Shire Plan 2012-2013
ROPER GULF SHIRESUSTAINABLE, VIABLE, VIBRANT
ii
The roper Gulf Shire Council logo
The logo was developed from a concept created by Lainie Joy of Borroloola. The five flowing figures have multiple meanings. They represent the five wards in our Shire (Never Never, Numbulwar, Nyirranggulung, South West Gulf and Yugul Mangi); the five main rivers winding through our Shire (the Limmen, McArthur, Robinson, Roper and Rose Rivers); the low-lying hills that are visible on the horizon nearly everywhere in the Shire and the Rainbow Serpent that underlies everything. The colours are based on the different colours of the soils and the peoples co-existing in the Shire.
Photography: David Hancock
Internal pages design and layout: Sprout Creative
Shire headquarters
Street Address 29 Crawford Street Katherine NT 0850
Postal Address PO Box 1321 Katherine NT 0851
Phone 08 8972 9000
Fax 08 8971 2607
Email [email protected]
Website www.ropergulf.nt.gov.au
Roper Gulf Shire Council ABN 94 746 956 090
infrastructure and Technical Services Depot
99 Emungalan Road Katherine NT 0850
night Patrol Depot
14 Chardon Street Katherine NT 0850
CDeP and Youth Service Depot
126 Victoria Highway Katherine NT 0850
Shire Service Delivery Centres
Phone Fax
Barunga 8975 4505 8944 7059Beswick 8975 4800 8975 4565Borroloola 8975 8758 8975 8762Bulman 8975 4189 8975 4753Jilkminggan 8975 4751 8975 4905Manyallaluk 8978 6466 8944 7049Mataranka 8975 4576 8975 4608Ngukurr 8975 4656 8975 4658Numbulwar 8975 4675 8975 4673
Other locations
Robinson RiverUrapunga (Rittarangu)WerenbunMinyerriAwumbuninjiBadawarrkaBeghettiBarrapunta (Emu Springs)Boomeran LagoonCostelloGaniyarrnad (Ross Hill)Jodetluk (Gorge Camp)GorpulyulLake KatherineMole HillMomobMount CattMulgganMumballina (Toll Gate)Nulawan (Nalawan)Nummerlorri (Namaliwirri)Turkey LagoonMobarn (Bluewater)LarrimahDaly Waters
Shire Plan 2012-2013 iii
ForewordThe Roper Gulf Shire Council acknowledges the Traditional Owners of the Shire area, past and present. Roper Gulf Shire Council has grown significantly since its commencement in July 2008. Rapid growth and increased service delivery have presented challenges and complex issues for the Council. The Council has worked hard to meet and overcome these challenges as it has moved forward.
The three year Strategic Plan 2010-2013 reflects the individual character of the Shire. The Shire continues to improve the quality of services and programs it delivers as it moves towards achieving the goals and objectives set out in the Strategic Plan. 2012 marked a significant milestone, being this Shire’s second Council election. Armed with a new Shire Plan, a wealth of cultural knowledge and stronger community ties, the new Council will be reviewing the Strategic Plan in 2013 to provide the organisation with goals and outcomes reflective of the evolving requirements of our communities. The new Council have the advantage of utilising past lessons learnt by the previous Council to ensure an efficient and consultative process.
The Shire is committed to improving and increasing remote service delivery to all our townships and will continue in its lead role in identifying opportunities for greater service delivery; industry growth and community development.
Our towns of Ngukurr and Numbulwar are Remote Service Delivery sites under the Australian Governments National Remote Partnership Agreement. These towns and Borroloola are Growth Towns under the Northern Territory Governments Working Futures Policy. The Shire is a signatory to the Local Implementation Plans (LIP). As a partner to the Federal and NT Governments, the Shire aims to achieve the best possible outcomes for our residents in these towns.
Since 2008 the Shire has continued to improve its services in all areas. We will continue to improve and increase the quality and standards of service delivery as we move towards achieving our goals. The purpose of the Shire Plan is to plan, strengthen and grow our delivery of local government services and other agency programs. The legislative requirements for this Shire Plan are located in the Appendix I of this document.
Thanks to Council, Community, Local Boards and stakeholders for their input into this Shire Plan. We encourage community members to work with the Local Boards and Councillors so we can all work together as one towards a Sustainable, Viable and Vibrant future.
On behalf of the Roper Gulf Shire Council,
iv
acronymsABS ...................Australian Bureau of Statistics
AG......................Australian Government
AGD ...................Attorney Generals Department
AMP...................Alcohol Management Plan
AMRRIC ............. Animal management in Rural and Remote Indigenous Communities
BRACS ............... Broadcasting for Remote Aboriginal Communities Scheme
CACP..................Community and Care Package
DCCS ................. Director of Corporate & Community Services
CDEP .................. Community Development Employment Projects
CEO ....................Chief Executive Officer
CO ......................Commercial Operations
Community ........ The term ‘community’ refers to all groups of people living in the shire, unless specifically stated otherwise
CS ......................Community Safety
DBE .................... Department of Business and Employment
DBCDE ............... Department Broadband, Communication and the Digital Economy
DCI ..................... Department of Construction and Infrastructure
DCF ....................Department of Children and Families
DEEWR .............. Department of Education, employment and Workplace Relations
DET ....................Department of Education and Training
DHF ....................Department of Health and Families
DHLGRS ............. Department of Housing, Local Government and Regional Services
DLP ....................Department of Lands and Planning (NT)
DoHA .................Department of Health and Ageing
DoJ ....................Department of Justice
DSEWPC ............ Department of Sustainability, Environment, Water, Population and Communities
DWP ..................Daly Waters Progress Association
EMT ...................Executive Management Team
FaHCSIA ............ Department of Families, Housing, Community Services and Indigenous Affairs
GBM ..................Government Business Manager
FCS .................... Family & Community Services
GCP ....................Governance & Corporate Planning
HACC .................Home and Community Care
HLP ....................Horticulture & Landcare Projects
HO......................Housing Operations
HQ......................Headquarters
HR ......................Human Resources
IBP ..................... Indigenous Broadcasting Program
ICC ..................... Indigenous Coordination Centre
ICT ..................... Information and Communication Technology
ITS ..................... Infrastructure & Technical Services
LB ...................... Local Boards
LIP ...................... Local Implementation Plan
LRG .................... Local Reference Group
MRLB .................Mataranka Region Local Board
MRM .................McArthur River Mine
MRM CBT .......... McArthur River Mine Community Benefits Trust
NRETAS ............. Natural Resources, Environment, the Arts and Sport
NTPFES .............. Northern Territory Police Fire and Emergency Services
NTG ...................Northern Territory Government
RGSC .................Roper Gulf Shire Council
RIBS ................... Remote Indigenous Broadcasting Services
ROC....................Regional Operations Centre
RTEED ................ Remote Training, Employment and Economic Development
S & R .................Sport & Recreation
SDC....................Service Delivery Centre
SIHIP .................. Strategic Indigenous Housing and Infrastructure Program
SSS ....................Satellite Subsidy Scheme
SSM...................Shire Service Manager
SNP....................School Nutrition Program
SHS....................Sunrise Health Service
SSMs .................Shire Service Managers
TWILG................This Week in Local Government
VDSC .................Victoria Daly Shire Council
Workshop ..........Mechanical Workshop
YMAC ................Yugul Mangi Aboriginal Corporation
YS ......................Youth Services
Shire Plan 2012-2013 v
Table of ContentsForeword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii
Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv
Section 1: introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.1 Our Vision – Mission – Value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.2 Governance Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.3 Strategic Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.4 Organisational Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.5 Shire Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Section 2: Service Delivery 2012-2013 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
2.1 Opportunities and Challenges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2.2 Town Priorities and Community Budgets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
2.3 Delivery of Goals and Performance Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
Section 3: Financial Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
3.1 Budget Summary 2012-2013. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
3.2 Estimates of Revenue and Expenditure 2012-2013 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
3.3 Financial Objectives, Measures and Indications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
3.4 Council Member Expenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
3.5 Long Term Financial Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
3.6 Capital Expenditure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
3.7 Rates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
3.8 Fees and Charges Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
appendix i – Shire Plan legislative requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
appendix ii – rates Declaration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101
appendix iii – acknowledgements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
Shire Plan 2012-2013 1
1 . inTrODUCTiOnThis is the fourth Shire Plan of the roper Gulf Shire Council . This will be the fifth year of Council . Over the previous 3 years the Shire has moved towards a more regional approach .
To emphasise this, the original Strategic Plan was revised and extensively altered in 2010 . This year’s Shire Plan comes from the Strategic Plan 2010-2013 and has been informed by the feedback we have received from the Council, local Board members, Shire residents and other stakeholders .
The ‘Community Priority Projects' list’ introduced in the 2010/11 Shire Plan has been continued and is now referred to as ‘Town Priorities’ . Through developing the “Town Priorities” we have identified key deliverables and issues which will be improved and progressed during this planning period .
The Council's plan to improve the level of service delivery to the residents of the Shire cannot be carried out without the support and commitment of staff members . roper Gulf Shire Council acknowledge staff contributions and achievements in the past 4 years .
2
1 .1 Our Vision – Mission – Values
Our Values are:h Honestye Equalitya Accountabilityr RespectT Trust
Our Vision is:Roper Gulf Shire, sustainable, viable and vibrant
Our Mission is:Working as one towards a better future through effective use of all resources
Shire Plan 2012-2013 3
1 .2 Governance Structure
The Roper Gulf Shire Council has a statutory requirement to provide 12 elected members to govern Roper Gulf Shire. The 12 Councillors are elected for a term of 4 years. The Mayor and Deputy Mayor are elected from and by the Council.
