technical leaflet cim 3723b
TRANSCRIPT
-
7/27/2019 Technical Leaflet Cim 3723B
1/12
Pagina 1 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
TECHNICAL INFORMATION
Flow measurement device
CIM 3723B
Description
Cim 3723B is a flow measurement device, wafer
type, with fixed orifice, assuring high accuracy
in differential pressure and relevant flow rate
measurement.
Cim 3723B is made of stainless steel AISI 304
with dimensions suitable for its installation
between flanges according to BS EN 1092.
Cim 3723B is suitable for heating and cooling
installation, with working pressure up to 16 bar,within the working temperature range -10C up to
+120C.
The main features ofCim 3723B are the following:
Possible installation with a balancing valve;
High accuracy flow rate reading, within 5% of nominal value, regardless of valve setting.
Made according to BS 7350 standard;
Two binder points allowing connection to a differential manometer.
Picture 1
-
7/27/2019 Technical Leaflet Cim 3723B
2/12
Pagina 2 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
Installation procedure
Before installation ofCim 3723B, check that inside the valve and the pipes there is no foreign matters which
might damage the tightness of binder points or cause turbulences to the water flow, preventing high
accuracy signal reading.
When installing the flow measurement device, please make sure to have a pipe length 5 times the DN
upstream the valve and pay attention to the arrow direction casted on the valve body, which shall be the
same as the flow one. The valve shall be installed with binder point upstream and blue one downstream.
To regulate flow rate, Cim 3723B can be coupled with a balancing valve; in this case, it shall be screwed on
the inlet screwed end of said valve. IfCim 3723B is installed by itself and not with a regulating valve, make
sure to have downstream a pipe length 2 times the DN.
J oints between valve and flanges shall be perfect and suitable for the working conditions required. During
installation, check that flange and relevant joint are coaxial, to avoid any water bore reduction. Tighten nuts
progressively and in a crossed way (first one nut and secondly the one diametrically opposite), in order to
avoid any bending to flanges.
If installed horizontally, Cim 3723B should have binder points faced up at 45 to avoid any deposit, which
might block holes of binder points. In case of ceiling installation, and consequently with no possibility of such
assembling (lack of enough room for sensors insertion), Cim 3723B can be installed with binder points
downward, but always at 45. If Cim 3723B is installed vertically, all positions are accepted, but always
taking into account the connection to a differential manometer: the insertion of sensors of this manometer
needs at least 100mm of free area along the axe of each binder point.
Binder points are supplied disassembled from the valve. Screw the extensions with a key acting on themilled surfaces; fix binder points at the end of said extension and make sure that binder point with red strap
is assembled upwards. For assembly purposes, use a suitable tightening material.
For high accuracy reading of differential pressure, release possible air inside the installation.
Differential pressure and flow rate reading
Unscrew the plugs of binder points placed on the fixed orifice ends of the valve and insert the sensors of
differential manometer Cim 726, pressing the measuring needles until the perforation of tightening rubber.
The colour of binder point straps means the following:
Red strap: the value registered in this point means the upstream pressure of fixed orifice;
Blue strap: the value registered in this point means the downstream pressure of fixed orifice.
IfCim 726 device is not available, differential pressures and relevant flow rate can be read in the diagrams
reported on following pages (see Graphs and Tables).
When measuring is over, remove measuring needles carefully, for some splash of water might come out.
Replace the plugs of binder points.
-
7/27/2019 Technical Leaflet Cim 3723B
3/12
Pagina 3 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
Maintenance
As a rule, the flow measurement device Cim 3723B does not need any maintenance. In case of
replacement or need of disassembling of some components of the valve, make sure that the installation is
not under service or pressure.
The following table shows the dimensions of the full range ofCim 3723B.
Legenda:
1. Valve body;
2. Extension;
3. Binder point.
DN 50 65 80 100 125 150 200 250 300
A 20 20 20 20 20 20 20 20 20
B 108 125 144 164 194 220 275 333 385
C 136 145 154 164 179 192 219 248 304
Fig 2
1
2
3
-
7/27/2019 Technical Leaflet Cim 3723B
4/12
Pagina 4 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
Graphs and tables
CIM 3723B DN 50
Kvs value registered on the binder points placed at the ends of f ixed orifice
Kvs (flow rate in m3/h @ 1bar pressure drop signal)
Size Kvs
DN 50 47,5
-
7/27/2019 Technical Leaflet Cim 3723B
5/12
Pagina 5 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
CIM 3723B - DN 65
Kvs value registered on the binder points placed at the ends of f ixed orifice
Kvs (flow rate in m3/h @ 1bar pressure drop signal)
Size Kvs
DN 65 88,5
-
7/27/2019 Technical Leaflet Cim 3723B
6/12
Pagina 6 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
CIM 3723B - DN 80
Kvs value registered on the binder points placed at the ends of f ixed orifice
Kvs (flow rate in m3/h @ 1bar pressure drop signal)
Size Kvs
DN 80 150,6
-
7/27/2019 Technical Leaflet Cim 3723B
7/12
Pagina 7 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
CIM 3723B DN 100
Kvs value registered on the binder points placed at the ends of f ixed orifice
Kvs (flow rate in m3/h @ 1bar pressure drop signal)
Size Kvs
DN 100 281,1
-
7/27/2019 Technical Leaflet Cim 3723B
8/12
Pagina 8 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
CIM 3723B DN 125
Kvs value registered on the binder points placed at the ends of f ixed orifice
Kvs (flow rate in m3/h @ 1bar pressure drop signal)
Size Kvs
DN 125 328,8
-
7/27/2019 Technical Leaflet Cim 3723B
9/12
Pagina 9 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
CIM 3723B DN 150
Kvs value registered on the binder points placed at the ends of f ixed orifice
Kvs (flow rate in m3/h @ 1bar pressure drop signal)
Size Kvs
DN 150 477,5
-
7/27/2019 Technical Leaflet Cim 3723B
10/12
Pagina 10 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
CIM 3723B DN 200
Kvs value registered on the binder points placed at the ends of f ixed orifice
Kvs (flow rate in m3/h @ 1bar pressure drop signal)
Size Kvs
DN 200 826,0
-
7/27/2019 Technical Leaflet Cim 3723B
11/12
Pagina 11 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
CIM 3723B DN 250
Kvs value registered on the binder points placed at the ends of f ixed orifice
Kvs (flow rate in m3/h @ 1bar pressure drop signal)
Size Kvs
DN 250 1218,0
-
7/27/2019 Technical Leaflet Cim 3723B
12/12
Pagina 12 di 12
Technical leaflet Cim 3723BRevisione 0
Emissione 03/2011
CIM 3723B DN 300
Kvs value registered on the binder points placed at the ends of f ixed orifice
Kvs (flow rate in m3/h @ 1bar pressure drop signal)
Size Kvs
DN 300 1794,0