welcome! we will begin momentarily€¦ · silver line project update 7 • the design-build status...
TRANSCRIPT
![Page 1: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/1.jpg)
0
Welcome!We Will Begin Momentarily
Please submit all questions and comments via the chat room.
If you have called into this meeting and wish to submit questions or comments please
email [email protected].
If we do not respond to your question/comments tonight,it will be responded to within 30 days of receipt.
Your question and answer will then be posted on www.DART.org/SilverLine
Thank You
![Page 2: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/2.jpg)
1
City of Dallas | Group 4 - Neighborhoods 5 & 6Betterments Workshop #4Wednesday, July 29, 2020
Dallas Area Rapid Transit (DART)Silver Line Regional Rail Project
![Page 3: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/3.jpg)
2
NOTICE
Audio and Video Recording In Progress
PLEASE SUBMIT QUESTIONS OR COMMENTS VIA THE CHAT ROOM, OR HOLD ALL QUESTIONS AND COMMENTS TO THE END OF THE PRESENTATION
![Page 4: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/4.jpg)
DART Community Engagement Representative
3
![Page 5: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/5.jpg)
COVID-19 Update
4
Due to the current pandemic, all public involvement sessions will take place via video conference.
DART urges you to follow the guidelines from the Centers for Disease Control and Prevention (CDC) to keep your
family healthy and safe.
Stay up to date by attending public involvement sessions online, signing up for construction alerts, visiting DART.org/SilverLine or calling 214-749-2543.
![Page 6: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/6.jpg)
How To Stay Informed
5
Attend meetings virtually
![Page 7: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/7.jpg)
Questions and Answers
6
Please submit all questions and comments via the chat room. Questions about Betterments will be reviewed by our Team and a
response will be prepared for the end of the presentation.
If a more detailed response is required, or it is anon-Betterment question, it will be responded to within 30 days of
receipt.
If you have called into this meeting and wish to submit questions or comments please email [email protected].
Thank You
![Page 8: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/8.jpg)
Silver Line Project Update
7
• The design-build status for Silver Line is 59% complete as of June 30, 2020.
• The Silver Line vehicle design is 85% complete as of June 30, 2020.
• The Equipment Maintenance Facility design is at 65% complete as of June 30, 2020.
• As of July 1, 2020 active construction in DFW International Airport, Coppell, Carrollton, and Addison.
• There is no current construction in the Dallas area. DART and the City of Dallas are still working on the required ILA (Interlocal Agreement). You will be notified prior to construction beginning in your area.
![Page 9: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/9.jpg)
Purpose of the Meeting
8
1. Review Results of the Previous Betterments Workshops
2. Review Recommendations from DART for Color and Finish of Sound and Betterment Walls and Vegetation Options
3. Obtain Input from Residential Adjacent Property Owners on Color and Finish of Sound and Betterment Walls and Vegetation Options
![Page 10: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/10.jpg)
Betterments Workshops Recap
9
Group 4 | Neighborhoods 5 & 6 –
Previous Betterment Workshops were held on the following dates:
• Kickoff – March 21, 2019
• Workshop #1 – May 23, 2019 & June 20, 2019
• Workshop #2 – July 25, 2019
• Workshop #3 – August 28, 2019
• Workshop #4 – July 29, 2020
![Page 11: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/11.jpg)
Group 4 | Neighborhoods 5 & 6 Consensus Results are as follows:
Willow Greene Condos29 out of 29 Votes Received- 15' Betterment Wall
Home | Dickerson Street0 out of 1 Votes Received- 15' Betterment Wall (Default)
Betterments Consensus Results - Dallas
10
![Page 12: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/12.jpg)
Betterments Consensus Results
11
![Page 13: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/13.jpg)
Betterments Consensus Results
12
![Page 14: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/14.jpg)
Wall Color Options
13
(DEFAULT)
![Page 15: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/15.jpg)
Wall Finish Options
BUSH HAMMER (DEFAULT)
ROLLED BRICKROLLED DRYSTACK
ROLLED ASHLAR
14
![Page 16: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/16.jpg)
TracksideTan Color and Bush Hammer Finish
15
* Posts will not be painted or have cladding.
![Page 17: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/17.jpg)
Neighborhood ViewTan Color and Bush Hammer Finish
16
* Posts will not be painted or have cladding.
![Page 18: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/18.jpg)
Bush Hammer Finish
17
* Posts will not be painted or have cladding.
![Page 19: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/19.jpg)
Rolled Ashlar Finish
18
* Posts will not be painted or have cladding.
![Page 20: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/20.jpg)
Rolled Drystack Finish
19
* Posts will not be painted or have cladding.
![Page 21: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/21.jpg)
Rolled Brick Finish
20
* Posts will not be painted or have cladding.
![Page 22: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/22.jpg)
Shade Tree Vegetation Options
21
Honey Locust Chinese PistacheLace Bark Elm
* City of Dallas may change vegetation choices in the future.
![Page 23: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/23.jpg)
Ornamental Tree Vegetation Options
22
Little Gem Magnolia Eve's NecklaceDesert Willow
* City of Dallas may change vegetation choices in the future.
![Page 24: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/24.jpg)
Large Shrub Vegetation Options
23
Texas Sage Dwarf Wax MyrtleIndian Hawthorn
* City of Dallas may change vegetation choices in the future.
![Page 25: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/25.jpg)
Utility Approved Large Shrub Vegetation Options
24
Dwarf Yaupon HollyAmerican Beautyberry
* City of Dallas may change vegetation choices in the future.
![Page 26: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/26.jpg)
Small Shrub Vegetation Options
25
Red BarberrySoft Leaf Yucca Red Yucca
* City of Dallas may change vegetation choices in the future.
![Page 27: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/27.jpg)
Utility Approved Small ShrubVegetation Options
26
Dwarf Indian HawthornDwarf Chinese Holly Red Barberry Boxwood
* City of Dallas may change vegetation choices in the future.
![Page 28: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/28.jpg)
Ground Cover Vegetation Options
27
Asian JasmineVincaPurple Winter Creeper
* City of Dallas may change vegetation choices in the future.
![Page 29: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/29.jpg)
Utility Approved Ground CoverVegetation Options
28
Asian JasmineLiriopeCreeping Juniper
* City of Dallas may change vegetation choices in the future.
![Page 30: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/30.jpg)
Vine Vegetation Options
29
Virginia CreeperTrumpet VineCoral Honey Suckle
* City of Dallas may change vegetation choices in the future.
![Page 31: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/31.jpg)
What To Expect Next
30
You will be receiving a letter confirming consensus for your area along with a ballot to choose wall color, finish and
vegetation. We ask that you complete the ballot and submit it by the enclosed date specified.
As we continue to progress with the project, DART will contact you for any further needs to complete the project. We strongly encourage you to sign up online to get project and construction
updates at www.DART.org/SilverLine.
![Page 32: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/32.jpg)
31
31Thank You For Joining Us!
If you still have questions or comments, please submit them [email protected]
We will respond to you question or comment within 30 days of receipt.
Your question and answer will then be posted on www.DART.org/SilverLine
![Page 33: Welcome! We Will Begin Momentarily€¦ · Silver Line Project Update 7 • The design-build status for Silver Line is 59% complete as of June 30, 2020. • The Silver Line vehicle](https://reader033.vdocuments.site/reader033/viewer/2022050403/5f8081aa1ebb20173c27d112/html5/thumbnails/33.jpg)
32
32
This Meeting Has Concluded