Boiler # 1 Inspection and Condition Assessment
Project No. : HiTR-131-303Oracle No. : 22648
Al-Khobar Power & Desalination Plant
1
Presentation Outline
Post Outage Activity1. Boiler # 1 Risk Table2. Hi Engineering Major Recommendations3. Force Outage Rates4. Tube Failures5. Boiler Maintenance History6. Boiler Chemical Cleaning Procedure Review• Lay-up Procedures• Miscellaneous
• Objective• Boiler No.1 Particulars1. General Information2. Boiler Lay-out
• Pre Outage Inspection1. Inspection Activity2. Inspection Major Findings• Inspection during Outage1. Water Wall Tubes2. Economizer Tube3. Superheater Tubes4. Water Wall supply Headers5. Economizer Inlet Header6. Steam Drum
7. Superheater Headers8. Dead Air Space9. Burners10. Rothemuhle Air Heater11. SCAH Air Heater12. Air & Flue Gas Duct
• Inspection Plan
2Index
Objective
Index
Inspection and Condition Assessment is designed to Improve the reliability of Boiler by evaluation of present condition of boiler, Avoiding boiler failures and forced outages, Identification of risky areas, Analysis of root cause of problems and Providing technical cost effective and practical solutions .
3
Boiler No.1 Particulars
Owner or User : SWCC, Al-Khobar Power & Desalination PlantBoiler Unit : No.1Manufacturer : Babcock & WilcoxType : El Paso Type Radiant BoilerMax. Cont. Rating (MCR) : 672,200 kg/hr (1,482,000 Ib/hr)Nom. Elect. Capacity : 190 MW (150 MW+ Desal)Design Pressure : 1575 PsigOperating Temperature : 380-520 °CCommissioned Year : 1983 (30 year)Boiler Height : 38.5 m (126.5 ft.) measured from lower furnace
wall headers to steam drum
Index
1. General Information
4
Index 5
PSH-O
TSH
SSH
PSH-I
ECONOMIZER
Steam Drum
PSH I. Header
Economizer Outlet Header
Water Wall supply Headers
Air Heaters
Water Wall Tubes
Gas & Flue Gas Duct
Economizer Inlet Header
Burners(rear side)
Burners(front side)
2.Boiler Lay-out
PSH O.
TSH O.TSH I.
SSH O.SSH I.
Bottom Dead Air Space
Inspection Plan
Index
Hi Engineering Inspection Plan
The total timeframe of the inspection activity conducted by Hi Engineering to Boiler No.1 of SWCC which encompassed each course of inspection and the plan amount in each equipment.
6
7Index
Pre Outage Inspection1. Inspection Activity
List of Activity:
1. General survey for boiler outer casing temperature.
2. Insulation condition3. Boiler structure & backstay 4. Signs of flue gas & heat leakage5. Manhole & sootblower penetration6. Boiler Expansion condition
Pre Outage Inspection
Index
No. Findings Photo Action
1
Sign of overheating at TSH man hole in 6th Floor, the temperature measurements in pre-outage inspection shows more than 300°C.
Door need to be overhauled before start-up.
Boiler Walk Downs
A pre-outage unit walk-down cover the complete unit from top to bottom and all auxiliary systems.
Below is the major findings during our Pre-outage Inspection to Boiler No.1.
8
2. Inspection Major Findings
Inspection during Outage
Index
1. Water Wall Tubes & Furnace
Type of Inspection Amount of NDT Inspections
Inspection Findings
Visual Inspection 100% Welded piece attachment; lifting lug left-over; soot deposition & deteriorated refractory.
Ultrasonic Thickness Measurements
1512 Points No tubes were found below minimum wall tube wall thickness.
Penetrant Testing 16 Locations (0.5 - 1 M length)
None
Material SA 210 A1 CF SMOOTH
No of tubes Front & Rear 143 Side Walls 128
OD, mm 63. 5 63.5 75.4 75.4
Thickness, mm 5.156 6.096 5.588 5.156
9
Index
Inspection during Outage
1. Water Wall Tubes & Furnace (continued)
No. Findings Photo Action
1
Attachment of welded piece in several locations at the water wall which may lead to stress corrosion cracking then tube leak.
1- Tube sample need to be taken for at least one location.2- All attachment need to be grinded.3- PT check need to be conducted.
