    Reinvesting in Atlanta’s Kids

    An overview of the APS SPLOST Program

    January 11, 2016

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    2/35

    Agenda

    Overview of previous and current SPLOST program

    Review of data to support the need for 2017 SPLOST

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    3/35

    SPLOST: Investments that have mattered for kids

    • 75 newly renovated buildings

    • 23 newly constructed buildings/stadiums

    • 3 buildings are currently undergoing majorrenovation efforts (Boyd, Kimberly, MLK)

    • 4 new building additions are currently

    under construction (Brandon Primary,Brown, Long, Young)

    • 16 critical building HVAC Projects

    • 11 newly constructed playgrounds(addressing equity issues): Adamsville,Beecher Hills, Benteen, Cascade, Connally,Continental Colony, Finch, Gideons,Heritage, Hope-Hill and Humphries

    3

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    4/35

    Sylvan Middle

    4

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    5/35

    E. Rivers Elementary

    5

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    6/35

    Bunche Middle

    6

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    7/35

    King Middle(Under Construction)

    7

    Architectural Rendering

    Architectural Rendering

    Architectural Rendering

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    8/35

    Springdale Park Elementary

    8

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    9/35

    Playgrounds

    9

    Humphries Beecher Hills

    Connally

    Kimberly@ Parks

    Heritage Academy

    Finch Adamsville

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    10/35

    APS participates in SPLOST referenda in 2 counties;in 2012 SPLOST, APS was authorized for ~519M

    10

    • Fulton County SPLOST - APS is coupled by law with Fulton Co. PublicSchools

    • DeKalb County SPLOST -APS is coupled by law with DeKalb Co.Schools and Decatur City Schools

    SPLOST 2012 Fulton County Authorization: $1.412B

    District % of FTEs $

    APS 35.39% $499.96M

    Fulton Co. 64.60% $912.40M

    Total 100% ~$1.412B

    SPLOST 2012 DeKalb County Authorization: $645M

    District % of FTEs $

    APS 3.02% $19.50M

    DeKalb Co. 94.16% $607.38M

    Decatur 2.81% $18.16M

    Total 100% ~$645M

    APS:

    $519.46M*

    *As of November 2015: Overall revenue receipts are tracking at

    ~85% of total authorization (projected ~$442.5M)

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    11/35

    Agenda

    Overview of previous and current SPLOST program

    Review of data to support the need for 2017 SPLOST

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    12/35

    Reinvestment in Atlanta’s Kids is necessary toachieve 5 critical goals on behalf of all students

    • Ensure students have access to learning environments that meet

    their academic needs by ensuring infrastructure is aligned tonew cluster signature program designs

    • Ensure students are not in overcrowded schools by addressingcapacity challenges in high-growth areas

    • Ensure students are in facilities that are safe, comfortable and

    conducive to learning by maintaining community’s ~$1.78 Billion “Build Smart” investment with building infrastructure andsystem upgrades (buildings and system upgrades completedunder the 1997 SPLOST are approaching the 20 year mark)

    • Ensure students have access to a comprehensive well-roundededucation by investing in athletic fields and technologyupgrades

    • Ensure students being served in APS-leased facilities (includingAPS charter school students) have access to equitable learningenvironments by investing in infrastructure improvements forselect APS leased facilities

    12

    1.

    2.

    3.

    4.

    5.

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    13/35

    If voters approve a 2017 SPLOST reinvestment,approximately $546M could be approved for APS

    Fulton County Proposed Authorization:

    $1.501BDistrict % of FTEs $(M)

    APS 35.0% $525.69M

    Fulton Co. 65.00% $976.29M

    Total 100% ~$1.501B

    DeKalb County Proposed Authorization:$645M

    District % of FTEs $(M)

    APS 3.19% $20.57MDeKalb Co. 92.37% $595.78M

    Decatur 4.42% $28.50M

    Total 100% ~$645M

    13

    Official GDOE district FTE counts, immediately preceding the referendum, will be used to determine FTE percentages.

