8/6/2019 SWMA 2a Presentation http://slidepdf.com/reader/full/swma-2a-presentation 1/51 MANAGEMENT & OPERATION SUNGAI MANAGEMENT & OPERATION SUNGAI (254154-U) SELANGOR PHA SE 1 WA TER TREA TMENT PLA NT (SSP1) SELANGOR PHA SE 1 WA TER TREA TMENT PLA NT (SSP1) The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Upload: adbwaterforall

Post on 07-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 1/51

MANAGEMENT & OPERATION SUNGAIMANAGEMENT & OPERATION SUNGAI

(254154-U)

SELANGOR PHASE 1 WATER TREATMENT PLANT(SSP1)

SELANGOR PHASE 1 WATER TREATMENT PLANT(SSP1)

The views expressed in this paper/presentation are the views of the author and do not necessarilyreflect the views or policies of the Asian Development Bank (ADB), or its Board of Governors, or thegovernments they represent. ADB does not guarantee the accuracy of the data included in this paper

and accepts no responsibility for any consequence of their use. Terminology used may not necessarilybe consistent with ADB official terms.

Page 2: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 2/51

CONTENTS SUNGAI HARMONI SDN BHD

Sungai Selangor Phase 1 Water Treatment Plant

 

2.0 Raw Water Sources

3.0 Treatment Works

3.1 Intake

3.2 Treatment Plant. eservo rs

4.0 Water Quality Monitoring

4.1 Raw Water

4.2 Along Treatment Process Train

5.0 Studies Conducted

Page 3: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 3/51

1.0 INTRODUCTION

SUNGAI HARMONI SDN BHD

Sungai Selangor Phase 1 Water Treatment Plant

 

• Sungai Selangor Water Supply Scheme Phase 1 (SSP1) wasdeveloped in 2 stages. The Phase 1 Stage 1 (Stream B) was

completed in early 1993 and stage 2 (Stream A) wascompleted in Sep tember 1995.

• Eac h Stream is capable of prod uc ing 475 MLD of potablewa ter.With the total nominal c apability of 950 MLD, SungaiSelangor Water Supply Scheme Phase 1 is c urrently one of the

biggest water supp ly scheme in Ma laysia

Page 4: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 4/51

• SSP1 is c urrently supplying approximately 30 % of Klang Valley and State

SUNGAI HARMONI SDN BHD

Sungai Selangor Phase 1 Water Treatment Plant

.

• Distribution Areas inc lude Petaling Jaya Utara, Kuala Lumpur Utara,som e areas in Gombak, Hulu Selangor, Kelang & Kuala Selangor

• The c onc ession ho lder of SSP1 is Syarikat Pengeluar Air Sungai Selangor

(SPLASH) which has been awa rded a 30 years concession period in year.

• Sungai Harmoni Sdn Bhd (SHSB) is the operator of the SSP1, responsiblefor the management, operation and maintenanc e of the scheme.

• SHSB is the wholly-owned subsidiary o f Taliworks Corporation Berhad.

 • o an a wor s orp are assoc a e su s arycompanies of Kumpulan Darul Ehsan Bhd.

Page 5: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 5/51

OVERALL LAYOUT OFPicture no.1

2.0 Raw Water Sources

SUNGAI SELANGORWATER SUPPLY

SCHEME RAW WATERSOURCE.

 DAMDAM

SG TINGGI DAMSG TINGGI DAM

SG.SELANGOR

INTAKESSSP3

SSP2

SSP1

SSP1,2 & 3WTP

 BERJUNTAI

TOWN

Page 6: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 6/51

Top Water Level = 220 meter, Total Storag e = 235 MCM

SUNGAI SELANGOR DAMPicture no.2

Dam Operator, SPLASH (Syarikat Pengeluar Air Sungai Selangor Sdn Bhd)

Page 7: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 7/51

Overflow & Scour - Sungai Selangor Dam

Page 8: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 8/51

Top Water Leve l = 59.50 meter, Total Storage = 122.50 MCM

SUNGAI TINGGI DAMPicture no.3

Dam Operator, SPLASH (Syarika t Pengeluar Air Sungai Selangor Sdn Bhd)

Page 9: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 9/51

 

3.0 Raw Water Sources

3.1 Intake

,.

SSP1 Intake consists of sc reening systems (Trash Sc reens

and Band Sc reens), Automatic Sand Rem oval System andPumping System.

