t +31 78 6969000 f +31 78 6969555 energy - royal ... stream shore pull of the first 48” pipeline....

20
SOLUTIONS BROCHURE ENERGY SOLUTIONS Royal Boskalis Westminster N.V. Rosmolenweg 20 PO Box 43 3350 AA Papendrecht The Netherlands [email protected] T +31 78 6969000 F +31 78 6969555 www.boskalis.com

Upload: phamnhu

Post on 18-May-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

SOLU

TIO

NS

br

Och

Ur

e eNergy SOLUTIONS

Royal Boskalis Westminster N.V.Rosmolenweg 20PO Box 433350 AA PapendrechtThe Netherlands

[email protected] +31 78 6969000F +31 78 6969555

www.boskalis.com

Page 2: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S2 3

EnEr

gy

SO

LUTI

On

S

hO

Ofd

STU

k

A prOveN NAme IN The eNergy mArkeT

Boskalis is a leading global dredging and marine expert.

With safety as our core value we provide innovative, sustainable and all-round solutions for our clients in the energy market. Realizing projects in remote locations with a heightened environmental focus is one of our specialties.

Under brands such as Boskalis, Dockwise, SMIT, Fairmount, VBMS and Smit Lamnalco we offer more services than any other company in our industry, making us your next one-stop solution provider. We support the development, construction, maintenance and decommissioning of oil and gas import and export facilities, fixed and floating exploration and drilling facilities, pipelines and cables and offshore wind farms. We also offer a total mining solution by applying proven dredging techniques.

Since our founding in 1910 our clients look to us to find cutting edge solutions to meet their specific requirements. Our track record includes a wide variety of demanding energy projects and contracts that established our name in the energy market.

DE RUYTER FIELD, THE NETHERLANDSBoskalis executed seabed preparation works for pipeline installation and burial. Precision work and stringent tolerance levels were challenges that were successfully met.

Page 3: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S4 5

EnEr

gy

SO

LUTI

On

S

Offices

Projects and operations

OU

r w

Or

Ld

OIL ANd gAS ImpOrT ANd eXpOrT FAcILITIeS

ONShOre ANd OFFShOre mININg

reNewAbLe eNergy pIpeLINeS ANd cAbLeSeXpLOrATION ANd prOdUcTION - FLOATINg

OUr wOrLd

whAT SeTS US ApArT

GloBal pReseNce

11,000 expeRts

committed to safety

oVeR 1,000 modeRN aNd flexiBle Vessels

ouR aBility to maNaGe complexity

Wide RaNGe of iNteGRated seRVices

iNNoVatiVe aNd sustaiNaBle solutioNs

cost leadeRship

Offices

Projects & operations

OUr SOLUTIONS FOr The eNergy mArkeT

eXpLOrATION ANd prOdUcTION - FIXed

Page 4: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S6 7

EnEr

gy

SO

LUTI

On

S

SAFe

AN

d S

UST

AIN

Ab

Le

SAFe ANd SUSTAINAbLe

Our work goes beyond the provision of services. With safety as our core value we have uncompromisely embraced safety within our culture. This is the essence of 'NINA', our No Injuries, No Accidents safety program.

Boskalis is known for its dedication to the environment. Wherever possible, we work to mitigate environmental concerns. By building with nature, we help preserve or even strengthen environmental assets without compromising economic benefits.

STANdArdS OF eXceLLeNce � ISO 14001 International environmental

quality � OHSAS 18001 Occupational health and safety � ISO 9001 Business management � IMCA Offshore operations standard

Page 5: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S8 9

EnEr

gy

SO

LUTI

On

S

hO

Ofd

STU

k

Our 11,000 experts are focused on achieving the best result.

In addition to a dedicated fleet crew, you can rely on our experts from a wide range of disciplines. These include hydraulic and civil engineering, operations and project management, ecology, finance, morphology, geology, geophysics and marine biology.

