the calgary airport authority parallel runway project ... · responsible in a safe, secure and...

36
1 The Calgary Airport Authority Parallel Runway Project Public Consultation Meetings April 30 th , May 2 nd & May 4 th

Upload: others

Post on 15-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

1

The Calgary Airport Authority

Parallel Runway Project

Public Consultation MeetingsApril 30th, May 2nd & May 4th

Page 2: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

2

AGENDA

• Welcome

• The Airport Authority

• The Project

• The Environmental Assessment Process

• Closing

Page 3: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

3

Parallel Runway Project

Page 4: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

4

• The Calgary Airport Authority is a not-for-profit non-share capital corporation,incorporated under the Alberta Regional Airports Authorities Act, responsible for the management, maintenance, operation and development of Calgary International Airport and Springbank Airport under long-term lease from the Government of Canada.

Page 5: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

5

Legislative Purpose:

• to manage and operate the airports for which it is responsible in a safe, secure and efficient manner, and

• to advance economic and community development by means that include promoting and encouraging improved airline and transportation service and an expanded aviation industry.

…for the general benefit of the public in our region.

Page 6: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

6

Page 7: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

7McKnight Blvd.

11th Street NE

Country Hills Blvd.Airport Trail

Deerfoot Trail

36th Street NE

48th Avenue NE

Page 8: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

8

Passenger & Aircraft Activity Levels

Page 9: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

9

Passenger/Aircraft/Cargo Activity (2008)

- Total Passengers – 12.5 Million+ 2% over 2007+ 60% - six years34,000 Passengers/day

- Total Annual Aircraft Movements 240,000 +660 Aircraft Movements / day (average)

- Total cargo tonnage – 125,000T

Page 10: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

10

4.9m 5.0m5.6m

7.1m

7.7m8.2m

8.6m 8.4m8.0m 7.8m

8.6m9.1m

10.1m

11.3m

12.2m12.5m

4.0

5.0

6.0

7.0

8.0

9.0

10.0

11.0

12.0

13.0

14.0

Pass

enge

rs P

er Y

ear

(in m

illio

ns)

1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Passengers Per Year1993 to 2008

Page 11: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

11

Economic Impact (2007)

•$6 BILLION VALUE-ADDED GDP

•40,000 Jobs

•15,000 jobs located On-Airport

Page 12: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

12

Major Expansion Sector $700M

Restoration $290M

CAPITAL INVESTMENT 1992 to 2008 $990 MILLION

Next 10 Years $ 3 Billion

Page 13: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

13

Page 14: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

14

Parallel Runway Project

Program Management Consultant: AECOM Canada Ltd.

Page 15: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

15

AECOM Role

• Program Manager– Costing and Scheduling

– Preliminary Design

– Pre-Construction Activities

– Project Environmental Management

2005 2009 20142011

Preliminary PlanningEA & Pre Design Construction

Page 16: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

16

NEW PARALLEL RUNWAY

EXISTING RUNWAYS

Page 17: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

17

What does the Project consist of?• A 14 000 foot by 200 foot runway

(4270 m by 60 m) and associated taxiways

• Visual and electronic navigation aids

• A maintenance facility, a field electrical centre, changes to airfield roads

• Closure of Barlow Trail between Airport Road and 48 Avenue NE

• An airfield tunnel to allow airport cargo and similar vehicles to pass under one of the taxiways

Page 18: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

18

Historical• Construction of the new runway has been planned

since the 1970’s when the Federal government acquired the land. Federal and Provincial Regulations and Municipal Land Use Bylaws were developed assuming the runway was in place and operating.

• The land use pattern around the airport has been regulated by the Province and the municipalities since this time to control residential development in the vicinity of the airport.

• There is more information about this on the boards.

Page 19: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

19

Why Do We Need a New Runway?

• A new runway is needed to accommodate the increasing demand and to satisfy the related economic needs of Calgary and the region.

• After years of City and regional growth, and related increases in air travel through YYC, the airport’s runways have reached their capacity.

• Many improvements have been made in the last ten years, successfully deferring the need to build the new runway until now.

Page 20: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

20

Current Runway Demands• Currently when the airport is at peak capacity,

flights are delayed.

• Flight delays :• Cause disruption to the travelling public;• Impose extra costs on the airlines and the airport;• Generate more greenhouse gases; and• If too onerous, limits airport activity with

consequent economic losses.

