{ { SPECIALIZED INDUSTRIAL SERVICES CO. LTD. (SISCO) WELCOMES YOU TO THE PRESENTATION ON CORPORATE PROFILE Re: SABIC General Construction Services (Global Contract 2014 - 19) DATE: 07 JAN 2015

Upload: kochumon-mathew-mbapgdembba

Post on 21-Mar-2017

551 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: SISCO - Presentation SABIC

SPECIALIZED INDUSTRIAL SERVICES CO. LTD. (SISCO)

WELCOMES YOUTO THE PRESENTATION ON

CORPORATE PROFILE Re: SABIC General Construction

Services (Global Contract 2014 - 19)

DATE: 07 JAN 2015

Page 2: SISCO - Presentation SABIC

INDEX Introduction / Overview Company at a Glance Area of Business Resources Capability & Clientele Equipment, Vehicles & Facilities Highlights Contract Features Project Organogram & Work Flow Diagram Mobilization Plan Your Feed Back

Page 3: SISCO - Presentation SABIC

INTRODUCTION / OVERVIEW SISCO is a 100% Saudi Owned Limited Liability Company

established in the year 1990, growing with 30% CAGR

Strategically located Offices, Laydown Yards and Camps

An ISO 9000 accredited company, executing projects in Plant Construction, Piping, Pipe Line & Maintenance

With 2000 skilled manpower; 700 light & heavy equipment and vehicles, SISCO operates in CMEI areas in Oil & Gas Sector – Refineries, Petrochemical, Fertilizer and Utility Plants

Page 4: SISCO - Presentation SABIC

COMPANY AT A GLANCE

INDUSTRIAL CONSTRUCTION

SHUTDOWN, OPERATION & MAINTENANCE

CROSS COUNTRY PIPELINE & IN-PLANT PIPING PROJECTS

ENGINEERING & TECHNICAL SUPPORT

Page 5: SISCO - Presentation SABIC

AREA OF BUSINESS / SECTORS Civil, Mechanical, Electrical & Instrumentation on LSTK basis

Cross-country Pipeline, In-Plant Piping & Industrial Construction

Plant - Operation, Maintenance & Turn Around

Refineries, Petrochemical, Fertilizer & GOSPs

Power, Water & Civil Infrastructure

Page 6: SISCO - Presentation SABIC

RESOURCES

Employees

Equipment & Vehicles

Laydown Yard

Block Visas

Camp Facilities

Jubail Rahima YanbuKhafji Jeddah Riyadh

Camp & Office Locations

2000 Nos.

700 Nos.

50,000 SqM at Jubail & Ras Tanura

Accommodate Over 4,500 Senior & Junior Staff

400 Nos.

Page 7: SISCO - Presentation SABIC

SAUDI ARAMCO

SABIC

SATORP

SADARA

KJO

CAPABILITIES

Pipe Erection & Welding 35,000 Ø Inch / Month

Steel Fabrication & Erection 300 Ton / Month

Reinforced Concreting 1,500 CM / Month

TASNEE

SAUDI CHEVRON

MA’ADEN

JANA

MARAFIQ

CLIENTELE JESCO

APPC

SIPCHEM

SASREF

SAHARA

Page 8: SISCO - Presentation SABIC

EQUIPMENT & VEHICLES

Page 9: SISCO - Presentation SABIC

FACILITIES

Page 10: SISCO - Presentation SABIC

HIGHLIGHTS SAUDI ARAMCO

1. Northern Area (NAPD) 2005-12 : General Construction Services2. RT Terminal 2011-16 : General Maintanence of Onshore Plants 3. RT Refinery 2006-13 : Mechanical & Civil Maintenance Services4. Riyadh Refinery 2008-12 : Mechanical Pipeline & Plant Maint. Services5. Install Sanitary Waste Water Facilities @ Ras Tanura (12 KM RTR Piping)6. Safaniyah Tank Farm : 9,000 CM Concrete Paving & Dykewall7. Khurzaniya Gas Plant : Slope Protection (65,000 CM Marl) 8. Southern Area : Flare Up-gradation of 29 GOSPs 9. RT Refinery: Replace Control System; Crude Oil & Sulfur Recovery System10. Riyadh Refinery Chlorination & Condensate System Upgrade 11. FCV Piping Replacement Work at Abu-Ali Plant12. Plant-471 Shutdown Activities @ Berri Gas Plant13. Install Fuel Metering Station for AAC Block Factory, Jubail Ind. City14. Demolish/Relocate Loads of MCC-01,9&10 @ Air & Water Plt. Abqaiq15. Various Short Form /Mid Form/Shutdown Project at Northern & Sothern Area

