Synaptic Project – Regeneration and Transport Investment in East Manchester. Richard Elliott Chief Executives. East Manchester: the Location. East Manchester: the History. 1951 – 2001. Manchester population reduces by 350,000 East Manchester population reduces by 100,000 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Synaptic Project –  Regeneration and Transport Investment in East Manchester

AuthorDepartment Name

Synaptic Project – Regeneration and Transport Investment in East Manchester

Richard ElliottChief Executives

Page 2: Synaptic Project –  Regeneration and Transport Investment in East Manchester

East Manchester: the Location

Page 3: Synaptic Project –  Regeneration and Transport Investment in East Manchester

East Manchester: the History

Page 4: Synaptic Project –  Regeneration and Transport Investment in East Manchester
Page 5: Synaptic Project –  Regeneration and Transport Investment in East Manchester
Page 6: Synaptic Project –  Regeneration and Transport Investment in East Manchester

1951 – 2001

• Manchester population reduces by 350,000

• East Manchester population reduces by 100,000

• East Manchester jobs reduce by 60,000

Page 7: Synaptic Project –  Regeneration and Transport Investment in East Manchester
Page 8: Synaptic Project –  Regeneration and Transport Investment in East Manchester
Page 9: Synaptic Project –  Regeneration and Transport Investment in East Manchester
Page 10: Synaptic Project –  Regeneration and Transport Investment in East Manchester
Page 11: Synaptic Project –  Regeneration and Transport Investment in East Manchester
Page 12: Synaptic Project –  Regeneration and Transport Investment in East Manchester
Page 13: Synaptic Project –  Regeneration and Transport Investment in East Manchester
Page 14: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Objectives

• •Restructure the economic base •Increase local employment

•Improve retail provision

•Improve education

•Restructure the housing market

•Improve Transport Connectivity

•Increase the population

Page 15: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Central ParkPoor business environment

4,700 new homes built to date and 3,000 in pipeline

1.8 million sq ft of new business floor space

Three High Schools rebuilt and refurbished

1 New Academy built and opened

2 New Primary schools

£36.5m Gateway Interchange

Two new Metrolink lines confirmed

Achievements

Page 16: Synaptic Project –  Regeneration and Transport Investment in East Manchester

GCSE results above Manchester average

3,500 new jobs created

Significant improvement to public perception

Major reduction in petty crime

Two new district centres completed and another underway

Two new state-of-the-art health centres

Achievements

Page 17: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Restructuring the Housing Market

Page 18: Synaptic Project –  Regeneration and Transport Investment in East Manchester

HISTORICAL DRIVERS OF CHANGE AND THEIR LEGACY

• Collapse of traditional industries 1960’s onwards• Population flight • Partial slum clearance and poor quality replacement

housing and limited choice for home owners • Over – concentration of social rented sector and private

rented sector• Low level of home ownership• Problems of low demand - abandonment, very low property

values• Severe concentrations of deprivation (200,000 + residents

in electoral wards within worst 10% nationally)

Page 19: Synaptic Project –  Regeneration and Transport Investment in East Manchester

TRANSFORMATIONAL AGENDA

• Remove most blighted pre 1919 stock and make land available for redevelopment (HMR – £93m 2003 - 2008)

• Stock transfer or social rented sector and estate restructuring (PFI, LVST, Decency Programmes - £250m and counting!

• Alignment of investment – transport, schools, leisure, retail – “Neighbourhoods of Choice”

Page 20: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Toxteth Street Openshaw 2003

Page 21: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Toxteth Street - Openshaw 2011

Page 22: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Beswick 2001

Page 23: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Beswick 2011

Page 24: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Beswick Neighbourhood

Lovell and Gleeson joint developers

1,100 new homes New primary school New 11- 16 academy Local shopping provision Community facilities and enhanced open

space Improved road network and enhanced

community safe-route

Total Public Sector Input: £65 million

Lovell homes

Gleeson homes

Ashbury Meadow Primary school

Page 25: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Neighbourhood planning in East Manchester

Strategic Regeneration Framework

Detailed Neighbourhood Plans

Community Engagement at a neighbourhood level

Community participation Comprehensive and

Inclusive

Page 26: Synaptic Project –  Regeneration and Transport Investment in East Manchester
Page 27: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Metrolink Development

Source: TfGM

Page 28: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Metrolink Development

Source: Projectmapping.co.uk

Page 29: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Infrastructure The £1.5bn GM Transport Fund has funded Metrolink to Chorlton with further extensions to East Manchester,

Wythenshawe and the Airport underway

Page 30: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Regeneration Impact

Page 31: Synaptic Project –  Regeneration and Transport Investment in East Manchester

Eastlands & Manchester City Football Club

Two new Metrolink lines opened in 2012/13

Next Generation Broadband Access

BUT Recession Public Sector Funding Reductions Development Platform but fragile

market

The journey continues…..

National Indoor BMX Centre

Eastlands

Metrolink work starts

Looking Forwards