A network of Local Boards has been established by the Shire to enable Council to have a systematic approach to community input on issues that affect a
particular community or local region. Membership of the Local Boards are reviewed regularly and reappointments, appointments, and other changes are actioned accordingly.
Council has formalised the Youth Voice Committees in the Growth Towns and aims to develop similar committees in all SDC’s as a commitment to the Strategic Plans key focus area.
4
1 .2 .1 Our Council
Tony Jack South West Gulf Ward
Borroloola
Judy MacFarlane Never Never Ward
Mataranka
nyirranggulung Ward
Councillor Ashley
Beswick
Councillor Andrews
Manyallaluk
Councillor Dalywater
Bulman
Councillor Numamurdirdi
Numbulwar
numbulwar numburindi WardYugul Mangi Ward
Councillor Daniels Ngukurr
Councillor Daniels Ngukurr
never never Ward
Councillor Roberts Minyerri
Councillor Daylight
Jilkminggan
South West Gulf Ward
Councillor Evans
Borroloola
Councillor Allen
Borroloola
Mayor Deputy Mayor
local Boards:Borroloola
Youth Voice Committee
local Boards:Mataranka Region
Jilkminggan Alawa
local Boards:Ngukurr
Youth Voice Committee
local Boards:NumbulwarYouth Voice Committee
local Boards:Beswick, Barunga, Bulman
& Weemol Manyallaluk
Shire Plan 2012-2013 5
Establishment of Committees
The members of a Council committee may include people who are not Council members. A Council committee can have a wide range of executive or advisory functions. A Council committee is subject to control and direction by the Council.
Finance Committee
The Shire has established a Council Finance Committee, which meets on alternative months to the Ordinary Council Meetings. Mayor Jack, Deputy Mayor MacFarlane, Councillor Allen, Councillor Numamurdirdi and Geoff Bishop, an independent member, form the membership of the committee. The addition of an independent member means this committee meets the requirements of an Audit Committee.
Joint Headquarters Committee
The Shire has established a Joint Headquarters Committee to participate in joint coordination with members of the Victoria Daly Shire Council to establish a Joint Headquarters in Katherine. Councillors on this committee are Mayor Jack, Deputy Mayor MacFarlane, Councillor Dalywater, and Councillor Evans.
Youth Voice Committee
Youth Voice Committees have been established in Borroloola, Ngukurr and Numbulwar to give youth a voice and participation in the Council governance structure.
Community Grants Selection Committee
Community Grants Selection Committee has been established to recommend to Council the allocation of community grant funds. Councillors on this committee are Mayor Jack, Deputy Mayor MacFarlane, Councillor Andrews and Councillor Ashley.
Local Boards
Local Boards have been established under the Local Government Act 2008. Local Boards have the following roles:•Provide advice to the Council on service delivery
plans for towns or local regions, and have input into Shire Plans and Regional Management Plans
•ProvideadviceoralertCounciltoexisting,newandemerging issues within the scope of Council activity
•Ensure the needs of the local community or regionare considered by the Council
•Other delegated roles such as organising community events
•Councillors are ex-officio members to any Local Board in their Ward
Members of Local Boards are nominated at the local level and the Shire Council approves the nominations at an ordinary meeting of Council. Local Boards and committees are supported by the Shire Service Managers and the Governance and Corporate Planning Unit.
Shire staff provide administrative and logistical support to the Local Board and committees in their Service Delivery area.
Council meetings open to the public
Apart from exceptional circumstances, Council meetings will be open to the public. Shire staff do not arrange permits to enter Aboriginal land. If required members of the public wishing to attend Council meetings on Aboriginal land will need to organise permits with The Northern Land Council. A full schedule of meetings is available on our website.
Formal deputations to Council
Council will accept formal deputations at Council meetings from individuals, Local Boards and other interest groups to allow them to put a particular point of view or argue a case (for example pastoralists, traditional owners, or youth groups may wish to present their views on the allocation of Council resources or service priorities).
Individual Councillors
Residents can raise issues individually with their local Councillor.
6
1 .2 .2 electoral representation and review
The Local Government Act (s23 (2)) and Local Government (Electoral) Regulations (s63) direct that once in every four years Council must carry out a review to ensure the most effective electoral representation in their area. This review must be completed at least one year before the next general local government election.
Council completed a review in February 2011.
Following extensive community consultation it was determined that all aspects of the model of representation remain the same, except for a minor change to the Nyirranggulung and Never Never Ward Boundary. This boundary change affected 5 enrolled
citizens. The ward sizes in the tables allows a greater perspective to the area Councillors have to travel to represent the residents of the Shire.
The original boundaries of the Wards within Roper Gulf Shire were gazetted by the Minister for Local Government in early 2008. After an Electoral Representation Review in 2010, changes to the ward boundaries were recommended. The proposed changes to the Nyirranggulung and Never Never Ward Boundary were sent to the Minister for Local Government in late February 2011 and approved in 2012.
Table 1: electoral representation with changes to boundaries of Wards
Ward
number of Councillors (including Mayor)
electors on roll as at 30 Sep 2010 a bs
electors per Councillor with proposed changes
land mass c (km2)
Never Never 3 686 229 60,600
Numbulwar Numburindi 1 509 509 4,414
Nyirranggulung 3 927 309 40,148
South West Gulf 3 855 285 60,055
Yugul Mangi 2 690 345 19,958
Totals 12 3,667 n/a 185,194
a. Source: NT Electoral Commission, 2010, 'Electoral Representation Data for Roper-Gulf Shire'. b. Five electors added to Never Never Ward & five removed from Nyirranggulung Ward.c. Source: NT Department of Lands and Planning, Lands Information Office, 2010.
Shire Plan 2012-2013 7
1 .3 Strategic PlanIn our fifth year of operation, we are looking to refine and improve upon our operations within the Shire that will lead to achieving our strategic goals of:-1. Strengthen quality of life in our Shire2. Move towards sustainability3. Care for our environment4. Improve our infrastructure5. Good Governance
In 2010 the Council made a commitment to focus on building expertise and expanding our reputation over the three years, 2010 to 2013, in 4 key areas:•Localjobsforlocalpeople;•Environment;•Counterdisasterplanning;and•Youth.
The Shire has made significant progress in these key areas over the previous 12 months. Further progress in these key focus areas are prescribed in the Shire Plan for 2012-2013 including:•Increasingthesupport,trainingandjobreadinessof
local people through further training and employment initiatives;
•EnvironmentPartnerships;NRMplanningandclimatechange adaptation measures; and the new Landcare and Animal Welfare Business Unit.
•CompletionofthesuiteofCounterDisasterPlanningtools including a Recovery Plan and Evacuation Centre Plan; and
•Strengthening and expanding youth services, sportand recreation program, and CDEP with a focus on engaging youth in the Shire.
The focal points in the Shire Plan 2012-2013 are on achieving the strategic goals by:•furtherdevelopmentofinternalsystems,policiesand
procedures;•creatingsustainablebusinessopportunities•improvingoperatingefficiencies•improving systems of accountability, reporting
and planning;•strengthening our strategic partnerships with
external stakeholders; and•improvingcommunicationsandfeedback.
The Roper Gulf Shire Council Strategic Plan 2010-2013 is available at www.ropergulf.nt.gov.au, Headquarters, Crawford Street, Katherine or the Shire Service Delivery Centres.
Consultation
Shire Council, Local Boards and Staff conducted a widespread consultation to inform the development of the Shire Plan 2012-2013. Initially information was provided generally on the Plan and its purpose. Through this process, useful input from local board members, town residents and other stakeholders was received. The second round of consultation consisted of the draft Shire Plan being released for the 21 day public consultation period required under the Northern Territory Local Government Act 2008.
During this period a further round of consultations took place with local boards, public meetings, individual residents and key stakeholders.
8
Chief executive Officer
•AdministrationofLocalBoards,AdvisoryBodies and Management Committees
•AdvocacyandRepresentationonlocaland regional issues
•RegionalManagementPlan
•CouncilPlanningandReporting
•CustomerRelationshipManagement
•Governance
• LocalEmergencyManagementPlanning
•PublicandCorporateRelations
Director Commercial Operations
Commercial Contracts•LocalRoadMaintenance• LocalRoadUpgradeand
Construction •WeedManagementand
Fire Hazard Reduction •CompanionAnimal
Welfare and Control •Airstrips•PowerandWater
agency•Outstations•AustraliaPost
Other•CommunityHousing
and Construction •OtherRoads•TenancyManagement•HMP-fencing
Director infrastructure and Technical Services
Core•ProjectManagement•Maintenanceandupgrade
of Council Controlled Parks, Reserves, and Open Spaces
•TrafficManagementonLocal Roads
•WasteManagement•CemeteryManagement•Maintenanceandupgrade
of Council Controlled Buildings, Facilities, and Fixed Assets
•AssetManagement• FleetandPlant
Management•LightingforPublicSafety
including Streetlighting
Other•SwimmingPools
Core•RecordsManagement•HumanResource
Management including •Recruitment •Training •Mentoring •Payroll• FinancialManagement •Budgets •Grants •APandAR •Rates •FinancialReporting •AuditCoordination•RiskManagement• InformationTechnology
and Communications
Core•Civic,Culturaland
Sporting Events•LibraryandCultural
Heritage•AdministrationofLocal
Laws
agency •AgedandDisableCare•ChildCareServices•CommunityMedia•CommunitySafety•SportandRecreation•VisitorInformation
Services•YouthServices•CDEP
Director Corporate Services
Director Community Services
local Boards
Council
1 .4 Organisational Structure
Shire Plan 2012-2013 9
1 .5 Shire Plan
This Shire Plan has been developed in accordance with Big Rivers Regional Management Plan. The Shire Plan communicates to Council, residents, key stakeholders and partners the activities and operations of the Shire during the 2012 – 2013 financial year.
