stormwater management planning & design mike novotney, p.e. (md) center for watershed protection...
TRANSCRIPT
![Page 1: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/1.jpg)
Stormwater Stormwater Management Planning Management Planning & Design& Design
Mike Novotney, P.E. (MD)Center for Watershed Protection
Dave Briglio, P.E.MACTEC
![Page 2: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/2.jpg)
Georgia StormwaterManagement Manual
Hydrologic Methods & Analysis
Dave Briglio, P.E.MACTEC
![Page 3: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/3.jpg)
Bankfull
Q critical
most most erosiveerosiveflowsflows
Channel Channel Protection CriteriaProtection Criteria
most most pollutedpolluted
flowsflows
Water QualityWater QualityCriteriaCriteria
most most destructivedestructive
flowsflows
OverbankOverbankFlooding CriteriaFlooding Criteria
infiltratedinfiltratedflowsflows
Stormwater Better Stormwater Better Site DesignSite Design
biggest flows biggest flows to considerto consider
Extreme Flood Extreme Flood (Floodplain) Criteria(Floodplain) Criteria
![Page 4: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/4.jpg)
Unified Stormwater Sizing Criteria Water Quality: Capture and treat runoff from
first 1.2 inches of rainfall
Channel Protection: Provide extended
detention of 1-yr, 24-hr storm over 24 hours
Overbank Flood Protection: Provide peak
flow attenuation of 25-yr, 24-hr storm
Extreme Flood Protection: Manage 100-yr
storm through detention or floodplain mgmt
![Page 5: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/5.jpg)
![Page 6: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/6.jpg)
Flood
Control
Channel
WQV
Runoff Reduction
Flood Control
CSS vs. GSMM…
Aquatic Resource Protection
Water Quality
![Page 7: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/7.jpg)
Hydrologic design tasks Runoff volumes
and flow rates– Water Balance
Calculations– Filtration/
infiltration rates
Design Support– Determine Outlet
Sizes– Downstream
analysis– Design diversion
structures
![Page 8: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/8.jpg)
Chapter 2.1
IDF Curves Rational Method SCS Method
– Curve numbers– Peak flows– Hydrographs
Georgia Regression– Peak flows– Hydrographs– Urban and Rural
Water Balance Water Quality
Calcs.– Volumes– Flow Rates
![Page 9: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/9.jpg)
Chapter 2.2
Storage volume calculations Channel protection volume
Chapter 2.3: outlet designChapter 2.3: outlet design
![Page 10: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/10.jpg)
Statewide consistency
Fitted to curves automated methods
Chapter 2.1 - IDF Curves
![Page 11: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/11.jpg)
SCS STORM
0
0.2
0.4
0.6
0.8
1
P/P
tot
0 4 8 12 16 20 24
TIME (HOURS)
6 - HOUR STORM
![Page 12: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/12.jpg)
SCS STORM
6 Hour Storm
The SCS storm is The SCS storm is just an “average” just an “average” balanced storm.balanced storm.
![Page 13: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/13.jpg)
From USGS Urban and Rural Different Regions Peak Flow Urban
– 25 ac. <A< 19 mi2
– 1% <TIA< 62% Hydrographs lag
times
Chapter 2.1- Regression Equations
![Page 14: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/14.jpg)
REGION 1
REGION 2
REGION 3
REGION 4
UNDEFINED AREA
Beware of odd Beware of odd situations that do situations that do not fit the “average” not fit the “average” criteria:criteria:
• odd shaped basins odd shaped basins and lag time and lag time impactsimpacts
• two basins versus two basins versus one big one – peak one big one – peak timingtiming
• storage within the storage within the basinbasin
• ““patchy” urban patchy” urban areasareas
![Page 15: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/15.jpg)
Basic mass balance equation
Localized for Georgia
Very approximate
Chapter 2.1 – Water Balance
![Page 16: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/16.jpg)
P = precipitation * pond surface area Ro = runoff based on watershed efficiency Bf = baseflow, normally zero I = infiltration, either measured or estimated E = evaporation based on free surface map
