Some background to letter from Exec. Secretary of
Montreal Protocol
Christiana Figueres
March 2007
![Page 2: Some background to letter from Exec. Secretary of Montreal Protocol Christiana Figueres March 2007](https://reader036.vdocuments.site/reader036/viewer/2022082820/56649ea05503460f94ba2e9e/html5/thumbnails/2.jpg)
Basic Facts
• Most ozone depleting substances have been phased out or are in the process
• HCFCs main remaining ODS– Intermediate substance– later timetable for developing countries
• HCFC22 widely used refrigerant in developing countries (not in A1)– HFC23 is by product of HCFC22 production– GWP of HFC23 = 11,700
![Page 3: Some background to letter from Exec. Secretary of Montreal Protocol Christiana Figueres March 2007](https://reader036.vdocuments.site/reader036/viewer/2022082820/56649ea05503460f94ba2e9e/html5/thumbnails/3.jpg)
![Page 4: Some background to letter from Exec. Secretary of Montreal Protocol Christiana Figueres March 2007](https://reader036.vdocuments.site/reader036/viewer/2022082820/56649ea05503460f94ba2e9e/html5/thumbnails/4.jpg)
• Developing countries– HCFCs freeze Jan 2016 at 2015 baseline– Elimination 2040– Schedule set in 1990 (before CDM and accelerated
growth of developing countries)
• Concerns– 2015 baseline is incentive to continue to increase
consumption (consumption=production + imports - exports)
– CDM promotes HCFC22 consumption• Unexpected damage to ozone layer
– Phaseout costs may exceed Multilateral Fund possibilities
![Page 5: Some background to letter from Exec. Secretary of Montreal Protocol Christiana Figueres March 2007](https://reader036.vdocuments.site/reader036/viewer/2022082820/56649ea05503460f94ba2e9e/html5/thumbnails/5.jpg)
CDM Effect(levels are indicative)
![Page 6: Some background to letter from Exec. Secretary of Montreal Protocol Christiana Figueres March 2007](https://reader036.vdocuments.site/reader036/viewer/2022082820/56649ea05503460f94ba2e9e/html5/thumbnails/6.jpg)
• Seven proposals for MOP19 in Sept ‘07
• Options– Lower baseline (e.g. 2010 instead of 2015)– Accelerate the phase out (e.g. 2030 instead of
2040)– Channel effect of CDM
![Page 7: Some background to letter from Exec. Secretary of Montreal Protocol Christiana Figueres March 2007](https://reader036.vdocuments.site/reader036/viewer/2022082820/56649ea05503460f94ba2e9e/html5/thumbnails/7.jpg)
Option 1: Lower the baseline to 2010
![Page 8: Some background to letter from Exec. Secretary of Montreal Protocol Christiana Figueres March 2007](https://reader036.vdocuments.site/reader036/viewer/2022082820/56649ea05503460f94ba2e9e/html5/thumbnails/8.jpg)
Option 2: Accelerate the phase out to 2030
![Page 9: Some background to letter from Exec. Secretary of Montreal Protocol Christiana Figueres March 2007](https://reader036.vdocuments.site/reader036/viewer/2022082820/56649ea05503460f94ba2e9e/html5/thumbnails/9.jpg)
Option 3:Channel the effect of CDM
• New plants allowed, third party gets CERs, revenue used for environmental activities.
![Page 10: Some background to letter from Exec. Secretary of Montreal Protocol Christiana Figueres March 2007](https://reader036.vdocuments.site/reader036/viewer/2022082820/56649ea05503460f94ba2e9e/html5/thumbnails/10.jpg)
• Tech and Ec Assess Panel (TEAP) is requested to analyze scenarios
• Request to EB– Info on volumes of HFC23 expected on the
market– Info on CER price expectations– Collaboration with Ozone Secretariat