Town priority lists have been compiled through consultation with residents, LIPs where relevant, Shire Service Managers and partners. Priorities have been classified as being Core, Agency or Advocacy. Commonalities in priorities across the Shire have been identified and are:
•Security of land tenure continues to be an issue for the Shire as it impacts on the Shire’s capacity to grow, develop infrastructure and make long term plans. Land tenure coupled with lack of power, water and sewerage infrastructure restricts the capacity of towns to attract investment and growth opportunities. The Council also recognises their advocacy role for services and issues that are not core to Shire operations.
•improved operating efficiency to increase profitability of commercial services and increase value for money in other service areas. Financial Sustainability remains a challenge in our Shire with a significant reliance on Federal and State Funding.
•Control and management of companion animals, in particular the introduction of by-laws for control and education and awareness has been flagged by
many townships as important. The Shire aims to continue its implementation of companion animal welfare management activities. The development and enforcement of by-laws and delivery of education and awareness programs are key components of the Animal Welfare Program. Assisting in managing companion animal control is the fencing of houses in partnership with Territory Housing.
•Management of cemeteries, incorporating the new design which is culturally appropriate, register administration, fencing, mapping and maintenance. The delivery and implementation of a Cemetery Management Plan and Standard Operating Procedures for each cemetery will address many of the issues pertaining to the delivery of this service.
•The Shire will be completing and implementinga framework for assets and infrastructure management, and the development and maintenance this year. Issues such as street lighting will be addressed through this process.
Roper Gulf Shire Council receives very little in rates or untied funding (that is, funding that is not tied to specific activities by the funding body). The level of untied funding and the success of applying for external grants determine whether Town Priorities can be achieved within the period of the plan. The Shire actively pursues grants to achieve these priorities.
Sport & Recreation Operational Plan
Commercial Operations Operational Plan
CDEP Operational Plan
Human Resources Operational Plan
Youth Services Operational Plan
SSM Operational Plan
Landcare & Animal Welfare Operational
Plan
Civil Works Operational Plan
Outstations Operational Plan
Night Patrol Operational Plan
Governance Operational Plan
Family & Community Services Operational Plan
Finance Operational Plan
Strategic Plan 2010-2013
Shire Plan 2012-2013
10
Core Services
Core services are those that all Shire Councils are required to deliver to specified communities from 1 July 2008 under the Local Government Act.
Core services comprise the following:•Maintenance and upgrade of parks, reserves and
open spaces•Maintenanceandupgradeofbuildings,facilitiesand
fixed assets•Maintenanceandmanagementofcemeteries•Lighting for public safety, including street lighting
[on local roads]•Localroadupgradingandconstruction•Localroadmaintenance•Trafficmanagementonlocalroads•Fleet,plantandequipmentmaintenance•Wastemanagement(includinglitterreduction)•Weeds control and fire hazard reduction in and
around community areas•Companionanimalwelfareandcontrol•Libraryandculturalheritageservices•Civicevents•Localemergencyservices•Trainingandemploymentof local people in council
operations•Administrationoflocallaws•Publicandcorporaterelations•Customer relationship management, including
complaints and responses•Governance: including administration of council
meetings, elections and elected member support•Administration of Local Boards, advisory bodies
and management committees•Advocacy and representation on local and regional
issues•Financialmanagement•Revenuegrowth•Humanresources•Assetmanagement•Recordsmanagement•Riskmanagement•Council planning and reporting: strategic, financial
and service delivery planning and reporting•ITandcommunications
Agency Services
Agency services include services that the Shire Council has agreed to deliver on behalf of other Government Agencies on a fee-for-service basis. It is anticipated that these services would be fully funded by the relevant agency and that funding would include a contribution to administrative costs and land lease arrangements associated with delivering the service.•CommunityAgedCarePackages(CACP)•HomeandCommunityCare(HACC)•ArtsandCultureProgram•MediaServices(BRACS)•Crèche•Employment, Training andCommunityDevelopment
Employment Program (CDEP)•CommunitySafety(NightPatrol)•SportandRecreation•YouthServices
•CentrelinkCommercial Services
Commercial Services are services that the Shire is undertaking on a full commercial basis with the intention of using profits from commercial activities to improve services to the community.•PowerWater•AirstripMaintenanceandReporting•HorticultureandLandcare•HousingOperationsProgram•IndigenousEnvironmentalHealth•AustraliaPost•TenancyManagement•RoadConstructionandMaintenance
Other Services
Roper Gulf Shire Council currently maintains swimming pools in Ngukurr and Borroloola. These services are not delivered on behalf of another organisation nor do they make a profit to help fund its operation or contribute to other services.
The Shire advocates on behalf of the Shire constituents/residents on a range of issues which are not core, agency or commercial services of the Shire.
Shire Plan 2012-2013 11
2 . SerViCe DeliVerY 2012-2013
The focus for the Shire and Service Delivery Plan in the 2012-13 Financial Year is on achieving key milestones and measuring performance against our goals and strategies . encapsulating and communicating this information has influenced the layout of the Service Delivery Plan .
12
According to the Strategic Plan 2010-2013, the Shire Plan is for the period from July 2012 – June 2013. Initiatives, services and activities to be carried out during the planning period are detailed. Performance indicators and milestones the Council aims to achieve are set in the plan.
Performance measures have been refined and linked to industry standards with the view to improving the quality of service; accountability and transparency.
The Service Delivery Plan contains the Shire’s key measurable achievements and milestones for the year. The sum aim of these key deliverables is to increase effectiveness, efficiency and quality. Major milestones for 2012-2013 are:•ImplementationofTheWorkforce
Development Plan•Policies•StandardOperatingProcedures•WHS – Work Health and
Safety Review•OrganisationRe-structure•AssetManagementPlan•Control and management of
companion animal welfare through a strategic roll out of further Companion Animal Welfare Management activities including by-laws
•Completion of a Sustainability /Revenue Growth policy
•Implementation of Disaster Recovery Plans
Key initiatives for the 2012-2013 year are recorded as milestones in the Service Delivery Plan.
Key initiatives are characteristically the total of a number of milestones within the plan.
2012-2013 will see the implementation of the Workforce Management and Performance Plan which includes:•Recruitment and retention
strategy•Skills training and development
analysis and schedule•Careerpathways•Mentoring•Implementation of Workplace
Common Conditions and standardised employee contracts
•Employee performance planningand management systems
The completion of an Assets and Infrastructure Management Plan and Framework and implementation of systems, incorporates:•CemeteryManagementPlan•Plan of Management for Parks
and Open Spaces•WasteManagementMasterplan•Roads Hierarchy, Repairs and
Maintenance Plan•TrafficManagementStrategy
Key Performance indicators
KPI reports are provided to Council at it’s OCM following the end of each quarter.
Performance measures are detailed within the Service Delivery plan. The performance measure box contains four variables collected to enable measurement of Shire performance.•Baseline data – collection of
figures, data and information as at
30 June 2011, this is our starting point. Increases or decreases will, over the next twelve months, be measured from this point or against this data.
•effectiveness – is a measure of how well the service delivery compares with the planned purpose or objective.
•efficiency – how productively resources are transferred into goods and services.
•Quality – the quality of goods and services, how well they are delivered to the constituency and to what they are satisfied.
Operational Plans
The activities of each Shire Business Unit are detailed in an ‘Operational Plan’ and are linked to the goals and strategies of the Roper Gulf Shire Strategic Plan.
Operational Plans include strategic alignment, reporting requirements, performance indicators, employee training and development, assets, budget, organisational structure, actions and milestones.
The information contained in the Operational Plans has been reviewed and analysed for the purpose of informing the Shire Plan. The Performance Indicators and Milestones of the operational plans are captured in the Shire Plan.
Implementation of the plans will be monitored during the financial year and results reported to Council through the management structure.
Shire Plan 2012-2013 13
2 .1 Opportunities and ChallengesRoper Gulf Shire Council covers an area of approximately 186,000 square kilometres of land, the majority of which is in the eastern side of the Big Rivers Region.
The Shire is divided into five wards with each being represented by elected members. There are 16 towns and communities of varying sizes including major roadhouses, 22 outstations and 50 pastoral properties in the Roper Gulf Shire. The distance and population size provide both opportunities and challenges in a vast array of aspects within RGSC operations.