    Percentages, survive the entire SPLOST cycle

    APS:

    $546.26M

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    14/35

    APS would likely only receive approximately 85%(~$464M) of authorized amount

    SPLOSTReferendum

    Authorization

    Actual/ProjectedReceipts

    Receipts as aPercentage ofAuthorization

    1997 $450.0 $448.5 99.6%

    2002 $541.0 $463.9 85.7%

    2007 $572.8 $424.9 74.2%

    2012 $519.4 $415.4* 80.0%

    2012 $519.4 $442.5* 85.2%

    2017 $546.3 $464.3* $85.0%

    14

    *Original Projected Receipts ( 2011)

    * Projected Receipts (As of: October 2015)

    *Projected Receipts (As of: January 2016)

    SPLOST 2017PlanningAmount

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    15/35

    Initial assessment reveals ~$764M in needs

    15

    Appropriations by ReferendumCategories

    SPLOST 2017Needs

    Construction and Renovation of Schools $202.0M

    Upgrading Building Infrastructure andSystems* $306.6M**

    Critical HVAC Phase 2 $40.0M

    Property Acquisition $10.0M

    Upgrading Security and Safety Systems $9.9M

    Surplus/Vacant Building Demolition $10.0M

    Upgrading Athletic Fields $23.0M

    PE Equipment Upgrades and Replacement $3.0M

    Upgrading Technology Infrastructure andEducational Support Equipment $89.7M

    Vehicle Replacement $22.0M

    Program Management $12.0M

    COPS Debt Liquidation $35.8M

    Total Need $764.0M

    *Includes APS Charter school facilities owned by APS

    ** Parsons 2015 Facilities Condition Assessment: Projected 2018-2022

    needs

    Given projectedrevenue of$464M, thedistrict will

    ultimately have toprioritize amongseveral importantneeds

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    16/35

    16

    Construction & Renovation of Schools

    Priorities:• Complete major renovation

    projects for schools with lowFacility Condition Index scores(including several schools notaddressed in prior SPLOST

    programs)• Address capacity challenges

    within Grady cluster includingGrady HS expansion, HowardMS construction, Morningside

    Renovation, and WaldenAthletic Complex

    Appropriations by Referendum CategoriesSPLOST 2017

    Needs

    Construction and Renovation of Schools $202.0M

    Upgrading Building Infrastructure andSystems* $306.6M**

    Critical HVAC Phase 2 $40.0M

    Property Acquisition $10.0M

    Upgrading Security and Safety Systems $9.9M

    Surplus/Vacant Building Demolition $10.0M

    Upgrading Athletic Fields $23.0MPE Equipment Upgrades and Replacement $3.0M

    Upgrading Technology Infrastructure andEducational Support Equipment $89.7M

    Vehicle Replacement $22.0M

    Program Management $12.0M

    COPS Debt Liquidation $35.8M

    Total $764.0M

    *Includes APS Charter school facilities owned by APS

    ** Parsons 2015 Facilities Condition Assessment: Projected 2018-2022

    needs

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    17/35

    17

    Upgrading Building Infrastructure & Systems &Critical HVAC Phase 2

    Priorities:• Complete remaining critical

    HVAC projects across thedistrict (approximately $40M)