2
Leftover of welded lifting lugs in several locations at the water wall which may lead to stress corrosion cracking then tube leak.
As per Finding No.1
10
Index
Inspection during Outage
1. Water Wall Tubes & Furnace (continued)
Recommendations:
1. Two (2) Tube samples need to be taken from water to evaluate the water side condition plus requirement the boiler wall chemical cleaning.
2. Attachment of welded piece and lifting lug leftover, tube sample is required to be taken for at least two locations to assess the tube ID condition. This has to be done in the next plan outage.
11
Inspection during Outage
Type of Inspection Amount of NDT Inspections Inspection Findings
Visual Inspection 100% Soot deposition;.
Ultrasonic Thickness Measurements
132 Points No tubes were found below minimum tube wall thickness.
Penetrant Testing 24 Locations (0.5 – 1 M length)
None
2. Economizer Tubes
Index
Row # 1-40
Material SA 178 C
Thickness, mm 4.57
OD, mm 50.8
12
Index
Inspection during Outage
2. Economizer Tubes (continued)
No. Findings Photo Action
1
Severe soot deposition on the tube surface at the lower bank.
Availability and Efficiency of sootblowers need to be checked.
13
Index
Inspection during Outage
2. Economizer Tubes (continued)
Recommendations:
Reliability and efficiency of all Economizer sootblowers need to be checked as soon as possible.
14
Index
3. Superheater Tubes
3.1 Primary Superheater TubesNo. Section OD, mm Thickness, mm Material
1 Inlet Bank (Tube Row # 1-14) 50.8 4.57 SA 178 C
2 Outlet Bank (Tube Row # 1-3) 50.8 7.87 SA 213 T22
3 Outlet Bank (Tube Row # 4-6) 50.8 6.48 SA 213 T22
4 Outlet Bank (Tube Row # 7-12) 50.8 5.59 SA 213 T22
5 Outlet Bank (Tube Row # 13-15) 50.8 4.78 SA 213 T2
6 Outlet Bank (Tube Row # 16-21) 50.8 4.57 SA 209 T1 A
7 Outlet Bank (Tube Row # 22-24) 50.8 4.78 SA 209 T1 A
8 Outlet Bank (Tube Row # 25-33) 50.8 4.57 SA 178 C
Inspection during Outage
15
Inspection during Outage
3. Superheater Tubes (continued)
3.2 Secondary Superheater TubesNo. Section OD, mm Thickness, mm Material
1 Row # 1-15 50.8 4.57 SA 209 T1 A
2 Row # 16-20 50.8 4.57 SA 213 T2
3 Row # 21-25 50.8 5.16 SA 213 T12
4 Row # 26-30 50.8 6.48 SA 213 T12
Index
3.3 Tertiary Superheater TubesNo. Section OD, mm Thickness, mm Material
1 Row # 1-6 44.45 4.19 SA 213 T12
2 Row # 7-15 44.45 5.59 SA 213 T12
3 Row # 16-18 44.45 5.16 SA 213 T12
16
Index
Type of Inspection Amount of NDT Inspections
Inspection Findings
Visual Inspection 100% Severe tube sagging; missing & disengaged mother lug; support lug crack, missing tube spacer; loose refractory, broken soot blower nozzle; dented tube & tube deformation.
Ultrasonic Thickness Measurements
384 Points No tubes were found below minimum tube wall thickness. (70% x t) Babcock & Wilcox – Guidelines for Tube Repair/Replacement.
Penetrant Testing 30 Locations (0.5 – 1 M length)
A crack at the 1st row of SSH Inlet leg at the top of the Furnace.
Inspection during Outage
3. Superheater Tubes (continued)
17
Index
3. Superheater Tubes (continued)
Inspection during Outage
No. Findings Photo Action
1
Excessive to Medium tube sagging for about 25 coils of TSH tubes which is indication of creep damage.
Tube analysis need to be done for minimum three samples of the most excessive sagged area. We suggest 3 m tubes no. 16, 22 & 26 to be sampled & no. 13, 15, 54 & 56 to be replaced.
2 Missing mother at TSH tube no. 23
Need to be repaired in the next planned outage.
18
Index
No. Findings Photo Action
3
A total of ten (10) disengaged mother lug of SSH lower bank front side at coil no’s. 1, 3, 4, 5, 9, 10, 18, 23, 28 & 32.