14
Opportunities
Opportunities Strategy responsibilityConstruction of new purpose built headquarters and offices
Work in partnership with Victoria Daly Shire
CEO Joint HQ Committee
Improvement and implementation of policies and procedures
Review and update existing policies as applicable. Communicate policies and procedures. Check compliance regularly against policies and procedures
EMT GCP
Improved systems of planning and reporting
Provide a sound planning structure from the Councils Strategic Plan; to annual Shire Plan and Operation and activity plans embedding reporting frameworks at each level
CEO DITS DCCS
Local Implementation Plans Report and deliver on the actions of the Shire towards the implementation of the LIP in the Growth Towns of Ngukurr, Numbulwar and Borroloola
DITS
Maximise opportunities to improve service delivery where the Shire has lead or supporting role in the implementation of Local Implementation Plans Borroloola, Ngukurr and Numbulwar
Reporting on Shire activity related to the LIP to the relevant agency being community reference groups, Regional Operations Centre (ROC) or Service Delivery Coordination Unit
Participate in negotiations relating to developments in the LIPS e.g. construction of Children and Families centre in Ngukurr requires the Shire to develop services for delivery from the facility and provision of ongoing repairs and maintenance as a service provider the Shire would expect they would be part of the consultation
EMT
Build capacity to provide greater opportunity to gain additional government contracts, and to value add to existing contracts
The newly formed position of Director of Commercial Operations provides capacity to further advance the operation of commercial ventures thereby strengthening Roper Gulf Shire Council’s ability to generate revenue and increase employment
DCO
Shire Plan 2012-2013 15
Opportunities Strategy responsibilityTerritory Government contracts for the repairs and maintenance of their remote assets
Actively participate in consultation and negotiations to secure future contract options
Mentoring and support to enable pathways to employment and
DCO
HR
YS
Opportunities for growth and development within the Shire
Investigate partnerships and linkages which will create opportunities for economic growth
CEO EMT
16
Challenges
Challenges Strategy responsibilityAll weather, consistent, reliable and cost affect road access to all townships and communities within the Shire
Continue to “lobby” government to invest in the upgrade and/or development of key access roads within the Shire
DITS
ICT systems and communication networks are unreliable, inconsistent coverage and constant operating issues. Mobile phone coverage across the Shire
Investigate and prepare a report on options from improving mobile access across the Shire
Review internal IT systems
CEO
DCCS
IT
Communication internal and external of Shire services, procedures, policies and operations
Implementation of a Communications Strategy
GCP
Long term land tenure for ‘security’ of fixed and non-fixed assets, purposes of town planning, growth, industry and business development
Continue to work in collaboration with other Shire Councils to secure land tenure through leasing
Council
CEO
Effective and efficient decision making, monitoring and reporting systems
Refinement of the planning and reporting framework
Terms of Reference for Managers and
Executive meetings
Reports to meetings contain evidence based, (research, data, feedback) recommendations
EMT
Recruitment and retention of suitably qualified staff
Implementation of the Workforce Management and Development Plan
Training and cross training of staff to ensure a multi-skilled, multi-talented and interested workforce
EMT
DCCS
Shire Plan 2012-2013 17
Challenges Strategy responsibilityFinancial compliance including Local Government Act
Quarterly compliance checks and reports
Electronic tracking system for key reporting and milestones
Compliance checklists for operational staff
Ad hoc compliance checks
EMT
GCP
Finance
Operational compliance with Service Standards, policies and procedures, Local Government Act, Funding Agreements and commercial contracts
Quarterly compliance checks and reports. Compliance checklists for operational staff Ad hoc compliance checks
Educational awareness and training policies and procedures
EMT
GCP
Finance
Continuation of services during the wet season
Management of workflows and plans
DITS
The population statistics quoted are from the Australian Bureau of Statistics 2011 census (www.abs.gov.au)
18
BarUnGaBarunga is a small community of indigenous people and is located approximately 80 kilometres south-east of Katherine . each year, the community holds the Barunga Festival which occurs in mid June . it is a cultural and sports festival with up to 3000 people attending . The ceremonies are an important part of Barunga community life . Total population of Barunga is 313 out of which there are 153 males and 160 females . The median age is 24 .
Shire Plan 2012-2013 19
Barunga Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Dog Bylaws to reduce and control number of dogs
June 2013 Council Governance and Planning
Budget
Footpaths around the town to enable old people and children to move through the township without having to use roadways
June 2013 Infrastructure To be sourced
Additional street lighting specially at the community entrance
Mar 2013 Infrastructure To be sourced
Improve traffic management, increase signage Mar 2013 Infrastructure To be sourced
agency Services
Project Key Stakeholders/ Partners
Timeframe Unit responsible
Program for school leavers to have a future pathway
DET Dec 2012 Youth Services
Establishment of a Women’s Centre Closing the Gap DHF
2013 Family and Community Services
Activities for youth 10 years and over in the community to keep them occupied
DHLGRS FaHCSIA
ongoing Sport and Recreation
22 fences around dwellings DHLGRS June 2013 CDEP
Other/advocacy Only
Project Timeframe lead agency
Community social club and promote responsible drinking – as part of the Alcohol Management Plan
2012/13 DoJ FaHCSIA Sponsoring Club
Startacrècheinthecommunityforvocational/childcareforworking parents
2012/13 DET DEEWR
Sewerage upgrade to prevent overflow from septic in the wet season
2013/14 DHLGRS
20
BUlManThe community is located about 312km north east of Katherine . it takes about 3 to 4 hours to get to the community from Katherine by road . a large community which has facilities including school, health centre, store and provides resources to nearby smaller communities and homeland centres/outstations . The community is accessible by road for most of the year except when there is severe flooding during the wet season . The road is a single lane and is sealed until Beswick, and after that it is dirt with patches of corrugation and bull dust . The community is usually cut-off during the wet season at the Mainoru river and Flying Fox Creek . however with careful driving the road is usable . Total population of Bulman is 275 out of which there are 121 males and 153 females . The median age is 23 .
Shire Plan 2012-2013 21
Bulman Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Road to be resealed in the area in front of the SDC
2013 Infrastructure To be sourced
Public toilet block for Weemol and Bulman including a laundry
2013 Infrastructure To be sourced
Road to be sealed from Bulman to the airstrip 2012 Infrastructure To be sourced
Flood Boat for the wet season 2013 Infrastructure To be sourced
Curb and guttering machine, which could be shared jointly with the other towns, to improve the condition of streets and storm water run off
2013 Infrastructure To be sourced
Kerbs and gutters – Bulman and Weemol 2012 Infrastructure To be sourced
Roads reseals – Bulman and Weemol – Council Office area
2012 Infrastructure To be sourced
Drainage improvements near Council Offices and Workshop area
2012 Infrastructure To be sourced
Compact rubbish truck 2012/13 Assets Budget
Dust suppression and park areas – grade to remove rocks, topsoil and lawn
2012 Infrastructure To be sourced
agency Services
Project Key Stakeholders/ Partners
Timeframe Unit responsible
Homelands roads – Access road to Mt Catt several sections which need crossing for all weather access
DHLGRS 2012/13 Infrastructure
Upgrade water supply system at Mt Catt current solar pump does not work at night or during the wet season due to cloud cover
DHLGRS 2012/13 Infrastructure
Vehicle to tow the septic pump out trailer DHLGRS 2013/14 Assets
9 fences around dwellings DHLGRS June 2013 CDEP
Other/advocacy Only
Project Timeframe lead agency
Airstrips repairs and maintenance Ongoing DCI
Housing upgrades and repairs 2012 SIHIP
Upgrade of septic system at Weemol as current individual systems flooding during the wet season as there is limited access for the pump out truck
2015/16 DHLGRS
22
BOrrOlOOlaThe Town is located on the eastern coast of the northern Territory on the Gulf of Carpentaria . The town is situated on the banks of the Mcarthur river, approximately 850 kilometres south-east of Darwin, 670km east south east of Katherine . The rivers of this region have carved spectacular gorges through sandstone deposits in their upper reaches . The rivers and coastal areas are host to barramundi, earning Borroloola a reputation among sports fisherman, and also to the deadly saltwater crocodile . The region has little rain from May to September, and is characterised by lightly treed Savannah grasslands . Total population of Borroloola is 926 out of which there are 472 males and 454 females . The median age is 26 .