A TeAm bUILT ArOUNd yOUr NeedS

‘ Boskalis has the resources to Build a gloBal team around the challenges you face’

A T

eAm

bU

ILT

Ar

OU

Nd

yO

Ur

Nee

dS

Page 6: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S10 11

EnEr

gy

SO

LUTI

On

S

OU

r A

bIL

ITy

TO

mA

NA

ge

cO

mpLe

XIT

y

OUr AbILITyTO mANAgecOmpLeXITy

� In the pre-design phase we can help determining the feasibility of your business case.

� During the design phase we will create a solution that fits your requirements.

� As your main contractor, we can streamline execution by managing sub-contractors and communicating with stakeholders.

� We can provide cost-effective solutions by offering reliable (long-term) operational services under brands such as SMIT, Dockwise and Smit Lamnalco.

� At the end of the life cycle we are able to reduce the total cost of ownership and limit the environmental footprint through our decommissioning services.

‘ involve Boskalis early on and we can significantly improve your processes, mitigate risks and minimize uncertainties’

topNORD STREAMCofferdam construction.

bottomNORD STREAMShore pull of the first 48” pipeline.

RUSSIA – GERMANYSeabed preparation, shore approach, trenching and rock protection for the two Nord Stream 1,224km gas pipelines from Russia to Germany. Precise timing, severe weather conditions, tight coordination and strict environmental requirements were successfully met.

Page 7: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

13

EnEr

gy

SO

LUTI

On

S

eNer

gy

SO

LUTI

ON

S12

OU

r S

OLU

TIO

NS

FOr

Th

e eN

erg

y m

Ar

keT

OUr SOLUTIONS FOr The eNergy mArkeT

Onshore and Offshore Mining

Exploration and Production-floating

Renewable Energy

Exploration and Production-fixed

Oil and Gas Import/Export facilities

Pipelines and Cables

Page 8: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S14 15

EnEr

gy

SO

LUTI

On

S

OIL

AN

d g

AS

ImpO

rT/

eXpO

rT

FAcIL

ITIe

S

1

2

6

3

5

4

4

OUr SOLUTIONS1 Construction and deepening in front of

quay wall2 Land reclamation, soil improvement and

shore protection 3 Deepening and maintenance of access

channel and turning basin4 Environmental monitoring5 Breakwater construction6 Terminal services7 Transport of modules8 Logistical management with floating

super pallets

7

8

OIL ANd gAS ImpOrT/eXpOrT FAcILITIeS

Page 9: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S16 17

EnEr

gy

SO

LUTI

On

S

OIL

& L

Ng

Im

pO

rT/

eXpO

rT

FAcIL

ITIe

S

A (pre)feasibility and design study for an oil and LNG import/export facility involves evaluating a complex matrix of interrelated parameters and uncertainties. These include expected throughput, environmental conditions and the securing of financing. Greenfield facilities in remote locations, with limited access and infrastructure and a heightened environmental focus, are especially challenging. The complexity and size of these projects mean that numerous disciplines and contractors are involved. In addition, the time-consuming nature of the design and planning phases mean that the construction phase often becomes time-critical.

We add value by developing innovative, best- for-project solutions and by optimizing the process through (parallel) design, permitting and execution.

We can streamline execution by managing subcontractors, communicate with stakeholders, eliminating interfaces and/or acting as a specialist subcontractor.

Once your facility is operational we can provide cost-effective solutions by offering reliable (long-term) services.

OIL ANd gAS ImpOrT/eXpOrT FAcILITIeS

RAS LAFFAN, QATARSatellite picture of one of the largest LNG ports in the world. Boskalis assisted in the design, constructed the port and managed the entire process. Complex logistics, numerous interfaces and strict environmental and safety challenges were successfully met.

leftROTTERDAM, THE NETHERLANDSSMIT tugs assisting a tanker calling at the LNG Gate Terminal.

rightLE HAVRE PORT, FRANCEBoskalis worked on the expansion of the port. Precision work, highly tidal waters and stringent environ mental requirements were challenges that were successfully met.