All disengaged mother lug to be reengaged in the right position in the next planned outage.
4Missing sliding lug at TSH tube no. 23 & 2 front side.
Need to be repaired in the next planned outage.
3. Superheater Tubes (continued)
Inspection during Outage
19
Inspection during Outage
Index
3. Superheater Tubes (continued)
No. Findings Photo Action
5Old repair of displaced SSH mother lug shows that the additional piece is overheated.
1- Old repair need to be removed. 2- Mother lug need to be fixed in the right position.
6A crack at the 1st row of SSH Inlet leg at the top of the Furnace.
The crack needs to be removed either by replacing the tube or grind out the crack and do repair weld.
20
Index
Inspection during Outage
3. Superheater Tubes (continued)
No. Findings Photo Action
7Missing mother lug of TSH tube no. 23 at front wall bottom side.
Need to be repaired in the next planned outage.
8
Sign of overheating at TSH man hole in 6th Floor, the temperature measurements in pre-outage inspection shows more than 300°C.
Door need to be overhauled before start-up.
21
Inspection during Outage
3. Superheater Tubes (continued)
No. Findings Photo Action
9 Crack at the Penetration Wall of SSH Inlet Tube Leg, left side when facing the header.
Major inspection need to be done for the tube penetrations in the next planned outage.
Index 22
Index
Inspection during Outage
3. Superheater Tubes (continued)
Recommendations:
1. At Tertiary Superheater Tube, tube analysis is needed for a minimum of three tube samples of the most excessive or severe sagged area. Hi Engineering suggests 3 meters for these tubes Nos. 16, 22 & 26 to be replaced and sampled. Six (6) to seven (7) tubes of the most sagged area need to be repaired. (See attachment in Tab 4).
2. All ten (10) disengaged mother lug (Tube Nos. 1, 3, 4, 5, 9, 10, 18, 23, 28, 32) in Secondary Superheater lower bank tube front side need to be re engaged on the right position.
3. Broken Sootblower nozzle head at Primary Superheater Inlet bank need to be repaired before unit start-up.
23
Inspection during Outage
3. Superheater Tubes (continued)
Index
3. A crack at the 1st row of Secondary Superheater Inlet leg at the top of the Furnace need to be removed either by replacing the tube or grind out the crack and do repair weld. This has to be done as soon as possible.
4. Missing spacer at front side (Tube Nos. 2 & 33) and bad repair mother lugs need to be repaired in the next plan outage.
24
Index
Inspection during Outage
4. Water Wall supply Headers
Material SA 106 GR C
Thickness, mm 34.925
OD, mm 241.3
Type of Inspection Amount of NDT Inspections
Inspection Findings
Visual Inspection 100% Slight general corrosion on Header surface.
Ultrasonic Thickness Measurements
204 Points No Header were found below minimum Header wall thickness based from the original specified header wall thickness.
Penetrant Testing 15 Locations (0.5 – 1 M Length)
None
25
Index
4. Water Wall supply Headers (continued)
Inspection during Outage
No. Findings Photo Action
1 A slight corrosion of water wall supply headers at rear platen wall.
No action required in the time being. Keep monitor in the next outage.Source of corrosion need to be eliminated (wet condition).
2 A slight corrosion of feedwater pipes at front platen wall.
As per Finding No.1
26
4. Water Wall supply Headers (continued)
Inspection during Outage
Index
Recommendations:
1. Borescope inspection need to be conducted within five (5) years in order to assess the header ID condition.
2. The wet conditions need to be eliminated.
27
Index
Inspection during Outage
5. Econmizer Inlet Header
Material SA 106 C
Thickness, mm 34.925
OD, mm 241.3
Type of Inspection Amount of NDT Inspections
Inspection Findings
Visual Inspection 100% Slight corrosion scale & disengaged guiding spacer
Ultrasonic Thickness Measurements
46 Points No Header were found below minimum Header wall thickness based from the original specified header wall thickness.
Penetrant Testing 10 Locations (0.5 – 1 M Length)
None
28
Index
Inspection during Outage
5. Econmizer Inlet Header (continued)
No. Findings Photo Action
1
Header guiding spacer at left-end was close to out of position.
Keep monitor during start up and in the next outage.(Adjustment or extension of the support may be required.)
2Flake-off scale of corrosion from Header tube stub.
