625 55 72 1319 282 4980

0545-0645 191 702 150 45 1061 178 331 601 58 76 1342 275 5010

0600-0700 190 722 150 47 1080 176 330 604 69 82 1322 276 5048

190 722 150

69 604 330

N. CRESCENT HEIGHTS BLVD.

47

1080

176

W. SUNSET BLVD.

P.M. PEAK HOUR0600-0700

276

1322

82

THE TRAFFIC SOLUTION329 DIAMOND STREETARCADIA, CALIFORNIA 91006626.448.7978 PHONE626.448.2877 FAX