5S- idemitsu

73
5S for Human Resource Development Idemitsu Kosan Co.,Ltd

Upload: hoang-thang

Post on 24-Nov-2015

45 views

Category:

Documents


4 download

TRANSCRIPT

  • for Human Resource Development

    Idemitsu Kosan Co.,Ltd

  • Head office: Tokyo, JapanFounded: 1911Employees: 7,826Annual Sales: 3,798billionRefineries: 4 (640MBPSD)Petrochemical Plant: 2 (997KTA)Overseas Offices: 36Service Stations: 4,598

    Idemitsu Head office

    Outline of Idemitsu

  • Exploration&Production

    OverseasBusiness

    New Energy

    Marketing

    Petrochemical

    R&D

    Transportation

    Stockpiling

    Refining

    4 Coal Mines in Australia

    1 Uranium Mine in Canada

    1 Geothermal Plantin Japan

    4,598 SS

    4 Refineries640MBPD

    9 VLCCs

    Norway andSE Asia

    Electronicmaterials

    IdemitsuGroup

    Group business of Idemitsu5 Lubricants blending factories in US, China and SE Asia

    2 Plants997KTPY

  • Refinery locations Total Capacity

    CDU 640 MBSD

    Ethylene 997 KTPY

    AICHI (1975-)

    TOKUYAMA (1957-)

    * CDU 120 MBSD* FCC 26 MBSD* Ethylene 623 KTPY

    * CDU 160 MBSD* ARDS 55 MBSD* RFCC 50 MBSD

    * CDU 140 MBSD* ARDS 38 MBSD* RFCC 30 MBSD

    * CDU 220 MBSD* ARDS 40 MBSD* FCC 45 MBSD* Ethylene 374 KTPY

    HOKKAIDO (1973-)

    CHIBA (1963-)

    High Conversion (RFCC) Refineries- Hokkaido and Aichi

    Refining and Petrochemical Complexes

    - Chiba and Tokuyama.

    Location of Refinery & Plant

    Technical Training Center

  • 5This line of thought is based on the fact that human beings are the main entity of economy and society,not material and money caution against putting the cartbefore the horse.

    Starting Point of Management

    3

    Respect for Human Being IdemitsuRespect for Human Being

  • 6Starting Point of Management

    Our Founder set up five principles:

    Respect for Human Beings

    The Great Family-like System

    Independent and Autonomy

    Do Not Be a Slave to Money

    A Bridge from Producer to Consumer

    Starting Point of Management4

  • We placed particular emphasis on discipline and education of our employees, so that they become a group respected by society.

    In practicing the ideal, we have also emphasized synergetic and wide application of Human Power gained through total cooperation.

    Starting Point of Management

  • KSS: Kaizen Suggestion System

    S

    JITJust-In-Time

    production

    TPMTotal

    Productive Management

    TQCTotal Quality

    Control

    QCCQC Circle

    Toward Goal

  • S

    5S is the beginning of a healthy, comfortable and productive life for everyone at work

    SEIRI(shifting)

    SEIKETSU(standardizing)

    SEITON(sorting)

    SEISOU(cleaning)

    SHITSUKE(discipline)

    SAHOU(manner)

    5S is an initial letter for 5 Japanese words

    S

  • SEIRI(shifting)Separate needed

    items and not needed items.and throw away not needed items.

    SEIKETSU(standardizing)

    Maintain shifted, sorted, and cleaned state.

