submission final term presentation-betterment of ehs conditions-daniyal

51
BETTERMENT OF EHS CONDITIONS A CASESTUDY OF PHARMACEUTICAL PROJECT BY MUHAMMAD DANIYAL MID TERM PRESENTATION ON NED UNIVERSITY OF ENGINEERING & TECHNLOGY EM 502 ACCOUNTING AND FINANCIAL MANAGEMENT

Upload: muhammad-daniyal

Post on 13-Apr-2017

231 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

BETTERMENT OF EHS CONDITIONSA C A S E S T U D Y O F P H A R M A C E U T I C A L P R O J E C T

B Y M U H A M M A D D A N I Y A L

MID TERM PRESENTATION ON

NED UNIVERSITY OF ENGINEERING & TECHNLOGYEM 502 ACCOUNTING AND FINANCIAL MANAGEMENT

Page 2: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

Muhammad Daniyal

I N T R O D U C T I O N

Post Graduate Student NED UET in Const. Mgmt.

Working as a Project Coordinator at AAA Partnership since 2011

Graduated as Civil Engr. From SSUET in 2010

Page 3: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

1. Aims and Objectives of Research2. Background3. Pharmaceutical Project4. EHS Goal and Objectives5. EHS Means and Awareness6. Key Performance Indicators7. Relation between means and awareness8. Site Safety Survey9. Conclusion

A G E N D A

Page 4: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

Study the effects of provision of safety equipment and training on EHS condition of site

Finding a relation between expenditure and training in betterment of EHS conditions

Suggesting a strategy and tentative budgets of future projects of similar magnitude.

A I M S A N D O B J E C T I V E S

Page 5: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

Study the effects of provision of safety equipment and training on EHS condition of site

Finding a relation between expenditure and training in betterment of EHS conditions

Suggesting a strategy and tentative budgets of future projects of similar magnitude.

A I M S A N D O B J E C T I V E S

Page 6: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

Study the effects of provision of safety equipment and training on EHS condition of site

Finding a relation between expenditure and training in betterment of EHS conditions

Suggesting a strategy and tentative budgets of future projects of similar magnitude.

A I M S A N D O B J E C T I V E S

Page 7: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

1. Aims and Objectives of Research2. Background3. Pharmaceutical Project4. EHS Goal and Objectives5. EHS Means and Awareness6. Key Performance Indicators7. Relation between means and awareness8. Site Safety Survey9. Conclusion

A G E N D A

Page 8: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

Construction industry employs

B A C K G R O U N D

4.1 millionof total 56.25 million workforce of Pakistan

Page 9: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

That’s equal to

B A C K G R O U N D

44%of Karachi’s population

4.1 million

5.23 million

Karachi

Source: Labor Force Survey 2013-14, Govt. of Pakistan, Bureau of Statistics

Page 10: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

Which ranks it

B A C K G R O U N D

5 th

most employed industry in Pakistan

Source: Labor Force Survey 2013-14, Govt. of Pakistan, Bureau of Statistics

Page 11: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

But unfortunately it is

B A C K G R O U N D

3rd

most injury prone industry in Pakistan

Source: Labor Force Survey 2013-14, Govt. of Pakistan, Bureau of Statistics

Page 12: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

B A C K G R O U N D

1 in 12 employed person is prone to injury or disease in construction industry

Page 13: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

Currently there is NO independent regulation for occupational health and safety in Pakistan

B A C K G R O U N D

Page 14: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

Clause 7 of Labor Policy states that the

B A C K G R O U N D

“ The Labor Laws are quite complex, over-lapping, anomalous, and at times render the subject matter difficult to understand, besides

creating confusion ”

It recommends formation of tripartite committee to draft the occupational safety laws which is

still pending !