    • Address major mechanical,electrical, plumbing, roofing, &

    interior upgrades for agingbuildings

    • Protect investments of priorSPLOST programs byappropriately updating aging

    infrastructure

    Appropriations by Referendum CategoriesSPLOST 2017

    Needs

    Construction and Renovation of Schools $202.0M

    Upgrading Building Infrastructure andSystems* $306.6M**

    Critical HVAC Phase 2 $40.0M

    Property Acquisition $10.0M

    Upgrading Security and Safety Systems $9.9M

    Surplus/Vacant Building Demolition $10.0M

    Upgrading Athletic Fields $23.0MPE Equipment Upgrades and Replacement $3.0M

    Upgrading Technology Infrastructure andEducational Support Equipment $89.7M

    Vehicle Replacement $22.0M

    Program Management $12.0M

    COPS Debt Liquidation $35.8M

    Total $764.0M

    *Includes APS Charter school facilities owned by APS

    ** Parsons 2015 Facilities Condition Assessment: Projected 2018-2022

    needs

    }

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    18/35

    18

    Upgrading Athletic Fields & PE Upgrades

    Priorities:• Ensure all high schools have

    fields houses and artificial turf • Complete upgrades to Grady

    and Lakewood Stadiums, per

    facility assessments• Complete necessary upgrades

    at Cheney Field to providemuch needed relief for athleticcompetition space

    Appropriations by Referendum CategoriesSPLOST 2017

    Needs

    Construction and Renovation of Schools $202.0M

    Upgrading Building Infrastructure andSystems* $306.6M**

    Critical HVAC Phase 2 $40.0M

    Property Acquisition $10.0M

    Upgrading Security and Safety Systems $9.9M

    Surplus/Vacant Building Demolition $10.0M

    Upgrading Athletic Fields $23.0MPE Equipment Upgrades and Replacement $3.0M

    Upgrading Technology Infrastructure andEducational Support Equipment $89.7M

    Vehicle Replacement $22.0M

    Program Management $12.0M

    COPS Debt Liquidation $35.8M

    Total $764.0M

    *Includes APS Charter school facilities owned by APS

    ** Parsons 2015 Facilities Condition Assessment: Projected 2018-2022

    needs

    }

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    19/35

    19

    Upgrading Technology Infrastructure &Educational Support Equipment

    Priorities:• Invest in up-to-date hardware

    for students and employees• Upgrade critical infrastructure

    including school intranet• Implement necessary system

    upgrades• Ensure students and

    employees have access tonewest instructional andoperational software

    Appropriations by Referendum CategoriesSPLOST 2017

    Needs

    Construction and Renovation of Schools $202.0M

    Upgrading Building Infrastructure andSystems* $306.6M**

    Critical HVAC Phase 2 $40.0M

    Property Acquisition $10.0M

    Upgrading Security and Safety Systems $9.9M

    Surplus/Vacant Building Demolition $10.0M

    Upgrading Athletic Fields $23.0MPE Equipment Upgrades and Replacement $3.0M

    Upgrading Technology Infrastructure andEducational Support Equipment $89.7M

    Vehicle Replacement $22.0M

    Program Management $12.0M

    COPS Debt Liquidation $35.8M

    Total $764.0M

    *Includes APS Charter school facilities owned by APS

    ** Parsons 2015 Facilities Condition Assessment: Projected 2018-2022

    needs

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    20/3520

    Vehicle Replacement

    Priorities:• Ensure that students are transported

    in safe and reliable school buses• Refresh Metric: 10 years or 100,000

    miles• 367 of 406 buses will meet or exceed

    10 years of age in the year 2022 (endof SPLOST cycle)

    • Current inventory model years: 2001-2015

    • Provide safe and reliable “white fleet”vehicles for maintenance, IT, athletic,operations, and security staff • 163 of 266 White fleet vehicles will

    meet or exceed 15 years of age in2022 (end of SPLOST cycle)

    • Current inventory model years: 1983-

    2015

    Appropriations by Referendum CategoriesSPLOST 2017

    Needs

    Construction and Renovation of Schools $202.0M

    Upgrading Building Infrastructure andSystems* $306.6M**

    Critical HVAC Phase 2 $40.0M

    Property Acquisition $10.0M

    Upgrading Security and Safety Systems $9.9M

    Surplus/Vacant Building Demolition $10.0M

    Upgrading Athletic Fields $23.0MPE Equipment Upgrades and Replacement $3.0M

    Upgrading Technology Infrastructure andEducational Support Equipment $89.7M

    Vehicle Replacement $22.0M

    Program Management $12.0M

    COPS Debt Liquidation $35.8M

    Total $764.0M

    *Includes APS Charter school facilities owned by APS

    ** Parsons 2015 Facilities Condition Assessment: Projected 2018-2022

    needs

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    21/35

    21

    August 2015

    Engaged Parsons and MGT of

    America to complete the 2015

    Facilities Condition Assessment.