    SEITON(sorting)Maintain the state to

    be able to take neededmatters when those areNeeded(Decide, restore)

    SEISOU(cleaning)Clean up garbage, dirtforeign materials in

    surroundings and workplace

    SHITSUKE(discipline)Be accustomed to

    follow decided matters (rules)

    SAHOU(manner)Reasonable style as

    a way of human shallbe established

    S

  • SSEIRI

    SEITONSEIKETSU

    SEISOU

    SHITUKESEIRI

    Seiri is the sorting out and discarding of unnecessary items in the workplace

  • SSEIRI

    SEITONSEIKETSU

    SEISOU

    SHITUKESEITON

    Seiton is the arrangement of necessary items into goodorder so that they can beeasily selected for use

  • SSEIRI

    SEITONSEIKETSU

    SEISOU

    SHITUKESEISOU

    Seiso is cleaning up ones workplace completely so that there is no dust on floors, machines or equipment

  • SSEIRI

    SEITONSEIKETSU

    SEISOU

    SHITUKESEIKETSU

    Seiketsu is maintaining ones workplace so that it isproductive and comfortable byrepeating Seiri-Seiton-Seisou

  • SSEIRI

    SEITONSEIKETSU

    SEISOU

    SHITUKESHITSUKE

    Shitsuke is training people to follow good work habits andthe strict observation of workplace rules.

  • Before After

    S

    Efficient working atmosphereNot only

    Employees have more independence of mindTeam work can be strengthenedLeadership would be developed

    But

  • SProductivity

    Quality of workSafety at workplace

    Go up!

  • Productivity

    Quality of workSafety at workplace

    SCompetencyCareer

    Mindset , Mentality Change!

  • Do your job, S!. If not, you, fired!S

    Its not my job!

    Rule by fear

  • S Four Key Factors for Successful 5S There are no observers in 5S,

    everyone participates

    22 Continued commitment andsupport by top management

    5S starts with education and training

    33

    Repeat the 5S cycle in order to achieve a higher standard

    44

  • S STEPTop managementTop manager should understand the philosophy and benefit of 5STop managers commitment to 5S implementationOrganize 5S working committee and appoint 5S facilitatorTrain 5S facilitators and participants

    Effect of 5S

    Efficiencyimprovement

    Qualityimprovement

    Securethe safety

    Motivationimprovement

    Costreduction

    Failurereduction

    Beautifulenvironment

    Inventoryreduction

  • S STEP2Official announcement by the top managerThe top manager should officially announce the implementationof a 5S programThe top manager explains the objectives of 5S program to colleagues.Publicize the 5S organization chart and layout diagram showing areas divided by borders for the assignment or responsibilityto small group

    Work on various promotion tools(banners, posters, newsletter etc.)Organize off- and on-the-job training programs on the basis of5S to all colleagues

    Top Manager

    5S Facilitator Committee

    MG/Group A MG/Group B MG/Group C

    5S Auditor

    Organization for Implementation of 5S

  • S STEP3Big cleaning by all colleagues Organize A Big Cleaning Day after the 5S implementation

    announcement by the top MG as soon as possibleAssign small groups to be responsible for each divided area.Provide enough tools and materials

    This big cleaning also includes Seiri (Shifting) of wastesA Big Cleaning Day should be continued (twice a year)

    Before AfterPhotographs for Improvement

  • S STEP4Initial Seiri ( Shifting ) Establish Disposal Standards for unnecessary items.Initial Seiri is an activity practiced by everyone to removeall unnecessary items after a big cleaning day. Everyone concentrates to identify and arrange unnecessaryitems for elimination.Unnecessary items that cost a lot should be evaluated and listed.Future purchase of unnecessary items can be avoided.

    Why do unnecessary items exist?

    Change in sales-production planThe excessive orderingThe incorrect orderingThe lack of quality controlThe lack of quantity controlImproper storage locations and poor

    storage methods

    A poor receiving and issuing systemDuplicated ordering or deliveringOld or aged machine and equipmentThe duplicated production and storage of

    paper work Others

  • S STEP5Daily Seiri , Seiton and Seiso SeiriDiscard things that are not needed and not being used. Use space more efficiently.

    Seiton: Improve locations and methods of sorting things.After the effort, searching and returning time is minimized.

    Seiso: Continue daily cleaning schedule for the creation of healthy and comfortable workplace.

    Motivate and stimulate colleagues to get ideas to improve their workplace.