Page 11: SISCO - Presentation SABIC

HIGHLIGHTS SATORP (JV SAUDI ARAMCO & TOTAL)

1. Jubail Export Refinery Package - 8 Piping - Install & Weld 150 KM 6”Ø - 36”Ø CS Pipelines Included 300,000 Ø Inch Welding

2. 150 KM Heat Tubes Installation 3. Repair / Replace 6.5 KM X 36ӯ Crude Oil Pipe Line4. Piping & Structural Works at KFIP Sea-Port, JUBAIL5. 8" & 6" Propylene Line from JERP to APPC & TASNEE6. 6" Benzene Line at Saudi Chevron Site, JUBAIL7. Dismantling of Naphtha/ Diesel Jump Over @ SASREF

SADARA (JV SAUDI ARAMCO & DOW CHEMICALS)1. PE LSPB-1, Train-01, Aboveground Piping Erection Works2. In Plant Work Support Services (2014-2016)3. M E I Construction of RO Plant Facilities (DOW/FLUOR)

SABIC (SAUDI BASIC INDUSTRIES CORPORATION)1. IBN-BAYTAR : Installation & Commissioning of HD Crusher2. SHARQ : Isolation Valve Tie-In for LP De-Ethanizer Reboiler Column3. SHARQ: Gas Cooler Drill 3" & Nozzle Welding (Shutdown) 4. IBN-ZAHR : Demolish & Reconstruct 4 Ea. Culverts & Channel Covers

Page 12: SISCO - Presentation SABIC

HIGHLIGHTS

TASNEE 1. Purging Speed up & Installation of C-2 Bypass Strainers for De-Ethanizer2. Install Duplex Filters & Replace Slice Gate @ SW Return3. Install Ammonia & Water Pumps

JANA1. LSTK Civil & MEI Works for New NACL Incinerator Plant 2. Electrical & Instrumentation work for CCL Plant 3. Piping Works & Supports For Foam & Fire Water Sprinkler Systems -

SABIC (Contin’d…)5. SAFCO: M Port Deducting System Modification in truck unloading Section 6. SAUDI KAYAN: Structural & Deluge Sys. for Tanks & Piping for U&O Nest7. AR-RAZI & IBN-ZAHR: Utilities & Yard Development8. HADEED : Mech Maint, FMT / BMT (2009, 2010, 2011, 2013)9. IBN-ZAHR : Repairs of MTBE-1 & 2 Catofin Reactor Header (2007, 2009)10. SHARQ Shipping & Logistics Support (1996-2014)11. Global Contract Mobile Workforce (2007-14)12. UNITED Golden Sand Housing Maint (2007-14)

Page 13: SISCO - Presentation SABIC

ISO CERTIFICATE

Page 14: SISCO - Presentation SABIC

CREDENTIALS

Page 15: SISCO - Presentation SABIC

CREDENTIALS

Page 16: SISCO - Presentation SABIC

CREDENTIALS

Page 17: SISCO - Presentation SABIC

CREDENTIALS

Page 18: SISCO - Presentation SABIC

CREDENTIALS

Page 19: SISCO - Presentation SABIC

Contract Title : SABIC General Construction Services (Global Contract)

Client : All SABIC Affiliates

Project Duration : 5 Years (From 22 July 2014 To 21 July 2019)

Scope of Work : Civil, Structural, Mechanical, Piping, Static & Rotating Equipment, Electrical, Instrumentation

Painting & Insulation including Material supply.

Mode of Contract : Work Unit Rates, Material, Time Unit Rates and Equipment Rates for undertaking construction activities in all SABIC affiliates.

Other : Special Material & Services as may be required

CONTRACT FEATURES

Page 20: SISCO - Presentation SABIC

PROJECT ORGANOGRAM

Project Manager

Construction Manager

(Civil)

Proj. Engr. (Civil) Nos. to Depend on

the Workload

Supervisor Civil

Work Permit Receiver

Surveyor

Mason-1Carpenter-1Steel Fixer-1Plumber-1Helper-1

Supervisor Structural

Work permit Receiver

Structural Fabricator-1

Erector-1Fitter-1

Helper-2

Construction Manger (Mech.)

Proj. Engr. (Mech.) Nos. to Depend

on Workload

Supervisor Piping

Work permit Receiver

Pipe Fabricator-1 Welder-4 (CS/ SS/AS/Monel)Pipe Fitter-1RTR Fitter-1

RTR Bonder-1Rigger-1Helper-2

Supervisor Static Eqpt.

