side- power paralell thruster systems switch box · “visual” wiring diagram to the thruster,...

8
Keep this manual onboard ! For thrusters: SP155TC / SP200TC / SP220TC Series / paralell switch box w. softstart installation manual IMPORTANT NOTICE: This manual is to be used in addition to the regular installation manual for the Sidepower thruster. This manual is intended for professionals only that can read and understand a wiring diagram, and does not contain all detailed work instructions for what must be done to ensure correct and safe installation SIDE- POWER Thruster systems Made in Norway © Sleipner Motor AS 2002 SLEIPNER MOTOR AS P.O. Box 519 N-1612 Fredrikstad Norway Tel: +47 69 30 00 60 Fax: +47 69 30 00 70 www.side-power.com [email protected] Series / paralell switch box (For 99 models or newer thrusters with 4 lead electric system)

Upload: others

Post on 08-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SIDE- POWER paralell Thruster systems switch box · “visual” wiring diagram to the thruster, series/paralell switch box and batteries. Make sure to label all cables in both ends

Keep this

manual onboard !

For thrusters: SP155TC / SP200TC / SP220TC

Series / paralell switch box w. softstartinstallation manual

IMPORTANT NOTICE:This manual is to be used in additionto the regular installation manual for

the Sidepower thruster.This manual is intended for

professionals only that can read andunderstand a wiring diagram, anddoes not contain all detailed work

instructions for what must be done toensure correct and safe installation

SIDE-POWER

Thruster systems

Mad

e in

Nor

way

© Sleipner Motor AS 2002

SLEIPNER MOTOR ASP.O. Box 519N-1612 FredrikstadNorwayTel: +47 69 30 00 60Fax:+47 69 30 00 70

[email protected]

Series /paralellswitch box

(For 99 models or newer thrusters with 4 lead electric system)

Page 2: SIDE- POWER paralell Thruster systems switch box · “visual” wiring diagram to the thruster, series/paralell switch box and batteries. Make sure to label all cables in both ends

2Series / paralell switch box intallation manual 1.0 - 2002

Installation of the Sidepower series / paralell switch box

Note! To achieve maximum effect, reliability and durability from your Sidepower thruster, a correctinstallation as per the instructions are very important. Please follow the instructions carefully, andmake sure that all checkpoints are carefully controlled.

Introduction and planning for the installation of the Sidepower series /paralell switch box.The Sidepower series/paralell switch box have been designed to provide a safe and reliable 24Vpower for a 24V thruster in a 12V boat.

It has been specially designed and built to accomodate for the high current demands of an electricthruster and are available in two versions, one for the SP155TC and one for the SP220TC. The onlydifference between these two units are the solenoid sizes for the different amp. draw.

It is also designed so that there is no need for additional charging devices and connections, the extrabattery will be automatically charged by the “original” charge feed in the boat for the standard battery(battery bank) that are being used as “Batt.1”.

There are no need to install 2 special battery banks as one of the boats “standard” banks can beused as Batt.1, preferably the start battery bank as this is “always” full. The start battery bank is alsopreferred as there are normally no electronics that can be knocked out by a voltage drop or peakcaused by all heavy electromtotors such as a thruster.NOTE ! If you have electronically controlled engines (MMC / Volvo EDC / Morse etc.) the power tothese must not be taken from the same battery as you power a thruster (or any other high powerelectric item). The best and most easy way to solve the power feed to such sensitive and criticalitems is to make their powersupply a protected one (either by a small extra battery for this, or by alarge condensator / diode pack). It is better, easier and less expensive to provide a seperate powerfeed to the electronic engine controls instead of a seperate battery system for the heavy users, as theelectronics have a very small power demand in comparison with a thruster, windlass and the enginesstarter motor.

Without exeptions, Batt.2 can have no other connections other than those described in theseinstructions.

We advice to install the extra battery (Batt.2) and the series / paralell switch box as close to thebattery (bank) used as Batt.1 as possible.

Make sure to use heavy duty power cables for all battery and thruster connections including the onesbetween the batteries and the series/paralell box. The minimum cable size to use is 70mm2 / OOOor more if required by the length. See list in manual for the thruster you are installing.

The series/paralell switch box is splash proof but must be installed in a dry position so that it can notbecome submerged in water.

