Construction Specifications InstituteKevin Volbrecht
Deputy Director, Construction
February 13, 2013
![Page 2: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/2.jpg)
Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project At-a-Glance
![Page 3: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/3.jpg)
3
Route MapRoute Map
![Page 4: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/4.jpg)
4
Nearing the Finish LineNearing the Finish LineConstruction Marching ForwardConstruction Marching ForwardPhase 1 from I-66 to RestonConstruction of the Dulles Corridor Metrorail Project is under way along the 11.7-mile corridor, from East Falls Church to Reston
CONSTRUCTION IS 88% CONSTRUCTION IS 88%
COMPLETECOMPLETE• Tracks almost complete
• Stations – elevators, escalators, systems being installed
• Pedestrian bridges and pavilions almost complete
• Completion – Summer 2013
• Opening – To Be Determined by WMATA
![Page 5: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/5.jpg)
5 West Falls Church YardWest Falls Church Yard
![Page 6: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/6.jpg)
6West Falls Church YardWest Falls Church Yard
![Page 7: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/7.jpg)
7Orange Line Tie-InOrange Line Tie-In
![Page 8: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/8.jpg)
McLean Station
![Page 9: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/9.jpg)
9McLean Station Pedestrian Bridge Work
![Page 10: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/10.jpg)
10McLean Station Stair and Escalator Installation
![Page 11: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/11.jpg)
11Tysons Corner Station Pedestrian BridgeTysons Corner Station Pedestrian Bridge
![Page 12: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/12.jpg)
12Tysons Corner Station First Span of the Pedestrian Tysons Corner Station First Span of the Pedestrian
BridgeBridge
![Page 13: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/13.jpg)
Tysons Corner StationTysons Corner Station
![Page 14: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/14.jpg)
14 Tunnel Entrance at Route 123
![Page 15: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/15.jpg)
15 Tunnels at Route 123 and Route 7
![Page 16: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/16.jpg)
16 Cut and Cover Tunnel at Route 123 and Route 7
![Page 17: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/17.jpg)
17 Greensboro Station
![Page 18: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/18.jpg)
18Greensboro Station Looking West
![Page 19: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/19.jpg)
19 Spring Hill Station
![Page 20: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/20.jpg)
Guideway from Route 7 to Dulles International Airport Guideway from Route 7 to Dulles International Airport Access Highway/Dulles Toll RoadAccess Highway/Dulles Toll Road
![Page 21: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/21.jpg)
Wiehle-Reston East Station (Wiehle Ave.)(Wiehle Ave.)Wiehle –Reston East StationWiehle –Reston East Station
![Page 22: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/22.jpg)
22 Comstock Development at Wiehle Avenue Station
![Page 23: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/23.jpg)
23Tail Track at Wiehle-Reston East Station
![Page 24: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/24.jpg)
24 Clearance Car Running the Alignment
![Page 25: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/25.jpg)
25
Phase 2Phase 2
• 11.4 –mile extension from Wiehle Avenue in Reston to Ashburn
• 6 stations:• Reston Town Center• Herndon• Innovation Center• Dulles Airport• Route 606• Route 772/Ashburn
• Rail Yard & Maintenance Facility
• 5 Parking Garages
![Page 26: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/26.jpg)
View from Platform to TerminalView from Platform to Terminal
• The Dulles Airport Station will feature an aerial station approximately 1,000 feet north of the terminal near the Daily 2 (North) Garage.
• The station will be linked to the terminal via the existing tunnel that connects with the North Garage and includes a number of moving walkways
Dulles Airport Location DetailsDulles Airport Location Details
![Page 27: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/27.jpg)
Phase 2 StatusPhase 2 Status
Completed Preliminary Engineering
February 2012
Qualifications Information Received
September 2012
Short-list Phase 2 Teams Selected
October 2012
Bechtel Transit PartnersBechtel Infrastructure Corporation
Capital Rail ConstructorsClark Construction Group, LLCKiewit Infrastructure South Co.
Dulles APC RailbuildersArcher Western Contractors, LLCPCL Civil Constructors, Inc.Corman Construction, Inc.
Dulles Metrorail ConnectorsSkanska USA Civil Southeast / Granite Construction CompanyG.A. & F.C. Wagman, Inc. / Trumbull CorporationFacchina Construction Company, Inc.
Silver Line ConstructorsFluor Enterprises, Inc. / Tutor Perini Corporation / Stacy and Witbeck, Inc.
Price Proposals Due April 2013
Contract Awarded May 2013
![Page 28: Silver Line Update (February 2013 Meeting)](https://reader037.vdocuments.site/reader037/viewer/2022102922/548ac474b47959a81a8b4591/html5/thumbnails/28.jpg)
28
Contact Information
1593 Spring Hill Road Suite 300
Vienna, VA 22182
703-572-0500
www.dullesmetro.com