    January 11, 2016

    ABOE 2017-2022 SPLOST

    Presentation

    September 2015

    Senior Executive Officer

    SPLOST Needs

    Development.

    November 2015

    State Economist 2017-

    2022 SPLOST Revenue

    Projections.

    November 2015

    Final 2015 Facilities

    Condition Assessment

    Report

    April 2016

    County Election

    Superintendent issues call for

    election and publishes notice

    of election—First publication

    week of April 18, 2016

    Pending board approval in February, voterswould vote on a 2017 SPLOST in May 2016

    December 14, 2015

    Facilities Condition

    Assessment Presentation to

    the ABOE and Community.

    February 1, 2016

    ABOE Adoption ofresolution calling for

    imposition of SPLOST andReferendum

    Adoption of SharedElection Cost IGA

    ;

    2015

    2016

    December 2015

    Draft Preliminary 2017-2022

    SPLOST project list

    .

    May 24, 2016

    Election Day

    SPLOST Ballot Issue

    July 1, 2017 – June 30, 2022SPLOST

    Effective Date

    21

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    22/35

    Questions

    22

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    23/35

    Appendix

    23

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    24/35

    SPLOST 2017Information Technology

    24

    Item Estimated

    Lawson/Infor Upgrades $ 2,000,000

    Project Management System $ 250,000

    Document Imaging - District Wide $ 1,000,000

    Time Management System $ 200,000

    Brong Your Own Device (BYOD) NAC solution for every device touching the network. $ 350,000

    1 Gigabit WAN Circuits for every school. $ 1,500,000

    Cisco Contact Center $ 120,000

    10 Edge Devices at every school $ 200,000

    Upgrade CLL IDF connection to Core to 10G $ 65,000

    District VoIP Phone upgrades (Phase 1) $ 1,230,000

    Install Distribution/Relay Servers at every school $ 200,000

    Upgrade Student (VDI) machines and monitors (Phase 1) $ 5,000,000

    Upgrade VMWare Host Servers $ 600,000

    Upgrade Virtual Tape Library (VTL) $ 250,000

    Upgrade Cisco UCS (VDI) $ 1,000,000

    Upgrade Netscalers $ 500,000Upgrade Whiptails $ 500,000

    Upgrade F5's $ 350,000

    Upgrade Tivoli Storage Manager (TSM) $ 500,000

    Install Additional Storage at CLL - Nimble $ 500,000

    S OS 20

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    25/35

    25

    Install Additional Storage at DR Site - Nimble $ 250,000

    Implement VMTurbo Tool to support Virtual Environment $ 250,000

    Implement VRealize Tool to support Virtual Environment $ 250,000

    Implement Appsence Enterprise Tool to support Student Virtual Environment $ 300,000

