stevens jim resume 07092015

5
James H. (Jim) Stevens III 10714 Cranbrook Road Houston, TX 77042 713-203-3820 - [email protected] Summary of Experience Over twenty five years of experience in the offshore oil and gas industry, international and USA domestic. This include15 years in structural engineering of offshore oil and gas production facilities and structures. Career Responsibilities Project Management Project Engineering Interface Management Engineering Management Document Management Regulatory System Selection Structural Engineering Concept Development General Arrangements Land, Ship and Air Transport Meeting Facilitator Hazid/Hazop Closeout Study Leader Major Project Experience Auger TLP (Shell) NaKika Semi (Shell) Mars TLP (Shell) Holstein Spar (bp) Ram-Powell TLP (Shell) Mad Dog Spar (bp) URSA TLP (Shell) Foxtrot (Africa) Brutus TLP (Shell Marine Well Containment Ship Conversion Delta House II (LLOG) Arctic Challenger Containment Vessel Detailed Experience Audubon Engineering –Senior Project Manager – May 2014 – May 2015 (force reduction) Project Manager – Williams Gulf Star Standard Pre-Feed, Design Basis rewrite and PFD/UFD/P&ID development. Project Manager – Superior Energy Arctic Challenger readiness upgrades. document.docx Page 1 of 5

Upload: jim-stevens

Post on 17-Aug-2015

109 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Stevens Jim resume 07092015

James H. (Jim) Stevens III10714 Cranbrook RoadHouston, TX 77042713-203-3820 - [email protected]

Summary of Experience

Over twenty five years of experience in the offshore oil and gas industry, international and USA domestic. This include15 years in structural engineering of offshore oil and gas production facilities and structures.

Career Responsibilities Project Management Project Engineering Interface Management Engineering Management Document Management Regulatory System Selection Structural Engineering Concept Development General Arrangements Land, Ship and Air Transport Meeting Facilitator Hazid/Hazop Closeout Study Leader

Major Project Experience Auger TLP (Shell) NaKika Semi (Shell) Mars TLP (Shell) Holstein Spar (bp) Ram-Powell TLP (Shell) Mad Dog Spar (bp) URSA TLP (Shell) Foxtrot (Africa) Brutus TLP (Shell Marine Well Containment Ship Conversion Delta House II (LLOG) Arctic Challenger Containment Vessel

Detailed Experience

Audubon Engineering –Senior Project Manager – May 2014 – May 2015 (force reduction)

Project Manager – Williams Gulf Star Standard Pre-Feed, Design Basis rewrite and PFD/UFD/P&ID development.

Project Manager – Superior Energy Arctic Challenger readiness upgrades. Project Manager - LLOG Delta House II Pre-Feed Layout and Weight Reduction Study

AMEC Paragon (Houston, Texas) – AMEC Paragon August 2008 – May 2014

Marine Well Containment EPC1 Contract – Ship Conversion project for Marine Well Containment Corporation.

o Engineering Manager Dec 2013 – May 2014 Led close out of final engineering deliverables and punch list items for project

closeout. o Technical Services Manager March 2012 – Dec 2013

Led managers of: Engineering, Regulatory, Interface, Information and Documentation

document.docx Page 1 of 4

Page 2: Stevens Jim resume 07092015

James H. (Jim) Stevens III10714 Cranbrook RoadHouston, TX 77042713-203-3820 - [email protected]

Successfully planned and shipped 9 structural modules by barge including all planning and safety concerns

Led and completed a multi-month study for quick installation/removal of a 100 foot flare boom with a bolt on foundation.

Conceptualized, designed and implemented acceptance test structural module for Bluewater’s 800MT Riser Turret module main pull in winch (200 Metric Ton capacity) at Kiewit’s yard.

o Deployment Studies Project Engineer Oct 2011 – March 2012 Lead various studies conducted to explore methods and modifications which led

to the reduction in Deployment time for Marine Capture Vessel

o Project Interface Manager – Nov 2010 – Oct 2011 . Leader of a team responsible for managing Interfaces between 4 contracts as

they concerned the AMEC EPC1 project Team. Developed and Interface Procedure and Tracking method for project.

Contractors included Technip (Riser/Umbilical), Weatherford (Topsides Process Equipment) Dubai Dry Docks (ship conversion contractor).