Page 10: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 10/51

INTAKE, FIVE RIVER GATESPicture no.4

5 units of river gates installed at SSP1 Intake. The mainpurpose o f the struc ture is to maintain river level at m inimumof 3.0 meter.

Page 11: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 11/51

RAW WATER PUMPING STATION (RWPS)Picture no.6

There a re 8 units Large pump with capac ity of 2361 L/ s and 2 units smaller pump withcapac ity of 1181 L/ s driven b y 810kW Motor and 410 KW pump motors respec tively

Raw Water is delivered to Treatment Plant via Twin p ipelines of 2100mm with length of5.0 km .

Page 12: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 12/51

TREATMENT WORKS, OVERALL LAYOUTPicture no.7

3.2 Treatment Works

Pulsator

Filters Stream A

ChemicalBuilding

 

Pulsator

Filters Stream B

Aerator

Overall layout Trea tment Works. Stream A on the right side of the c hem ical build ing

Page 13: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 13/51

AERATORPicture no.8

Aerator (cascade type)

Page 14: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 14/51

CHEMICAL MIXING CHAMBERPicture no.9

Stream B Chemical Mixing Cham ber. Coagulant is mixedwith raw water at the inlets of the c ham ber.

Page 15: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 15/51

POLYMER DOSING POINTSPicture no.10

Liquid Polymer is added before entering Pulsators / 

Clarifiers.

Page 16: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 16/51

Picture no.11 PULSATOR / CLARIFIER

6 units vertical flow Pulsators/ Clarifiers ava ilab le in eac hStream.

Page 17: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 17/51

FILTERS

Coagulant PAC – Fi l t er – SSP1 Coagulant A lum – Fi l t er – SSP1

Page 18: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 18/51

CLEAR WATER TANK (CWT)Picture no.13

142 ML Clear Water Tank.

Page 19: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 19/51

TREATED WATER PUMPING STATION (TWPS)Picture no.14

8 pum p sets (6 nos. 2164 L/ s & 2 nos. of 1082 L/ s) ava ilab le for Matang Pagar reservoirDistribution System driven by 2900 kW and 1450 kW motors and 5 pump sets (3 nos. of 596 L/ s &2 nos. of 1192 L/ s) ava ilab le for Bukit Mayong Reservoir driven by 710 KW and 1300 KW motors.

Page 20: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 20/51

BUKIT MAYONG BALANCING RESERVOIR

3.3 Reservoirs

.

Storage capac ity 50 ML. Two outlets, Kuala Selangor and Estate Lam Bee . Single p ipeline

of 9.3 km with d iameter of 1550mm is laid from Treatment Works to the reservoir.

Page 21: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 21/51

MATANG PAGAR BALANCING RESERVOIRPicture no.16

Trea ted Water is delivered to Matang Pagar Reservoir (capac ity 182 ML) via twin 2100

mm pumping mains about 22.5km in length. Three outlets; Kuang, Kep ong and EffinghamEstate Servic e Reservo irs.

Page 22: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 22/51

 

Bukit Frasier

4.0 Water Qua lity Monitoring

4.1 Raw Water

 

SAMPLING POINTS OFRIVER SURVEILLANCE

PROGRAM - UARTERLY

Kuala Kubu

Baru

Sg. SelangorDam

Sg. Tinggi

Dam Sg. Luit

 

4

3

2

1

Rasa

Batang Kali

 Rasa

Sungai TinggiRPS

Intakes SSP1, 2 & 3

1110

9

8 7

6

5

KualaSelangor

Batang

SSP1,2,3 WTPRantau

Panjang WTP16

15

14

13

12

Description of Sampling Points

1-S Selan or at Pertak, Kuala Kubu Baru

BatuArang

Sg. Garing

Berjuntai

Bt. Badong

 2-Sg Selangor before confluence with Sg.Kubu

3-Sg Kubu4-Sg Selangor before confluence with Sg Rening5-Sg Rening6-Sg Selangor before confluence Sg Batang Kali7-Sg Batang Kali8-Sg Selangor before confluence Sg Kerling9-Sg Kerling

Kuang

- g e angor e ore con uence g u o11-Sg Buloh12-Sg Selangor before confluence Sg Sembah13-Sg Sembah14-Sg Selangor before confluence Sg Air Hitam15-Sg Air Hitam16-Sg Selangor at Intake (SSP1)

