technology provider and energy system change - innovation
TRANSCRIPT
Technology provider and energy system change - Innovation and business opportunities
Tuula Ruokonen
Director, Digital Services Solutions
Valmet Technologies Oy
Energy Forum 3.10.2019
Aalto University
Contents
Valmet in brief
Selected process innovations and customer references
Dialogue with Data: New data driven business opportunities
Examples of Industrial Internet applications
1
2
3
4
5
Customer needs drive our innovation process
ValmetLeading process technologies,
automation and services for the pulp,
paper and energy industries
From cloth making to high-tech processes
Progress built on 220 years of industrial history
7 October 2019 © Valmet 4
2015Metso
Process
Automation
Systems
to Valmet
1951Valmet
1968–1996Several M&As:
1986 KMW
1987 Wärtsilä paper
finishing machinery
1992 Tampella
Papertech
1999Metso created through
merger of Valmet and
Rauma
Acquisitions2000 Beloit Technology
2006
Kvaerner Pulping
Kvaerner Power
2009 Tamfelt
End of 2013Demerger to
Valmet and
Metso
1797 Tampereen
Verkatehdas
1841 Götaverken
1856 Tampella
1858 Beloit
1860 KMW
1868 Sunds Defibrator
1942Rauma-
Raahe
2019Valmet
acquires
GL&V
Key figures in 2018
7 October 2019 © Valmet 5
Orders received by business lineOrders received
EUR 3,722 million
Net sales
EUR 3,325 million
Comparable EBITA
EUR 257 million
Comparable EBITA margin
7.7%
Employees (on Dec 31, 2018)
12,528
35%
9%27%
29%
Services
Automation
Pulp and Energy
Paper
20%
13%
43%
14%
10%
North America
South America
EMEA
China
Asia-Pacific
Orders received by area
360° approach to sustainability
Acknowledged leader in sustainability
7 October 2019 © Valmet 6
• In Dow Jones Sustainability
Index for the fifth consecutive
year
• Received Bronze Class 2019
Sustainability Award
• Achieved A rating in CDP’s
climate program in 2018
• In Ethibel Sustainability Index
Excellence Europe
Corporate
citizenship
Sustainable
supply chain
We are a trusted partner
and respected corporate
citizen
We develop
sustainable supply
chain practices
People and
performance
Sustainable
solutions
We are a responsible
employer and
promote diversity
We develop and provide
solutions that support
sustainability
We protect the
safety of our people
and partners and
minimize our
environmental
impact
Health,
safety and
environment360°
7 October 2019 © Valmet 7
16research and
development centers*
EUR 66 million
R&D spendingin 2018
Significant, customer focused research and development work
1,300Protected inventions
*Without GL&V acquisition
Customer needs drive our innovation process
Megatrends – impacting our business environment
Climate change, environmental
awareness and resource scarcity drive
the need to improve resource efficiency
and lower emissions
Resource efficient and clean world Digitalization and new technologies Aware, urban and global customer
Digitalization, automatization and new
high impact technologies drive efficiency
and new business models
Urbanization, increasing living standards,
changing demographics, and
globalization drive changes in consumer
behavior
7 October 2019 © Valmet 9
7 October 2019
© Valmet
10
Market prices Electricity prices
Carbon allowance prices
Source: Bloomberg Terminal 05.09.2019
Fortum and the City of Espoo have committed to carbon-neutral
district heating in the district heating network operating in the
Espoo, Kauniainen and Kirkkonummi regions in the 2020s.
The development work is being accelerated with a new intermediate
goal to discontinue the use of coal in 2025. The accelerated project
for carbon-neutrality in the 2020s is called Espoo Clean Heat.
First of the two coal-fired units will be decommissioned in summer 2020. To replace the remaining coal
production, Fortum is pursuing new solutions - from utilising the waste heat of data centres, wastewater and
industry to electric heat pumps, geothermal, smart demand-response solutions, and bioenergy.