Keep monitor in the next outage.Source of corrosion need to be eliminated (wet condition.)
29
Index
Inspection during Outage
5. Econmizer Inlet Header (continued)
Recommendations:
1. A close to disengaged guiding spacer need to be monitored during unit start-up. The spacer should be extended if necessary.
2. The wet conditions in the header need to be eliminated in order to control the presence of corrosion. This has to be done as soon as possible.
3. Borescope inspection need to be conducted within five (5) years in order to assess the header ID condition.
30
Inspection during Outage
Index
6. Steam DrumMaterial Carbon Steel (CS)
Thickness, mm 96
ID, mm 1,829
Type of Inspection Amount of NDT Inspections
Inspection Findings
Visual Inspection 100% Slight rust deposition, foreign deposits, slight flow accelerated corrosion at Feedwater pipe spray nozzle & pinhole at drain pipe.
Ultrasonic Thickness Measurements
32 Points No Header were found below minimum Header wall thickness based from the original specified header wall thickness.
Penetrant Testing 15 Locations (0.5 – 1 M length)
Deep undercut at Feedwater pipe support
31
Inspection during Outage
6. Steam Drum (continued)
No. Findings Photo Action
1
Heavy deposition at both ends of drum heads below vortex arrestor.
1. Layup procedure needs to be improved.
2. Water chemistry need to be reviewed and improved.
3. Need to be cleaned before start up.
2Feedwater pipe support at right side of Steam Drum shows deep and wide undercut and spatters.
Need repair in the next planned outage.
Index 32
Inspection during Outage
Index
6. Steam Drum (continued)
Recommendations:
1. Lay-up procedure and water chemistry need to be reviewed and improved. This has to be done as soon as possible.
2. Welding defects at non-pressure parts of the Steam Drum need to be repaired in the next plan outage.
33
Inspection during Outage
Index
7. Superheater Headers
No. Component OD, mm Thickness, mm Material
1 PSH Outlet Header 425.45 41.275 SA 335 P11
2 TSH Outlet Header 533.4 60.325 SA 335 P22
3 TSH Inlet Header 355.6 34.925 SA 335 P11
4 SSH Outlet Header 431.8 44.45 SA 335 P11
5 SSH Inlet Header 425.45 34.925 SA 335 P11
34
Executive Summary
Index
7. Superheater Headers (continued)
Type of Inspection Amount of NDT Inspections
Inspection Findings
Visual Inspection 100% Slight deterioration of wall & ceiling; sign of water leakage
Remote Visual Inspection 20% Two (2) broken Attemperators spray nozzle head at TSH Inlet Header; slight accumulation of water at TSH Outlet Header
Replica 10 Locations No evidence of creep related damage
Ultrasonic Thickness Measurements
280 Points No Headers were found below minimum header wall thickness based from specified original wall thickness.
Ultrasonic Testing (Shear wave)
3 Joints No Headers were found any indication of discontinuities.
Penetrant Testing 30 Locations (0.5 – 1 M length)
None
35
Executive Summary
Index
No. Findings Photo Action
1
Two (2) broken Attemperators spray nozzle head was found inside the TSH Inlet Header.
Attemperators need to be repaired and broken parts to be removed before boiler start-up.
2 Slight accumulation of water at TSH Outlet Header internal.
Required for total drain of the header in order to eliminate the water inside. And review the storage procedure.
7. Superheater Headers (continued)
36
Inspection during Outage
Index
7. Superheater Headers (continued)
Recommendations:
1. Two (2) broken Attemperator spray nozzle head need to be repaired before unit start-up.
2. SSH inlet header and its attemperator need to be inspected for the same finding before unit start-up.
3. Boiler need to be drained totally during shutdown period. 4. Lay-up procedure needs to be reviewed and improved as soon as
possible.5. Major inspection need to be done for the tube penetrations in the next
plan outage.
37
Inspection during Outage
Index
8. Bottom Dead Air Space
Type of Inspection Amount of NDT Inspections
Inspection Findings
Visual Inspection 100% One (1) tube leak at tube no.19 Platen Wall; slight tube corrosion; loose nut of boiler structural support; tube deformation; moderate corrosion on structural support; bottom & wall deformation.
Penetrant Testing 15 Locations (0.5 – 1 M length)
None
38
Inspection during Outage
Index
No. Findings Photo Action
1
Tube leak from rear platen wall tube No. 19 at the penetration area between furnace and dead air space.
