Page 1: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

Team 14: GRE-cycleStatus Update

3/4/15

Page 2: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

The Team

Cole Walker Ben Guilfoyle Hannah Albers Melanie Thelen

Page 3: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

Outline• Problem• Project• Process Overview• Accomplishments

o Pre-Treatmento Reactor

• Obstacles Overcome• Future Work

Page 4: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

The Problem The Project Pre-treatment Reactor ObstaclesProcess Overview Future Work

The Problem

• Restaurant grease is a waste

• Often recycled back into clean grease

• Potential for greater use

http://www.energy4me.org/images2010/source_petroleum.jpg

3/10

Page 5: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

The Problem The Project Pre-treatment Reactor ObstaclesProcess Overview Future Work

Our Project• Biodiesel Production Plant

• Feed: Restaurant Grease

4/10

Page 6: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

The Problem The Project Pre-treatment Reactor ObstaclesProcess Overview Future Work

Plant Process

5/10

Page 7: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

The Problem The Project Pre-treatment Reactor ObstaclesProcess Overview Future Work

Pretreatment Progress

• Preliminary design of pretreatment reactor• Used to avoid soap formation

• Membrane filter to separate feed

• Distillation column to recycle methanol

6/10

Page 8: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

The Problem The Project Pre-treatment Reactor ObstaclesProcess Overview Future Work

Main Reactor

• Design Criteria• Simple is better• Congruent with process

chemistry• Handles a variable feedstock

• Design Decision• Batch• Plug-flow

Oscillatory Baffled

Microwave

Batch Plug-Flow

MembraneMicroreactor

Reactive Distillation

Continuous Stirred Tank

7/10

Page 9: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

The Problem The Project Pre-treatment Reactor ObstaclesProcess Overview Future Work

Raw Materials

• Pretreatment• Methanol• Sulfuric Acid

• Main Reaction• Methanol• Sodium Hydroxide

8/10

Page 10: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

The Problem The Project Pre-treatment Reactor ObstaclesProcess Overview Future Work

Obstacles OvercomeEstablished unit operations and raw materials, which were incorporated into a base case UNISIM design

9/10

Page 11: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

The Problem The Project Pre-treatment Reactor ObstaclesProcess Overview Future Work

Future Work

• Kinetic modeling• Batch vs. continuous

• Reactor Configuration

• Post-treatment design http://en.wikipedia.org/wiki/Linseed_oil

10/10

Page 12: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

Questions?

Page 13: Team 14: GRE-cycle Status Update 3/4/15. The Team Cole WalkerBen Guilfoyle Hannah Albers Melanie Thelen

Design Norms

• Stewardship

• Transparency

• Caringhttp://www.biodieselmagazine.com/uploads/posts/web/2011/01/12948046006374.JPG