AMEC scope included Integration, Hookup, Commissioning and Operational Readiness of equipment from all contractors.

Browse/Wison - Pre-Feed Proposal Topsides Project Manager - June-Nov 2010

Pre-Feed study/design competition for major Australian oil/gas producer (Woodside). Led AMEC team in developing solutions for a hull/topsides design competition Responsibility was for design submittal for Topsides of two gas producing TLP’s. Study

includes layout, equipment selection, Quarters, electrical, process, Hazid’s, coordination of estimating for project topsides engineering through installation.

Foxtrot International – Project/ Engineering Manager – December 2008 – May 2010

Facility upgrade and Gas Compressor Module addition (offshore Ivory Coast). o Successfully managed the design, fabrication, procurement and shipping of modules,

crane, living quarters, and all other upgrades to 4 pile facility in remote location.o Led the effort to develop imaginative solutions for executing installation of new

equipment at a remote location off the African Coast with minimal derrick barge usage.o Compressor Module Project consisted of FEED, detailed design, procurement,

fabrication, transport and installation of a 500 ton compressor module with separation and cooling vessels.

o Upgrades included cooling water pumps, quarters modules, new crane, flare upgrade, life boats plus various coordination efforts in the US to support Foxtrot’s needs.

EnerSea Project/Engineering Manager Aug 2008 – Dec 2008

Colombia Gas Transportation pre-feed project o Led a conceptual study for transportation of compressed natural gas in a barge at (-)40

deg F.

document.docx Page 2 of 4

Page 3: Stevens Jim resume 07092015

James H. (Jim) Stevens III10714 Cranbrook RoadHouston, TX 77042713-203-3820 - [email protected]

o Developed innovative solutions for installing and mounting low temperature containment vessels into ocean going barge.

o The study included Process analysis of loading/unloading compressors, heat exchangers, preliminary P&ID development, structural support of gas containment cylinders, weight studies and cost estimate.

Mustang Engineering – Houston, TX 2001 - 2008

CTR manager for BP Holstein and Mad Dog Project interface follow-on work. o Developed and executed a management plan, including a specification for a database,

for Cost, Time Resource estimates.o Facilitated, identified and recorded inter-delivery team action items and meeting

minutes. o Project engineer for various Brownfield modifications to Mad Dog and Holstein.

Interface Manager o I nterface position with client and Mustang personnel. BP Holstein project. o Led interface management of groups including hull, topsides, rig, risers, subsea.o Coordinated Project Hazard Management items close out.

Interface Engineering Coordinator: met facilitation, database development coordination, identified and recorded Inter-Delivery Team action items and meeting minutes. General facilitation and coordinator of inter-delivery team information flow. Facilitated Interface meetings, maintained interface action items database and meeting minutes. BP Holstein project.

WH Linder & Associates – New Orleans, Louisiana 1989 - 2001

Lead Structural Engineer /Interface Coordinator:

o Developed initial multi-discipline scheduling and work scope for hull systems, estimated manpower needs and WBS elements.

o Successfully delivered Hull Systems Structural packages for 4 TLP Hulls. Was responsible for hull systems structural design and interface coordination

relating to all disciplines. o Coordinated structural aspects of hull prep work for offshore integration.

Shipping Expediter for the construction phase of Auger tension leg platform: o Successfully managed transport of Critical Path items to be shipped to Italy and

McDermott in Amelia,La.

Engineering Development Group, Metairie, La.1988 – 1989 Structural Engineer in Training.

Sam Z. Scandaliato Consulting Engineering, New Orleans, La. 1986-1988 Field Engineering Coordinator/Construction Manager – Foundation design/repair

Education B.S., Civil Engineering, University of New Orleans, 1987

Industry Affiliations

Passed ABET Civil Engineering Professional Engineering examination, Louisiana, 1997

document.docx Page 3 of 4

Page 4: Stevens Jim resume 07092015

James H. (Jim) Stevens III10714 Cranbrook RoadHouston, TX 77042713-203-3820 - [email protected]

API RP-2T (TLP Recommended Practices) Team Leader, Marine Systems Section 12 rewrite Dale Carnegie Course “Effective Human Relations,” 1995

document.docx Page 4 of 4