Page 15: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

In absence of specific law, the current law which governs OHS is

B A C K G R O U N D

Chapter 3 of Factories Act, 1934 and

The Hazardous Occupations Rules, 1963

Page 16: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

1. Aims and Objectives of Research2. Background3. Pharmaceutical Project4. EHS Goal and Objectives5. EHS Means and Awareness6. Key Performance Indicators7. Relation between means and awareness8. Site Safety Survey9. Conclusion

A G E N D A

Page 17: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

P R O J E C T

Package Areas Construction Areas

1 Production Block A & Warehouse 5,64,825 sft.

2 Production Block B 5,65,740 sft

3 Production Block C & Utility Block 3,72,592 sft

4 Infrastructure 3,51,452 sft

Page 18: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

P R O J E C T

Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-150

50

100

150

200

250

300

350

400

450

68 68

171

267

344368

274

424

Avg. Manpower

Average Manpower at Site

Page 19: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

1. Aims and Objectives of Research2. Background3. Pharmaceutical Project4. EHS Goal and Objectives5. EHS Means and Awareness6. Key Performance Indicators7. Relation between means and awareness8. Site Safety Survey9. Conclusion

A G E N D A

Page 20: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

0

E H S G O A L S A N D O B J E C T I V E S

Injury RateMotor Vehicle AccidentTraffic Citations

Keep record of Loss Time, Audits, Unsafe Conditions, Emergency Drills and Awareness

Sessions

Page 21: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

1. Aims and Objectives of Research2. Background3. Pharmaceutical Project4. EHS Goal and Objectives5. EHS Means and Awareness6. Key Performance Indicators7. Relation between means and awareness

A G E N D A

Page 22: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

E H S M E A N S A N D A W A R E N E S S

MEANS AWARENESS

Personal Protective Equipment (PPEs)

EHS Team

Induction Meetings

Tool Box Meetings

Specific Trainings

Page 23: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

E H S M E A N S A N D A W A R E N E S S

Personal Protective Equipment (PPEs)

Page 24: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

E H S M E A N S A N D A W A R E N E S S

EHS Team

Page 25: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

E H S M E A N S A N D A W A R E N E S S

Awareness

Page 26: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

1. Aims and Objectives of Research2. Background3. Pharmaceutical Project4. EHS Goal and Objectives5. EHS Means and Awareness6. Key Performance Indicators7. Relation between means and awareness8. Site Safety Survey9. Conclusion

A G E N D A

Page 27: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

K E Y P E R F O R M A N C E I N D I C A T O R S

First Aid CasesMajor Injuries

Safety Warning NoticesWork stoppage Notices

Near MissesUnsafe Condition Notices

Page 28: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

K E Y P E R F O R M A N C E I N D I C A T O R S

Page 29: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

K E Y P E R F O R M A N C E I N D I C A T O R S

How to combine KPIs to arrive at a singular safety

index ?

Page 30: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

K E Y P E R F O R M A N C E I N D I C A T O R S

Risk Priority Number (RPN) analysis

Page 31: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

K E Y P E R F O R M A N C E I N D I C A T O R S

Risk Priority Number (RPN) analysis

Page 32: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

K E Y P E R F O R M A N C E I N D I C A T O R S

Site safety index is inversely proportional to EHS condition at site, more index is near to 0 better are the site safety conditions

Page 33: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

1. Aims and Objectives of Research2. Background3. Pharmaceutical Project4. EHS Goal and Objectives5. EHS Means and Awareness6. Key Performance Indicators7. Relation between means and awareness

