Small Hydro Resource Mapping in Indonesia
LIST OF MOST PROMISING SITES
August 2016
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
This report was prepared by GESTO, AQUALOGUS and INDONESIA HYDRO CONSULT, under contract to The World Bank.
It is one of several outputs from the small hydro resource mapping component of the activity Energy Resource Mapping and Geospatial Planning Indonesia [Project ID: P145273]. This activity is funded and supported by the Energy Sector Management Assistance Program (ESMAP), a multi-donor trust fund administered by The World Bank, under a global initiative on Renewable Energy Resource Mapping. Further details on the initiative can be obtained from the ESMAP website. This document is an interim output from the above-mentioned project. Users are strongly advised to exercise caution when utilizing the information and data contained, as this has not been subject to full peer review. The final, validated, peer reviewed output from this project will be the Indonesia Small Hydro Atlas, which will be published once the project is completed.
Copyright © 2016 International Bank for Reconstruction and Development / THE WORLD BANK Washington DC 20433 Telephone: +1-202-473-1000 Internet: www.worldbank.org
This work is a product of the consultants listed, and not of World Bank staff. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent.
The World Bank does not guarantee the accuracy of the data included in this work and accept no responsibility for any consequence of their use. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries.
The material in this work is subject to copyright. Because The World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for non-commercial purposes as long as full attribution to this work is given. Any queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: +1-202-522-2625; e-mail: [email protected]. Furthermore, the ESMAP Program Manager would appreciate receiving a copy of the publication that uses this publication for its source sent in care of the address above, or to [email protected].
SMALL HYDROPOWER MAPPING AND IMPROVED
GEOSPATIAL ELECTRIFICATION PLANNING
INDONESIA
LIST OF MOST PROMISING SITES
August 2016
SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA
LIST OF MOST PROMISING SITES
2 ID.2016.R.001.0
TABLE OF CONTENTS
1 PROJECT SYNOPSIS .......................................................................................................................................................... 3
2 LIST OF MOST PROMISING SITES ..................................................................................................................................... 4
TABLES
Table 2.1 – List of most promising sites. ........................................................................................................................................4
ANNEXES
Annex I – Project Information Brochure and Evapower Results
SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA
LIST OF MOST PROMISING SITES
3 ID.2014.R.003.0
1 PROJECT SYNOPSIS
Project title: Small Hydropower Mapping and Improved Geospatial Electrification Planning in Indonesia
Project Number: Selection No. 1125330
Country: Indonesia
Project objectives: Facilitate and improve the planning and investment process for small hydro
development in both grid and isolated systems through:
a) Building up a central database on small hydro at national scale and validating the mapping of
small hydro in NTT, Maluku, Maluku Utara and Sulawesi
b) Improved electrification planning by integrating small hydro potential for the provinces of NTT,
Maluku, Maluku Utara and Sulawesi into the planning process
Expected results:
National Small Hydro Resource Database with statistics and relevant GIS data
Small Hydro Mapping Report outlining national information on small hydro in Indonesia,
including maps of existing, planned and potential schemes
A report/annex on small hydro potential in NTT, Maluku, Maluku Utara and Sulawesi for both
grid expansion and isolated systems
Workshop and introductory training in the small hydro GIS database
A list of prioritized small hydro development sites in NTT, Maluku, Maluku Utara and Sulawesi,
including recommendations for further studies, investigation and monitoring to support the
development of the schemes
Recommendations on improvement of the existing Geospatial Electrification Planning tool to
take into account small hydro potential
Input data on small hydro potential for the least cost geospatial electrification planning for NTT,
Maluku, Maluku Utara and Sulawesi
Update final reporting coordinated with the parallel contract to give a complete description of
the Small Hydropower Mapping and Improved Geospatial Electrification Planning process in
Indonesia
Final Workshop
Training on Small Hydro GIS database and Small Hydro Potential Evaluation
Contract signing date: February 12, 2014
Project duration after final methodology approval: 22 months
SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA
LIST OF MOST PROMISING SITES
4 ID.2014.R.003.0
2 LIST OF MOST PROMISING SITES
The purpose of this deliverable is the presentation of the list of most promising sites. This list was the
result of a screening process and site evaluation.