    Implement Teacher/Staff Voicemail, Skype for Business $ 77,000

    SIEM/Log Analysis $ 300,000

    Identity & Access Management $ 500,000

    Anti-Virus Upgrade (Phase 1) $ 1,000,000

    Data Loss Prevention $ 1,000,000

    IT Service Management System (Phase 2) $ 700,000

    Classroom Interactive Technology Upgrades (Phase 1) $ 10,000,000

    Teacher/Employee Equipment Upgrades (Phase 1) $ 7,000,000

    Kronos System Upgrades $ 550,000

    Technology Support Service $ 870,000

    1-to-1 Device intitiative for 6-12 grade students (Phase 1) $ 10,000,000

    SIS - Cloud Upgrade $ 600,000

    Enterprse Date Warehouse - Improvements/Upgrades $ 400,000

    Data Visualization Software $ 200,000

    Upgrade IMS $ 500,000

    Upgrade Virtual Software platforms $ 750,000

    SPLOST 2017Information Technology Continued

    SPLOST 2017

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    26/35

    26

    Item Estimated

    APS Intranet System $ 1,500,000.00

    APS Private Fiber Ring to every school $ 20,000,000.00

    District VoIP Phone upgrades (Phase 2) $ 1,000,000.00

    Upgrade Network Infrastructure at Admin Sites to HP $ 150,000.00

    Upgrade Wireless Infrastructure at Admin Sites to Cisco Miraki $ 560,000.00

    Upgrade Student (VDI) machines and monitors (Phase 2) $ 2,500,000.00

    Anti-Virus Upgrade (Phase 2) $ 1,000,000.00

    IT Service Management System (Phase 3) $ 500,000.00

    Classroom Interactive Technology Upgrades (Phase 2) $ 6,000,000.00

    Teacher/Employee Equipment Upgrades (Phase 2) $ 1,400,000.00

    1-to-1 Device intitiative for 6-12 grade students (Phase 2) $ 3,296,600.00

    TOT $ 89,718,600.00

    SPLOST 2017Information Technology Continued

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    27/35

    HVAC ProjectsPhase 2

    Project Estimated Cost ($M) Anticipated Completion

    Scott ES $1.72 TBD

    Toomer ES $1.38 TBD

    Washington HS $1.39 TBD

    Peyton Forrest $0.18 TBD

    FL Stanton ES $0.51 TBD

    Slater ES $0.44 TBD

    Deerwood ES $0.47 TBD

    Oglethorpe (North/South Metro) $1.48 TBD

    Finch ES $1.73 TBD

    Long MS $0.18 TBD

    Fickett ES $0.13 TBD

    Mays $0.25 TBD

    Dean Rusk/ISC $0.18 TBD

    Sutton 6th Grade Academy $0.63 TBD

    CS King $1.06 TBD

    Young MS $0.67 TBD

    Cleveland ES $3.62 TBD

    Benteen ES $1.85 TBD

    Douglass HS $2.63 TBD

    27Estimates are subject to change

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    28/35

    HVAC ProjectsPhase 2

    Project Estimated Cost ($M) Anticipated Completion

    MA Jones ES $1.11 TBD

    Parkside ES $1.97 TBD

    Parks (Relocation Site) $1.33 TBD

    Price MS $0.45 TBD

    Miles ES $1.42 TBD

    Heritage Academy $0.22 TBD

    Burgess-Peterson ES $0.79 TBD

    Usher ES $0.97 TBD

    Bolton Academy $0.59 TBD

    BEST Academy $1.33 TBD

    Coan (Relocation Site) $1.11 TBD

    West End Academy $0.30 TBD

    CLL Building $0.51 TBD

    Campbell Building $1.01 TBD

    Brewer Building $0.22 TBD

    Facilities Building $0.51 TBD

    Peterson Building $0.76 TBD

    HVAC Phase 2 Total $40.0

    28Estimates are subject to change

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    29/35

    High School Athletic Fields

    School Estimated Cost ($M) Scope

    BEST Academy $1.26M Turf & Field House

    Carver HS $1.62M Turf & Field House

    Crim $0.57M Field House

    CSK $1.30M Turf & Field HouseDouglass HS $1.63M Turf & Field House

    Maynard Jackson HS $0.36M Field House

    Mays HS $0.76M Field House

    South Atlanta HS $1.36M Turf & Field House

    Therrell HS $0.46M Field House

    Washington HS $1.78M Turf & Field House

    Total $11.1M

    29

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    30/35

    Schools Without LED Signs

    Adamsville ES Gideons ES Stanton F.L. ES

    Beecher Hills ES Grove Park ES Thomasville Heights ES

    Benteen ES Heritage Academy Toomer ES

    Bethune ES Humphries ES Towns ES

    Brandon ES Hutchinson ES Venetian Hills ES

    Cascade ES Jackson Primary West Manor ESCentennial Academy Morningside ES White ES

    Connally ES Oglethorpe (North/SouthMetro)