Sampling Points (on main river, Sg Selangor)

Sampling Points (tributaries)

Page 23: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 23/51

PERAKSUNGAI SELANGOR RIVER BASIN &ACTIVITIES UPSTREAM OF INTAKES

The Gap

Bukit Fraser

Legend

Orang Asli village

Factory Open Dumping

Aquaculture

KKBSg. Selangor

Dam

Sg. TinggiDam

Sg. Luit

Kem Khidmat Negara

NS Camp

Pig Abattoir

Cow Abattoir

IWK

Landfill

 

Pig Farm Sg. Rinting

Rasa

Batang Kali

 Rasa

Bukit Tagar Landfill

 

Sungai TinggiRPS

KualaSelangor

Batang

SSP1,2,3 WTP

Kg. Timah

Pig Farm

RantauPanjang WTP

Kawasan PerindustrianSerendah

BatuArang

Sg.Garing

Berjuntai

Bt. Badong TIP TOP Meat

Bukit Tadun BR

Kundang Open Dumping

Perindustrian Rawang

Kuang

Page 24: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 24/51

SamplingDescriptions

SP1 Sg. Sela ng or a t Perta k, Kua la Kubu Ba ru

SP2 Sg. Selangor be fore c onfluenc e w ith Sg. Kubu.

 . .

SP4

Sg. Selangor be fore c onfluence w ith Sg. Rening .

SP5 Sg. Rening.

Sg. Selangor be fore c onfluenc e w ith Sg. Bata ng Ka li.

SP7 Sg. Ba ta ng Ka li.

SP8 Sg. Selangor befo re c onfluenc e w ith Sg. Kerling

SP9 Sg. Kerling.

SP10 Sg. Selangor be fore c onfluenc e w ith Sg. Buloh.

SP11 Sg. Buloh.

 Sg. Selangor be fore co nfluenc e Sg. Sem bah.

SP13 Sg. Sem bah.

SP14 Sg. Selangor be fore c onfluenc e w ith Sg. Air Hita m.

 g. r am

SP16 Sg. Sela ng or at Inta ke

Page 25: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 25/51

Page 26: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 26/51

to Sg Tengi

6-SAMPLING POINTS OF CRITICALLOCATIONS (BI-MONTHLY)

Bukit Tagar Landfill Flow Direction

to NKVE

D Sg. SelangorSg. Nyamuk

A

ESg. Air HitamRoad

Lim Tan

Mining Lake

Legends

B

C

F

SSP1,2&3 Intakes

Sg. Sembah

 

to K.Selangor

Batang Berjuntai

A - At Sungai Selangor, 50m after Lim Tan Mining Lake outlet.

B - Sungai Sembah-200m Before Confluence With Sungai Selangor.

C - 200 m (upstream) before confluence with Sungai Air Hitam.

D - Sungai Nyamok - After Bukit Tagar Landfill (Near the Bridge).

E - Sungai Air Hitam - 20m before Confluence With sungai selangor.

F - Intake - At river Gate.Tip Top

From Ijok

Town 

Landfill

Pig Abattoir

Sand Mining

Cow Abattoir

Aquaculture

ea Sg. Garing

Page 27: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 27/51

WATER RESOURCERIVER FLOW AT INTAKE

7000 

8000 

9000 

4000 

5000 

6000 

   I   L   Y

   F   L   O   W   (   M   L   D

2000 

3000    A   V   G   D

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC  

MONTH

Page 28: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 28/51

Page 29: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 29/51

A) PHYSICAL AND CHEMICAL ANALYSIS REPORT

On analysis of the sample(s) submitted, the results were obtained :

METHOD

REF. No. :

Sampling Points MOH

GuidelinesPARAMETERNo. UNIT

1 pH APHA 4500-H+B 6.6 5.3 6.3 6.2 4.9 6.2 5.5-9.0 

2 Turbidity NTU APHA 2130B 112 393 376 94 297 388 1000 

3 True Colour Hazen APHA 2120B 10 20 15 5 50 10 - 

4 Apparent Colour Hazen APHA 2120B 200 500 500 120 600 600 300 

5 Iron as Fe mg/L Hach No. 8008 1.16 2.11 3.12 1.10 4.04 2.96 1.0 

6 Total Organic Carbon (TOC) mg/L**Hach No. 10129

4.9 13.4 9.2 3.9 13.7 9.3- 

7 Manganese as Mn mg/L Hach No. 8149 0.10 0.40 0.58 0.13 0.49 0.60 0.2 

8 Ammonia as N mg/L Hach No. 8038 0.02 0.17 0.09 0.02 0.18 0.11 1.5 

**or e mg ac o. . . . . . .

Remarks 

Sampling points : 

A - At Sungai Selangor, 50m after Lim Tan Mining Lake outlet.