The initial list contained 433 projects. This number was reduced to 167 projects by the screening
process. In the next phase, the remaining projects were evaluated using Evapower program. This
software, developed by Indonesia Hydro Consult, allows the user to make a preliminary site assessment.
After this assessment, 12 projects were excluded from the final list because they were not feasible. The
final phase consists on a multi-criteria analysis with different criterion and corresponding relevance in
order to sort out the best projects. The multi-criteria analysis was based on the following as aspects:
Installed capacity;
LCOE - Levelized Cost of Electricity;
Protected and environmentally sensitive areas;
Local electrification demand.
The final report will include the complete description of the methodology used and the grid
expansion/isolated systems analysis. The list of most promising sites is presented in the Table 2.1.
Table 2.1 – List of most promising sites.
Project ID Island River Installed capacity
(MW)
LCOE (USD/MWh)
IRR Protected
Area
1 Meseh-2 JicaPR_1134 Nusa Tenggara Wai Maseh 11,87 67,2 22,7% APL
2 Lapai II hp_0221 Sulawesi 8 97,8 14,5% APL
3 Menu-1 JicaPR_1181 Nusa Tenggara Menu 5,22 71,9 21,2% APL
4 Menu-2 JicaPR_1182 Nusa Tenggara Menu 8,41 72,9 20,9% APL
5 Ria JicaPR_1129 Nusa Tenggara Paseria 8,69 72,4 21,1% APL
6 PLTM Sabuku fs_215 Sulawesi Sabuku 11,16 99,4 14,2% APL
7 Laku JicaPR_1135 Nusa Tenggara Wai Laku 4,71 73,4 20,8% APL
8 Wai Ranjang JicaPR_1116 Nusa Tenggara Wai Ratjang 2,63 87,6 17,2% APL
9 PLTM Paun fs_203 Sulawesi Nosu 15,86 54,8 26,7% APL
10 Meseh-1 JicaPR_1133 Nusa Tenggara Wai Miseh 3,43 79,6 19,1% APL
11 PLTM Ma'dong fs_195 Sulawesi Maiting 8,8 44,9 32,2% APL
12 Tuke JicaPR_1184 Nusa Tenggara Tuke 4,68 86,2 17,5% APL
13 PLTM Maiting Hulu
2 fs_198 Sulawesi Maiting 8,96 57,0 25,7% APL
14 PLTM Rongkong 3 fs_206 Sulawesi Rongkong 14,17 71,4 20,5% APL
15 PLTM Sapaya fs_199 Sulawesi Sapaya 8,09 47,9 30,4% APL
16 Ria Mboeli JicaPR_1130 Nusa Tenggara Ria Mboeli 3,82 89,4 16,8% APL
17 PLTM Karangana I fs_210 Sulawesi Karangana 18,78 56,6 25,9% HPT & APL
18 PLTM Yaentu fs_165 Sulawesi Yaentu 15,33 57,6 25,5% HPT
19 PLTM Sapalewa fs_192 Maluku Sapalewa 20,12 58,1 27,3% HPK
SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA
LIST OF MOST PROMISING SITES
5 ID.2014.R.003.0
Project ID Island River Installed capacity
(MW)
LCOE (USD/MWh)
IRR Protected
Area
20 Rongkong hp_0436 Sulawesi 12,07 99,1 14,3% APL
21 Kalada JicaPR_1093 Nusa Tenggara Kalada 7,26 90,9 16,5% APL
22 PLTM Batukede fs_193 Sulawesi Nosu 6,34 55,0 26,6% APL
23 PLTM Aralle fs_232 Sulawesi Aralle 14,86 73,0 20,0% HPT
24 Lawo Lambo JicaPR_1122 Nusa Tenggara Lawo Lambo 3,51 96,3 15,5% APL
25 Lake JicaPR_1131 Nusa Tenggara Wai Lake 5,74 93,2 16,1% HP & APL
26 Bobo JicaPR_1136 Nusa Tenggara Wai bobo 2 122,6 11,5% APL
27 PLTM Pono fs_163 Sulawesi Kerpap 3,5 103,6 13,5% APL
28 PLTM Masewo fs_223 Sulawesi Karangana 15,45 90,4 15,9% HPT
29 PLTM Tomoni fs_204 Sulawesi Tomoni 9,26 50,3 29,0% HL & HP
30 Muke JicaPR_1183 Nusa Tenggara Muke 3,11 123,8 11,4% APL
31 Rentelemo JicaPR_0811 Sulawesi Mapili 5,21 65,3 22,4% APL
32 PLTM Mapahi fs_213 Sulawesi Karangana 24,59 70,0 20,9% HL
33 Tangkak-1 JicaPR_0793 Sulawesi Tangkak 4,96 70,1 20,9% APL
34 PLTM Karangana II fs_211 Sulawesi Karangana 26,28 73,2 20,0% HL & HPT
35 PLTM Ranowano
Minahasa fs_171 Sulawesi
Sosoan Ranowangko
4,33 65,4 22,4% APL
36 PLTM Tabong fs_216 Sulawesi Tabong 13,94 137,0 9,3% APL
37 Benain-1 JicaPR_1177 Nusa Tenggara Benain 15,48 133,6 10,2% HP & APL
38 PLTM Pamoseang fs_231 Sulawesi Aralle 7,85 83,4 17,4% HPT
39 PLTA Tina fs_234 Maluku Tina 10,08 116,3 13,0% HP
40 PLTM Siyuntoyo fs_227 Sulawesi 4,17 149,9 8,1% HPT
41 PLTM Sampaga fs_162 Sulawesi Sampaga 1,26 155,1 7,7% APL
42 Mikuasi (PLN) hp_0447 Sulawesi 2,67 103,2 13,6% HL
43 Manasako JicaPR_1190 Nusa Tenggara Manasako 7,82 64,0 23,9% HL
44 Buleleng hp_0456 Sulawesi 3,91 93,1 15,4% HPT & HPK
45 PLTM Kindang 2 fs_205 Sulawesi Balantieng 3,45 74,6 19,6% APL
46 PLTM Tincep 3 fs_173 Sulawesi Munthe 3,15 72,7 20,1% APL
47 PLTM
Bontomantene fs_208 Sulawesi Balantieng 2,88 69,9 21,0% APL
48 Kuala Tengah fs_221 Sulawesi Kuala Tengah 5,37 101,8 13,8% APL
49 Lariang-11 JicaPR_0841 Sulawesi Tributary of
Lariang 10,7 129,7 10,1% HPT
50 Anail JicaPR_1188 Nusa Tenggara Anail 4,64 95,7 15,6% APL
51 Karendi-2 JicaPR_1092 Nusa Tenggara Karendi 2,33 110,1 13,2% HL & APL
52 PLTM Wae Lega fs_236 Nusa Tenggara Wae Lega 2,34 72,7 21,0% APL
53 Sawidago-1 #1 hp_0367 Sulawesi 2,15 71,8 20,4% APL
54 Randangan-2 JicaPR_0718 Sulawesi Randangan 5,52 82,9 17,5% HPT
