temporary meter (construction or … · temporary meter (construction or hydrant) size deposit fee...

1

Click here to load reader

Upload: dinhlien

Post on 29-Aug-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TEMPORARY METER (CONSTRUCTION OR … · TEMPORARY METER (CONSTRUCTION OR HYDRANT) Size Deposit Fee Meter Fee Total Fee 5/8” $ 300.00 $ 60.00 $ 360.00 1” $ 350.00 $ 60.00 $ 410

TEMPORARY METER (CONSTRUCTION OR HYDRANT) Size Deposit Fee Meter Fee Total Fee

5/8” $ 300.00 $ 60.00 $ 360.00

1” $ 350.00 $ 60.00 $ 410.00

1.5” $ 400.00 $ 60.00 $ 460.00

2” $ 450.00 $ 60.00 $ 510.00

3” $ 500.00 $ 60.00 $ 560.00

PERMANENT METER (RESIDENTIAL*) Size Meter Fee Backflow Total Fee

5/8” $ 492.44 $ 7.56 $ 500.00

1” $ 591.28 $ 8.72 $ 600.00

1.5” $ 1,284.88 $ 15.12 $1,300.00

2” $ 1,530.55 $ 19.45 $1,550.00

* Larger than 2” call for pricing

CONNECTION FEES

Single Family Unit: Water $ 1,500.00 Sewer $ 1,200.00 Multi Family Unit: Water $ 1,071.00 Sewer $ 2,163.00

CAPACITY RESERVATION FEES (ANNUAL)

Single Family Unit Water $ 231.84 Sewer $ 336.36 Multi Family Unit Water $ 155.28 Sewer $ 269.16

WATER SERVICE LINE INSTALLATION

• 1” service tap and line (short side) $ 850.00

• 1” service tap and line (long side) $ 1,825.00

• 1.5” & 2” service tap and line (short side) $ 1,200.00

• 1.5” & 2” service tap and line (long side) $ 2,175.00

METER CHANGE OUT

Requests to exchange the existing meter for a larger size will result in the following charges:

• Difference of current cost between smaller and larger meter

• Labor and materials required for change out • Difference of current connection charges between

smaller and larger meter

Water Distribution will need to verify the system is able to service a larger meter, if not a tapping fee and capping of existing service will be required.