derived for Georgia Et = evapotranspiration, use free surface
unless lots of emergent vegetation Of = pond overflow when ever pond exceeds
capacity
V = P + Ro + Bf – I – E – Et – Of
![Page 17: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/17.jpg)
Water quality volume calculation – volume based BMPs
Peak discharge – flow based BMPs
Chapter 2.1 - Water Quality
![Page 18: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/18.jpg)
Water Quality Volume Calculation - 85% RuleWQv = (1.2 in) (Rv) (A)/12
where: WQv = water quality volume
1.2 = approx. 85th percentile storm
Rv = 0.05 + 0.009(I)I = percent
imperviousnessA = site area
![Page 19: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/19.jpg)
Athens Airport15 Minute, 6-Hour Storm
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
Percent of Storms
Inch
es
of
Rai
nfa
ll 85% rule example85% rule example
![Page 20: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/20.jpg)
Water Quality Volume Calculation Impervious cover can be taken directly
off plans or estimated using TR-55 land use factors
WQv should be calculated and addressed separately for each drainage area on a development site
Off-site drainage areas can be excluded
![Page 21: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/21.jpg)
![Page 22: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/22.jpg)
Graphical method Based on extended
detention – 24-hours
Approximate but proven accurate
Avoids iterative approaches
Chapter 2.2 - Channel Protection
![Page 23: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/23.jpg)
Channel Protection Volume EstimationChannel Protection Volume Estimation
Step 1- Compute Unit Peak Discharge Ia = 0.2S and S = (1000/CN) –10
P = XX inches (1-year storm) from TablesIa/P = 0.2S/P
Tc = developed conditions time-of-concentration
qu = from figure 2.1.5-6 XX
cubic feet per square mile per inch (csm/in)
![Page 24: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/24.jpg)
Step1:Step1:Knowing: IKnowing: Iaa, P, T, P, Tcc
Read: qRead: quu
p. 2.1-30p. 2.1-30
Extended Detention Estimated VolumeExtended Detention Estimated Volume
![Page 25: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/25.jpg)
Step2:Step2:Knowing: qu & T (drawdown time) Knowing: qu & T (drawdown time) Read: qo/qi (ratio of outflow to inflow)Read: qo/qi (ratio of outflow to inflow)
p. 2.2-10p. 2.2-10
qo/qi = 12.03 qu –0.9406qo/qi = 12.03 qu –0.9406
Extended Detention Estimated VolumeExtended Detention Estimated Volume
![Page 26: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/26.jpg)
p. 2.2-10p. 2.2-10
Step3:Step3:Knowing:qo/qi (ratio of outflow to inflow) & Knowing:qo/qi (ratio of outflow to inflow) & Storm Type I or IIStorm Type I or IIRead: Vs/Vr (ratio of storage volume to runoff Read: Vs/Vr (ratio of storage volume to runoff volume – Q in the SCS equation)volume – Q in the SCS equation)
Vs/Vr = 0.683 - 1.43(qo/qi) +1.64(qo/qi) Vs/Vr = 0.683 - 1.43(qo/qi) +1.64(qo/qi) 2 2 - 0.804(qo/qi)- 0.804(qo/qi)33
Extended Detention Estimated VolumeExtended Detention Estimated Volume
![Page 27: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/27.jpg)
WQ Peak Flow1. Back out curve
number
2. Calculate unit peak discharge using SCS simplified peak figures
3. Calculate peak discharge as:
CN = 1000/[10 + 5P +10Qwv - 10(Qwv² + 1.25 QwvP)½]
Qwq = qu * A * Qwv
Ia=0.2S=1000/CN-10
![Page 28: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/28.jpg)
Works for 25-year, 100-year, etc. Works for 25-year, 100-year, etc. Storm Volume:Storm Volume:
For:For:Know QKnow Qinin and Q and Qoutout = q = qoo/q/qi i p. 2.2-10p. 2.2-10
Read VRead Vss/V/Vrr
VVrr= runoff volume= runoff volume
Then VThen Vss= storage volume (af)= storage volume (af)
For multiple outlets multiply VFor multiple outlets multiply Vss by by
safety factor of 1.15.safety factor of 1.15.
![Page 29: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/29.jpg)
A few new things derived for this manual
![Page 30: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/30.jpg)
![Page 31: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/31.jpg)
Downstream AssessmentRequirement
The “poor man’s master plan”.