55 Noni JicaPR_1138 Nusa Tenggara Tarumanu 3,47 89,5 16,9% APL
56 Kamatang-2 JicaPR_1100 Nusa Tenggara Kamatang 4,6 105,2 14,0% APL
57 Leke JicaPR_1185 Nusa Tenggara Leke 1,77 96,5 15,4% APL
58 PLTM Bungin 2 fs_207 Sulawesi Bungin 4,91 61,5 23,9% HL
59 Waikudu JicaPR_1104 Nusa Tenggara Waikudu 4,22 84,7 17,9% HPK & APL
SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA
LIST OF MOST PROMISING SITES
6 ID.2014.R.003.0
Project ID Island River Installed capacity
(MW)
LCOE (USD/MWh)
IRR Protected
Area
60 Wai Ru JicaPR_1115 Nusa Tenggara Wai Ru 2,39 93,6 16,0% APL
61 PLTM Harunda fs_242 Nusa Tenggara Harunda 3,06 74,4 20,5% HPT & APL
62 Gamputa JicaPR_0858 Sulawesi Gamputa 5,01 99,4 14,2% HPK
63 Palu-2A JicaPR_0845 Sulawesi Plau 5,03 131,0 9,9% APL
64 Mata Alo-1 JicaPR_0806 Sulawesi Pasui 3,12 107,3 12,9% APL
65 Palame-2 JicaPR_1095 Nusa Tenggara Palamedo 4,08 113,2 12,9% HPT & APL
66 PLTM Bongkasoa-
Simpoyo fs_160 Sulawesi
Bongkasoa Simpoya
1,65 92,0 15,5% APL
67 Buol-1 JicaPR_0850 Sulawesi Buol 4,08 124,5 10,7% APL
68 Ngodama JicaPR_1236 Maluku Ngodana 5,69 113,9 13,3% HPT
69 Wooi Besar-2 JicaPR_1250 Maluku Wooi Besar 8,23 146,3 9,5% HP
70 Wai Racang JicaEX_0108 Nusa Tenggara Wai Racang 1,5 97,6 15,2% APL
71 PLTM Lobu fs_222 Sulawesi Lobu 3,54 93,4 15,3% HPT
72 Taramanu-1 JicaPR_1139 Nusa Tenggara Tarumanu 3,57 127,5 10,9% APL
73 Wajo-2 JicaPR_1128 Nusa Tenggara Lowo Mego 0,85 221,0 4,0% APL
74 Nowa JicaPR_1114 Nusa Tenggara Nowa 1,16 175,3 6,7% HP & APL
75 Rita JicaPR_1107 Nusa Tenggara Rita 2,47 164,9 7,4% APL
76 PLTM Pasui 2 fs_184 Sulawesi Pasui 1,74 113,7 12,0% APL
77 Halulai hp_0391 Sulawesi 2,21 88,6 16,2% HPT
78 Kamatang-1 JicaPR_1099 Nusa Tenggara Kamatang 2,53 149,2 8,8% APL
79 Siwa JicaPR_0781 Sulawesi Siwa 1,8 116,0 11,7% APL
80 PLTM Benteng
Malewang fs_194 Sulawesi Bialo 1,33 111,0 12,4% APL
81 Ilanga-1 JicaPR_0854 Sulawesi llanga 5,52 133,5 9,7% HPT
82 Dondo-3 JicaPR_1126 Nusa Tenggara Lawo Dondo 1,94 205,3 4,8% APL
83 Maraja-3 JicaPR_0848 Sulawesi Botaonyo
Maraja 1,18 164,9 6,9% HPT & APL
84 Lakalamba JicaPR_1101 Nusa Tenggara Lakalamba 1,15 126,0 11,1% HP
85 Kuala Kilo fs_220 Sulawesi Kuala Kilo 5,27 166,3 6,8% APL
86 Palame-1 JicaPR_1094 Nusa Tenggara Palamedo 1,88 157,9 8,0% HPT & APL
87 PLTM Malua fs_188 Sulawesi Malua 1,48 121,0 11,1% APL
