standard 8.5.01 1 transrapid maglev system. standard 8.5.01 2 titel wheel-on-railelectromagnetic...
TRANSCRIPT
Sta
ndar
d 8.
5.01
1
Transrapid Maglev System
Sta
ndar
d 8.
5.01
2
Titel
Wheel-on-rail Electromagnetic Levitation
Guidance
Propulsion
SupportSupport
Propulsion
Guidance
Comparison of Systems Railroad / Maglev
Sta
ndar
d 8.
5.01
3
System Components
Stator Pack
Support Magnet
Linear Generator
Guidance MagnetEddy Current Brake
Guidance Rail
Electromagnetic Levitation
Sta
ndar
d 8.
5.01
4
Linear Motor
Sta
ndar
d 8.
5.01
5
Propulsion Principle
MagneticTravelingField
Sta
ndar
d 8.
5.01
6
Motor SectionSwitched Off
ActivatedMotor Section
Motor SectionSwitched Off
Energy Supply
Longstator Propulsion Switching
Sta
ndar
d 8.
5.01
7
Comparison Propulsion Systems
Transrapid(Track-mounted drive)
Gradient (max 10%)
Gradient (max 4%)Railroad(Vehicle-mounted drive)
Sta
ndar
d 8.
5.01
8
Guideway Types
Elevated Guideway
62 m
31 m
2.2
-20
m
4.4 - 5.1 m
1.25
-3.
5 m
6.2 m
4.4 - 5.1 m
At-grade Guideway
Sta
ndar
d 8.
5.01
9
Transrapid 08
Sta
ndar
d 8.
5.01
10
Trainset Configurations
2 Sections with up to 184 Seats
Up to 10 Sections with 1172 Seats
Sta
ndar
d 8.
5.01
11
Cargo Vehicle
Sta
ndar
d 8.
5.01
12
Safety
Sta
ndar
d 8.
5.01
13
Land Consumption
(m2/m)(m2/m)
14
12
2
ICE
TR at grade
TR elevated
Sta
ndar
d 8.
5.01
14
TransrapidCollocation with railroads
Sta
ndar
d 8.
5.01
15
TransrapidCollocation with highways
Sta
ndar
d 8.
5.01
16
Specific Energy Consumption
52
34
51
22
29
Wh/seat-km(under identical conditions)
can
no
t b
e ac
hie
ved
by
ICE
3
Tra
nsr
apid
Tra
nsr
apid
Tra
nsr
apid
ICE
3
ICE
3
200 km/h125 mph
400 km/h250 mph
300 km/h185 mph
Sta
ndar
d 8.
5.01
17
190
60
33
23
30
Specific CO2 Emissions
Sh
ort
-hau
l F
lig
ht
Tra
nsr
apid
Values in grams per seat-km
Car
Tra
nsr
apid
ICE
300 km/h185 mph
400 km/h250 mph
Sta
ndar
d 8.
5.01
18
899290
8085
82
7380
Noise Emission
Pass-by Level in dB(A) at a Distance of 25 m (82 ft)S
ub
urb
an T
rain
Tra
nsr
apid
07
ICE
1+
2
TG
V-A
Tra
nsr
apid
07
ICE
1+
2
TG
V-A
Tra
nsr
apid
07
200 km/h125 mph
400 km/h250 mph
300 km/h185 mph
80 km/h50 mph
Sta
ndar
d 8.
5.01
19
Magnetic Field Strengths
Earth’sMagnetic
Field
Transrapid Color TV HairDryer
Electric Stove
in µTesla
10001000
500
10050
Sta
ndar
d 8.
5.01
20
34
47
42
3634
MannheimStuttgart
HannoverWürzburg
HannoverBerlin
CologneFrankfurt
BerlinHamburg
ICEICE
ICE
ICE
Transrapid
New route including track infrastructure, operation/maintenance facilities, without trains and stationNew route including guideway infrastructure, operation/maintenance facilities, without vehicles and stations (Berlin-Hamburg Project planning)
level,few tunnels,
94 mi,Price level 1997
low-mountains,many tunnels,
205 mi,Price level 1988
low-mountainsmany tunnels,
62 mi,Price level 1988
low-mountainsmany tunnels,
118 mi,Price level 1998
level,few tunnels,
181 mi,Price level 1998
Track Investment Costs ICE/Transrapid (in million DM per double track km)
Sta
ndar
d 8.
5.01
21
Overall System Maintenance Costs
1.1
3.46
0.72
2.53
0.38
0.93
ICE TR ICE TR ICE TR
Operating Speed: ICE = 250 km/h (155 mph)Transrapid (TR) = 450 km/h (280 mph)
Vehicle Guideway Overall System
100%
41%
100%
29%
100%
34%
Pfennigs per seat-km(under identical conditions)
Sta
ndar
d 8.
5.01
22
TransrapidEmsland Test Facility (TVE)
North Loop
Guideway Length: 31.5 km / 19.5 miles
South Loop
At-gradeGuideway
Observation Point
High-speed Section (400-450 km/h)
SwitchAt-grade
GuidewayVisitor / Test Center
Switch Switch