Work permit Receiver

Millwright-1Helpers-2

Supervisor Rotat’g Eqpt

Work Permit Receiver

Millwright-1Helpers-2

Supervisor Paint/Insul’n

Work Permit Receiver

Sand Blaster-2

Spray Painter-1

Brush Painter-1

Insulators-2Helpers-2

Construction Manager

(E&I)

Proj. Engr. (E&I) Nos. to Depend on

Workload

Supervisor Electrical

Work Permit Receiver

Industrial Elctrician-2Electrical

Technician-2Fitter-1

Helpers-2

Supervisor Instrument’n

Work Permit Receiver

Instrument Technician-2Instr. Fitter-2

Splicers-2Helpers-2

QC Manager

Civil & Structural

Inspectors - 2

Mech. QC – 2 Piping QC – 2

Welding QC - 2

E & I Inspectors - 2

HSE Manager

Safety Supervisor -2

Safety Officer - 6

Fire Watch /Flag man

Planning & Coordination

Planning Engineer

Documentation/ Document

Controller - 2

Quantity Surveyor

PRO ID Coordinator

Procurement Manager

Procurement Coordination

Material Coordinator

Store Keeper

Page 21: SISCO - Presentation SABIC

WORK FLOW DIAGRAM

Introduction/Marketing(BD/PM)

Assignment in Estimation Dept.

(Biju/John)

Recieve Scope(PM/CM/CD)

Job Ex / Site Visit(Est./Exec. Dept.)

Preparation of BOQ

Approval From

Client (SABIC)

Sub-Contracts Rates/

Quotations Recieving

Budget Preparation &Manpower &

Equip. Finalzation

If Not Approved By Client the process

will repeat

Preparation Tech. Documents & Mobilization

Activites

Specific Project Quality

Plan

SHE Documentation

Qualifying SHE Personnel

Planning & Scheduling

Direct & Indirect

Manpower Allocation

Equipment Inspection &

Approval

Material Approval & Placing P.O

Materials Store in

Central Store

ID Processing

Approved & Service Order

Release

Mobilization

Hand Over of Site & QC Dossier Submission &

Approval

Execution of Works as per Scope

QC Inspections

Punch List Clearence &

Approval of Work

Invoicing(Incl.Retention &

Warranty)

End of Work Flow and repeats for every S.O

BASIC WORK FLOW CHART FOR SABIC GLOBAL GENERAL CONTRUCTION CONTRACT

Variations & Change orders

(If Any)

Page 22: SISCO - Presentation SABIC

G C S PROJECTS IN PROGRESSAffiliate AF # Project Title Value (SR)HADEED AF-1221089 Upgrade Power Stack Fan for DR

Module A/B 17,950,000.00

KEMYA AF-1215004 Alkyl Waste Handling Project 3,318,751.93

AF-1315021 Install Higher Capacity Fuel Gas Knock-Out Drum (TD-12A)

1,626,752.06

AF-1315032 Medium Pressue Steam to Condensate Pump

95,404.79

SHARQ AF-1112020 AF-1212057

Replace Drip Vessels in EG 1&3 1,650,693.08

AF-1112033 SHARQ Ethylene Sulfur Guard Bed in EG-4

2,650,000.00

SAUDI KAYAN

AF-1219022 Spare Guard Dryer Tie-In Installation 716,861.70

AF-1319001 Butane Line (Mercury bed) Tie-in 169,547.75

AF-1219038 Offload/Preserve Cold Box 160,171.60

Page 23: SISCO - Presentation SABIC

Current Manpower : 2000 Nos. Engineers 500, Skilled 700

Block Visa Availability : 400 Nos.

Mobilization Phase-1 : 350 Employees Currently Working

Phase-2 : 150 Employees throgh Demobilization

Phase-3 : 200 Employees by 01 February 2015

Phase-4 : Fresh Recruits depending on Additional Visa Recommendation from SABIC

Equipment : Adequate Vehicles & Equipment available for mobilization (Phase1 & 2).

We are capable to meet any additional Requirements as and when required.

MOBILIZATION PLAN

Page 24: SISCO - Presentation SABIC

How will the Affiliate utilize this Contract?

Affiliates Planned Work Load for Next Two (2) Years

Provision for Office, Laydown & Fabrication Facility

Suggestions for effective utilization of this Contract

Any Comments / Recommendations !

YOUR FEED BACK

Page 25: SISCO - Presentation SABIC

We Continually Strive to Improve our Performance

for the Betterment of all the Stakeholders.

Thank You!