A G E N D A

Page 34: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

C O - R E L A T I O N B E T W E E N M E A N S A N D A W A R E N E S S

Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-150

50

100

150

200

250

300

350

400

450

68 68

171

267

344

368

274

424

Page 35: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

C O - R E L A T I O N B E T W E E N M E A N S A N D A W A R E N E S S

Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-150

200

400

600

800

1000

1200

1400

68 68

171

267

344 368

274

424

770

997

1,070

883

801 813

1,169

907

Page 36: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

C O - R E L A T I O N B E T W E E N M E A N S A N D A W A R E N E S S

Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-150

200

400

600

800

1000

1200

1400

0

5

10

15

20

25

30

35

40

45

50

68 68

171

267

344 368

274

424

770

997

1,070

883

801 813

1,169

907 31

24

39

43

36 36

30

40

Page 37: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

C O - R E L A T I O N B E T W E E N M E A N S A N D A W A R E N E S S

Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-150

200

400

600

800

1000

1200

1400

0

5

10

15

20

25

30

35

40

45

50

68 68

171

267

344 368

274

424

770

997

1,070

883

801 813

1,169

907 31

24

39

43

36 36

30

40

Page 38: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

C O - R E L A T I O N B E T W E E N M E A N S A N D A W A R E N E S S

Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-150

200

400

600

800

1000

1200

1400

0

5

10

15

20

25

30

35

40

45

50

68 68

171

267

344 368

274

424

770

997

1,070

883

801 813

1,169

907 31

24

39

43

36 36

30

40

2

16

35

1110

23

14

36

Page 39: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

C O - R E L A T I O N B E T W E E N M E A N S A N D A W A R E N E S S

Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-150

200

400

600

800

1000

1200

1400

0

5

10

15

20

25

30

35

40

45

50

68 68

171

267

344 368

274

424

770

997

1,070

883

801 813

1,169

907 31

24

39

43

36 36

30

40

2

16

35

1110

23

14

36

2 2 23

4 4 4 4

Page 40: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

C O - R E L A T I O N B E T W E E N M E A N S A N D A W A R E N E S S

March April August

Manpower 171 267 424

Site Safety Index 35 11 36

EHS Personnel 2 3 4

Trainings 39 43 40

Cum. Expenses 126,105 168,200 336,884

Page 41: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

C O - R E L A T I O N B E T W E E N M E A N S A N D A W A R E N E S S

Since the PPEs are routinely provided to the labor, the number of trainings and strength of

EHS team is directly proportional to site safety index

Page 42: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

1. Aims and Objectives of Research2. Background3. Pharmaceutical Project4. EHS Goal and Objectives5. EHS Means and Awareness6. Key Performance Indicators7. Relation between means and awareness8. Site Safety Survey9. Conclusion

A G E N D A

Page 43: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

S U R V E Y D E S I G N A N D A D M I N I S T R A T I O N

Labor Force : 400

Sample Size : 30

Error Percentage : 5%

Confidence Level : 95%

Confidence Interval : 7.5

Page 44: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

S U R V E Y A N A L Y S I S

Page 45: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

S U R V E Y D E S I G N A N D A D M I N I S T R A T I O N

Labor force is well aware of the EHS requirements for general working at site, fire

incident and medical conditions as the percentages of correct responses is equal to

or above 80%

more work is required in creating awareness for electrical hazards and

working at height whose correct responses were below 80%.

Page 46: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

1. Aims and Objectives of Research2. Background3. Pharmaceutical Project4. EHS Goal and Objectives5. EHS Means and Awareness6. Key Performance Indicators7. Relation between means and awareness8. Site Safety Survey9. Conclusion

A G E N D A

Page 47: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

S U R V E Y D E S I G N A N D A D M I N I S T R A T I O N

STRATEGY

Page 48: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

S U R V E Y D E S I G N A N D A D M I N I S T R A T I O N

Develop a strong EHS Monitoring team which needs to be retained for complete duration of project and must be enhanced with the enhancement of workforce.

Develop a system of trainings for creating awareness.

Provide general as well as job specific PPEs in timely manner

Install display signs creating awareness and motivating workforce for safe working conditions.

Conduct periodic safety survey of work force and arrange specific trainings to encounter deficiencies in training plans.

Page 49: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

S U R V E Y D E S I G N A N D A D M I N I S T R A T I O N

The trainings should be planned in three phases as follows:

Induction Training in order to brief new inductees on EHS procedures

Regular Trainings / Tool Box Talks in order to reinforce the concepts presented in induction trainings

Specialized Trainings on individual concepts of General Safety, Fire Hazards, Electrical Hazzard, Working at height and Working in confined space.

Page 50: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

S U R V E Y D E S I G N A N D A D M I N I S T R A T I O N

BUDGET

Page 51: Submission Final Term Presentation-Betterment of EHS Conditions-Daniyal

S U R V E Y D E S I G N A N D A D M I N I S T R A T I O N

During the study period a total of PKR 384,500 worth of PPEs andPKR 34,680 worth of Site Safety Equipment were utilized

The total billing for works executed by contractor was PKR 23,909,680 making it 15.86% of total project cost.

The combined cost of PPEs and Site Safety Equipment is 2% of total billed amount which is adequate to meet the requirements of safety standards

Therefore it is recommended for future projects of similar nature EHS Budget to be set between 2-3% of total project cost.