88 Lamo-2 JicaPR_1233 Maluku Lamo 4,06 160,6 8,3% APL
89 Paddumpu hp_0311 Sulawesi 1,91 107,7 12,9% HPT & APL
90 Jajawi JicaPR_1230 Maluku Tajawi 6,52 134,8 10,7% HL
91 Watumbaka JicaPR_1109 Nusa Tenggara Walumbaka 1,52 170,0 7,0% HP & APL
92 Batuputi JicaPR_0786 Sulawesi Batuputi 1,96 144,9 8,6% APL
93 Ranoyapo-1 JicaPR_0867 Sulawesi Ranojapo 2,84 127,0 10,4% HP
94 Sawidago-3 hp_0394 Sulawesi 1,87 84,1 17,2% HL
95 PLTMH Eremerasa fs_181 Sulawesi Jene Biyangloe 0,59 132,7 9,8% APL
96 Poigar-4 JicaPR_0866 Sulawesi Poigar 2,61 137,6 9,3% HP
97 Melolo-2 JicaPR_1111 Nusa Tenggara Melolo 1,98 167,0 7,3% HL
98 Ranu-2 JicaPR_1206 Maluku Nibe 5,46 145,7 9,7% HL
99 PLTM Kahaya fs_180 Sulawesi Balantieng 2,23 106,0 13,1% HL & APL
SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA
LIST OF MOST PROMISING SITES
7 ID.2014.R.003.0
Project ID Island River Installed capacity
(MW)
LCOE (USD/MWh)
IRR Protected
Area
100 Pastu Ra JicaPR_1247 Maluku Pastu Ra 1,29 179,9 6,8% HL
101 Riorita hp_0401 Sulawesi 2,13 105,4 12,9% HL & APL
102 Nua JicaPR_1222 Maluku Wae Nua 4,03 160,9 8,2% HPK
103 Taramanu-2 JicaPR_1140 Nusa Tenggara Tarumanu 4,11 197,3 5,3% APL
104 Kapsali JicaPR_1141 Nusa Tenggara Tarumanu 1,57 159,6 7,8% HPT
105 PLTM Soru fs_237 Nusa Tenggara Cikur 0,66 154,9 8,2% APL
106 PLTM Wanokaka 2 fs_246 Nusa Tenggara Labariri 0,64 155,5 8,2% APL
107 Lariang-10 JicaPR_0840 Sulawesi Tributary of
Lariang 5,52 154,1 7,8% HL & HPT
108 Dondo-1 JicaPR_1124 Nusa Tenggara Lawo Dondo 0,96 163,9 7,5% APL
109 Melolo-1 JicaPR_1110 Nusa Tenggara Melolo 0,82 190,4 5,7% HL & APL
110 Paca JicaPR_1234 Maluku Danau Paca 0,49 238,6 3,5% HPK
111 Larana JicaPR_1191 Nusa Tenggara Larana 0,6 168,4 7,2% APL
112 Irauri JicaPR_1189 Nusa Tenggara Irauri 3,14 78,1 19,5% HSA-W
113 PLTM Tirtanagaya fs_229 Sulawesi 2,07 159,6 7,3% HPT
114 Bajo JicaPR_0779 Sulawesi Bajo 1,2 181,2 5,8% APL
115 Taima JicaPR_0729 Sulawesi Taima 1,6 187,7 5,5% APL
116 Mama JicaPR_1204 Maluku Wa Mana 1,84 161,4 8,2% HPT
117 Leman JicaPR_1208 Maluku Wa Leman 1,36 225,0 4,2% HPK
118 PLTM Dako fs_161 Sulawesi Dako 0,43 179,9 5,9% APL
119 Toma-2 JicaPR_0754 Sulawesi Lawe Toma 1,66 208,6 4,2% HL
120 Kambera-3 JicaPR_1105 Nusa Tenggara Kambera 2,54 244,0 2,8% APL
121 PLTM Bengkoli fs_168 Sulawesi Bengkoli 1,57 179,0 5,9% HPT & APL