Tube need to be repaired before unit start-up.
2 Slight corrosion at rear platen water wall tube.
The wet conditions need to be eliminated in order to control the corrosion.
8. Bottom Dead Air Space (continued)
39
Inspection during Outage
Index
8. Bottom Dead Air Space (continued)
Recommendations:
1. Tube leak from rear Platen Water Wall at tube no.19 need to be repaired before unit start-up.
2. Bottom and wall deformation need to be inspected in the next plan outage.
40
Inspection during Outage
Index
9. BurnersOil Burner Gas Burner
Design Data Design Data
Oil Pressure 16.4 Kpa (238 Psi) Throat Diameter 813 mm (32”)
Atomizing Steam/Burner
76.2 Kg/hr @ 10.3 Bar Impeller Diameter 304.8 mm (12”)
Throat Diameter 812.8 mm (32”) No. of Gas Spuds 8
Impeller Diameter 304.8 mm (12”) Flame Retainer Diameter
114.3 mm (4.5”)
Type of Inspection Amount of NDT Inspections Inspection Findings
Visual Inspection 100% Six (6) broken support at windbox side; support lug was tilting; slight corrosion at structural support.
Penetrant Testing 4 Locations (0.5 – 1 M length) None
41
Inspection during Outage
Index
9. Burners (continued)
No. Findings Photo Action
1A general photo of PT check at Burner Swirler shows weld in good condition.
No action is required.
2 A general photo of the Igniter shows in condition.
No action is required.
42
Inspection during Outage
Index
9. Burners (continued)
Recommendations:
1. Bad welding quality at non-pressure parts of the burner windbox side need to be repaired in the next plan outage.
2. Support lug tilting downward need to be fixed in the next plan outage.
43
Inspection during Outage
Index
10. Air Heater - Rothemuhle
Manufacturer Hitachi Zosen – Rothemuhle
Design Pressure 889 mmWG
Design Temperature 370 °C
Heating Surface 10608 m²
Type Vu 6.7/0.0675+0.675+0.3C
Serial No. 1604/1605
Type of Inspection Amount of NDT Inspections
Inspection Findings
Visual Inspection 100% Broken & deformed expansion joints; slight rust in the unit surface.
44
Inspection during Outage
Index
10. Air Heater – Rothemuhle (continued)
No. Findings Photo Action
1
A minor cut in the AH expansion joint at No.2 unit.
1-Need to study the root cause of failures of the expansion joints.2-It needs to be repaired in the next planned outage.
2Moderate deformation of AH Expansion joint at No.1 unit.
As per Findings No.1
45
Inspection during Outage
Index
10. Air Heater – Rothemuhle (continued)
Recommendations:
1. Defective expansion joints need to be repaired in the next outage.2. Need to study the root cause of failures of the defective expansion joints
in order to eliminate recurrence.
46
Inspection during Outage
Index
11. Air Heater - SCAH
Design Pressure 14.8 BARg (200 Psig)
Design Temperature 171 °F
Approx. Weight/Element 816 Kg (1800 Ibs)
Approx. Size/Element 228 mm (9”)w x 1.8 m (6’)h x 3.66 m (12’)L
Type of Inspection Amount of NDT Inspections
Inspection Findings
Visual Inspection 100% Twenty-eight (28) defected tubes
47
Inspection during Outage
Index
11. Air Heater – SCAH (continued)No. Findings Photo Action
1
Old repair by tube plugging of SCAH at Unit No.1, right side.
SWCC has already set a major repair in this equipment and plan for a major replacement to be done during the outage and Hi Engineering support this action.
2 Defective tube at Unit No.1, left side
As per Findings No.1
48
Inspection during Outage
Index
11. Air Heater – SCAH (continued)
Recommendations:
1. SWCC has already set a major repair in this equipment and plan for a major replacement to be done during the outage and Hi Engineering support this action.
49
Inspection during Outage
Index
12. Air & Flue Gas Duct
Type of Inspection Amount of NDT Inspections
Inspection Findings
Visual Inspection 100% Broken pressure measurement tube; excessive loose of insulation; debris deposition
Penetrant Testing 20 Locations (0.5 – 1 M length)
None
50
Inspection during Outage
Index
12. Air & Flue Gas Duct continued
No. Findings Photo Action
1
Broken pressure measurement tube at the left side of the flue gas duct
Shall be replaced with new spare before start-up.