Observe and follow the minimum battery capasity ratings described here. The smallest rating is for theSP155 and the largest for the SP200 & SP220. Remember, these are minimum ratings, bigger isbetter.Always install main power switches in the main positive cables from each battery bank so that incase of a failure or emergency, the power can be switched off. The boat owner / operator must beinformed of the location of these switches and instructed to shut them off when leaving the boat.

We also advice to install fuses at each battery as described in the wiring diagrams.

Page 3: SIDE- POWER paralell Thruster systems switch box · “visual” wiring diagram to the thruster, series/paralell switch box and batteries. Make sure to label all cables in both ends

3Series / paralell switch box intallation manual 1.0 - 2002

The switch box works like this

When the thruster is not running: (see FIG.1)

The two batteries (battery banks) are connected in paralell so that the extra battery is being charged bythe boats normal 12V charge system, the same charge system that is charging the standard Batt.1.By this, the extra battery (Batt.2) becomes a full part of the Batt.1 bank and thereby also increase thecapasity of this.

The box is built so that you can draw thesame amount current from the extraBatt.2 as the thruster draws as thesolenoids have the same capasity intheir inactive position as in the activeposition.(and basically nothing on aboat draws as much as a thruster).There is no power on the main positivelead to the thruster until the thruster isactivated by the controlpanel.

The power to the thrusterscontrolsystem and panel is supplied bythe series/paralell switch box, via thegrey and black leads to the control sideof the thrusters solenoid only.Both batteries are now at 0V - 12V

-

+Batt.112V

SIDE-POWER

M24 VDC

-

+Batt.212V

SIDEPOWERSeries / paralell switch box

+

To engine starter,alternator,

charger etc.

-

FIG 1

THIS IS NOT A WIRING DIAGRAM.Only for functional illustration.

When you run the thruster: (see FIG.2)

When a run signal is sent to the thruster from the panel, the solenoids in the series/paralell box reactsfirst so that Batt.2 is moved into a series connection with Batt.1. so that there is 24V on the mainpower supply cable to the thruster.

The main contactors on the thrusterdoes not engage until this have beendone so that you have 24V at thethruster to control the 24V mainsolenoid contactors on the thruster.

Now, only Batt.1 is being chargedwhile Batt.2 can only draw from itsown capasity.In this position, Batt.1 is 0 - 12V andBatt.2 becomes the 12V - 24Vportion of the 24V feed to thethruster.

Batt.2 can only be connected to theseries/paralell switch box asdescribed in the manual.

-

+Batt.112V

SIDE-POWER

M24 VDC

-

+Batt.212V

SIDEPOWERSeries / paralell switch box

+

To engine starter,alternator,

charger etc.

-THIS IS NOT A WIRING DIAGRAM.Only for functional illustration.

FIG 2

Page 4: SIDE- POWER paralell Thruster systems switch box · “visual” wiring diagram to the thruster, series/paralell switch box and batteries. Make sure to label all cables in both ends

4Series / paralell switch box intallation manual 1.0 - 2002

Series / paralell switch box installation

Installation

1. Install the thruster as per the installation instructions following it, but disregard the wiringdiagram which are being replaced by the diagrams in this manual. Make sure to use thecorrect main cable size according to the length to thruster as listed in the thrusters manual.PS ! The length measurements in this list is the total of the + and - cable.

2. Bolt the box to a bulkhead in an accesible location as close to the two battery banks aspossible. It should be positioned so that the cable openings face down .

3. Connect the heavy main cables, main battery switches and fuses as described in the“visual” wiringdiagram to the thruster, series/paralell switch box and batteries. Make sureto label all cables in both ends to ensure correct connection points. Remember to fit therubber seals around the cables and in the box. All the connection studs in the series/paralell switch box are ø10mm . (See FIG.3 and FIG.4)

4. Check again that the main cable wiring in the system is correct !

5. Extend the included 2-lead wire coming out of the series/paralell switch box (grey andblack) and connect these to the lower connectors on the thrusters main solenoid contactor.(See FIG.3 + FIG.5)

6. Install the controlpanel(s) as per the instructions. The panels should be connected directlyto the thruster as in a “normal” installation without a series/paralell switch box.

