tank fire caused by the earthquake at idemitsu hokkaido refinery
DESCRIPTION
Tank Fire Caused by the Earthquake at Idemitsu Hokkaido Refinery. Makoto Hirai Manager, Research and Technology Idemitsu International (Europe) plc. AGENDA. Company Profile Outline of Tank Fire Conclusion. AGENDA. Company Profile Outline of Tank Fire Conclusion. 1. Company Profile. - PowerPoint PPT PresentationTRANSCRIPT
Tank Fire Caused by the
Earthquake
at Idemitsu Hokkaido Refinery
Makoto HiraiManager, Research and TechnologyIdemitsu International (Europe) plc
AGENDA
1. Company Profile
2. Outline of Tank Fire
3. Conclusion
AGENDA
1. Company Profile
2. Outline of Tank Fire
3. Conclusion
Head Office : Tokyo, Japan Founded : June 20, 1911 Employees (Group) : 7,737 (31st March, 2006) Net Sales (Group) : 3,327 billions (\) Refineries : 4 (640,000B/D) Overseas Office : 36
In Middle East
Abu Dhabi, Tehran,
Dhahran, Muscat, Doha (5)
1. Company Profile
Oil Exploitation
Crude Oil Transportation
Oil Refining 4 RefineriesChemical Plant 2 Plants
Domestic Transportation
Retail: 5,294 station
1. Company Profile (Cont’d)
Aichi
Tokuyama
Hokkaido
ChibaSTARTED YEAR : 1957
Petrochemical Complex
*CDU / FCC
*Steam Cracker 450 Mt/yr
STARTED YEAR : 1975
*CDU / ARDS / R2R / ALK
STARTED YEAR : 1973
*CDU / ARDS / R2R
STARTED YEAR : 1963
Lube & Petrochemical Complex *CDU / ARDS / FCC
*Steam Cracker 374 Mt/yr
Aichi
1. Company Profile (Cont’d)
Location of Idemitsu Refineries
AGENDA
1. Company Profile
2. Outline of Tank Fire
3. Conclusion
2 . Outline of Tank Fire
Two Tank Fire were occurred after Earthquake (at 4.50am, 26th September, 2003)
#30006(#3’6) #30063(#3’63)Tank No.
D:42.7m, H:24.39m, Max 32,779kl (FRT)Tank Prof.
Crude Oil(31,160kl)
Naphtha(26,874kl)
Content(incident)
Ring Fire Full Surface FireIncident
case
Occurred: at 4.51 26th Sep.
Extinguished: after 12hours
Occurred: at 10.45 28th Sep.
Extinguished: after 44hours
Fire fighting Situation
Appendix 1 Overview of the Tokachi ー Oki Earthquake and Hokkaido Refinery Seismograph Data
Overview of the 2003 Earthquake Hokkaido Refinery Seismograph Data Acceleration Time Series)
Time of Earthquake
Depth of epicenter
Magnitude
Location ofepicenter
: About 04:50 September 26th 2003
: 42 km
: 8.0
: Latitude 41º46.78’ Longitude 144º4.71’
Maximum surface acceleration (Combined maximum acceleration : 86 gal) N orth-south : 69 gal East-west : 76 gal Up-down : 38 galN.B. This map has been reproduced with permission
from Numerical Map 200000 (coast lines, administrative Areas) published by the Geographical Survey Institute ( Permit Number 2003 Copy No. 367 )
epicenter
Hokkaido Refinery
24°30′
警防
60001 6000560002 60003 60004
6000960007 6000830006
40061 40062
4006430063
10151
10155
10159
10163 10164
25153 25154
25157 25158
10253
10255
10257
10252
10254
10256
10258
20262 20263 20264
20265 20266 20267
30351
変電所
計器室1001110012 40013
Electric generator
Inner portOffice Laboratory
Cafeteria
5259 5260
B-H3
Deionizer
Central TransformerStation
Industrial water storage tank
YO
CPI
YO-T1A YO-T1B
YO-T2A YO-T2B
Central TransformerStation No. 2PC
Storage
NO.9NO.8
NO.7 NO.5 NO.4 NO.3 NO.1 Berth
Sea water pump
10251
Power Area
B-H1B-H2
No. 1 Flare
Changing Room Tower
Main Building
Now-defunct
Smokestack assembly
放流口
Rising Bridge
Atmospheric Distillation
Facility
Hydrogen Recovery
Facility
Contact Modification Facility
Naphtha HydrogenationDesulphurization Facility
Kerosene and Diesel Oil Hydrogenation Desulphurization Facility
Heavy Diesel OilHydrogenation
Dissolution Facility
West Bridge
DepressurizationDistillation
Facility
No. 1 Nitrogen Supply FacilityGas/LPGCleansing FacilityLPG Refining Facility
Through Gate
Main Gate
Crude Oil Direct Desulphurization Facility
Sulphur Recovery Facility
Hydrogen Manufacturing Facility
Gas turbine
Steamturbine
Crude Oil Fluid Catalytic Analysis Facility
Diesel Depth HydrogenationSulpherization
Facility
Sulphur Supply FacilityNo. 2