2
Excessive loose of insulation at 1st expansion joint top center wall - left side of the flue gas duct.
Shall be repaired as soon as possible.
51
Inspection during Outage
Index
12. Air & Flue Gas Duct (continued)
Recommendations:
1. Defective pressure instrument tubes need to be repaired before unit start-up.
52
Post Outage Activity1. Boiler # 1 Risk Table
Index
No. Section Risk Risk Source Action to Reduce Risk Time
1 PSH Tubes M Broken soot blower Sootblower need to be repaired
Before start-up
2 SSH Tubes
H Crack at tube support Crack need to be repaired
Before start-up
M
1. 10 numbers of mother lug disengaged
2. 2 numbers of tube spacer missing
3. Bad Repair mother lug
All lugs need to be repaired
Next Outage
L Anti-vibration ties overheating
Anti-vibration need to be replaced
5 years
H Manhole overheating Manhole need to be repaired
Before start-up
53
Post Outage Activity
Index
1. Boiler # 1 Risk Table (continued)
No. Section Risk Risk Source Action to Reduce Risk Time
3 TSH Tubes
H Severe tube sagging
Three (3) tube samples is required to assess the life (Tubes No’s. 16, 22 & 56) and6-7 (Tube No’s. 13, 16, 18, 22, 26, 54 & 56) tube need to be replaced.
ASAP
MH Missing mother lug Missing lug need to be repaired
ASAP
4 TSH Inlet Header
MH Water accumulation
1. Boiler need to be drained totally during shutdown
2. Layup procedure need to be improved
ASAP
54
Post Outage Activity
Index
1. Boiler # 1 Risk Table (continued)
No. Section Risk Risk Source Action to Reduce Risk Time
TSH Inlet Header
H Two (2) broken Attemperator
Attemperator need to be repaired
Before start-up
5 TSH Outlet Header
MH Water accumulation
1. Boiler need to be drained totally during shutdown
2. Layup procedure need to be improved
ASAP
6 SSH Inlet Header
MH Unknown condition for tube penetration
Major inspection need to be done for the tube penetrations
Next Outage
7 SSH Outlet Header
MH Unknown condition for tube penetration
Major inspection need to be done for the tube penetrations
Next Outage
55
Index
1. Boiler # 1 Risk Table (continued)
Post Outage Activity
No. Section Risk Risk Source Action to Reduce Risk Time
8 Water Wall Tube
MH Unknown condition of tube ID
Tube sample is required to assess the tube ID condition
ASAP
MH Leftover welded pieceLeftover lifting lugs
Tube sample is required to assess the tube ID condition
Next Outage
M Slight soot deposition
Boiler tuning is required to improve the firing condition
ASAP
9 Economizer Tube
M Severe soot deposition
Sootblower need to be paired
Next Outage
MUnknown condition of tube ID
Tube sample is required to assess the tube ID condition
Next Outage
56
Index
Post Outage Activity1. Boiler # 1 Risk Table (continued)
No. Section Risk Risk Source Action to Reduce Risk Time
10Water Wall supply Headers
MH General corrosion Tube leak need to be repaired Before start-up
M Unknown condition of Header inside
Borescope need to be conducted
5 Years
11Economizer Header
MH Close to disengaged guiding spacer
1. Monitor during start-up2. Extend the spacer ASAP
MH Corrosion under insulation
Eliminate the wet condition ASAP
12 Steam Drum
M Deposit accumulation
1. Layup procedure need to be improved
2. Water chemistry need to be reviewed and improved
ASAP
57
Index
Post Outage Activity1. Boiler # 1 Risk Table (continued)
No. Section Risk Risk Source Action to Reduce Risk Time
Steam Drum
M Bad quality of non-pressure parts welds
Welding defects need to be repaired
Next Outage
13 Bottom Dead Air Space
MH General corrosion
1. Tube leak need o be repaired
2. Wet condition need to be eliminated
Before start-up
M Support loose nut Need to be fastened ASAP
L Bottom & wall deformation
Need to be inspected Next Outage
14 Burners M
1. Bad quality of non-pressure parts welds
2. Support lug3. Support lug
tilting
Welding defects need to be repaired
Next Outage
58
Index
Post Outage Activity1. Boiler # 1 Risk Table (continued)
No. Section Risk Risk Source Action to Reduce Risk Time
15 Air Heater Rothemuhle
M
1. Defective expansion joints
2. Expansion joints deformation
Expansion joints need to be replaced
Next Outage
16 Air Heater - SCAH
H 28 number of defective tubes
SWCC already plan to replace the equipment
Next Outage
17 Air & Flue Gas Duct
M Defective pressure instrument tube
Pressure instrument tube need to be repaired
Before start-up
Abbreviations:
H : HighMH : Medium to HighM : MediumL : Low
59
Index
2. Hi Engineering Major Recommendations
Post Outage Activity
The following is the summary of the Hi Engineering recommendations for boiler No. 1 which need to be done to increase the Boiler reliability and availability.