B - Sungai Sembah-200m Before Confluence With Sungai Selangor.

C - 200 m (upstream) before confluence with Sungai Air Hitam.

D - Sungai Nyamok - After Bukit Tagar Landfill (Near the Bridge)

E - Sungai Air Hitam - 20m before Confluence With sungai selangor 

F - Intake - At river Gate.

B) MICROBIOLOGICAL ANALYSIS REPORT

METHOD

REF. No. : A B C D E F

1 Total Coliform

Sampling Points MOH

GuidelinesPARAMETERNo. UNIT

MPN /100

@ 35oC for 24 Hours

2 E-Coli

@ 35oC for 24 Hours

 

mL

MPN /100

mL APHA 9223B

APHA 9223B 37,900 125,000 93,200 25,600 166,400

6,300

5,000 

2,000 11,900 9,600 1,000

122,300

7,400

Page 30: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 30/51

SCHEMATIC DIAGRAM OF SSP1 WATER TREATMENT PROCESSESPicture no.17

4.2 Along The Trea tment Proc ess Train

AeratorClarifier Filter

Pre-Lime

Pre-Chlorine

Coagulant

Polymer

 

Mixing

Clear Water Tank

Band Sc reen

River Gate

(SUNGAI SELANGOR) Raw Water

PumpingStation

am er

Trea ted WaterPumping Station

(TO RESERVOIRS,

FluoridePost-Chlorine

Post-Lime

 a t   er r  e c  ov  er  y l  i  nTrash Screen

 

AND BUKITMAYONG)

 eSa nd Ho pp er Suc tio n

Chamber

Sludge

Thic keningTank

 

Wash WaterRec ove ry

Tank

Sludg e Lag oon

DAILY WATER QUALITY MONITORING

Page 31: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 31/51

Stream A Balancing

2-Hourly Sampling Points Locations

DAILY WATER QUALITY MONITORING

AeratorMixing

Chamber

TWPS

Reservoirs

Matang

Pagar

to Service

Reservoirs / 

ungaSelangor

Aerator

Mixing

Chamber

Pulsator Filters

Bukit

Mayong

Consumer

Stream B

Type of Water : RAW WATER

Sampling Point : Laboratory

Dates & Time

0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500

1 pH 6.3 6.2 6.1 6.2 6.2 6.2 6.3 6.3 6.4 6.2 6.3 6.3 6.3

2 Turbidity (NTU) 214 192 132 131 92 82 86 71 70 70 68 63 106

Item

. . . .Average(hours)

Parameters

3 Colour (Hazen) 375 250 250 250 187 187 187 187 187 187 187 187 218

4 Iron as Fe (mg/L) 2.85 1.08 1.14 1.08 1.54

5 Ammonia as N (mg/L) 0.03 0.03 0.03 0.02 0.03

anganese as n mg . . . . .

7 Alkalinity (mg/L as CaCO3) 11.2 10.6 10.9

Page 32: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 32/51

DAILY WATER QUALITY MONITORING

Stream A Balancing

2-Hourly Sampling Points Locations

AeratorMixing

Chamber

TWPS

Reservoirs

Matang

Pagar

to Service

Reservoirs / 

ungaSelangor

Aerator

Mixing

Chamber

Pulsator Filters

Bukit

Mayong

Consumer

Type of Water : SETTLED WATER Stream : A

Stream B

Sampling Point : Laboratory

0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500

1 H 6.3 6.3 6.3 6.3 6.3 6.3 6.2 6.1 6.1 6.1 6.1 6.2 6.2 6.3

Item

Average(Raw

Water)

19.10.2007 20.10.2007Average

Parameters

Dates & Time

(hours)