OIL

AN

d g

AS

ImpO

rT/

eXpO

rT

FAcIL

ITIe

S

Page 10: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S18 19

EnEr

gy

SO

LUTI

On

S

eXpLO

rA

TIO

N A

Nd

pr

Od

UcTI

ON

- F

IXed

9

8

1

2

7

4

6 3

10

11

12

13

5

OUr SOLUTIONS1 Land reclamation and soil improvement2 Topside transportation with float-over barge 3 Jacket installation4 Ballasting of GBS5 Scour protection6 Seabed preparation/gravel bed installation,

followed by towing and placement of GBS 7 Pug mark removal8 Transportation of modules9 Platform removal/decommissioning10 Removal and remediation of drill cuttings11 Platform installation/commissioning12 Subsea spool piece installation through air

or saturation diving13 IRM with Remote Operated Vehicle

eXpLOrATION ANd prOdUcTION - FIXed

Page 11: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S20 21

EnEr

gy

SO

LUTI

On

S

eXpLO

rA

TIO

N A

Nd

pr

Od

UcTI

ON

- F

IXed

The heavy marine transport and (de)installation of near- and offshore exploration and production facilities present challenges due to the hostile marine environments, remote locations and adverse soil conditions involved. As your partner you can rely on our experience and expertise. Together we can develop innovative, best-for-project solutions.

Planning, engineering and construction tend to involve numerous disciplines and contractors. This may result in complex interfaces with associated cost and time risks. We can streamline the execution by managing subcontractors, eliminating interfaces and/or acting as a specialist subcontractor.

A safe and reliable operation of your drilling and production facilities is essential. We reduce costs through reliable (long-term) operational services and through Inspection, Repair and Maintenance services by air/saturation diving and/or Remote Operated Vehicles.

Through our decommissioning services we reduce the total cost of ownership and limit your environmental footprint. Our services include recycling of structure parts and cleaning (contaminated) tailings in compliance with strict environmental standards.

eXpLOrATION ANd prOdUcTION - FIXed

DSV Constructor providing saturation diving services for Maersk Oil's lifetime extension of the Dan Platform.

Diamond Offshore's semi-submersible drilling rig, Ocean Monarch, was successfully loaded onboard the Dockwise Blue Marlin in New Orleans (USA) and discharged in Vung Tau (Vietnam).

NORTH SEAConstruction diver at work.

QATARTerminal services performed for MOQ.

Page 12: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

23

EnEr

gy

SO

LUTI

On

S

eNer

gy

SO

LUTI

ON

S22

eXpLO

rA

TIO

N A

Nd

pr

Od

UcTI

ON

- F

LOA

TIN

g

OUr SOLUTIONS1 Transportation of platform2 Mooring, handling and installation of FPSO3 Mooring, handling and installation of SPAR4 Transportation of SPAR5 FPSO in situ dry docking services6 Engineering, procurement, installation and

subsea IRM of SPM7 Terminal services8 Installation of pipeline end manifold or subsea

structures9 Ballasting TLP foundation

2

eXpLOrATION ANd prOdUcTION - FLOATINg

9

8

1

7

4

6

3

5

Page 13: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

25

EnEr

gy

SO

LUTI

On

S

eNer

gy

SO

LUTI

ON

S24

eXpLO

rA

TIO

N A

Nd

pr

Od

UcTI

ON

- F

LOA

TIN

g

eXpLOrATION ANd prOdUcTION - FLOATINg

Planning, engineering, transportation and (de)installation of floating exploration and production facilities involve numerous disciplines and contractors. This may result in complex interfaces with associated cost and time risks. Hostile marine environments, deep sea conditions and remote locations present additional challenges.

As your partner you can rely on our experience and expertise. We can offer one-stop-shop solutions by managing subcontractors, eliminating interfaces and/or acting as a specialist subcontractor. Together we can develop innovative, best-for-project solutions.

A safe and reliable operation of your floating facilities is essential. We reduce costs through reliable (long-term) operational services, including offshore dry-docking and transport services and through Inspection, Repair and Maintenance services by air/saturation diving and/or Remote Operated Vehicles.

leftSINGAPOREFloating sheerleg Asian Hercules loading a module on FPSO Cidade de Anchieta.

middleFairmount AHT transporting an FPSO.

rightThe semi-submersible drilling rig Polar Pioneer onboard the Blue Marlin being transported from Stavanger (Norway) to Singapore.