Look downstream until the flow is small compared to the total flow
Based on modeling numerous locations
![Page 32: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/32.jpg)
0
2
4
6
8
10
12
14
0 10 20 30 40 50 60 70 80 90 100
Minutes
Disc
harg
e
Post
Pre Pond
Volume is the issueVolume is the issueSame peaksSame peaks
Different volumesDifferent volumes
![Page 33: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/33.jpg)
Downstream Assessments use “10% Rule”
Ten Percent RuleAldridge Creek, Huntsville, AL
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
1.40
1.45
1.50
0 5 10 15 20 25 30 35
Total Area/Pond Area
Dev
. Q/P
ond
Q
Point where pond controlled area is 10% of the total
drainage area
With pond
No pond
Total Area/Pond Controlled Area
Po
std
evel
op
men
t Q
/Pre
dev
elo
pm
ent
Q
![Page 34: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/34.jpg)
5 acres5 acres
Example 1
20 acres20 acres40 acres40 acres
60 acres60 acres
80 acres80 acres
![Page 35: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/35.jpg)
Example 2
25 acres25 acresBigBig
![Page 36: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/36.jpg)
10% Rule Steps
Determine the 10% point Determine pre-development flows to 10% point Determine post-development flows to 10% point Note any increases Design detention for no increase or negotiate
another solution– Flow easement– Downstream improvements– Regional solution
![Page 37: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/37.jpg)
5 acres5 acres
Example 3
20 acres20 acres40 acres40 acres
60 acres60 acres
80 acres80 acres
CC20 acres20 acresTc=15 minTc=15 minCN = 70CN = 70
AA15 acres15 acresTc=20 minTc=20 minCN = 75CN = 75
BB20 acres20 acresTc=20 minTc=20 minCN = 75CN = 75
![Page 38: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/38.jpg)
43434343
![Page 39: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/39.jpg)
Advantages of Downstream Assessments Fairly easy to accomplish Protects from the liability of downstream
impacts Allows for potential waiver of detention Stops unnecessary or harmful detention Allows for “horse trading” Cheaper than master planning Do not use with extended detention
design
![Page 40: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/40.jpg)
<Insert MEN replacement slides>
![Page 41: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/41.jpg)
Other CSS/GSMM Tools
Site Suitability Design Criteria Design Calculation Forms RRv Criteria Satisfaction CSS Design Credits Coastal Challenges Appendix Information
![Page 42: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/42.jpg)
Site Suitability
![Page 43: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/43.jpg)
Site Suitability
![Page 44: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/44.jpg)
Site Suitability
![Page 45: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/45.jpg)
Design Criteria
![Page 46: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/46.jpg)
Design Criteria
![Page 47: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/47.jpg)
Design Schematics
![Page 48: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/48.jpg)
Step-By-Step…
![Page 49: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/49.jpg)
Design Calculation Forms
![Page 50: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/50.jpg)
CSS Criteria SatisfactionTable 6.4: How Low Impact Development Practices Can Be Used to Help Satisfy the Stormwater Management Criteria
Low Impact Development Practice
Stormwater RunoffReduction
Water Quality Protection
Aquatic Resource Protection
Overbank Flood Protection
Extreme Flood Protection
Alternatives to Disturbed Pervious Surfaces
Soil Restoration
“Credit”:Subtract 50% of any restored areas from the total site area and re-calculate the runoff reduction volume (RRv) that applies to a development site.
“Credit”:Subtract 50% of any restored areas from the total site area and re-calculate the runoff reduction volume (RRv) that applies to a development site.
“Credit”:Assume that the post-development hydrologic conditions of any restored areas are equivalent to those of open space in good condition.
“Credit”:Assume that the post-development hydrologic conditions of any restored areas are equivalent to those of open space in good condition.
“Credit”:Assume that the post-development hydrologic conditions of any restored areas are equivalent to those of open space in good condition.
Site Reforestation/ Revegetation
“Credit”:Subtract 50% of any reforested revegetated areas from the total site area and re-calculate the runoff reduction volume (RRv) that applies to a development site.
“Credit”:Subtract 50% of any reforested/revegetated areas from the total site area and re-calculate the runoff reduction volume (RRv) that applies to a development site.
“Credit”:Assume that the post-development hydrologic conditions of any reforested/revegetated areas are equivalent to those of a similar cover type in fair condition.
“Credit”:Assume that the post-development hydrologic conditions of any reforested/revegetated areas are equivalent to those of a similar cover type in fair condition.
“Credit”:Assume that the post-development hydrologic conditions of any reforested/revegetated areas are equivalent to those of a similar cover type in fair condition.
Soil Restoration with Site Reforestation/ Revegetation
“Credit”:Subtract 100% of any restored and reforested/ revegetated areas from the total site area and re-calculate the runoff reduction volume (RRv) that applies to a development site.