2 Turbidity (NTU) 1.1 1.2 1.2 1.2 1.3 1.1 1.3 1.3 1.4 1.2 1.4 1.3 1.2 106

3 Colour (Hazen) 5 5 5 5 5 5 5 5 5 5 5 5 5 218

4 Aluminium (mg/L) 0.00 0.00 0.01 0.02 0.00 0.00 0.01 -

5 Iron as Fe (mg/L) 0.02 0.01 0.02 1.54

6 Manganese as Mn (mg/L) 0.01 0.03 0.02 0.20

DAILY WATER QUALITY MONITORING

Page 33: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 33/51

DAILY WATER QUALITY MONITORING

Stream A Balancing

2-Hourly Sampling Points Locations

AeratorMixing

Chamber

TWPS

Reservoirs

Matang

Pagar

to Service

Reservoirs / 

ungaSelangor

Aerator

Mixing

Chamber

Pulsator Filters

Bukit

Mayong

Consumer

Type of Water : SETTLED WATER : BStream

Stream B

:

0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500

1 pH 5.3 5.2 5.4 5.5 5.6 5.6 5.9 6.0 6.0 6.0 5.9 6.0 5.7 6.3

Item

Average(Raw

Water)

19.10.2007 20.10.2007Average

Parameters

Dates & Time

(hours)

2 Turbidity (NTU) 0.6 0.8 0.8 0.8 0.7 0.7 0.7 1.3 1.8 1.6 2.2 2.3 1.2 106

3 Colour (Hazen) 3 3 3 3 3 3 3 5 5 5 5 5 3.8 218

4 Aluminium (mg/L) 0.19 0.06 0.03 0.04 0.04 0.04 0.07 -

5 Iron as Fe (mg/L) 0.02 0.07 0.05 1.54

6 Manganese as Mn (mg/L) 0.09 0.06 0.07 0.20

DAILY WATER QUALITY MONITORING

Page 34: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 34/51

DAILY WATER QUALITY MONITORING

Stream A Balancing

2-Hourly Sampling Points Locations

AeratorMixing

Chamber

TWPS

Reservoirs

Matang

Pagar

to Service

Reservoirs / 

ungaSelangor

Aerator

Mixing

Chamber

Pulsator Filters

Bukit

Mayong

Consumer

Type of Water : FILTERED WATER : A

Sampling Point : Laboratory

Stream

Stream B

0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500

1 pH 6.1 6.3 6.3 6.3 6.3 6.3 6.4 6.3 6.3 6.4 6.3 6.4 6.3 6.3

Item

Average(Settled W.

A)

19.10.2007 20.10.2007Average

Parameters

Dates & Time

(hours)

. . . . . . . . . . . . . .

3 Colour (Hazen) 3 3 3 3 3 3 3 3 3 3 3 3 3 5

4 Aluminium (mg/L) -

5 Iron as Fe (mg/L) 0.00 0.01 0.01 0.02

6 Ammonia as N (mg/L) -

7 Manganese as Mn (mg/L) 0.00 0.00 0.00 0.02

DAILY WATERQUALITY MONITORING

Page 35: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 35/51

DAILY WATER QUALITY MONITORING

Stream A Balancing

2-Hourly Sampling Points Locations

AeratorMixing

Chamber

TWPS

Reservoirs

Matang

Pagar

to Service

Reservoirs / 

ungaSelangor

Aerator

Mixing

Chamber

Pulsator Filters

Bukit

Mayong

Consumer

Type of Water : FILTERED WATER : B

Sampling Point : Laboratory

Stream

Stream B

0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500

1 pH 5.3 5.1 5.1 5.1 5.2 5.3 5.2 5.2 5.3 5.5 5.5 5.4 5.3 5.7

Item

Average(Settled W.

B)

19.10.2007 20.10.2007Average

Parameters

Dates & Time

(hours)

. . . . . . . . . . . . . .