    Whitefoord ES

    Cleveland ES Parkside ES Woodson

    Fain ES Stanton D.H. ES

    Total Schools Without LEDSigns

    35

    Total Estimated Costs ($60Kper)

    $2,100,000

    30

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    31/35

    APS Buildings Used by Charter Schools

    31

    APS Buildings Used byCharter Schools

    Building Charter

    Centennial Place Centennial Academy

    Capitol View Latin Academy

    Cook Wesley International

    Herndon KIPP WAYS

    Hill, C.W. Kindezi

    Slaton Neighborhood Charter

    Turner KIPP Collegiate

    Waters KIPP Vision

    White Kindezi

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    32/35

    School House Demographics

    32

    Elementary Schools Acres Sq.Ft.PlanningCapacity@ 25/1

    SF perStudent

    CoreClassrooms

    10/12/2015Enrollment

    2015 / 2016(KK-12)

    Utilization

    1 Adamsville 4.9 75,058 750 100 30 372 49.6%

    2 Beecher Hills 9.5 49,925 525 95 21 309 58.9%

    3 Benteen 4.0 79,633 600 133 24 294 49.0%

    4 Bethune 4.5 78,561 825 95 33 499 60.5%

    5 Bolton Academy 4.0 83,653 900 93 36 512 56.9%

    6 Boyd 19.7 72,405 575 126 23   Under Construction

    7 Brandon 10.0 76,672 875 88 35 705 80.6%8 Brandon Primary 9.8 59,941 625 96 25 343 54.9%

    9 Burgess-Peterson 8.3 85,836 875 98 35 303 34.6%

    10 Cascade 8.7 70,101 625 112 25 435 69.6%

    11 Centennial Place 5.0 63,806 650 98 26 750 115.4%

    12 Cleveland 15.8 75,286 675 112 27 322 47.7%

    13 Connally 3.7 88,417 1,000 88 40 356 35.6%

    14 Continental Colony 8.7 85,562 600 143 24 449 74.8%

    15 Deerwood Academy 21.0 91,566 900 102 36 650 72.2%

    16 Dobbs 19.6 86,907 900 97 36 449 49.9%

    17 Dunbar 5.3 98,959 500 198 20 390 78.0%

    18 Fain 8.0 83,782 700 120 28 493 70.4%19 Fickett 12.0 86,490 900 96 36 530 58.9%

    20 Finch 4.1 95,024 950 100 38 317 33.4%

    21 Garden Hills 8.0 82,176 775 106 31 468 60.4%

    22 Gideons 4.5 72,402 825 88 33 358 43.4%

    23 Grove Park 7.0 88,921 725 123 29 275 37.9%

    24 Heritage Academy 7.0 80,864 850 95 34 469 55.2%

    25 Hope - Hill 2.4 75,631 700 108 28 410 58.6%

    26 Humphries 8.2 66,228 650 102 26 334 51.4%

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    33/35

    School House Demographics

    33

    Elementary Schools Acres Sq.Ft.PlanningCapacity@ 25/1

    SF per

    Student

    Core

    Classrooms

    10/12/2015Enrollment

    2015 / 2016(KK-12)