“Credit”:Subtract 100% of any restored and reforested/ revegetated areas from the total site area and re-calculate the runoff reduction volume (RRv) that applies to a development site.
“Credit”:Assume that the post-development hydrologic conditions of any restored and reforested/ revegetated areas are equivalent to those of a similar cover type in good condition.
“Credit”:Assume that the post-development hydrologic conditions of any restored and reforested/ revegetated areas are equivalent to those of a similar cover type in good condition.
“Credit”:Assume that the post-development hydrologic conditions of any restored and reforested/ revegetated areas are equivalent to those of a similar cover type in good condition.
![Page 51: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/51.jpg)
CSS Criteria SatisfactionTable 6.5: How Stormwater Management Practices Can Be Used to Help Satisfy the Stormwater Management Criteria
Stormwater Management Practice
Stormwater RunoffReduction
Water Quality Protection
Aquatic Resource Protection
Overbank Flood Protection
Extreme Flood Protection
General Application Practices
Stormwater Ponds
“Credit”:None
“Credit”:Assume that a stormwater pond provides an 80% reduction in TSS loads, a 30% reduction in TN loads and a 70% reduction in bacteria loads.
“Credit”:A stormwater pond can be designed to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv).
“Credit”:A stormwater pond can be designed to attenuate the overbank peak discharge (Qp25) on a development site.
“Credit”:A stormwater pond can be designed to attenuate the extreme peak discharge (Qp100) on a development site.
Stormwater Wetlands
“Credit”:None
“Credit”:Assume that a stormwater wetland provides an 80% reduction in TSS loads, a 30% reduction in TN loads and a 70% reduction in bacteria loads.
“Credit”:A stormwater wetland can be designed to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv).
“Credit”:A stormwater wetland can be designed to attenuate the overbank peak discharge (Qp25) on a development site.
“Credit”:A stormwater wetland can be designed to attenuate the extreme peak discharge (Qp100) on a development site.
Bioretention Areas, No Underdrain
“Credit”:Subtract 100% of the storage volume provided by a non-underdrained bioretention area from the runoff reduction volume (RRv) conveyed through the bioretention area.
“Credit”:Assume that a bioretention area provides an 80% reduction in TSS loads, an 80% reduction in TN loads and a 90% reduction in bacteria loads.
“Credit”:Although uncommon, on some development sites, a bioretention area can be designed to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv).
“Credit”:Although uncommon, on some development sites, a bioretention area can be designed to attenuate the overbank peak discharge (Qp25).
“Credit”:Although uncommon, on some development sites, a bioretention area can be designed to attenuate the extreme peak discharge (Qp100).
![Page 52: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/52.jpg)
CSS Criteria Satisfaction
Table 6.5: How Stormwater Management Practices Can Be Used to Help Satisfy the Stormwater Management Criteria
Stormwater Management Practice
Stormwater RunoffReduction
Water Quality Protection
Aquatic Resource Protection
Overbank Flood Protection
Extreme Flood Protection
Limited Application Practices
Water Quantity Management Practices
Dry Detention Basins
“Credit”:None
“Credit”:None
“Credit”:None
“Credit”:A dry detention basin can be used to attenuate the overbank peak discharge (Qp25) on a development site.
“Credit”:A dry detention basin can be used to attenuate the extreme peak discharge (Qp100) on a development site.
Dry Extended Detention Basins
“Credit”:None
“Credit”:Assume that underground filters provide an 80% reduction in TSS loads, a 25% reduction in TN loads and a 40% reduction in bacteria loads.
“Credit”:A dry extended detention basin can be used to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv).
“Credit”:A dry extended detention basin can be used to attenuate the overbank peak discharge (Qp25) on a development site.
“Credit”:A dry extended detention basin can be used to attenuate the extreme peak discharge (Qp100) on a development site.
Multi-Purpose Detention Areas
“Credit”:None
“Credit”:None
“Credit”:None
“Credit”:A multi-purpose detention area can be used to attenuate the overbank peak discharge (Qp25) on a development site.
“Credit”:A multi-purpose detention area can be used to attenuate the overbank peak discharge (Qp25) on a development site.
Underground Detention Systems
“Credit”:None
“Credit”:None
“Credit”:An underground detention system can be used to provide 24-hours of extended detention for the aquatic resource protection volume (ARPv).
“Credit”:An underground detention system can be used to attenuate the overbank peak discharge (Qp25) on a development site.