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
Shire Plan 2012-2013 23
Borroloola Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Continue street lighting to eliminate dark spots 2013 Infrastructure Budget
Roads restoration 2013 Infrastructure To be sourced
More public toilets including one at the cemetery 2013 Infrastructure To be sourced
Signage at Cemetery Entrance 2013 Infrastructure To be sourced
Manned Station at Dump 2013 Infrastructure To be sourced
Box drain at pool car park December 2013 Infrastructure SSM
To be sourced
Landfill for and upgrade of Waste Disposal Facility
June 2013 DITS SSM
To be sourced
Identify and make available, opportunities for people to gain appropriate training and employment
Ongoing All Shire Business unit
To be sourced
Provide training and skill enhancement opportunities for community representatives across a range of areas including finance, governance and management
Ongoing Governance and Corporate Planning
To be sourced
Cemetery grounds - plan of management which includes, formalise and standardise new plots, maintenance schedule and defines roles and responsibilities of Shire and Cemetery Trust Corporation
2013 DITS SSM
To be sourced
Provision of pedestrian pathways inclusive of, but not restricted to school crossing zone
July 2013 Infrastructure To be sourced
Pedestrian crossing at the pool July 2012 Infrastructure Budget
Flood lighting at Show Grounds 2012/13 Infrastructure To be sourced
Improve Mara back access track 2012/13 Infrastructure To be sourced
Upgrade Mara track connecting Mara to Bing Bong Road for wet season access
2012/13 Infrastructure To be sourced
Lengthen and upgrade sports oval at Show Grounds
2012/13 Infrastructure To be sourced
24
agency Services
Project Key Stakeholders/ Partners
Timeframe Unit responsible
Lighting on McArthur River Bridge
Continue to develop recreation facilities based around the swimming pool
NRETAS 2014/15 Sports & Recreation
Establish short, medium and long term programs for upgrading all roads including river crossings in the region- applicable to roads the Shire is responsible for
DLP 2013/14 Infrastructure
Support the operation of the existing Women’s Safe House
DCF Ongoing Community Safety
Manage antisocial behaviour such as public drunkenness, disorderly behaviours and vandalism
NT Police Ongoing Community Safety
Provide Youth leadership courses to develop leadership skill in youth across the region
DET Ongoing Youth Services Youth Voice Committee
Shire Plan 2012-2013 25
Other/advocacy Only
Project Timeframe lead agency
Removal of a buffer zone around the power station and the power station to enable business development
2012 PowerWater
Establish a youth hostel for young people participating in education and training
2014/15 MRM CBT
Continue to develop and support community events such as the Boonu Boonu Festival, Borroloola Show, Rodeo, King Ash Bay Easter Fishing Classic as well as local sporting events
Ongoing Family and Community Services
Improve the range of public, private and commercial accommodation in the region
2015/16 DEEWR DHLGRS
Expand and improve infrastructure to provide more options for visitors to the region
2015/16 Tourism NT
Assist indigenous organisations to engage in commercial investment opportunities in the region
Ongoing DBE
Encourage Indigenous organisations and individuals to participate in business development opportunities
Ongoing DHLGRS
Upgrade the mobile phone footprint 2014/15 DLP
Develop further public internet access and upgrade the mobile phone footprint
2012/13 DBE
Undertake proactive policing such as community and pub patrols 2011/12 NT Police
Establish a sobering up shelter 2015/16 NT Police
Establish a cultural centre to promote the culture, art and language of the four groups in Borroloola
2015/16 NRETAS
Baseline mapping of services and infrastructure in town and surrounding service populations to inform Local Implementation Plan
2011/12 DHLGRS
Partnership for development of a Community Complex to serve as a multi-purpose facility
2015/16 RGSC McArthur River Mine Community Benefits Trust
26
Daly Waters Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Ongoing monitoring of dump Ongoing Infrastructure To be sourced
Tennis court repairs Jan 2013 Infrastructure To be sourced
Maintenance/upgrade of ablution block at Roy Beebe Park
Dec 2012 Infrastructure To be sourced
Other/advocacy Only
Project Timeframe lead agency
Reticulated sewerage system Dec 2015 DHLGRS
Road repairs by pass road to Kalala 2012/13 DCI
DalY WaTerS Daly Waters is a small town in the northern Territory in australia, about 620 kilometres south of Darwin and three kilometres west of the Stuart highway . The area's traditional owners, the Jingili people, believe the Dreaming tracks of the emu and the Sun travelled through here on their way to the southern parts of the northern Territory .
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
Shire Plan 2012-2013 27
JilKMinGGan The community is located approximately 140 km south east of Katherine, and 3 km north of the roper highway . The journey takes about 1 .5 hours to Katherine; 20 mins to Mataranka . There is a community bus to Katherine and Mataranka 3 days a week . The community is accessible by road for most of the year except when there is severe flooding during the wet season . Total population of Jilkminggan is 280 out of which there are 138 males and 142 females . The median age is 18 .
28
Jilkminggan Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Street lighting as per plan tabled at Local Board Meeting
December 2012 Infrastructure Budget
Street Naming Mar 2013 Infrastructure to be sourced
Backhoe June 2012 Assets to be sourced
Increase employment and training opportunities for local people
Ongoing Employment and Training
to be sourced
Traffic Management – No standing area directly in front to allow safe crossing of the road/safety island outside the shop to slow traffic down (road narrowing)
2013 Infrastructure to be sourced
Traffic management – Parking area near shop. 2013 Infrastructure to be sourced
Lighting – corner near SDC 2013 Infrastructure to be sourced
Lighting – near the workshop 2013 Infrastructure to be sourced
Lighting – on corner near the wallaby sculpture and access road
2013 Infrastructure to be sourced
Footpaths next to main roads 2014 Infrastructure to be sourced
Upgrade of fencing around the oval to prevent animal accessing area
2014 Infrastructure to be sourced
Speed bumps on entrance road 2013 Infrastructure to be sourced
Welcome sign on entrance compound 2013 Infrastructure to be sourced
agency Services
Project Timeframe Unit responsible
Shed over the basketball court June 2014 Sport and Recreation
Sport and recreation bus June 2012 Sport and Recreation
Resurfacing of the football and the installation of a softball diamond June 2014 Sport and Recreation
13 fences around dwellings June 2013 CDEP
Other/advocacy Only
Project Timeframe lead agency
More housing to reduce crowding 2013/14 Housing
Single men’s accommodation 2013/14 Housing
Repair and upgrading of housing fences 2012/13 Housing
Mobile phone coverage tower 2012/13 Telstra
Back yard gardens 2012/13 Housing
Shire Plan 2012-2013 29
larrimah Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Improvements to the Park area at Lot 62 (Subject to transfer of lease from Larrimah Development Association to RGSC)
December 2012 Infrastructure Landcare
To be sourced
Road repairs to • InternalRoad–lastsealedin1975 • InternalRoads
2012/13 Infrastructure To be sourced
Western Creek Access Road direct onto highway instead of winding through town
2012/13 Infrastructure To be sourced
Parking bay across the road from FRANS • ParkingBaysigns2010–CDI
2012/13 Infrastructure To be sourced
Clean up & maintain Lot 58 2012 Infrastructure To be sourced
Redevelopment of the dump 2012/13 Infrastructure To be sourced
Other/advocacy Only
Project Timeframe lead agency
Clean Up Green Park Roadhouse 2012/13 Bank/Insurer
Western Creek Road – R & M – Radio Transmission 2012/13 Central Government
Resurvey for township 2012/13 Department of Land and Planning
Upgrade and development of the realignment of the western creek access road to Stuart Highway
2012/13 DCI
larriMah larrimah is a tiny hamlet in the northern Territory of australia with population of just 11 people . it is built along the Stuart highway . it was the railhead on the north australia railway during World War ii .
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
30
ManYallalUKThe name Manyallaluk means Frog Dreaming and is the name of a traditional site near the community . The Town is a small community of indigenous people and the lands of the community stretch for 3000 square km and are bordered by arnhem land, nitmiluk national Park and Kakadu national Park . The community is located approximately 100 km east south of Katherine in the Central arnhem highway . Manyallaluk is also known as eva Valley . Total population of Manyallaluk is 105 out of which there are 48 males and 57 females . The median age is 20 .
Shire Plan 2012-2013 31
Manyallaluk Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Sealing of internal roads and the main town road to the jump up for dust suppression
2012 Infrastructure To be sourced
Compact rubbish truck 2012 Assets To be sourced
Street Lighting – In the middle park and outer areas, from the undercover courts to the workshop and on at the parking bay at the tourist park
2012 Infrastructure To be sourced
Dog Bylaws to control number of dogs 2013 Governance Infrastructure
budget
Seal from the highway to the jump up on the Manyallaluk access road
2012/13 Infrastructure To be sourced
Job opportunities and training for women in the township
2012 Employment and Training Human Resources
budget
Cemetery Fencing 2013 Infrastructure To be sourced
Area for animal burial ground – possibly to side of cemetery
2013 Infrastructure To be sourced
Bridge in park ie raised walkway for their walkers 2013 Infrastructure To be sourced
Public Toilets 2014 Infrastructure To be sourced
agency Services
Project Key Stakeholders/ Partners
Timeframe Unit responsible
Sports Oval DHLGRS June 2014 Sports and Recreation
Sport and recreation vehicle such as a gator DHLGRS June 2014 Sports and Recreation
1 fence around dwelling DHLGRS June 2013 CDEP
Other/advocacy Only
Project Timeframe Unit responsible
Current phone does not work in the wet season and has wiring problems. Require new phone and a speaker installed
Urgent Telstra
Relocate airstrip At the end of the life of the current strip
DCI
Improve sewerage system all houses with own septic on the lower side of the main street (clinic side)
2013 PowerWater
Increased housing 2014/15 DHLGRS
Central ablution block and laundry located in the community area 2013 FaHCSIA
Localised mechanic at either Manyallaluk, Barunga or Beswick to service all three locations
2015 Infrastructure or Commercial Opportunity
32
MaTaranKaMataranka is located approximately 420 km south-east of the territorial capital, Darwin, and 107 km south from Katherine . The main attraction in this region is the elsey national Park which contains the beautiful roper river and two great Thermal Pools: Bitter Springs and rainbow Springs . The headwaters of the roper river inside elsey national Park (where crocodiles are managed) are popular for bushwalking, birdwatching, canoeing, swimming and fishing . Bitter Springs Thermal Pools is on the north east side of Mataranka township at the end of Martin road . These pools flow at a constant 32 degrees C . and are still very much in their natural state . Swimmers can glide with the current downstream to view the beautiful riparian vegetation and birdlife along the way . rainbow Springs is about 9 km south east of Mataranka at the end of homestead road . Total population of Mataranka is 244 out of which there are 117 males and 127 females . The median age is 40 .