3 Colour (Hazen) 3 3 3 3 3 3 3 3 3 3 3 3 3 3.8

4 Aluminium (mg/L) -

5 Iron as Fe (mg/L) 0.01 0.01 0.01 0.05

6 Ammonia as N (mg/L) -

7 Manganese as Mn (mg/L) 0.01 0.03 0.02 0.07

DAILY WATERQUALITY MONITORING 2-Hourly Sampling Points Locations

Page 36: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 36/51

DAILY WATER QUALITY MONITORING

Stream A

AeratorMixing

Chamber

Pulsator FiltersBalancing

ReservoirsSungai

Selangor

y p g

Pulsator Filters

RWPS TWPS

Matang

Pagar

to Service

Reservoirs / 

ConsumerCWT

Stream B

Aerator 

Chamber Bukit

Mayong

 

Sampling Point : Laboratory

0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500

1 pH 7.6 7.9 7.5 7.5 8.1 8.9 8.2 7.7 7.6 7.9 7.8 7.7 7.9

Item

19.10.2007 20.10.2007Average

Parameters

Dates & Time

(hours)

2 Turbidity (NTU) 0.4 0.4 0.4 0.3 0.5 0.4 0.5 0.5 0.5 0.4 0.5 0.6 0.4

3 Colour (Hazen) 3 3 3 3 3 3 3 3 3 3 3 3 3

4 Free Chlorine (mg/L) 1.7 1.7 1.9 1.7 1.7 1.4 1.5 1.7 1.7 1.8 1.7 1.7 1.7

5 Combined Chlorine (mg/L) 0.1 0.1 0.1 0.2 0.1 0.2 0.1 0.1 0.1 0.2 0.2 0.1 0.1

6 Total Chlorine (mg/L) 1.8 1.8 2.0 1.9 1.7 1.6 1.7 1.8 1.9 2.0 1.9 1.7 1.8

7 Fluoride (mg/L) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5

8 Aluminium (mg/L) 0.00 0.02 0.01 0.00 0.06 0.08 0.01 0.00 0.01 0.01 0.01 0.02 0.02

9 Iron as Fe (mg/L) 0.00 0.01 0.01 0.01 0.00 0.01 0.01

mmon a as mg . . . . .

11 Manganese as Mn (mg/L) 0.00 0.01 0.01 0.01 0.01 0.01 0.01

12 Alkalinity (mg/L as CaCO3) 14.1 14.8 14.5

13 Odour UO UO UO UO UO UO UO UO UO UO UO UO UO

 Remarks : UO means Unobjectionable

DAILY WATER QUALITY MONITORING

Page 37: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 37/51

Stream A

Mixing

Pulsator FiltersBalancing

ReservoirsSungai

Selan or

2-Hourly Sampling Points Locations

erator Chamber

RWPS TWPS

Matang

Pagar

to Service

Reservoirs / 

ConsumerCWT

Type of Water : TREATED WATERStream B

AeratorMixing

Chamber

Pulsator Filters

Bukit

Mayong

Sampling Point : Bukit Mayong Reservoir Outlet

0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500

1 pH 7.0 7.5 7.8 7.6 7.5 8.1 8.6 8.7 7.8 8.3 8.1 8.0 7.9

Item

19.10.2007 20.10.2007Average

Parameters

Dates & Time

(hours)

2 Turbidity (NTU) 0.6 0.6 0.6 0.6 0.6 0.8 0.7 0.7 0.6 0.5 0.5 0.5 0.6

3 Colour (Hazen) 3 3 3 3 3 3 3 3 3 3 3 3 3

4 Free Chlorine (mg/L) 1.8 1.7 1.5 1.7 1.8 1.8 1.4 1.4 1.5 1.5 1.6 1.5 1.6

5 Combined Chlorine (mg/L) 0.1 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.1

6 Total Chlorine (mg/L) 1.9 1.8 1.7 1.8 1.9 1.8 1.5 1.5 1.6 1.7 1.7 1.7 1.7

7 Fluoride (mg/L) 0.6 0.5 0.5 0.7 0.6 0.5 0.4 0.5 0.4 0.4 0.4 0.4 0.5

8 Aluminium (mg/L) 0.03 0.01 0.03 0.01 0.02 0.05 0.03 0.07 0.01 0.04 0.05 0.04 0.03

9 Iron as Fe (mg/L) 0.01 0.02 0.02

10 Manganese as Mn (mg/L) 0.02 0.01 0.02

11 Ammonia as N (mg/L)

12 Odour UO UO UO UO UO UO UO UO UO UO UO UO UO

 Remarks : UO means Unobjectionable

DAILY WATER QUALITY MONITORING

Page 38: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 38/51

Stream A

Mixing

Pulsator FiltersBalancing

ReservoirsSungai

Selan or

2-Hourly Sampling Points Locations

erator Chamber

RWPS TWPS

Matang

Pagar

to Service

Reservoirs / 

ConsumerCWT

T e of Water : TREATED WATERStream B

AeratorMixing

Chamber

Pulsator Filters

Bukit

Mayong

 

Sampling Point : Matang Pagar Reservoir Outlet

0700 0900 1100 1300 1500 1700 1900 2100 2300 0100 0300 0500Item

19.10.2007 20.10.2007Average

Parameters

Dates & Time

(hours)

. . . . . . . . . . . . .