7. If you are installing a sternthruster, make sure to follow the instructions in the sternthrusterinstallation manual to move the electronic controlbox away from the thruster and seal thethruster compartment from general bilgewater. The electric installation of bow and sternthrusters must be treated as seperate thrusters in terms of electric wiring so that eachthruster must have its own series paralell box with all the connections and a seperateBatt.2 and the 2-lead controlcable between the series paralell box and the thruster.There is an example diagram (FIG.6) on page 7. You can also use seperate battery bank 1for each thruster, remember the 12V charge feed as described.

NB! If you are installing both a bow and a sternthruster with series/paralell switch boxes theBatt.1 bank can be common for both thrusters providing it has the necessary capasity(minimum x 2,5) but there must be an individual Batt.2 for each thrusters. (see FIG. 6)

Minimum battery capacities

Batt.1 Batt.2 Slow fuse / main switch ratingSP155TC 600CCA din 600CCA din 400A for 10 minutesSP200TC 750CCA din 750CCA din 550A for 10 minutesSP220TC 800CCA din 800CCA din 600A for 10 minutes

- CCA din is the Cold Cranking Amps rating by the DIN standard.If your battery is rated by other standards, you should use the following factors:DIN = SAE & BCA / 1,9 (Example: rating is 800 CCA BCA = 421 CCA DIN)DIN = IEC / 1,3

REMEMBER: Bigger and more powerful batteries and cables will increase the thrusters performanceas there will be less voltage drop to the thruster. The sizes mentioned in the manuals are theminimum sizes and the larger, the better.

Page 5: SIDE- POWER paralell Thruster systems switch box · “visual” wiring diagram to the thruster, series/paralell switch box and batteries. Make sure to label all cables in both ends

5Series / paralell switch box intallation manual 1.0 - 2002

Visual wiring diagram

A1

Red

Red Blu

eGr

ey

SLE

IPN

ER

SID

EPO

WER

TH

RU

ST

ER

OFF

ONON

Black

Con

trol

cab

le2

lead

from

box

Grey

Black

Red

_ ++

Fro

m s

er/p

ar b

ox

- Fro

m B

att.1

neg

ativ

e

+ -

12V

Bat

t 2

+ -

12V

Bat

t 1

deR

deR

eulByer G

kcalB

elba c lortnoC

xo b m or f d ae l 3

yer G

kcal B

deR

s elba c rew op llA

x ob ,seir etta b neewte b

eb dlu oh s r ets urh t d naht i

w ecnad roc ca ni de zis. ecnatsid la utca e ht:s i

mumi ni

m etu losb Am

m07 = 55 1P S ro f2

mm59 = 02 2PS ro f

2 1/3 202-S:o n .w ar

D

esu FA006 ot 0 04

ep y t w ol

S

esu FA006 ot 0 04

epy t wol

S

n iaM

gnit cenno csidh cti

ws

ni aM

gnit cenn ocsi dhct i

ws

+

sd ne daeLe b tsu

mdetalosi

1A

l lelarap / sei re s rewopedi

Sxob hcti

ws

+-

ev it ag en 1 .tt aB

mor F -

x ob rap/res mor F +

Eng

ine

alte

rnat

oran

d or

oth

erch

arge

dev

ice

12V

+ -S

LEIP

NE

R

SID

EPO

WER

TH

RU

ST

ER

OFF

ONON

Co

nn

ectio

ns

on

mo

tor

for

SP

220T

C a

nd

old

erS

P15

5TC

FIG 3

Page 6: SIDE- POWER paralell Thruster systems switch box · “visual” wiring diagram to the thruster, series/paralell switch box and batteries. Make sure to label all cables in both ends

6Series/ Paralell switch box installation manual 1.0 - 2004

Visual wiring diagram SP 200TC-S12

Technical wiring diagram SP 200TC-S12

To controlpanel(s)

see manual

C4C3

A1

A2SIDE-

POWER

M48 VDC

-

12VBat.bank 1(12V)

+

K2K1

Co

Electronicmotor interface

K1 K2Di1

Di2

Fuse10-15 A

3 x 1,5mm2

3m + extendable

1

2

3

Re1

-

Bat.bank 2(12V)

+

C1

30

87Re1 Re2

30

87

Di7

MainFuse

Bat.switch

Re2

8iD C2

Main Fuse

6iD

Soft-starttimer

Brown

Blue

eulB

Violet

White

Red16¤

Bat.switch

OvertempSwitch

Red

Grey

Black

Red

+To engine starter,

alternator etc.