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
Shire Plan 2012-2013 33
Mataranka Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Companion animal control June 2013 SSM, Landcare and Animal Welfare, Governance
Budget
New Cemetery – Site to be identified followed by a development plan
March 2013 Infrastructure To be sourced
Upgrade toilets at Community Hall and add another toilet for wheel chair access and remove Eucalyptus Tree near toilet
2012/13 Infrastructure To be sourced
Playground – completion and final inspection July 2013 Project Management
Budget
Road repairs and up grades – Warlock Road – priority, Beswick St, Sterling St, Gunn St, Elsey St (drainage) and Dump roads
2012/13 Infrastructure To be sourced
agency Services
Project Timeframe Unit responsible
Community Hall – separate power for hall and shire buildings ASAP Infrastructure
HACC kitchen extended to incorporate storage 2013 Family and Community Services
Toilet block upgrade for stage 2 – Community Hall 2012/13 Sport and Recreation
Community Hall Sound System 2012/13 Sport and Recreation
Improve drainage at Mulgan Camp – at the entrance there is flooding during the wet which causes the power to cut out
2013/14 Infrastructure
Sport and recreation grounds – multi function court (covered) 2012/13 Infrastructure
Skate park and bike track 2013/14 Infrastructure / Sport and Recreation
High set house for caretaker at Sports Ground 2013/14 Infrastructure
The purchase of a sport and recreation bus for Mataranka 2012/13 Sport and Recreation
34
Other/advocacy Only
Project Timeframe Unit responsible
Alcohol Management Plan 2013 DoJ
Aged Care Centre 2012/13 DoHA
Family and Community Services to investigate the options for aged care, including an aged care hub, in Mataranka and present findings
February 2012 DoHA
Child Care Centre 2012/13 DEEWR
Television retransmission 2013 DBCDE
Lighting in park across from the pub June 2012 DCI
Little Roper bridge (Homestead road) 2014 DCI
Town planner visit December 2012 DLP
The development of a walking track from Bitter Springs to the Homestead
2014 Northern Territory Tourism Commission
Reticulated sewerage for Mataranka June 2012 PowerWater
Mobile phone coverage from Mataranka to Katherine 2013 Telstra
Public Housing – there has been a loss of availability of public housing due to leasing by NT Government agencies
December 2012 CEO
Water Quality June 2012 CEO
Land release ASAP CEO/Council
Other
Catering Shed to remain for community events
Shire Plan 2012-2013 35
Minyerri Town Priorities
Other/advocacy Only
Project Timeframe lead agency
Roads and maintenance July 2013 DCI
More Housing to reduce crowding December 2014 DHLGRS
Safe House – men/women 2013 DHLGRS
Morgue 2014 DHLGRS/DoH
Mobile phone reception 2013 Telstra
18 fences around dwellings June 2013 ALAWA
MinYerriMinyerri is a community of approximately 450 people and is located approximately 270 km south-east of Katherine by road . The hodgson river is in close proximity . Total population of Minyerri is 441 out of which there are 215 males and 227 females . The median age is 18 .
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
36
nGUKUrrngukurr is a community of indigenous people and is built on hilly ground alongside the roper river in south-east arnhem land, about 330 km southeast of Katherine . The community is accessible by road, air and water . ngukurr people are culturally strong with deep connections to their country and the dreamings . The landscape is prolific Top end growth, billabongs and wetlands . in the early 1900’s the area was called roper river Mission . Most of the senior artists at ngukurr attended the mission school and have many stories to tell of life in the old mission days . Total population of ngukurr is 1056 out of which there are 503 males and 553 females . The median age is 22 .
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
Shire Plan 2012-2013 37
ngukurr Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Enclose open drains 2012/13 Infrastructure To be sourced
Upgrade dump, complete fencing 2012/13 Infrastructure/SSM To be sourced
Develop park area at barge landing 2012 SSM/Landcare To be sourced
Lot 225 – create secure storage area for visitors, old housing yard
July 2012 SSM To be sourced
Upgrade park near oval
Shade structure at oval July 2012 Finance/SSM To be sourced
RGSC local board members and other incorporated bodies to receive ongoing governance and leadership training to allow them to better understand and undertake their roles
Ongoing Governance and Planning
Budget
Work with the community to develop and integrated and strategic program of community governance and leadership support that suits the needs of men, women and youth of Ngukurr
Ongoing Governance and Planning Youth Services
Budget
Development of new lawn cemetery 2012/13 Governance and Planning / DITS
To be sourced
Total Plumbing Upgrade 2012/13 DITS To be sourced
Review of Local Board representation and Meeting arrangements
December 2012 Governance Budget
Road Signage for heavy vehicles (corners and regular freight drop off area)
2013 DITS To be sourced
Upgrade Mutju Street 2013 DITS To be sourced
Upgrade boat ramp, boat landing. Establish floating pontoons
2013 DITS To be sourced
Office workstation for Dump 2014 DITS To be sourced
38
agency Services
Project Details Key Stakeholders/ Partners
Timeframe Unit responsible
Develop a submission for sport and recreation grants to upgrade facility, improve co-ordination and standards of sport and recreation programs, including swimming and other carnivals
NRETAS Ongoing Sports and Recreation
Jobs, training or further education offers guarantee for all NTCET graduates living in Ngukurr, through an organized transition to work program
DBE DET RGSC
Review July 2012 Employment and Training
Youth Services
Discuss with Roper Gulf Shire the current operational status of the RIBS program in Ngukurr
LRG ROC RGSC
ongoing Family and Community
Sporting Facility Management Plan incorporate infrastructure development
DHLGRS RGSC
September 2012 Sport and Recreation
Flood Lighting for Oval 2013 Sport and Recreation / DITS
Seating and refurbishment of Oval 2013/14 Sport and Recreation / DITS
Mobile Stage 2013/14 Youth Services
Other/advocacy Only
Project Timeframe Unit responsible
Compost toilet at airport 2012/13 DCI
Complete and gazette a town plan 2012 DLP
Assess fencing requirements for houses and develop a fencing program December 2012 DHLGRS FaHCSIA HMP
Improve transport arrangements – facilitate workshops in partnership with stakeholders to investigate passenger transport needs
September 2012 DLP DCI
Work on project “Pioneer Valley Rotary Club” June 2013 Community
Communities are encouraged to use school facilities from 3 pm to 9 pm to increase the community’s contact with the school and to help improve school attendance. After hours access can be for local language courses and activities as well as adult literacy, IT, parenting skills, music, sport and the arts
Ongoing DET
Develop a Ngukurr alcohol management plan – consult with the broader community through public meetings to plan a way forward
July 2012 DoJ
Shire Plan 2012-2013 39
Working partnership to support the small business developments – develop a government business and service centre at Ngukurr
2012 Commercial Operations
In partnership with community champions hold Futures Forums that provide information on employment options and business development services available to community members. Provide information on opportunities arising from potential private sector involvement
2012 FaHCSIA
Establish a community safety committee to work with Ngukurr’s Justice and Harmony Committee and other key stakeholders to develop place-based strategies that will address safety concerns
Review October 2012
DoJ
Government will review the safe place infrastructure and program delivery of both the women’s centre and men’s centre in negotiation with the community including improved links to the night patrol service
December 2012 DHF
Train Volunteer Emergency Services Response group in Ngukurr Review October 2012
NTPFES
Support NT Emergency Service Volunteer units capable of reacting to known hazards for the community
Review October 2012
NTPFES
40
nUMBUlWarnumbulwar is surrounded by wilderness and beaches and is one of the most isolated of the major arnhem land communities . it is located on the sand hills of the far south-eastern coast of the rose river estuary, approximately 400 km east of Katherine, 570 km south east of Darwin . During the dry season the community can be accessed by road .
The numbulwar people have a close relationship with the sea and coastal areas, which feature strongly in their culture . Ceremonial activities are still very important and boys’ initiations and other men’s rituals are performed regularly . numbulwar is also home to the international renowned Red Flag Dancers and Yilila band .
Total population of numbulwar is 687 out of which there are 343 males and 344 females . The median age is 26 .
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
Shire Plan 2012-2013 41
numbulwar Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Upgrade/repair street lighting, sewers and drainage. More lights needed for some areas
2012/13 SSM/Infrastructure To be sourced
Internal fence around play equipment near recreation hall
December 2012 SSM To be sourced
Extend bitumen roads from community to airstrip and around and out to the dump
June 2012 SSM/Infrastructure (subject to DCI partnership)
To be sourced
Education awareness programs for: • Healthanddogs• Litter• Adultlearning• Governance
Ongoing Governance and Corporate Planning DITS SSM’s
budget
New cemetery and ongoing management 2013 Infrastructure To be sourced
Footpaths in the community May 2013 Infrastructure To be sourced
Installation of a communications system such as loud speakers
July 2012 Infrastructure To be sourced
Roads upgrade – Undertake a detailed survey of road network in and around Numbulwar including options for progressive road upgrade, sealing of road to airport. Prepare submission to upgrade roads
Ongoing Infrastructure To be sourced
Working partnership to support the small business developments – develop a government business and service centre at Ngukurr
Review July 2012 Infrastructure Commercial Opportunity
42
agency Services
Project Details Key Stakeholders/ Partners
Timeframe Unit responsible
Shed and roof around basketball courts DHLGRS December 2012 Sport and Recreation
Construction of new BRACS facility (television and radio)
DBCDE March 2013 Family and Community
Relocation of football/sports oval DHLGRS July 2013 Sport and Recreation
Tow Truck DHLGRS September 2012 Family and Community
Establish an early childhood coordinator to lead the integration of family services tailored to the Numbulwar community and its surrounding service delivery area
DET LRG DHF SHS
Review October 2012
Family and Community
DET in partnership with DHF, DEEWR, FaHCSIA, RGSC, non-government organizations and community will lead the integration of universal services for families and their children
DEEWR DET DHF FaHCSIA
Review October 2012
Family and Community
NTG with support from RGSC guarantees all Year 12 leavers employment and training opportunities under the Jobs Guarantee Plan
DBE DET
Review October 2012
Youth Services Employment and Training
Market Garden Dred Hollows Foundation
May 2013 Horticulture and Landcare
Better mail service Australia Post February 2013 Commercial Operations
Shire Plan 2012-2013 43
Other/advocacy Only
Project Timeframe Unit responsible
Upgrade airport building to include shelter and toilets 2012/13 DCI
Child Care Centre 2012/13 DEEWR
Establish a School Attendance Working Group to develop a localised school attendance strategy that will increase school attendance and have young adults and parents returning to school
Review December 2012
DET
Undertake an assessment of what is currently available and what will be required for future aged care services in Numbulwar
November 2012 DoHA DHF
Complete and gazette an Area plan including street names December 2012 DLP
Enforcement of road rules including signage Ongoing NT Police RGSC
Develop Town Centre Urban Design plan including community transport strategies
December 2011 DLP DCI
Arts and Craft Centre 2013/14 Office of the Arts GBM
Bridge to be built over Phelps River 2015 DCI
Early Childhood – Complete a study on future of education and associated infrastructure needs including the establishment ofacrècheandchildcarefacilityinNumbulwar
December 2012 DEEWR
44
rOBinSOn riVerThe Town is located 120 km south east of Borroloola . There are 8 creeks and rivers that flow into the robinson river . The five longest tributaries are Kangaroo Creek, hobblestrap Creek, Quaker Creek, Koolfella Creek and Skull Creek . robinson river is regarded as a safe and friendly community and great for fishing, bush walking and remote community life . Total population of robinson river is 258 out of which there are 128 males and 130 females . The median age is 21 .