122 Kadassa-2 JicaPR_1097 Nusa Tenggara Kadassa 2,61 268,6 1,9% APL
123 PLTM Kadundung fs_202 Sulawesi Bajo 1,17 144,8 8,6% HL
124 Iwoimenda JicaPR_0764 Sulawesi S.Iwoimenda 2,39 163,8 7,0% HL
125 PLTM Sinombulung fs_228 Sulawesi 2,98 204,1 4,4% HPT
126 Liocopa JicaPR_1224 Maluku Liocopa 1,03 244,8 3,3% HP
127 PLTM Ponju fs_169 Sulawesi Balukang 0,76 177,3 6,0% HPT
128 Paguyaman-1 JicaPR_0715 Sulawesi Paguyaman 3,83 126,5 10,4% HSA-W
129 Kambera-1 JicaPR_1102 Nusa Tenggara Kanjiji 0,61 326,2 -0,2% APL
130 Dumoga-1 JicaPR_0860 Sulawesi Onggak
Dumogao 3,38 126,3 10,5% HSA-W
131 Labu-2 JicaPR_0734 Sulawesi Labu 0,92 223,3 3,4% APL
132 Pia JicaPR_1221 Maluku Wae Pia 3,46 196,8 5,8% HL, HPT &
HPK
133 Lamuk JicaPR_1106 Nusa Tenggara Lamuk 0,82 234,0 3,3% HL & APL
134 Ili-1 JicaPR_1201 Maluku Wa Ili 4,82 220,2 4,5% HL & HPT
135 Wai Miha JicaPR_1251 Maluku Wai Miha 1,35 254,3 2,8% HP
136 Makariki hp_0216 Maluku 1,04 211,3 4,9% HPK
137 Awo JicaPR_0780 Sulawesi Awo 0,79 193,1 5,1% HL
138 Kolori hp_0281 Sulawesi 0,75 131,8 9,8% HSA-W
139 Lasolo-2 JicaPR_0751 Sulawesi Lasolo 2,36 417,9 -3,2% HL
SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA
LIST OF MOST PROMISING SITES
8 ID.2014.R.003.0
Project ID Island River Installed capacity
(MW)
LCOE (USD/MWh)
IRR Protected
Area
140 Mala JicaPR_1220 Maluku Wae Mala 2,39 246,9 3,2% HPT
141 Bayau-1 JicaPR_0856 Sulawesi Bayau 1,94 260,0 1,7% HPT
142 Sissa JicaPR_1121 Nusa Tenggara Sissa 1,37 285,6 1,2% APL
143 PLTM Pidung fs_174 Sulawesi Onggunoi 0,56 251,4 2,1% HPT
144 Lelipang hp_0297 Sulawesi 0,38 283,3 0,8% APL
145 Kalempang-3 JicaPR_0792 Sulawesi Rica 0,39 287,7 0,7% APL
146 Dopi JicaPR_0747 Sulawesi Dopi 3,46 574,3 -6,5% HPT
147 Malik JicaPR_0735 Sulawesi Malik 0,3 350,3 -1,4% APL
148 Lot JicaPR_1228 Maluku Loi 0,19 497,2 -4,3% APL
149 Kina JicaPR_1217 Maluku Wai Wakina 1,16 323,6 0,3% HPT
150 Sumara JicaPR_0740 Sulawesi Sumara 1,34 208,7 4,2% HSA-W
151 Ayoung JicaPR_0859 Sulawesi Ayong 1,69 229,5 3,1% HSA-W &
APL
152 Toma-4 JicaPR_0756 Sulawesi Lawe Toma 1,52 355,7 -1,6% HL & HPK
153 Toma-3 JicaPR_0755 Sulawesi Lawe Toma 0,59 888,7 -10,5% HL
154 Ela JicaPR_1227 Maluku Ela 0,2105 555,5 -5,4% HL
155 Bonehau hp_0448 Sulawesi 0,21 387,8 -2,5% HL & APL
The project information brochure and the results of the site assessment are presented in Annex I.