-To engine starter, alternator

etc.

30

87bRe1C1

3iD

c1

C2

a

NOTES !- Main battery fuses: recommended min. 500A- Main battery switches : must be rated at

minimum 500A for minimum 10 minutes. Usehigh quality switches to avoid voltage drop.

- See installation manual for correct cable sizesfor different total cable lengths

BlackRed

yerGeul

B

White

NB! Make sure to not use any electronicinterface box (delay box) older than the 61232i (ex. 6 122x).

A1

SLEIPNER

SIDEPOWERTHRUSTER

OFFON ONEngine alternator

and or othercharge device 12V

+

-

Control leadto box

PS ! Battery bank 2 can not beconnected to anything else.Must be exactly as shown here.

SIDEPOWER THRUSTERSSleipner Motor AS

N-1612 FREDRIKSTAD

*

*

**

*

Visual wiring diagram for 24-48Vserial paralell switch box for

Sidepower SP200TC-S12

Size of power cablesbetween batteries, box and

thruster is depending ondistance. Minimum is 50mm2

Use minimum the main cablesizes for main stretch asadviced in the list in the

manual

*

1kn

abyr

et ta B

2 1V

+

- 2kn

abyr

et taB

V21

+

-

Drawing no:LG 10/04-S12

Date:

26.08.2004

BlackGreyRedRed

lB ue

Red

Grey

12V

Page 7: SIDE- POWER paralell Thruster systems switch box · “visual” wiring diagram to the thruster, series/paralell switch box and batteries. Make sure to label all cables in both ends

7Series / paralell switch box intallation manual 1.0 - 2002

Technical drawings

ExistingRED

ExistingGREY

New GREY fromser/par box

ExistingRED

ExistingBLUE

New BLACKfrom ser/par box

NB

!�

Bat

tery

ban

ks 2

"bo

w"

and

2 "s

tern

" ca

n no

t be

conn

ecte

d to

anyt

hing

els

e. M

ust b

e ex

actly

as

show

n he

re.

�S

e ot

her

diag

ram

s an

d re

com

enda

tion

shee

t for

cab

ledi

men

sion

.�

PS

! 7

0 m

m2

is a

bsol

ute

min

imum

, als

o on

sho

rt in

tern

al w

irin

gbe

twee

n ba

tter

ies

and

seri

es/p

aral

ell b

ox.

Sle

ipne

r Mot

or A

SN

-161

2 FR

ED

RIK

STA

D

Spe

cial

wiri

ng d

iagr

am fo

r ins

talla

tion

of 2

xth

rust

ers

with

ser

ies

/ par

alel

l sw

itch

boxe

sD

raw

ing

no:

S-9

957

Dat

e:16

.08.

1999

For c

harg

ing,

use

sta

ndar

d / n

orm

alco

nnec

tions

to b

atte

ry b

ank

1 (s

tart

batte

ry b

ank)

Con

trol

lead

tobo

w th

rust

er

+ -

Con

trol

lead

tost

ern

thru

ster

Battery bank2 "Stern" 12V

min. 600/800 CCA

+ -

Pos

itive

pow

er le

adto

bow

thru

ster

Neg

ativ

e po

wer

lead

tobo

w th

rust

er

+ -

Neg

ativ

e po

wer

lead

tost

ern

thru

ster

Pos

itive

pow

er le

adto

ste

rn th

rust

er

24 V

to s

tern

thru

ster

24 V

to b

owth

rust

er

Inte

rnal

wiri

ngno

tsh

own

Inte

rnal

wiri

ngno

tsh

own

Bat

tery

ban

k1

(12V

)S

tart

bat

terie

sM

ini.

