status of the implementation of clc2006 wp 1.2.6

16
Status of the implementation of CLC2006 WP 1.2.6 Ana Sousa, EEA; George Büttner, ETC-LUSI ETC / EIONET Workshop Copenhagen, EEA, 12-13 November 2007

Upload: truong

Post on 28-Jan-2016

31 views

Category:

Documents


0 download

DESCRIPTION

Status of the implementation of CLC2006 WP 1.2.6. Ana Sousa, EEA ; George Büttner , ETC-LUSI. ETC / EIONET Workshop Copenhagen, EEA, 12-13 November 2007. Contents. Outlines of CLC2006 Status of the project A few examples Conclusions. ETC / EIONET workshop, EEA, 12-13 Nov 2007. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Status of the implementation of CLC2006 WP  1.2.6

Status of the implementation of CLC2006

WP 1.2.6

Ana Sousa, EEA; George Büttner, ETC-LUSI

ETC / EIONET Workshop

Copenhagen, EEA, 12-13 November 2007

Page 2: Status of the implementation of CLC2006 WP  1.2.6

Contents

• Outlines of CLC2006• Status of the project• A few examples• Conclusions

ETC / EIONET workshop, EEA, 12-13 Nov 2007

Page 3: Status of the implementation of CLC2006 WP  1.2.6

Plans

Coverage: • EEA member countries (32)• Collaborating countries (6)

Deadline (national production)• 31 December 2008 (at the latest)

ETC / EIONET workshop, EEA, 12-13 Nov 2007

Page 4: Status of the implementation of CLC2006 WP  1.2.6

Geographical coverage

ETC / EIONET workshop, EEA, 12-13 Nov 2007

38 countries

5.8 Mkm2

Page 5: Status of the implementation of CLC2006 WP  1.2.6

Current status - CLC2006

ETC / EIONET workshop, EEA, 12-13 Nov 2007

CLC2006 – status of EEA grant agreements

Page 6: Status of the implementation of CLC2006 WP  1.2.6

Current status - CLC2006

CLC2006 training / technical discussions:Only in those countries which requestedReasons: new team, no CLC200013 countries (more than planned): SE, SI, AT-LI, LU, IS, CY, MT, EE, CH, AL, PT,

RS, ME

ETC / EIONET workshop, EEA, 12-13 Nov 2007

Page 7: Status of the implementation of CLC2006 WP  1.2.6

Current status - CLC2006

CLC2006 verification missions:

Usually two verifications in each countriesCountries verified at least once: SI, MT, LU,

RO, NL, IE, LV, (LT, EE)No problems in applying the revised change

mapping rules

CLC2006 completed: MT, LU, SI (3/38)

Support to ‘late CLC2000’ countries: NO (training, verification)TR (verifications)

ETC / EIONET workshop, EEA, 12-13 Nov 2007

Page 8: Status of the implementation of CLC2006 WP  1.2.6

Current status - CLC2006

ETC / EIONET workshop, EEA, 12-13 Nov 2007

Page 9: Status of the implementation of CLC2006 WP  1.2.6

% completed, Nov 2007

0

20

40

60

80

100

120

Turk

ey

Fran

ce

Spain

Sweden

Germ

any

Finla

nd

Norway

Poland Ita

ly

United

King

dom

Roman

ia

Greec

e

Bulgar

ia

Icelan

d

Hunga

ry

Portu

gal

Serbia

(exc

l. Kos

ovo)

Austri

a

Czech

Rep

ublic

Irelan

d

Lithu

aniaLa

tvia

Croat

ia

Bosnia

-Her

zego

vina

Slovak

Rep

ublic

Estonia

Denm

ark

Switzer

land

Nethe

rland

s

Belgium

Albania

Mac

edon

ia (F

YROM)

Sloven

ia

Mon

tene

gro

Cypru

s

Luxe

mbu

rgM

alta

Liech

tens

tein

% completed, Nov 2007

Current status - CLC2006

ETC / EIONET workshop, EEA, 12-13 Nov 2007

No start or small progress in the 10 largest countries

Half of the countries are working on implementation

Altogether 7.1 % of total area has been interpreted

Page 10: Status of the implementation of CLC2006 WP  1.2.6

Problems

Having CLC2006 finished for 38 countries by end 2008 is a difficult task!

National deadline in many countries is end 2008. European dataset will not be completed by end 2008!

ETC / EIONET workshop, EEA, 12-13 Nov 2007

Page 11: Status of the implementation of CLC2006 WP  1.2.6

CLC2006 in Slovenia (1)

Starting national tender: 22 Febr 2007

Selection of the partner: 20 March Start of the project: 4 AprilTraining by CLC Technical Team: 14

May1st verification: .. June2nd verification: .. August Both databases completed: end October Metadata and report completed: early

November

Longer than the planned 94 days

ETC / EIONET workshop, EEA, 12-13 Nov 2007

Methodology: standard

Reference data: topomaps (1:25.000), orthophotos

Page 12: Status of the implementation of CLC2006 WP  1.2.6

CLC2006 in Slovenia (2)

Results:Corrections in CLC2000Altogether 220 change polygons (5 times more than in

CLC2000) Mostly related to forestry: 312-324, 311-324, 313-324,

324-311and constructions: 313-133, 311-133, 242-133

ETC / EIONET workshop, EEA, 12-13 Nov 2007

Good project organisation, no major problems (Project Manager)

Reasons of the delay:Waiting for satellite images, 2nd verification, delivery

guidelines,, etcDelayed implementation of corrections

Page 13: Status of the implementation of CLC2006 WP  1.2.6

Change examples, Romania

ETC / EIONET workshop, EEA, 12-13 Nov 2007

New construction site

Page 14: Status of the implementation of CLC2006 WP  1.2.6

Change examples, Romania

ETC / EIONET workshop, EEA, 12-13 Nov 2007

Increased mineral extraction site

Page 15: Status of the implementation of CLC2006 WP  1.2.6

Change examples, Romania

ETC / EIONET workshop, EEA, 12-13 Nov 2007

Loss of green urban areas by new construction

Page 16: Status of the implementation of CLC2006 WP  1.2.6

Conclusions and proposals

Implementation of CLC2006 is going on without technical difficulties

Progress is slower than expected because getting 38 national projects implemented in the same time frame is difficult

Lessons for GMES leadersEEA has started discussions with ‘silent’ countriesIn January 2008 different scenarios to complete

the work by 2008 will be evaluated (to be decided by the Steering Committee)

ETC / EIONET workshop, EEA, 12-13 Nov 2007