“Credit”:An underground detention system can be used to attenuate the extreme peak discharge (Qp100) on a development site.
![Page 53: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/53.jpg)
CSS Design Criteria
7.4 Better Site Planning Technique Profile Sheets7.4.2 Protection Secondary Conservation
Areas7.4.1 Protect Primary Conservation Areas
![Page 54: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/54.jpg)
CSS Design Criteria
7.4.1 Preserve Primary Conservation AreasKEY CONSIDERATIONSProtects important priority habitat areas from the direct impacts of the land development processHelps maintain pre-development site hydrology by reducing post-construction stormwater runoff rates, volumes and pollutant loadsPreserves a site’s natural character and aesthetic features, which may increase the resale value of the development project Conservation areas can be used to “receive” stormwater runoff generated elsewhere on the development site (Section 6.8.3)
USING THIS TECHINQUE Complete Natural Resources Inventory prior to initiating site planning and design process Ensure that primary conservation areas are maintained in an undisturbed, natural state before, during and after construction
![Page 55: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/55.jpg)
CSS Design Credits
Stormwater Management “Credits”Runoff Reduction/Water Quality ProtectionSubtract any primary conservation areas from the total site area when calculating the runoff reduction volume (RRv) that applies to a development site.
Large Storm EventsAssume that the post-development hydrologic conditions of any primary conservation areas are equivalent to the pre-development hydrologic conditions for those same areas.
![Page 56: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/56.jpg)
Coastal Challenges
Challenges Associated with Using Vegetated Filter Strips in Coastal Georgia
Site Characterist
ic
How it Influences the Use Potential Solutions
Poorly drained soils, such as hydrologic soil group C and D soils
Reduces the ability of vegetated filter strips to reduce stormwater runoff volumes and pollutant loads.
Use soil restoration (Sect. 7.6.1) to improve soil porosity.Place buildings & impervious surfaces on poorly drained soils or preserve as secondary conservation areas (Sect. 7.4.2).Use small stormwater wetlands (Sect. 8.4.2) to capture and treat stormwater.
![Page 57: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/57.jpg)
Coastal Challenges
Challenges Associated with Using Vegetated Filter Strips in Coastal Georgia
Site Characterist
ic
How it Influences the Use Potential Solutions
Well drained soils, such as hydrologic soil group A and B soils
Enhances the ability of vegetated filter strips to reduce stormwater runoff volumes and pollutant loads, but may allow stormwater pollutants to reach groundwater aquifers with greater ease.
Avoid the use of infiltration-based stormwater management practices, including vegetated filter strips, at stormwater hotspot facilities and in areas known to provide groundwater recharge to aquifers used as a water supply.
![Page 58: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/58.jpg)
Coastal Challenges
Challenges Associated with Using Vegetated Filter Strips in Coastal Georgia
Site Characterist
ic
How it Influences the Use Potential Solutions
Flat terrain May be difficult to provide positive drainage and may cause stormwater runoff to pond on the surface of the vegetated filter strip.
Design vegetated filter strips with a slope to promote positive drainage.Where soils are sufficiently permeable, use infiltration practices (Sect. 8.4.5) and non-underdrained bioretention areas (Sect. 8.4.3).Where soils have low permeabilities, use small stormwater wetlands (Sect. 8.4.2)
![Page 59: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/59.jpg)
Coastal Challenges
Challenges Associated with Using Vegetated Filter Strips in Coastal Georgia
Site Characterist
ic
How it Influences the Use Potential Solutions
Shallow water table
May cause stormwater runoff to pond on the surface of the vegetated filter strip.
Use small stormwater wetlands (e.g. pocket wetlands) (Sect. 8.4.2) or wet swales (Sect. 8.4.6).
Tidally-influenced drainage system
May prevent stormwater runoff from moving through the vegetated filter strip, particularly during high tide.
Investigate the use of other stormwater management practices to manage stormwater runoff in these areas.
![Page 60: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/60.jpg)
GSMM Appendix Information
![Page 61: Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC](https://reader035.vdocuments.site/reader035/viewer/2022062518/56649cd55503460f9499cb21/html5/thumbnails/61.jpg)
CSS Appendix Information Appendix A High Priority Plant & Animal
Species
Appendix B Coastal Georgia Rainfall Analysis
Appendix C Stormwater Management Practice Monitoring Protocol
Appendix D Model Post-Construction Stormwater Ordinance