Fortum and the City of Espoo have already taken significant steps to replace coal with carbon-neutral
solutions: the new Kivenlahti bioheating plant will come on stream in summer 2020, the Otaniemi geothermal
plant is expected to be commissioned late 2020, and the new heat pump unit utilising waste heat from
wastewater will start its operations at the Suomenoja power plant in 2021. With these actions, Espoo's district
heating production will achieve 50% carbon neutrality in 2022. Discontinuing the use of coal in 2025 will raise
the share of carbon-neutral production to about 85%.
24.9.2019: Fortum to discontinue the coal use in Espoo in 2025 – Espoo Clean Heat project to make district heating carbon-neutral
7 October 2019 © Valmet 11
Biomass to Energy, Waste to Energy and Multifuel solutions
– Fuel handling systems
– Boiler islands, modularized power plants and heating plants
– Air pollution control systems
Products and Technologies
– Circulating fluidized bed boilers (CYMIC) and Bubbling fluidized bed boilers (HYBEX)
– Biomass and waste gasification
– Oil and gas boilers, waste heat recovery boilers
Rebuilds and conversions
– BFB conversions, capacity increases and lower emission levels
Services
Facts• Solutions for demanding fuels: biomass, waste
and multifuel
• Multifuel capabilities
• Wide capacity range
• From-Fuel-to-Stack solutions
• Large installed base
Results• High fuel flexibility gives economic advantage and
security
• Replacement of fossil fuels
• Reducing CO2 emissions economically
• Minimum emissions
7 October 2019 © Valmet 12
Comprehensive offering for energy customers
Dry, semidry and wet flue gas cleaning processes for removal of
particular and gaseous emissions
Condensing scrubbers and heat exchangers for recovering heat
from flue gas
SNCR and SCR technology for NOx reduction
Odorous gas treatment and chemical balance control systems for
pulp mills processes
Scrubbers for marine exhaust gas cleaning
Facts• Complete flue gas cleaning and heat recovery
systems
• Odor and mill balance control for pulp mills
• 500 air quality control references
Results• Minimum emissions
• Reliable and proven technology solutions
• Increased plant efficiency
• Fuel savings
7 October 2019 © Valmet 13
Extensive offering of air emission control systems
CFB gasification technologies for biomass and waste gasification
Pyrolysis solutions for bio-oil production
LignoBoost system for extracting lignin from kraft black liquor
Solutions for prehydrolysis of biomass to sugars and lignin for
further refining to fuels or chemicals
Complete production lines for steam exploded pellets, black pellets,
and revamps of existing white pellet plants
Facts Commercial scale gasification of biomass and waste since
2011
First demonstration scale bio-oil pilot production plant in operation in 2013
World’s first commercial lignin extraction installation in operation since 2013
Several prehydrolysis pilot scale deliveries. First demonstration scale plant in operation in 2012.
