Taupo Case Study19th November 2013SH1 Desert Road - Waikato Stream

Page 2: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

Geographical Location

• Incident Location

Page 3: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

• SH 1 leaves Turangi and ascends onto the North Island Volcanic Plateau, passing through the fringes of the Tongariro National Park and into the Rangipo Desert, and is commonly known as the Desert Road

Geographical Location

Page 4: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

Detour Extent

Page 5: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

• 52km Affected – approx. 36 Minutes

• 107km Detour – approx. 84 minutes, adding 48 minutes to the journey

• MADT for the Desert Road for this month was 4300 vehicles – 179 vehicles per hour.

Detour Details

Page 6: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

SH1 Desert Road – 19th November 2013

Page 7: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

• Initial Incident – Trailer Roll Over • 2.10pm Event Logged and Contractors

Dispatched• 3.00pm Communications that bridge was

“smashed” – Consultant en-route• 3.45pm Confirmed incident details and advised

only 1 lane closure with lights overnight – No road closure until the next day.

Timeline of Events

Page 8: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

Initial Incident – Trailer Roll Over

Page 9: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

Initial Incident - Trailer Roll Over

Page 10: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

Initial Incident - Trailer Roll Over

Page 11: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

• Planned Road Closure at 7am – 12pm• Establishment of Site• Righting and Removal of Trailer• Righting and Removal of Crusher Unit• Pavement repairs and barrier erection• Road Opening

Day 2 – Recovery

Page 12: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

Recovery Operation – Trailer/Crusher

Page 13: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

Recovery Operation – Trailer/Crusher

Page 14: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

Recovery Operation – Trailer/Crusher

Page 15: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

Recovery Operation – Trailer/Crusher

Page 16: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

Recovery Operation – Trailer/Crusher

Page 17: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream

• 1 Incident • 7 Hour Road Closure• Estimated 1300 Vehicles effected (Based

on MADT)• Additional 48 minutes of travelling per

vehicle for signed detour• Social/Economic Costs

Effects of Entire Event

Page 18: Taupo Case Study 19 th November 2013 SH1 Desert Road - Waikato Stream