    Utilization

    27 Hutchinson 8.5 70,797 825 86 33 452 54.8%

    28 Jackson 12.5 96,639 850 114 34 575 67.6%

    29 Jackson Primary 7.2 48,982 500 98 20 254 50.8%

    30 Jones, M. A. 7.5 92,272 875 105 35 561 64.1%

    31 Kimberly * 7.2 63,379 825 77 33 0.0%

    32 Lin, Mary 5.2 60,115 725 83 29 631 87.0%

    33 Miles 15.0 82,211 900 91 36 360 40.0%

    34 Morningside 5.2 98,037 900 109 36 816 90.7%

    35 Parkside 8.3 80,836 775 104 31 532 68.6%

    36 Perkerson 9.0 75,297 700 108 28 511 73.0%37 Peyton Forest 25.0 64,300 625 103 25 436 69.8%

    38 Rivers (New) 8.0 112,000 900 124 36 715 79.4%

    39 Scott 8.0 72,891 800 91 32 328 41.0%

    40 Slater 13.0 78,232 800 98 32 541 67.6%

    41 Smith, Sarah 10.3 70,545 750 94 30 564 75.2%

    42 Smith Intermediate 6.2 78,173 750 104 30 540 72.0%

    43 Springdale Park 5.5 95,555 825 116 33 660 80.0%

    44 Stanton, D. H. 6.0 75,646 825 92 33 233 28.2%

    45 Stanton, F. L. 5.2 57,910 425 136 17 266 62.6%

    46 Thomasville Heights 11.2 83,023 950 87 38 397 41.8%

    47 Toomer 10.6 70,012 700 100 28 277 39.6%48 Towns 8.9 70,084 675 104 27 323 47.9%

    49 Usher - Collier 14.0 102,962 900 114 36 393 43.7%

    50 Venetian Hills 9.3 60,924 600 102 24 312 52.0%

    51 West Manor 10.8 37,150 400 93 16 253 63.3%

    52 Whitefoord 2.3 59,438 650 91 26 252 38.8%

    53 Woodson 4.1 76,708 675 114 27 340 50.4%

    Elementary School Totals 467.7 4,087,924 39,600 105 1,584

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    34/35

    School House Demographics

    34

    Middle Schools Acres Sq.Ft.Planning

    Capacity @25/1

    SF perStudent

    CoreClassrooms

    Enrollment2015 / 2016

    Utilization

    1Brown 15.6 151,081 975 155 39   Under

    Construction

    2 Bunche 42.3 148,708 975 153 39 768 78.8%

    3 Harper - Archer 18.1 229,745 1,100 209 44 641 58.3%

    4 Inman 4.2 146,035 875 167 35 1,067 121.9%

    5King, M.L.

    6.5 192,3001,040 185 41   Under

    Construction

    6 Long 15.6 125,237 1,000 125 40 650 65.0%

    7 Price 19.0 167,168 975 171 39 311 31.9%

    8 Sutton 7th-8th (@ fmr NAS) 17.5 301,386 1,625 185 65 940 57.8%

    9 Sutton 6th (@ fmr Sutton MS) 12.5 160,667 1,000 161 40 545 54.5%

    10 Sylvan Hills (New) 13.0 156,000 975 160 39 558 57.2%

    11 Young 15.0 172,980 975 177 39 915 93.8%

    Middle School Totals 179.3 1,951,307 11,515 168 460

  • 8/17/2019 Splost Presentation - 1 11 16 - Final

    35/35

    School House Demographics

    35

    High Schools Acres Sq.Ft.PlanningCapacity@ 25/1

    SF perStudent

    CoreClassrooms

    Enrollment2015 / 2016

    Utilization

    1 BEST 15.1 217,578 1,750 124 70 511 29.2%

    2 Carver 35.4 271,429 1,525 178 61 1,272 83.4%

    3 Crim 17.9 203,949 925 220 37 155 16.8%

    4 Douglass 32.0 336,101 1,950 172 78 861 44.2%5 Forrest Hill 5.8 69,254 750 92 30 187 24.9%

    6 Grady 19.5 253,095 1,275 199 51 1,355 106.3%

    7 Jackson, M.H. 25.0 314,251 1,500 210 60 1,095 73.0%

    8 King, C.S. 21.2 264,874 1,750 151 70 497 28.4%

    9 Mays 70.0 339,758 2,000 170 80 1,729 86.5%

    10 North Atlanta 56.6 507,093 2,425 209 97 1,722 71.0%

    11 South Atlanta 50.2 277,779 1,950 142 78 843 43.2%

    12 Therrell 17.3 249,830 1,500 167 60 808 53.9%

    13 Washington 21.1 261,269 1,625 161 65 830 51.1%

    High School Totals 387.1 3,566,260 20,925 169 834