First demonstration scale black pellet plant sold in 2018
Results New revenue streams
Reduction of emissions
From fossil fuels to utilization of sorted waste and biomass
Alternative renewable fuels
7 October 2019 © Valmet 14
New biomass conversion technologies
Ma
rke
t n
ee
d
Technical challenges in fuel combustion
Wood biomass
Northern wood
Pulp&Paper sludges
Wood pellets
Agro biomass
Straw
Sunflower hulls
Corn Stover
Miscanthus
Fast growing wood
Willow
Eucalyptus
Recycled fuels
MSW
Recycled wood
1 5 10
Fossil
Hard coal
Lignite
Petroleum coke
Technical challenge
Ma
rke
t in
tere
st
Fuel Cl-content0.05% 0.1% 1.0%0.01%
15
Energy and biotechnology R&D Center
Tampere
Complete heating plant for versatile research and development purposes
Focusing on fluidized bed boilers, pyrolysis and environmental systems
Facilities include fluidized bed boiler, pyrolysis oil pilot, tube reactors, cold
models, equipment for full-scale field testing and measurements
Key achievements:
– CYMIC and HYBEX fluidized bed boiler development and combustibility knowledge
– New technology development: Pyrolysis process for bio oil production
– Development of bag house filter and electrostatic precipitator key components
10,000 hours of pilot operation executed7 October 2019 © Valmet 16
Long-term R&D to improve CYMIC boiler’s competitiveness
May 1990
First test-runs in
R&D Center
June 1990
R&D Center
inaugurated
1985First membrane
cyclone
1995-2006
Loop seal superheater
Sep 2014
80 CYMIC boilers
delivered
7 October 2019
2000’s
Multifuel capability
Emission reduction and
corrosion knowledge
Full scale test runs
1999-2015
Cyclone development
Cold model testing
2015
Agro-Coal-Waste
SO2 reduction
© Valmet 17
Long-term R&D co-operation with partners produces results – Pyrolysis as an example
1990’s
First R&D projects
including Finnish
companies
2007Technology
development
consortium formed
(Valmet, UPM, VTT)
Tekes support granted
Cold model tests start
at Valmet R&D Center
in Tampere
2009
Fortum joins
development
consortium
Bio-oil pilot tests at
Valmet R&D Center
starts
2010
Pyrolysis oil
combustion tests in 1
MW scale
Start of concept
planning for a
commercial demo
plant
2012
Fortum and Valmet
sign contract on
Joensuu plant
2013 -
R&D projects
on pyrolysis oil
upgrading
on-going
2013Commissioning and
commercial operation
of Joensuu plant
© Valmet
2014 -
LignoCat-consortium is
developing technology to
produce advanced
biomass based fuels
2015
Joensuu plant
handed over
to Fortum
1980’s
First Finnish
R&D laboratory
studies on
pyrolysis (VTT)
Press release April 10, 2018
Valmet, Fortum and Preem
co-operate in the
development of forest
based advanced biofuels
7 October 201918
Dialogue with dataValmet Industrial Internet
See in Youtube: https://www.youtube.com/watch?v=4y9VhCL6WPI&t=9s
and https://www.youtube.com/watch?v=3u9kO0JBIp8
Valmet has a long history in the digitalization of process industries
7 October 2019 © Valmet 20
1970Elmatic-100
system, electronic
instrumentation
1990’sPaperIQ, QCS
metsoDNA, Dynamic Network
of Applications
1980’sDamatic, the first Distributed Control
System (DCS)
Sensodec Condition Monitoring System
Damatic XD, modular second generation
DCS
2000’sMultivariable Model
Predictive Controls (MPC)
24/7 ProCenter for DCS/QCS
PaperIQ Select
2010’sMetso PQV
web inspection system
2015Valmet DNA
2015Valmet IQ
1960The Airmatic
a pneumatic
measurement and
control system
2017Augmented and virtual
reality applications
Valmet
Performance
Centers
Distributing
controls &
gathering
performance data
Increasing
availability
Increasing
productivity
through
information
services
Embedded
intelligence &
advanced
information
Advantages to
customer
industries:
Benchmarking and
best practice
sharing capability
A meaningful dialogue with data brings tangible results
Results
Company level data
Mill and plant level data
Process and equipment data
Valmet Industrial Internet
Dialogue with data:
• Combining process and business data from
different mill or plant systems
• Leveraging advanced analytics and Valmet’s
know-how to create new data driven
applications
• Providing applications for operator assistance
and new set points for the automation system
Improved product qualityReduced downtime and
unplanned stops
Reduced raw material and
energy cost7 October 2019 © Valmet 21
Valmet Industrial InternetExamples of Industrial Internet offering for Energy producers
Turun Seudun Energiantuotanto, Naantali, FinlandInvestment enables use of renewable fuels
Benefits
• Large-scale multifuel plant is designed to generate power by utilizing
bio fuels at a very high efficiency ratio
• Meets the IEA emissions directive
• Automation to secure the plant’s availability
• The total uniform solution without integration costs
• Single point of responsibility for design, implementation, start-up and
tests
”We are convinced that Valmet's total solution that features both automation
and boiler technology from the same supplier works best for us," says
Tapani Bastman, Managing Director, Turun Seudun Energiantuotanto.