1. Regarding the TSH tube sagging at Material SA 213 T11, The seven most excessive sagged tube (Tube Nos. 13, 16, 18, 22, 26, 54, 56) need to be replaced and three (3) tube need to be sent for analysis to evaluate the material creep and the signs of aging. When the study show this section need to be replaced we suggest to replace SA 213-T11 with SA 213-T22.
2. Two (2) Tube samples need to be taken from water to evaluate the water side condition and the requirement of boiler wall chemical cleaning.
3. Attachment of welded piece and lifting lug leftover, tube sample is required to be taken for at least one (1) location to assess the tube ID condition. This has to be done in the next plan outage.
4. When boiler shut down for maintenance, the Boiler should be in dry for two reasons, first to allow maintenance group to do their activity. Second it will be healthier for boiler compare than wet condition with boiler partially filled with the absence of pressurized Nitrogen blanket.
60
Post Outage Activity
Index
3. Force Outage Rates
Forced Outage Rates covered the date from January 1, 2008 until September 14, 2013.
Defined as,FOR = B A – C
Where:FOR = Force Outage Rate, in %A = Total no. of hrs from 1-1-2008 to 14-9-2013 = 50,016 hrsB = Total no. of hrs S/D, Overhaul due to tube failures = 782.74 hrsC = Total no. of hrs S/D, Trip & Overhaul due to non-tube failures = 10,239.7 hrs
Thus,FOR = 782.74 50,016 – 10, 239.7
X 100%
X 100%
61
= 1.97
Post Outage Activity
Index
4. Tube Failures
Below is the Summary of Tube Failures History of Boiler No.1 since commissioned time until September 14, 2013.
Table 3Tube Failures History
No. Date Findings
1 December 1995 Economizer Inlet Header tube stub joint failure.
2 December 1998 Economizer bottom bank tube welded joint has leak and caused another leak from adjacent tube.
3 February 2001 Division wall tube failure at Economizer area.
4 July 2008 Every shutdown Tertiary Superheater Outlet Bank tubes found serious sagging, bowing and displaced from the row.
5 July 2008 Primary Superheater Outlet Header handhole end cap welding has cracked.
6 January 2013 Shutdown due to eighteen (18) Header leaks.
62
Post Outage Activity
Index
5. Boiler Maintenance History
Below is the Summary of Boiler No.1 Maintenance History covered the date from January 1, 2008 until September 14, 2013.
Table 4Boiler Maintenance History
No. StatusDate
Total Hours ActivityFrom To
1 Overhaul 09-07-08 03-11-08 2,799.53 Shutdown for major Overhaul.
2 S/D 18-03-09 25-03-09 184.12 To install strainer 1RA20/300N001.
3 S/D 19-12-09 26-12-09 157.85
Shutdown for stopping all equipment for trfs 01AT01/BT01 isolation for Generator protection panel replacement.
4 S/D 01-05-11 03-05-11 54.62 230 KV Breaker protection upgrade.
5 S/D 11-04-12 26-04-11 364.34Unit Transformer AT/BT01 Oil Filtration job.
63
Post Outage Activity
Index
5. Boiler Maintenance History (continued)
No. StatusDate
Total Hours ActivityFrom To
6 S/D 22-05-12 23-05-12 16.93Shutdown due to replace Drum level control valve gland packing.
7 Overhaul 21-04-13 14-09-13 3509 Shutdown for major Overhaul.
Table 4Boiler Maintenance History
64
Index
Post Outage Activity6. Boiler Chemical Cleaning Procedure Review
Hi Engineering did not receive any Boiler Chemical Cleaning Procedure from SWCC plus no record of Boiler Chemical Cleaning history.