2 Turbidity (NTU) 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.4

3 Colour (Hazen) 3 3 3 3 3 3 3 3 3 3 3 3 3

4 Free Chlorine (mg/L) 1.2 1.1 1.2 1.2 1.3 1.3 1.4 1.3 1.4 1.4 1.4 1.3 1.3

5 Combined Chlorine (mg/L) 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.0 0.1

6 Total Chlorine (mg/L) 1.2 1.2 1.3 1.3 1.4 1.4 1.4 1.3 1.4 1.4 1.4 1.3 1.3

7 Fluoride (mg/L) 0.5 0.5 0.4 0.5 0.4 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.4

8 Aluminium (mg/L) 0.08 0.07 0.05 0.05 0.01 0.02 0.02 0.01 0.02 0.02 0.03 0.04 0.04

9 Iron as Fe (mg/L) 0.02 0.02 0.01 0.02

10 Manganese as Mn (mg/L) 0.03 0.03 0.02 0.02

11 Ammonia as N (mg/L) 0.01 0.06 0.00 0.02

12 Odour UO UO UO UO UO UO UO UO UO UO UO UO UO

 Remarks : UO means Unobjectionable

Supervisory Control And Data Acquisition (SCADA)

Page 39: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 39/51

Supervisory Control And Data Acquisition (SCADA)

Certification and Ac c red ita tion

Page 40: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 40/51

Certification and Ac c red ita tion

In Oc tober 2000, the SSP1 Laboratory was awarded theIn Oc tober 2000, the SSP1 Laboratory was awarded theSea l of Acc red itation (ISO/ IEC Guide 25) by the JabatanSea l of Acc red itation (ISO/ IEC Guide 25) by the Jabatan

 Ma laysia (SAMM) scheme. The SSP1 Laboratory wasMa laysia (SAMM) scheme. The SSP1 Laboratory was

subsequently eleva ted to the ISO 17025 acc red itation insubsequently eleva ted to the ISO 17025 acc red itation inOc tober 2002.Oc tober 2002.

SIRIM had carried out the c omplianc e audit on the SSP1SIRIM had carried out the c omplianc e audit on the SSP1

operations in November 2002 and we are p roud to informoperations in November 2002 and we are p roud to inform

tha t SSP1 was conferred with the ISO 9001:2000tha t SSP1 was conferred with the ISO 9001:2000acc red itation on 21acc red itation on 21stst March 2003. The effort to achieveMarch 2003. The effort to achieveISO 9001:2000 c ertification was undertaken entirely inISO 9001:2000 c ertification was undertaken entirely in--house and the c ertification is a testimony to the staffhouse and the c ertification is a testimony to the staff

 , ., .

Partic ipa te in Profic ienc y Testing organized by JKM annually.Partic ipa te in Profic ienc y Testing organized by JKM annually.

Page 41: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 41/51

Sta ff Training

,Mechanical, Production, Security Safety & Health and Risk Management,Lab & QC, Electrical & Instrumentation, IT & Telemetry, Civil Maintenance,Civil Maintenance, Quality Assurance and Administration.

• –  Internal Training; conducted by Senior Staff

 –  In-House Training; by outside certified trainer conducted at site –  Public Training; conducted by certified organizations/related agencies

• Course content may vary depending on target groups. Training formatinclude class room training and on site trainings.

• Staff category includes Plant Operators, Controllers/Technicians,, , ,Staffs, Civil Workers and Patrolmen and Officers/Managers

• Discussion on studies carried out, participated by all staff involved in theparticular study, irrespective of rank. This promotes dissemination ofknowled e and exchan e of views amon the staff and enhance teamwork

Page 42: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 42/51

Security, Safety & Health

• SSP1 is classified as Major Hazard installation due to storage of chlorine atsite and is subjected to CIMAH Act

• SSP1’s has 28 members Emergency Response Team (ERT) consist ofstaffs from various sections.