Page 21: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

21

Environmental Assessment

• I am going to talk about:

• Environmental Assessment

• The Project Description and Scoping Document

• Public Consultation

Page 22: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

22

What is the first step in the development of the Parallel Runway Project?

• Large infrastructure projects require a long preparation time. Even if we start now, the runway will not be operational until 2014.

• One of the first steps is an environmental assessment, which has just begun.

Page 23: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

23

Environmental Assessment

• The airport is located on Federal land. Normally this would require an assessment under the Canadian Environmental Assessment Act(CEAA).

• At the moment the Act does not apply to airport authorities, however the government has stated that it may apply within two years.

Page 24: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

24

Comprehensive Study

• A comprehensive study is a very detailed type of environmental assessment.

• The runway would be subject to a Comprehensive Study under CEAA, the Authority is undertaking a Comprehensive Study that would meet CEAA requirements if it applied.

• Consultation with interested stakeholders and the public is central to an assessment under CEAA. It is important to obtain their input as early as possible in project planning.

Page 25: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

25

2009Parallel CEAA Process

Page 26: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

26

Project Description and Scoping Document (PD and SD)

• The PD and SD describes our initial approach to conducting the assessment. This includes an outline of:

• What we are going to assess; and • How we are going to assess it.

• I am going to give you a quick summary of what is in the document. There is more information on the boards around the room.

Page 27: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

27

• Section 1 – Introduction

• Section 2 – The Calgary International Airport (YYC): Describes the development at the airport since 1939.

• Section 3 – Sustainability: Describes the sustainability principles embraced by the Airport Authority but the final Scoping Document will contain more detail. That detail will be influenced by your response to the draft document.

Project Description and Scoping Document

Page 28: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

28

• Section 4 – Airport Authority Governance and Regulatory Framework: Describes the laws and regulations under which the airport operates. Some of these affect what happens in the communities around the airport.

• Section 5 – Environmental Assessment: Describes environmental assessment requirements for Canadian airports in general.

Project Description and Scoping Document

Page 29: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

29

• Section 6 – Self-Directed Environmental Assessment Process: Describes the environmental assessment process that will be followed for the project by the Airport Authority.

• Section 7 – Communications and Consultation: Describes how we will conduct public consultation. Public consultation is of paramount importance in the CEAA process.

• Section 8 – Need and Purpose of the Parallel Runway Project (PRP).

Project Description and Scoping Document

Page 30: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

30

• Section 9 – Project Description: Provides a detailed description of the components of the project. It also outlines how we will assess alternatives to the project.

• Section 10 – General Scope of the Assessment: Provides a general description of the methods proposed to carry out the assessment. As an example of public input, we have already received requests to consider what will happen if the runway is not built and we will be incorporating this into our assessment.

Project Description and Scoping Document

Page 31: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

31

• Section 11 – Detailed Scope: Provides more detail on how the assessment would be conducted for each discipline area.

• Section 12 – Schedule: Describes how we will reach the end of the Comprehensive Study Process by May 2011.

• Section 13 – References

Project Description and Scoping Document

Page 32: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

32

2009Parallel CEAA Process

Page 33: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

33

This Meeting

So now you know what the Scoping Document is…• The purpose of this meeting was to introduce it and,

more significantly, for you to tell us what you think we should consider in our assessment.

• Issues and concerns raised will be the focus of the Comprehensive Study so please talk to our staff at the boards about your issues. Every issue you raise will be addressed in the Comprehensive Study.

Page 34: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

34

Where to find the Project Description and Scoping Document• The scoping document has been posted on our

Registry Website and can be downloaded from there: http://www.yyc.com/rdp

• The website also tells you where you can email ([email protected]) to receive a CD or hard copy if you need one. You can also talk to our staff here today and they will arrange to provide what you want.

Page 35: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

35

Communications and Consultation • A number of display boards are set up around

the room and our staff will be standing nearby to answer your questions.

• You can register your comments with us at this meeting by filling out an issue sheet. You can also identify them at a later date by visiting our Project Registry Website and contacting us by email or regular mail. You will receive a response.

Page 36: The Calgary Airport Authority Parallel Runway Project ... · responsible in a safe, secure and efficient manner, and ... • Many improvements have been made in the last ten years,

36

Contact Us

• Website: http://www.yyc.com/rdp

• Mailing address: Parallel Runway Projectc/o The Calgary Airport Authority2000 Airport Road NECalgary, AB T2E 6W5

• Email: [email protected]