symposium 2015 : identifying points of vulnerability in a feasability study
TRANSCRIPT
1
Identifying Points of Vulnerability in a Feasibility Study
By Olivier Mesly October 7th, 2015, 11h15
PMI Montréal Symposium
Olivier Mesly is professor at Université Sainte-Anne in Nova Scotia and
associate professor at UQO
Note: Toutes les photos de la présentation entière sont la propriété exclusive d’Olivier Mesly et ne peuvent en aucun
cas être utilisées sans son autorisation écrite.
TODAY’S PRESENTATION
Speaker
Introduction
Points of Vulnerability
The 4 P’s of project management
Conclusion and questions
2
Introduction
4
Note: Toutes les photos de la présentation entière sont la propriété exclusive d’Olivier Mesly et ne peuvent en aucun
cas être utilisées sans son autorisation écrite.
7
“ We’ve had to expand our plant every
year for the last five years, It’s a good
problem to have. Business is good.”
Brian Saulnier, president of SCF
WITH GROWTH…VULNERABILITIES
RISKS
SOCIO-CULTURAL (EXTERNAL)
Environnemental
Technological
Marketing Organizational
Politico-legal
Financial
PMBOK FRAME
22
CRITERIA P
A CHANGE PROCESS PROCESSES
A SCOPE PLAN
METICULOUS PLANNING
GROUP OF MANAGERS
POWER
MEASURES OF SUCCESS
CONTROL SYSTEM
PMBOK FRAME
23
CRITERIA P
A CHANGE PROCESS PROCESSES
A SCOPE PLAN
METICULOUS PLANNING
GROUP OF MANAGERS
POWER
MEASURES OF SUCCESS
CONTROL SYSTEM
24
PROBLEMS IDENTIFIED BY MANAGERS % 4 P
LACK OF COMMITMENT 59
PERSONS AND
POWER COMMUNICATION MISHAPS 54
CONFLICTS 35
INSUFFICIENT RESOURCES 69 PROCESSES
AMBIGUOUS GOALS 67
PLAN
NON REALISTIC DEADLINES 63
POOR PLANNING 56
INAPPROPRIATE CHANGES 42
Sourc
e: M
ered
ith e
t M
ante
lé (
2009
)
4 P’s
extrants
Transformation
Ceilings (costs)
Floors (Norms of Q)
25
CLOSED DYNAMIC SYSTEM
Walls (calendar)
30
Plan and
Processes
Impacts
Products
BOK
Transformation
People and
Power
Mechanical
aspect
Human aspect
POV
FRAMES OF ANALYSIS
33
• DEFINITION
• CONTEXTUAL FRAME OF RISKS
• POTENTIALITY
• PARAMETRIC
• KSF AND KFF
35
Collaboration
Distance
Fairness
Commitment
Control/
Transparency
(I +)
(I ±)
(I +)
(I +)
(T)
(T)
Costs
NQ Calendar Project
(C+)
Trust (t)