SDM Temporary Building
SDM Temporary Building
SulfurRecovery
Facility
Primary DrainageTreatment Facility
Area 650
100651 100652
100653 100654
Oil drainer T‐V690
Naphtha
Crude oil
24°30′
RN
Tank with outbreak of fire on 26th
Area 0
Area 50
511310111
10106
10101
10112
10107 5108
5114
5109
5115
5110
5104 5105
T-V129T-V220Area 100
Area 150 Area 250 Area 350
20301 20302 20303 20304
20305 20306 10307
20308
5311 5312
3313
3315
3314
3316
Area 300
Lorry Shipments
While Oil Lorry
Black Oil Lorry
LPG Larding Area
IP
Storage
No. 2 Flare
AS Loading Area
2501 2502
3506 3507
1508SUL 3560 3561 3562
3564 3565
4454 4455
34523451
3563
3453
Measuring FacilityShipping Facility
Shipping Facility for Spherical Tanks
5503 3553
Area 500 Area 550
Area 450
N
20201 20202 20203
20206 20207 20208
20204 20205
20209 20210
T-V230T-V219
Area 200
: Roof damaged
: FRT
: Maintenance
: CFRT
: Roof sunken
Appendix 2 Hokkaido Refinery: Outline of Damage to Tanks (Site Plan)
Tank with outbreak of fire on 28th
2 . Outline of Tank Fire - #3’6 -
-Incident was happened immediately after the Earthquake.
-Because of the sloshing, crude oil was overflowed on the tank roof and dike.
Ignition source would be “Electric Sparks caused by fractures of electric cable” or “Electric Sparks from collision of floating roof and measurement cabin or fall of measurement cabin”.
Electric spark
Measurement cabin in a normal state
(reference)
Measurement Cabin
Pontoon
Gauge Pole
Collision
electric cable
Measurement cabin fell on the floating roof
where measurement cabin stood
Sloshing height approx. 3.1 m( calculated measure )
Height of collision between the pontoon’s outer rim and the base of the measurement cabin: approx. 2.9m
Deck Plate
Appendix 3 Main Damaged Sections on Floating Roof of Crude Oil 30006 Tank
Over flow
Collision
2 . Outline of Tank Fire - #3’63 -
-Incident was happened 2days after of the earthquake.
-Because of the sloshing, the floating roof was completely sunken. Foam was continuously applied after the earthquake to prevent from contact between naphtha and air, but strong wind broke the foam blanket in the morning of 28th Sep.
Measurement cabin
Naphtha
Roof completelyfell into fuel
Fuel level : 18.5m
Distance from top of tank to fuel surface : 5.9m
Wind: South south east 7.3m/s, Temperature: 16.9 degC
Foam seems to have been blown away to direction of 160°
Ripples seem to have been caused by strong wind
180 ゚
90 ゚270 ゚
0 ゚Fixed foam system(total 7 spots)
Boundaries of foam at about 10:45 of ignition (appears to have been 1/3 – 1/4)
Boundaries of foam at about 10:35(appears to have been 3/4)
Appendix 4 Situation in Naphtha #30063 Tank before Ignition
Point of ignition
We had been doing foam application from fixed foam system from 26th.
But the foam blanket was broken by strong wind in the morning of 28th.
The foam applicationwas tried again, but the wind was too strong to keep the foam blanket.Ignition occurred after about 10 mins.
#30063 tank-Content: Naphtha-Diameter: 42.7m
2 . Outline of Tank Fire - Video -
- Japanese National Broadcast made a TV programme about Idemitsu Incident.
- #3’6 3min 17- 4min 30-#3’63 5min 59-6min 20, 10min 05 11min 54-Sloshing, etc 15min 22 - 22min 10
AGENDA
1. Company Profile
2. Outline of Tank Fire
3. Conclusion
3. Conclusion
1 . We lowered fuel operation levels of 3 Refineries (Hokkaido, Chiba and Aichi), total volume of 600,000 kl, taking into consideration their respective velocity response spectrum.
2 . We removed structures on tank, in particular, all measurement cabins in Hokkaido Refinery.
3 . We are reinforcing the floating roofs against earthquakes.
(1) 100,000 kl tanks in Hokkaido Refinery are changed to double-deck structure.
(2) For other tanks, the pontoons of floating roof are reinforced.
4 . We purchased 2 big monitors, 30,000 l/min and 11,000 l/min, in Hokkaido Refinery.
Thank you for your attentions.
End of Report