The case - customer
• Turun Seudun Energiantuotanto Oy (TSE)
• TSE is owned by Turku Energy, Turku's
neighboring cities Raisio, Kaarina, and
Naantali, and Fortum Power and Heat
• Combined heat and power (CHP) plant
produces district heat and electricity for
the area of Turku and process steam for
the needs of nearby companies.
Driver
• To replace an old coal power plant that
has been operating for 50 years
• To increase renewable fuels in power
generation
• Enables to fulfil the new IEA emissions
directive
Scope
• Valmet CYMIC boiler based on circulating
fluidized bed (CFB, Circulating Fluidized
Bed boiler technology)
• Flue gas cleaning equipment
• Flue gas condensing equipment
• Asphaltene combustion systems
• Valmet DNA automation and safety
interlocking systems
• Valmet Training Simulators and Valmet
Online Learning courses
7 October 2019 © Valmet 23
Function specific service solutions sold to TSE Naantali
NOx emission optimization
Predictive reliability diagnostics
• NOx emission optimization application
– Guides operator to choose the most economic way to lower NOx emissions
• Predictive reliability diagnostics application
– Enables proactive condition monitoring of plant equipment, based on process
data
– Currently monitors 14 pieces of equipment (valves, pumps, motors, fans)
Delivery includes:
• NOx emission optimization application
• Predictive reliability diagnostics application
• Operations Panel: Real-time performance status
• Application upkeep by Performance Center
Benefits:
• Meeting emission limits cost effectively
• Focused maintenance based on real-time equipment condition
7 October 2019 © Valmet 24
Naantali Raisio
KaarinaTurku
Valmet DNA in Turun Seudun EnergiantuotantoEfficient data flow thru power plant procesess
7 October 2019© Valmet 25
PRODUCTION
OPTIMIZATION
FUEL MANAGEMENT
FUEL PROCESS
MANAGEMENT PROCESS
MONITORING
AND REPORTING
FUEL
LOGISTICS
Driver
terminals
- Naantali
- Oriketo
Transport companies
Fuel suppliers
Drivers
Steam
customers
FORECASTS
- Coal and CO2 price
- Electricity
(also realized price)
- Weather
ELECTRICITY
MEASUREMENTS
MAINTENANCE
MANAGEMENT
Valmet DNA automation
DISTRICT
HEATING
CONTROLS
NAANTALI POWER PLANT NA1,2,3&4
Biofuel processes
FORTUMElectricity trading and
purchasing
TURKU ENERGIA- Electricity trading and
purchasing
- District heat purchasing
Valmet DNA project scope
District heat network
Heat pump and DH
plans
Training simulator
Results for Kuopion Energia Oy, CHP plant
Valmet DNA Asset Monitoring
7 October 2019 © Valmet
ResultsIncreased maximum steam
production by
5%
Share of biomass used as
fuel
100%CHP plant, Haapaniemi 3 power plant
- Two boilers in use, three turbines
- Main fuels: locally produced peat & wood residues
- 2016 performance agreement goal was raise steam production from
62 kg/s to 65 kg/s.
Before control optimization boiler design value was not easy to gain. In
co-operation with Valmet target 65 kg/s was gained and even 66 kg/s has
been done with good fuel mix which means that savings will double in
optimum conditions.
Samuli Räisänen
Operations Manager
Performance Limits
Design Target
Plant Manager Dashboard
An alarm is activated based on detected process deviations. Task-specified
dashboards are then used to find the limiting factor in machinery in real
time. Specified machine is analyzed based on collected data.