• The ER team will act as first responder to any emergency (chlorine leak, fire

etc) at site• Trainings and refresher trainings are continuously provided to EmergencyRes onse Team members b Chlorine su liers and also b JabatanBomba & Penyelamat

• Safety and Health Committee represented by SSP1 staff from all rank andfile hold meeting every three months to discuss various safety & health

issues• Safety & Health Awareness Trainings/Courses are also provided to all

SSP1 staffs. The trainings are either by SSP1’s Safety Officer or certifiedtrainers from National Institute of Occupational Safety & Health (NIOSH) orMalaysian Society for Occupational Safety & Health (MSOSH)

• or ne an re r s are con uc e rom me o me

Page 43: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 43/51

5.0 Studies Conducted

Page 44: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 44/51

b) Limnological Survey of Impounded Water

Page 45: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 45/51

b) Limnological Survey of Impounded WaterConclusion :Iron and manganese are in the soluble form in the Hypolimnion. With intake further downstream

of the dam releases from the hypolimnion will not pose treatment problem.

WATER QUALITY IN DEEP RESERVOIRS

30%

Epilimnion: Upper layer ofwell-mixed warm water

Thermocline: Intermediate/boundary

temperature and density

Hypoliminion: Lower layer,poorly mixed cool water.ow an anaero c

28.5%Lake

Thermal Stratification

(2) Potential Enhancement and Economy of Treatment Processes

Page 46: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 46/51

ya) Selection of Coagulants

Aluminium Sulphate (Alum) and Polyaluminium Chloride (PAC)

Coagulant PAC – Fi l t er – SSP1 Coagulant Alum – Fi l t er – SSP1

Conclusion :PAC more effective in removal of iron and manganese.(i) PAC does not depress pH as much as Alum.(ii) Due to the catalytic action of PAC.

b) Removal of Iron (Fe) and Manganese (Mn)Use of Potassium Permanganate (KmNO4)

Page 47: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 47/51

g ( )

The chemical converts the soluble form of Fe and Mn

o e nso u e orm.

c) Dissolved Oxygen (DO) Concentration Variation in a Sludge Blanket

Page 48: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 48/51

c) Dissolved Oxygen (DO) Concentration Variation in a Sludge Blanket

Conclusion :

. . .(ii) The rate of D.O. concentration varies with the length of time of retaining the sludge.The sludge could turn anaerobic, changing the form of Fe and Mn from insoluble to soluble.

(iii) The study indicates the appropriate time for washing the clarifier.

STUDY OF D.O. IN SLUDGE

Water LevelA

2.50 M Max.

Water LevelA

2.50 M Max.

Cross-Section of Clarifier 

A

3.00 M

3.50 M Min.

D.O. ConcentrationCross-Section of Clarifier 

A

3.00 M

3.50 M Min.

D.O. Concentration

B

. . . . . . . . . . .

B

. . . . . . . . . . .

View -AA- View -BB-View -AA- View -BB-

Page 49: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 49/51

d) Study on the Effect of Prechlorination on Bacteria, Iron and Manganese

Results of Study

-

Sample

 Coliform

E. ColiSample

Filtered Sample

MPN/100mL

MPN/100mL

Iron Manganese Iron Manganese

Raw Water >100,000 3000 1.77 0.269 0.17 0.082

Raw Water +0.5 ppm C12

. . . .

Raw Water +1.0 ppm C12

0 0 1.71 0.26 0.16 0.073

Raw Water +1.5 ppm C12

. . . .

e) Study on Effectiveness of Specific Treatment Processes

Page 50: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 50/51

Specific Treatment Processes :

• •

Sg. Selangor Source – Microbiological Water Quality,Sg. Selangor Treatment Plant, Phase 1

Streams

Sampling LocationSampling TypeSampling Time

AeratorRaw Water0900 Hours

Pulsator No. 3Settled Water1100 Hours

Filter No. 10Filtered Water1400 Hours

acter a ount : m

Stream A

(475 MLD)

SAMPLING DATE : 16.02.2005

Total Coliform 52,000 0 5

E. Coli 0 0 0

Filter running : 60.7 hours

Stream B475 MLD

SAMPLING DATE : 07.02.2005

Total Coliform 40,800 0 2

  .

Filter running hours : 12.4 hours

Page 51: SWMA 2a Presentation

8/6/2019 SWMA 2a Presentation

http://slidepdf.com/reader/full/swma-2a-presentation 51/51