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
Shire Plan 2012-2013 45
robinson river Town Priorities
Other/advocacy Only
Project Details Timeframe lead agency
Land tenure – township leasing ASAP Mungoorbada Aboriginal Corporation
Enterprise development Ongoing Mungoorbada Aboriginal Corporation
Cover over the basketball court and an oval 2014/15 Mungoorbada Aboriginal Corporation
Cemetery management 2012 Mungoorbada Aboriginal Corporation
Dog management 2012 Mungoorbada Aboriginal Corporation
Traffic calming 2012 Mungoorbada Aboriginal Corporation
Adult education programs delivered locally 2013/14 Mungoorbada Aboriginal Corporation
More housing to address housing shortage 2015/16 Mungoorbada Aboriginal Corporation
Two more Government employee houses 2015/16 DET
Tourism Development Ongoing Mangoorbada Aboriginal Corporation
Employment and training Ongoing DET
46
UraPUnGaUrapunga is located about 470 km east-southeast of Darwin and 250km from Katherine . it is also known as rittarangu and is situated on the banks of the Wilton river in the northern Territory . The nearest town ngukurr which is 18 km away .
Urapunga Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Realign access road and the end of the airstrip to provide all-weather access to the residents and business
2012/2013 DITS To be sourced
Continue to develop Shire services On-going DITS Budgeted
Animal Welfare On-going DITS Budgeted
Other/advocacy Only
Project lead agency
Request DCI to provide more maintenance grades from Roper Bar to Urapunga DCI
Improve boat ramp DCI
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
agency Services
Project Details Timeframe Unit responsibleHMP to deliver fences around 5 dwellings 2012/2013 CDEP
Night Patrol services On-going Night Patrol
Shire Plan 2012-2013 47
WeeMOlWeemol, although located only 306km from Katherine, is one of the Shires most remote communities especially in the wet season . Weemol’s closest neighbour is Bulman .
Weemol Town Priorities
Core Services
Project Details Unit responsible Funding Source
Upgrade access roads DITS To be sourced
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
agency Services
Project Details Unit responsible Funding SourceUpgrade Weemol office building – CDEP CDEP To be sourced
Development of a CDEP Shed CDEP To be sourced
HMP to deliver 8 fences CDEP To be sourced
48
WUGUlarr (BeSWiCK)Wugularr also know as Beswick is 120kms south-east of Katherine along the arnhem highway . Beswick is on the banks of the Waterhouse river approximately 118km south east of Katherine and 31 km east of Barunga . Total population of Beswick is 512 out of which there are 265 males and 247 females . The median age is 23 .
© 2012 Google – imagery copyright symbol Cnes/Spot image, DigitalGlobe, Geoeye
Shire Plan 2012-2013 49
Wugularr (Beswick) Town Priorities
Core Services
Project Details Timeframe Unit responsible Funding Source
Irrigate oval Sept 2012 Infrastructure Budget
Light footpath to new subdivision June 2013 Infrastructure To be sourced
Shire Service Delivery Centre refurbishment Dec 2012 Infrastructure Budget
Ablution block at the red shed 2012/2013 Project Management / Infrastructure
To be sourced
Street lighting along the road which runs from top to bottom. From the highway turn off to the new subdivision
Installation scheduled for July 2012
Infrastructure To be sourced
Create heritage park 2013/2014 To be sourced
Public toilet block in new sub-division 2013 Infrastructure To be sourced
agency Services
Project Details Key Stakeholders/ Partners
Timeframe Unit responsible
Shower and toilet block at basketball court FaHCSIA NRETAS
2012/13 Sport and Recreation
Relocate oval FaHCSIA NRETAS
2013/14 Sport and Recreation
Other/advocacy Only
Project Timeframe lead agency
Refurbishment of the red shed Partially done GBM – to follow up
Move the gate to before Butterfly Creek and fence the side to stop people going around
Dec 2012 DCI
Establishment of an Action Group to move forward – driver education to reduce number of accidents caused from unlicensed, intoxicated, speeding drivers
2012 GBM DoJ
Kerb and gutter in new sub-division 2012 GBM – following up DCI, Housing Reference Group
Stormwater drainage in new sub-division 2012 DCI
Central Arnhem Road traffic calming devices 2012 DCI
Reconstruct Central Arnhem Road 2015 DCI
Upgrade of bridge 2015 DCI
Helipad 2015 DCI
Relocate sewerage ponds 2015 PowerWater
50
2 .3 Delivery of Goals and Performance Monitoring
Shire Plan 2012-2013 51
Service Delivery PlanGoal 1
Strengthen quality of life in our Shire
Strategy: Supporting communities to care for their aged and disabled people
Outcome: The best nutrition, care and well being services are being provided to our aged, disabled and children ofcrècheandprimaryschoolage.
Performance Measure Baseline data•NumberofagedanddisabledresidentsintheShire
effectiveness•Numberofagedanddisabledresidentsaccessing
Shire services•Numberofservicesreceivedpereligibleresidentperweek•NumberofCarePlansupdatedbyduedate•NumberofCarePlansnotupdatedbyduedate
efficiency•Numberofactivitiesdeliveredusinguserpayfunds•Averagecostperactivity•Averagecostperperson
Quality•Annualcustomersurvey•AnnualStakeholdersurvey•Resultsofcustomerfeedback
Milestones responsibility Timeframe
Regional Approach Strategy Model developed and implement for the delivery of aged care and disabled services across the Roper Gulf Shire Region.
Director Corporate and CommunityManager Family and Community Services
Development and implementation of MOU’s to achieve coordination in delivery of services. MOUs with:•TerritoryandAustralianGovernmentagencies•SunriseHealthService•GoldenGlow
Director Corporate and Community
Manager Family and Community Services
52
Strategy: helping our children get a good start to life
Outcome: The best nutrition, care and well being services are being provided to our aged, disabled and children ofcrècheandprimaryschoolage.
Performance Measure Baseline data•Numberofcrèches•NumberofPrimaryschools
effectiveness•Numberofchildrenattendingcrèche
•Numberofprimaryschoolchildrenbeingprovidedwithmeals
efficiency•Averagepercentageof0–5yearoldsattendingcrèche•Averagepercentageofprimaryschoolchildrenprovided with meals•ValueofSchoolNutritionProgram•AveragecostperpersonforSchoolNutritionProgram
Quality•Annualcustomersurvey•AnnualStakeholdersurvey•Resultsofcustomerfeedback
Shire Plan 2012-2013 53
Strategy: helping our people grow strong and proud
Outcome: To increase the quality and number of services and activities which build community engagement, capacity, involvement and knowledge.Performance Measure Baseline data
•NumberofYouthVoicemeetingsscheduled•Currentnumberofholdersoflibraryborrowingcards
effectiveness•Numberofsportingactivitiesdeliveredbycommunity•Typesofsportingactivitiesdelivered•Numberofrecreationalactivitiesdeliveredbycommunity•Typesofrecreationalactivitiesdelivered•Numberandtypeofyouthactivitiesdeliveredbycommunity•NumberofYouthVoicemeetingsheld•NumberofyouthattendingYouthVoicemeetings•Numberoflibraryusers•Numberoforganisations/agenciesutilisingIBPfor
broadcasting purposes•Numberofbroadcastinghours
efficiency•Communityparticipationasapercentageinsportingactivities by community•Communityparticipationasapercentageinrecreationalactivities by community•Costperparticipant•ActionscompletedbyyouthasaresultofYouthVoice
meetings
Quality•Annualcustomersurvey•AnnualStakeholdersurvey•ResultsofcustomerfeedbackincludinglibrariesandIBP
Milestones Responsibility TimeframeYouth Service 50 youth have attained
Certificate 1 of higher.
