TEMPORARY METER (CONSTRUCTION OR HYDRANT) Size Deposit Fee Meter Fee Total Fee
5/8” $ 300.00 $ 60.00 $ 360.00
1” $ 350.00 $ 60.00 $ 410.00
1.5” $ 400.00 $ 60.00 $ 460.00
2” $ 450.00 $ 60.00 $ 510.00
3” $ 500.00 $ 60.00 $ 560.00
PERMANENT METER (RESIDENTIAL*) Size Meter Fee Backflow Total Fee
5/8” $ 492.44 $ 7.56 $ 500.00
1” $ 591.28 $ 8.72 $ 600.00
1.5” $ 1,284.88 $ 15.12 $1,300.00
2” $ 1,530.55 $ 19.45 $1,550.00
* Larger than 2” call for pricing
CONNECTION FEES
Single Family Unit: Water $ 1,500.00 Sewer $ 1,200.00 Multi Family Unit: Water $ 1,071.00 Sewer $ 2,163.00
CAPACITY RESERVATION FEES (ANNUAL)
Single Family Unit Water $ 231.84 Sewer $ 336.36 Multi Family Unit Water $ 155.28 Sewer $ 269.16
WATER SERVICE LINE INSTALLATION
• 1” service tap and line (short side) $ 850.00
• 1” service tap and line (long side) $ 1,825.00
• 1.5” & 2” service tap and line (short side) $ 1,200.00
• 1.5” & 2” service tap and line (long side) $ 2,175.00
METER CHANGE OUT
Requests to exchange the existing meter for a larger size will result in the following charges:
• Difference of current cost between smaller and larger meter
• Labor and materials required for change out • Difference of current connection charges between
smaller and larger meter
Water Distribution will need to verify the system is able to service a larger meter, if not a tapping fee and capping of existing service will be required.