The Dockwise Vanguard successfully executed the float-on exercise of the Jack/St. Malo platform hull in South Korea. The Dockwise Vanguard departed at sunrise and navigated around Cape of Good Hope towards the Kiewit yard in Ingleside, Texas, USA.

Page 14: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S26 27

EnEr

gy

SO

LUTI

On

S

pIp

eLIN

eS A

Nd

cA

bLe

S

pIpeLINeS ANd cAbLeS

OUr SOLUTIONS1 Pipeline pull-in with linear winch2 Installation of cofferdam and landfall

dredging 3 Pipeline trenching4 Post-lay pipeline burial 5 Installation of rock for subsea crossings 6 Seabed levelling7 Trenching 8 Post-lay backfilling9 Deepwater trenching/dredging with Remote

Operated Vehicle (ROV) grab excavation system

10 Survey with Autonomous Underwater Vehicle11 Deepwater IRM with ROV 12 Deepwater seabed preparation, ballasting

and rock protection installation 13 Installation of subsea cables or umbilicals14 Shallow water pipeline installation or pull-out15 Transport, installation, and subsea IRM of

SPM16 Horizontal directional drilling

10

9

2

1

7

3

5

8

4

11

12

13

14

6

15

16

Page 15: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S28 29

EnEr

gy

SO

LUTI

On

S

Requirements for the installation of umbilicals, high-voltage power and fiber-optic cables and oil and gas pipelines are getting tougher all the time. This is due to factors such as longer lifetimes and greater water depths, which in turn mean higher physical pressure. Pipelines also have to be able to cope with high temperatures and aggressive fluids.We can develop technically and commercially viable solutions that will help you to meet your challenges.

Pipeline and cable installations are often executed in remote areas and under difficult environmental circumstances. They tend to involve numerous disciplines and contractors. This may result in complex interfaces with associated cost and time risks. We can streamline the execution by managing subcontractors, eliminating interfaces in complex Engineering, Procurement, Installation and Commissioning projects and/or acting as specialist subcontractor for capital and maintenance works.

Safe and reliable operation is essential. Our long-standing and reliable track record proves that we move promptly to correct free spans to reduce vortex induced vibration; to level the seabed for flow assurance or to reduce pipe/cable stresses; to stabilize the pipeline or cable to prevent flotation, upheaval buckling or wave-induced liquefaction; to provide thermal insulation or protect the pipeline/cable against anchors, fishing gear and erosion.

TAIWANBoskalis was involved in the installation of a 130km gas pipeline. Boskalis dredged the trenches, protected it with sand and rock and constructed four landfalls.

leftJAVA – BALICable laying vessel Ndurance installed two 4.5 km long 150 kV submarine power cables between Java and Bali in water depths of up to 95 m. The project included four cable landings and the installation of a protective rock berm over nearly the entire length of the two cables.

rightARGENTINAAt the remote southernmost tip of Argentina, a pipeline has been installed across the Magellan Strait, which included a 6.5-km record length of pipe pull and accurate seabed preparation at the deeper, undulating section of the strait.

pIp

eLIN

eS A

Nd

cA

bLe

S

pIpeLINeS ANd cAbLeS

Page 16: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S30 31

EnEr

gy

SO

LUTI

On

S

ON

ShO

re

AN

d O

FFSh

Or

e m

ININ

g

ONShOre ANd OFFShOre mININg 1

2

8

6

4

5

3

7

OUr SOLUTIONS1 Removal of overburden2 Open pit mining of minerals3 Deepsea (mineral) mining4 Ultra deepsea (mineral) mining5 Oil sands mining and transport6 Soil separation and remediation by soil

washing plant7 Processing of Mature Fine Tailings through

capping and drains8 Logistical management with floating

super pallets

Page 17: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S32 33

EnEr

gy

SO

LUTI

On

S

ON

ShO

re

AN

d O

FFSh

Or

e m

ININ

g

ONShOre ANd OFFShOre mININg

Mining valuable minerals and commodities such as bauxite and phosphates and the processing of tailings present challenges. A successful business case will depend on reliable and sustainable excavation methods based on proven technology, high production capacity and separation and remediation costs.