    Space & Time

  • S STEPPeriodic S Audits Establish 5S evaluations and incentive plans. Conduct 5S audits regularly by auditors.

    (a)Score on the 5S level achieved(b)Score on good practices identified

    Organize 5S internal competition to prevent backsliding andfor further upgrading.

    Periodically award groups and individuals that implementgood practices in appreciation for participation.

  • SEIRI(shifting)SEITON(sorting)

    SAHOU(cleaning)

    At Workplace

    Human resourceHuman resourceDevelopment

    ComfortableComfortableCircumstances

    Without Useless,Without Useless,Unreasonableness,

    Unevenness(Muda, Muri, Mura)

    VisualVisualManagement

    Elimination ofElimination ofMicro Defects

    SEIKETSU(standardizing)SHITSUKE(discipline)

    SAHOU(manner)

    Individuals Try

    GoodQuality

    NoNuisance

    Low Cost

    Timely

    See-ThinkPDCAon 5S

    Action Plan

    DoCheckPeriodically

    Daily

    Clear(Sukkiri)Activity

    Special5S

    Special Action

    S Mechanism of 5S

  • SPrinciple of SEIRI (Shifting)

    Neededitems

    Treatment

    Items used at all times

    Items used occasionally

    Items rarely used

    Judgment criteria

    Preferably place the itemsat hand

    SEIRI(shifting)

    Place the items at predeter-mined place, little separated Place are allowed

    Separately stored at designated place

    Not Neededitems

    Items can be thrownaway immediately

    Items thrown away afterconsideration of sales

    Items some expense isnecessary to throw away

    Throw away immediately

    Separate sales parts, and throw away remains

    Throw away after checkingdisposal method(Non expensive method)

    Judgment criteria (principle) for SEIRI (shifting) shall be fixed on necessity!

  • SPrinciple of SEITON (Sorting)

    Treatment

    Where(Define a place/fixed place)

    What(Define an item/fixed item)

    How manyDefine quantity/fixed quantity

    The principle of Seiton

    Define the place-Adjustthe place

    SEITON(sorting)

    Define items to be placed

    Define quantity to beplaced

    Restore to Original state

    (Rule)

    A-1 A-2 A-3

    B-1 B-2 B-3

    C-1 C-2 C-3

    A-1

    A-2

    A-3B-1

    B-2

    B-3

    C-2

    C-1

    C-3

    9Boxes

  • SProcedure of SEISOU (Cleaning)

    Define Cleaning Items

    Assign member in chargeof cleaning

    Define how to clean

    Place, machine, inventoryaisle, backside, etc.

    SEISOU(Cleaning)

    Rolls and responsibility

    When, method, tools

    Prepare cleaning tools

    Implement cleaning

    Tools with good usability,even tools are a little expensive

    Identity of waste and dirt can be found out.Generation source of waste and smudge can be disclosed.Intrusion point of waste and smudge can be specified

    Problem Consciousness

    Machine MaintenanceFailures of machine and equipment can be found.By repeating this work, chronic (lasting) problem becomes visible

    Dirt

  • SPrinciple of SEIKETSU (Standardizing)

    SEIRI(Shifting)

    SEITON(Sorting)

    SEISOU(Cleaning)

    SEIKETSU(Standardizing)

    Implemented by each person

    Established in workplace

    Improving Level

    Returning to original point

    Time Time

    Improving Level

    Building-up status of improvement and maintaining

  • SPrinciple of SEIKETSU (Standardizing)

    SEIRI(Shifting)

    SEITON(Sorting)

    SEISOU(Cleaning)

    SEIKETSU(Standardizing)

    Implemented by each person

    Established in workplace

    We have to make it possible for anybody to find out little dirt and abnormality.