1200

/16

00 C

CA

Battery bank2 "Stern" 12V

min. 600/800 CCA

Sid

epow

er s

erie

s / p

aral

ell

switc

h bo

x fo

r bo

w-t

hrus

ter

Sid

epow

er s

erie

s / p

aral

ell

switc

h bo

x fo

r st

ern-

thru

ster

Connection on the thrusters solenoids

FIG 5

FIG 6

Example diagram if bow + stern thruster

Page 8: SIDE- POWER paralell Thruster systems switch box · “visual” wiring diagram to the thruster, series/paralell switch box and batteries. Make sure to label all cables in both ends

Service Centres

Sleipner Motor AS, P. O. Box 519, N-1612 Fredrikstad, NorwayTel: +47 69 30 00 60 Fax: +47 69 30 00 70 [email protected] www.side-power.com

ArgentinaTrimer SABuenos AiresTel: +54 11 4580 0444Fax: +54 11 4580 [email protected]

AustraliaAMI SalesFreemantle, WATel: +61 8 9331 0000Fax: +61 8 9314 [email protected]

AustriaG. Ascherl GmbHHard, BregenzTel: +43 5574 899000Fax: +43 5574 [email protected]

BeneluxASA Boot ElectroWatergangTel: +31 20 436 9100Fax: +31 20 436 [email protected]@asabootelectro.nl

CanadaImtra CorporationNew Bedford, MATel: +1 508 995 7000Fax: +1 508 998 [email protected]

CroatiaAC Yacht & nautical supportIciciTel: +385 51 704 500Fax: +385 51 704 [email protected]

DenmarkGertsen & Olufsen ASHørsholmTel: +45 4576 3600Fax: +45 4576 [email protected]

FinlandNautikulma OYTurkuTel: +358 2 2503 444Fax: +358 2 2518 [email protected]

FranceKent Marine EquipmentNantesTel: +33 240 921 584Fax: +33 240 921 [email protected]

GermanyJabsco GmbHNorderstedtTel: +49 40 535 373-0Fax: +49 40 535 373-11

GreeceAmaltheia MarineAthensTel: +30 210 2588 985Fax: +30 210 2588 [email protected]

IcelandMaras EHFReykjavikTel: +354 555 6444Fax: +354 565 [email protected]

Ireland

IsraelAtlantis Marine Ltd.Tel AvivTel: +972 3 522 7978Fax: +972 3 523 [email protected]

ItalySaim S.P.A.Assago-MilanTel: +39 02 488 531Fax: +39 02 488 254 5www.saim-group.com

JapanTurtle Marine Inc.NagasakiTel: +81 95 840 7977Fax: +81 95 840 [email protected]

MaltaS & D Yachts Ltd.CaliTel: +356 21 339 908Fax: +356 21 332 [email protected]

New ZealandLusty & Blundel Ltd.AucklandTel: +64 9 415 8303Fax: +64 9 415 [email protected]

NorwaySleipner Motor ASFredrikstadTel: +47 69 30 00 60Fax: +47 69 30 00 [email protected]

PolandTaurus Sea Power SP. Z.O.OGdanskTel: +48 58 344 30 50Fax: +48 58 341 67 62

PortugalKrautli Portugal Lda.LisboaTel: +351 21 953 56 00Fax: +351 21 953 56 [email protected]

RussiaStandarteStarbeyevoTel: +7 495 575 67 23Fax: +7 495 575 39 [email protected]

SpainImnasa Marine ProductsGironaTel: +34 972 820210Fax: +34 972 [email protected]

SwedenSleipner ABStrömstadTel: +46 526 629 50Fax: +46 526 152 95www.sleipnerab.se

SwitzerlandMarine Parts Technics AGVolketswilTel: +41 44 997 40 90Fax: +41 44 997 40 [email protected]

Singapore/Malaysia/IndonesiaAlquest MarketingSingaporeTel: +65 6749 9359Fax: +65 6749 [email protected]

TaiwanMercury Marine SupplyKaohsiungTel: +886 7 8133 233Fax: +886 7 8133 236

TurkeyDenpar Ltd.IstanbulTel: +90 212 285 0334Fax: +90 212 285 [email protected]

U KSleipner Motor Ltd.South BrentTel: +44 1364 649 400Fax: +44 1364 649 [email protected]

United Arab EmiratesTeignbridge PropulsionDubaiTel: +971 4 324 0084Fax: +971 4 324 [email protected]

USAImtra CorporationNew Bedford, MATel: +1 508 995 7000Fax: +1 508 998 [email protected]

All other:Sleipner Motor AS

Sleipner Motor Ltd.South BrentTel: +44 1364 649 400Fax: +44 1364 649 [email protected]

Singapore/Malaysia/IndonesiaOK-Maritime Pte LtdSingaporeTel: +65 9669 8051Fax: +65 6769 [email protected]