By applying proven dredging techniques we offer an innovative and cost-effective solution. This is particularly true when the work has to be executed in remote or offshore areas, often with a heightened environmental focus. We offer a total mining concept. Our solutions range from feasibility studies right through to the final design and execution, and include communicating with stakeholders and layout of the entire mining, blending, transportation, separation and remediation process for optimum results.

With over a century of dredging and excavation experience we are able to reduce the total cost of ownership and limit the environmental footprint through our state-of-the-art equipment. Our solutions include in-situ capping or cleaning of (contaminated) tailings in compliance with strict environmental standards and the relocation of suitable overburden material including acceleration of the consolidation process by the installation of drains.

SURINAMRemoval of overburden in a bauxite mine with a cutter suction dredger.

left and middleUSABoskalis Dolman specializes in cleaning contaminated sediments with in-house developed (mobile) soil washing plants. They designed and constructed a soil washing plant for the Fox River clean up to process 4 million cubic yards of PCB contaminated sediments.

rightGUYANACutter suction dredger with water jet removing overburden in a bauxite mine.

Page 18: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S34 35

EnEr

gy

SO

LUTI

On

S

reN

ewA

bLe

eN

erg

y:

wIN

d,

TId

AL

AN

d w

Av

e

reNewAbLe eNergy: wINd, TIdAL ANd wAve

9

8

6

7

3

4

1

5

2

OUr SOLUTIONS1 Monopile installation on prepared location2 Transition Piece installation3 Scour protection installation4 Jacket installation on prepared location5 Scour mattress installation6 Gravel bed installation7 Concrete gravity base foundation installation8 Installation of permanent ballast9 Subsea cabling installation10 Offshore High Voltage Station installation11 Post burial of subsea cabling12 Shore connection and landfall construction13 Unexploded ordnance survey and removal14 Subsea IRM through air or saturation diving or

with Remote Operated Vehicle

10

11

12

13 14

Page 19: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

37

EnEr

gy

SO

LUTI

On

S

eNer

gy

SO

LUTI

ON

S36

hO

OFd

STU

k

reNewAbLe eNergy: wINd, TIdAL ANd wAve

Planning and installing offshore wind parks and tidal or wave energy facilities, often under difficult environmental circumstances, is challenging. The installation of scour protection, foundations, topsides, turbines and offshore high voltage substations as well as infield and interconnecting export cables, tends to involve numerous disciplines and contractors. This may result in suboptimal solutions and complex interfaces with associated cost and time risks.

We can offer tailor-made, innovative and economically attractive solutions. We streamline the execution by managing subcontractors and eliminating interfaces. We have the capability to assume full-scope responsibility including cable installation works.

We are able to reduce operational costs by offering (long-term) and reliable Inspection, Repair and Maintenance services by air/saturation diving and/or Remote Operated Vehicles. Through our decommissioning services we can reduce the total cost of ownership and limit the environmental footprint of your facilities

topScour protection with fallpipe vessel.

middleTransportation and installation of monopiles.

leftFloating sheerleg Taklift 4 installing jackets at an offshore wind farm in the Baltic Sea.

Page 20: T +31 78 6969000 F +31 78 6969555 eNergy - Royal ... STREAM Shore pull of the first 48” pipeline. RUSSIA – GERMANY Seabed preparation, shore approach, trenching and rock protection

EnEr

gy

SO

LUTI

On

S38 39

eNer

gy

SO

LUTI

ON

S –

10.2

014

LeT'

S TA

Lk

LeT'S TALk

‘ tell us aBout your challenges’

For over 100 years, Boskalis has helped clients meet some of the toughest challenges.

How can we help you? Give us a call and tell us about your challenges. Or look at our portfolio on www.boskalis.com. You can download our corporate brochure and our other solutions brochures for Ports and Infrastructure.