We suggest SWCC to have a written Chemical Cleaning Procedure for Boiler which includes the requirement criteria of the Chemical Cleaning & Chemical Cleaning Procedure.
65
Index
Best Lay-up Procedure
Best lay-up practices and Boiler Storage during outages
In order to maintain high plant availability, it is essential to use good storage techniques during off-load periods. Improper storage practice has a major contributor to boiler tube in power plants and a major cause of reduced plant reliability and availability. Hi Engineering tries to identify the best practices and the practical methods to protect boiler during outages that will aid plant operators in achieving successful boiler storage.
.The primary purpose of the shutdown and storage practice should be to preserve those protective oxide surfaces and prevent damaging corrosion.
66
Best Lay-up Procedure
Storage Methods: Wet and Dry
Wet Storage permits chemically treated and deaerated water to remain in the Boiler, deaerator, condenser, and all associated piping. The goal is to provide proper chemical treatment and prevent air from entering any wet area in the cycle where pitting and corrosion can occur.
Dry Storage is an effective method when equipment must be periodically opened and inspected. Two options can be used for dry storage: nitrogen gas blanketing and dry air.
Index 67
Index
Storage Methods: Wet and Dry (continued)
1. Dry air offers additional advantages to nitrogen gas. The dry condition can be maintained even while equipment is opened for routine inspections. Dehumidified air systems are also less costly to maintain over the long term.
Best Lay-up Procedure
68
Index
Best Lay-up Procedure
For a particular plant, the final choice of storage procedure will require a balance of the following requirements, some of which may conflict with each other:
1. Duration of the Outage2. How fast the unit need to be return in service3. Purpose of the Outage4. Availability of specialized storage equipment
Storage Methods: Wet and Dry (continued)
69
Index
Best Lay-up Procedure
Duration of the Outage
How fast plant personnel need to return a unit to service, can place constraints on how it is shutdown or on the procedures and practices used for storage.
• Short-Period Shutdown
Involves periods extending overnight or through a weekend. This shutdown period is typical of cycling operation and utilizes a wet storage or hot standby approach.
70
Index
Duration of the Outage (continued)
Best Lay-up Procedure
• Long-Period shutdown
Is one extending from a few weeks to six months. Such outages can involve major equipment repair, a planned outage, or a long-term storage due to system load requirements. Both wet and dry approaches can be applied, but if return-to-service timing is not an issue, totally dry storage is preferred for extended outages.
71
Index
Best Lay-up Procedure
Purpose of the Outage
A prime factor affecting the choice of a storage procedure is the type or purpose of the Outage: Economic operation, Forced outage, or Scheduled outage for maintenance.
72
Index
Best Lay-up Procedure
Item Type of Outage Duration Boiler Deaerator Condenser
1Forced Outage for Boiler Tube Failure
Less than 24 hours
Dry storage drained for repairs
Wet storage Wet storage residual heat of turbine should mitigate damage
2Short Scheduled Outage
8 to 24 hours
Wet storage w/ Nitrogen, if pressure decays
Wet storage w/ Nitrogen, if pressure decays
Maintain steam seals and vacuum on condenser
3Scheduled Outage with uncertain Return to Service
Uncertain return to service quickly
Wet storage w/ Nitrogen
Wet storage w/ Nitrogen
Dry storage w/ dehumidified air or wet storage w/ Nitrogen
4Maintenance or Seasonal Outage
More than two weeks
Dry storage w/ dehumidified air
Dry storage w/ dehumidified air
Dry storage w/ dehumidified air
Purpose of the Outage (continued)
73
Index
Best Lay-up Procedure
Three key points should be emphasized:
1. Keep water and moisture out of steam-touched components and any water-touched surface to be maintained dry during the shutdown period.
2. Partial storage of the system, or storage of only some of the equipment (boiler), will not produce the desired results or protect against corrosion. The simultaneous presence of moisture and oxygen should be avoided.
3. Quickly and completely draining all water-containing equipment while it is hot at the start of overhauls, utilizing residual heat to facilitate drying.
74
Index
Miscellaneous
1. Numbering Procedure
2. Illustrations, Records & Measurements during Inspections
75
Thank you
Index 76