26
General impact of availability for a CFB boiler
Boiler inspection management system
7 October 2019 © Valmet
Results
Cost savings are created through
• Availability and risk management based on all relevant data
• A systematic approach to evaluating boiler tubes’ thickness
One tube leakage results in
1.5%availability decrease.
Avoiding unplanned shutdown for
corrective maintenance due to tube
leakages saves operating costs in the
same.
Avoiding unplanned
shutdown for corrective
maintenance due to tube
leakages saves operating
costs in the same.
- Quality losses
- Customer satisfaction
- Higher energy cost
Knowledge about individual tube’s wall thickness allows
predicting its lifetime and proactive maintenance actions.
27
Boiler inspection management system with 3D visualization
Easy to use 3D model for best illustration of results
Measurement results visualized in a 3D model of your
boiler
Walk inside boiler (Virtual Reality experience or on your
own laptop)
Trends of tube thickness measurements
Illustrative colors to warn for critical thicknesses
7 October 2019 © Valmet 28
Energy optimization with remote support
Energy optimization with remote support
for paper and board machine
Energy optimization with remote support
7 October 2019 © Valmet
Service description
– Process optimization both remotely and on-site to save energy
– An operator application integrated to the machine control system
– Energy usage shown in real time and compared to best achieved
performance
– Grade-specific energy consumption and history reports
– Continuous monitoring and reporting by Valmet Performance Center
experts
Benefits
– Increased awareness and understanding of energy used in the process
– Improvement opportunities can be identified
– Energy savings in electricity and steam
– Significant cost savings
30
Results for a containerboard customer (name confidential)
Energy optimization with remote support
7 October 2019 © Valmet
Key facts of the containerboard machine
• Grade: recycled fluting
• Basis weight 90–150 g/m2
• Design speed 1,200 m/min
• Trim width 6,660 mm
• Start-up 2014
Results
15%energy savings
in electricity
16%energy savings
in steam
3M€/a
value
Corrugating Medium 105 g/m2Corrugating Medium 105 g/m2
Oct 2014 Feb 2015 Oct 2014 Feb 2015
Ste
am
Co
nsu
mp
tio
n [ t/t
]
Ele
ctr
icity C
onsu
mp
tio
n [ k
Wh
/t]
280
260
240
220
200
180
160
1.8
1.6
1.4
1.2
1
Electricity consumption reduction
from 235 kWh/t to 200 kWh/t
Steam consumption reduction
from 1.55 t/t to 1.3 t/t
31
Valmet Performance CenterEasy access to the expertise you need
© Valmet 32
Valmet
Performance Center
Local
Valmet
experts
Customer
experts
Global
equipment fleet
Valmet expert
network
On-demand expert supportRemote monitoring
and optimizationAnalytics as a service
TissueBoard & paperEnergy AutomationPulp
Automation
7 October 2019
Valmet Industrial Internet platform components Based on certified and secure world-leading technologies
7 October 2019 © Valmet 33
Valmet DNA
Valmet’s cloud environment
Database
Valmet Customer Portal
Valmet Performance Center
Security in the core of Valmet Industrial Internet
7 October 2019 © Valmet
Valmet’s Industrial Internet
solutions are based on
certified and world leading
technologies
Secure and productized
connectivity and data
management both in transit
and cloud environment
Role-based access control
Secure authentication for
both customers and Valmet
users
Safe, secured and
protected data
Authenticated users and
access control
Secure and certified
platform
34
Key elements of Valmet Industrial Internet
© Valmet 7 October 2019
Valmet Performance CenterIndustrial Internet applications Valmet Customer Portal
Provides remote support, monitoring and data
analysis and access to Valmet’s expert network
From analytical applications for reliability and
performance to Advanced Process Controls,
information management and process simulators
A digital, personalized collaboration space
between you and Valmet
Solution ecosystem
Brings leading industry players and innovative
start-ups together to co-create new value-adding
data driven servicesA solid data source for Industrial Internet solutions
Intelligent machines and automation
35