    Visual management is thoroughly effective

    Indications and color code shall be applied to recognize normal status

    Make criteria of abnormality clear and countermeasures are also clear

  • SPrinciple of SEIKETSU (Standardizing)

    5.0

    0

    7.5kg

    2.02.5kgA Grade

    2.5

    Indication of control range by color

    Labeling proper seats by color

  • SPrinciple of SHITSUKE (Discipline)

    The habit, to follow the decidedmatter (rules), has been build up.

    SHITSUKE(discipline)

    The Original StateEagerness Motivation

    A sense ofaccomplishment

    The first priority matter is achievement of taking action from other persons standpoint. Without understanding causes of necessity on Seiri and Seiton in workplace and necessity of voluntary cleaning, 5S is difficult to be established.

    Self-governing

    compulsoryWhats wrong?On a street, OK!

  • SPrinciple of SHITSUKE (Discipline)

    Yourself!

    Some Suggested Good Shitsuke Practice

    Contact people with a big smileBe good listenerBe devoted and Kaizen (Improvement) -oriented Demonstrate team spiritConduct yourself as the member of reputable organizationBe punctualAlways keep your workplace clean and tidyKeep safety rules strictly

  • 5S of Analytical Laboratory

    Idemitsu Kosan Co., Ltd.

  • Quality Control Laboratory

  • Laboratory starts morning with exercise.

  • Lab Manager and Refinery Deputy GM join the exercise.

    Lab Manager

    Refinery Deputy GM

  • Umbrellas Box for Customer (Hand-made, DIY)

    Customer First

    Pull Inside Out

  • Morning Meeting of Quality Control Laboratory

    Lab ManagerDay Leader

    Work Schedule Board

  • They Chant Safety Slogan at the end of Morning Meeting.

  • Safety Slogan is posted on the wall.

  • Around the wall, they post their targets and schedule of TPM.

  • Around the wall, they post their targets and schedule of TPM.

  • The record of Activities are kept for future review.

  • Files are well arranged as 5S activities.

  • Colored Light Indicates Topics (Entrance Area).

    Green Light

    Switch of Green Light (General Affair)

    Training

    Safety

    TPM

    Welfare

    Nickname: Mr. Look-Look

  • They constructed Laboratory Supplies Stock Area by themselves.

  • Stock Shelf of Analytical Reagents

    It is visible how many bottles of Reagent we have in stock.

  • Standard Thermometers

    Finger Hole

  • Standard Thermometer

    Address

  • Address

    Standard Thermometers

  • Standard Thermometers

    OrderedIn Use

  • Paper Towels

  • Laboratory Supplies

  • Recorder Papers

    Before TPM activities, those lab supplies and recorder paperswere kept by each of lab staff.

  • Recorder Roll Papers

    If remaining stock becomes less than two,you have to order supplies.

    Item Number

  • Order FormsItem Number

  • Order Form

  • Item Number

    Name and Specifications Unit of Order Date of Delivery

    Name and Fax Number of Supplier

    Authorization Signatures

  • Sample CansFor Earthquake, Shelves are tilted and wire codes were installed.

  • Desk Drawer in LabVisualization of Position for Test Device.

  • Floor SignsDear night shift operators,please Bring Water Sample to this Direction.

  • Lab staff are trying to communicate with Night Shift staff who come in the lab late in the evening Lab staff do not have chance to meet them. They are talking to the night shift staff by painting guide arrows on the floor.

  • This is the entrance of Analytical LaboratoryFloor Signs

  • This is the direction of Analytical Reagent Stock Shelf.

    Ceiling Signs

  • If you do not know where laboratory supplies are, push buttons.

    Recording Papers

    Roll Papers

    Cans

  • Lump is on for Cans

  • LUBLIFE

    Waste of Tested Heavy Oil

    This machine tells fill-up point of heavy oil by cuckoo voice. It is easy to know when we have to throw it away.

  • Analysis Machine (Caution & Maintenance Period)

    Caution! Rotating Machine Maintenance Period

  • Electric Dryer (Indication of Contents Inside)

    We cannot knowwhats inside.When the door is open, dangerous situation must be avoided. IndicationIs effective for safety