Manager Youth Services June 2013
20 Youth have secured full time employment Manager Youth Services June 2013
54
Strategy: Community Safety and harmony
Outcome: Increased safety for women and children within townships.Performance Measure Baseline data
•Numberandtypesofcompanionanimalsbytownship•Plannednumberofpatrolsperweekfor11/12•Numberofpeopleassistedin10/11
effectiveness•Numberofcommunitypatrolsperweek•Numberofpeopleassisted•Numberofcompanionanimalsdesexed•Numberofcompanionanimalsyoutheuthanized•Numberofcompanionanimalsimpounded
efficiency•Percentage reduction in the number of companion animals
by township•Totalexpenditureondesexing•Totalexpenditureonyoutheuthanizing•Numberofpatrolscompletedasapercentageagainstplanned
patrols•Percentage increaseordecrease in incidentsagainstprevious
quarter•Percentageincreaseordecreaseinincidentsagainstsame
time in previous financial yearQuality•Annualcustomersurvey•AnnualStakeholdersurvey•Resultsofcustomerfeedback•AnimalPopulationSurvey
Milestones Responsibility TimeframeBy-laws Governance, Animal Welfare,
CouncilJuly 2013
Policies and procedures for Animal Management Activities and Pound Operation.
Organisational restructure increasing number of community personnel in the Organisation with an aim of putting great focus on community.
Governance Animal Welfare
EMT
2013
2013
Shire Plan 2012-2013 55
Goal 2
Move towards sustainability
Strategy: local jobs for local people
Outcome: The Roper Gulf Shire Council is an “employer of choice” within the Northern Territory.Performance Measure •Totalnumberofpositions(excludingCDEP)withintheShire
Council•Totalnumberofemployees•TotalnumberofIndigenousemployees(excludingCDEP)•Totalnumberofemployeesmeetingminimumqualifications•Totalnumberofmaleemployees•Totalnumberoffemaleemployees•Totalnumberandtypeoftraininganddevelopment
scheduled for delivery over the financial year•TotalnumberofpeopleleavingtheOrganisation•TotalnumberofnewemployeeintheOrganisation•Retentionrateasof1Julybasedonpreviousyear•Indigenousretentionrateasof1Julybasedonpreviousyeareffectiveness•Numberandtypeoftrainingsessionsdelivered•Numberofparticipants•Indigenousemployeesasapercentageoftheworkforce
(excluding CDEP)•Percentageofemployeesenrolledandundertakingfurther
development including training•PercentageofIndigenousemployeesenrolledand
undertaking further development including training•Percentageofemployeesunderformalperformance
management•NumberofpeopleengagedinCDEP“shadowpositions”•NumberandtypeoftrainingcoursesdeliveredthroughCDEP
(Employment and Training)•NumberofCDEPparticipantssecuringanemploymentoutcome•NumberofCDEPparticipantsunder25efficiency•Averagetrainingcostperparticipant•Averageretentionratefortheperiod•AverageIndigenousretentionrate(excludingCDEP)•Averagerecruitmenttime•Averagevacancyrate•PercentageofAnnualPerformancePlans/ReviewsCompleted•Percentageofquarterlyfeedbackiscompletedwithin2
weeks of the end of the quarter being March and September•PercentageofCDEP“shadow”positionsfilled•Participationrateintrainingcoursesthrough(Employment
and Training)Quality•Employeefeedback
56
Milestones Responsibility TimeframeImplementation of the Workforce Management and Performance Plan which includes:•Recruitmentandretentionstrategy•Skillstraininganddevelopmentanalysis
and schedule•Careerpathways•MentoringProgram•Employeeperformanceplanningand
management systems
Completion of Human Resources Policies and Standard Operating Procedures
Revision of all employee Performance Plans for 2011-12 financial year which include performance measures linked to the Shire Plan and training and development
CEOExecutive Management Team
Director Corporate and Community Human Resources Manager, Governance
CEO
October 2012
Ongoing
August 2012
Completion of all employee six monthlyPerformance Plan Reviews
CEO/ Human Resource 2012/13
All employee quarterly Performance feedback is completed
Completion of Annual Training and Development Calendar
CEO/ Human Resource
CEO
October 2012 April 2013
September 2012
Schedule employees as per individual Performance Plans and Business Unit Operational Plans
Human Resource 2012/13
Development of Regional jobs in Community Strategy including employment and training package and local jobs for local people
EMT December 2012
Organisational restructure increasing number of community personnel in the Organisation with a aim of putting great focus on Community
EMT December 2012
Shire Plan 2012-2013 57
Strategy: Diversify income streams
Outcome: To generate income from range of income producing commercial operations in order to support Shire services and infrastructure.Performance Measure Baseline data
•Numberofcommercialcontractsinpreviousfinancialyear•Netandgrossprofitforthefinancialyear
effectiveness•Numberofcurrentcommercialcontracts•Valueofcommercialcontracts•Profitorlossoncommercialcontractsfortheperiod•Profitorlossoncommercialbusinessfortheperiod
efficiency•Grossprofitmarginoneachcommercialcontract•Netprofitmarginoneachcommercialcontract•Grossprofitmarginoneachcommercialbusiness•Netprofitmarginoneachcommercialbusiness
Quality•Numberofnegativefeedbackcommentsfromcustomers
(business and commercial)•Numberofcommercialcontractscompleted
Milestones Responsibility TimeframeCompletion of Sustainability/ Revenue growth policy
Director Corporate and Community Services August 2012
58
Strategy: increase cost-effectiveness of roper Gulf Shire Council operations
Outcome: Increase in the quality and number of services delivered as a result of cost reductions due to effective and efficient decision making processes which are accountable, communicative, planned and responsive.Performance Measure Baseline data
•Percentagerateofunspentfundsreimbursedtofundingagencies as at 30 June 2012
•Percentagerateofoutstandingpaymentstocreditorsover30 days as at 30 June 2012
•Percentagerateinoutstandingpaymentsfromdebtorsover30 days as at 30 June 2012
•Percentageofrecoveryofallpropertyrateschargesas at 30 June 2011
•Revenuesurplusratioasat30June2012•AverageCashbalanceamount($)asat30June2012•NumberofEMTmeetingsheldinpreviousfinancialyear•NumberofactionscompletedbyEMTinpreviousfinancialyear•NumberofManagersMeetingsheldinpreviousfinancialyear•Numberofbusinessunitstaffmeetingsheldinprevious
financial year
effectiveness•Numberofprogramfundingagreements/agencycontracts
with unexpended funds at the end of the period•Numberofoutstandingcreditorpaymentsexceedingterms
of credit and average number of days outstanding at the end of the period
•Numberofoutstandingdebtorsover30daysandaveragenumber of days outstanding at the end of the period
•Numberofactionsarisingduetoperformancereports•Closingperiodcashbalance
efficiency•Percentagerateofreductioninunspentfundsreimbursed
to funding agencies•Percentagerateofreductioninoutstandingpayments
to creditors exceeding terms of credit•Percentagerateofreductioninoutstandingpayments
to creditors over 30 days•Percentagerateofreductioninoutstandingpayments
from debtors over 30 days•Percentageofrecoveryofallpropertyratescharges•Revenuesurplusratio•Cashbalanceincrease/decrease•Averagetimetakentocompleteenactdecisions
or completed actions arising from EMT•AveragetimetakentocompleteactionsarisingfromBusiness
Unit meetings
Shire Plan 2012-2013 59
Performance Measure Quality•TotalnumberofcomplaintsreceivedbytheShireinthe
period•Changeinthelevelofcomplaints•Totalnumberofnegativefeedbackcommentsreceivedby
month by the Shire•Changeinthelevelofnegativefeedback
Milestones Responsibility TimeframeAnnual Performance Report by Directors. Directors 14th July 2012
14th July 2013
Completion of Annual Report EMTGovernance and Planning
15th November 2012
Completion of the Shire Plan EMTGovernance and Planning
31st July 2013
Review of service delivery framework and organisational structure in terms of achieving effective and efficient service delivery across the Shire
CEOGovernance and Planning
March 2013
Completion of all employee Performance Plans for 2011-12 financial year which include performance measures linked to the Shire Plan
CEO Human Resource
2012/13
60
Goal 3
Care for our environment
Strategy: effectively manage legislated responsibilities directly impacting on the Shire’s environment and on people’s enjoyment of it .
Outcome: A reduction in the impact on the environment of rubbish, litter, fire and weeds by effective and efficient service delivery.Performance Measure Baseline data
•NumberofhouseholdseligibleforkerbsidecollectedintheShire by township
•Sizeandnumberofparks,gardens,openreservesandpublicareas in which litter collection occurs
•Lengthoffirebreakstobecompleted
effectiveness•Numberofpropertiesservicedperweek•Numberofkerbsidecollectionsperweek•Number of parks, gardens, open reserves andpublic areas
having litter collection per week•Numberofcollectionsoflitterperweekfromgardens,open
reserves and public areas•Lengthoffirebreaksaddedduringtheperiod•Sizeofareaandlocationburnedforfuelreduction•Sizeofareaforweedspraying•Typeofweedssprayed
efficiency•Averagecollectioncostperpropertybytownship•Operatingcostofrubbishdumpsperpropertybytownship•Costofpubliclittercollectionpercapita•Costperhectareforweedspraying
Quality•Numberofgarbagecollectionandlittercomplaints•Changeinthelevelofcomplaints• Number of Incidents of damage and loss within the town
boundary caused by fire intrusions•WeedsActcompliance
Milestones Responsibility TimeframeCompletion of Waste Management Masterplan. Director Technical Services
Implementation of Weed Management Plan Director Technical Services/ Landcare and Animal Welfare
Ongoing
Implementation of Pest Control Measurement Director Technical Services/ Landcare and Animal Welfar
Ongoing
Shire Plan 2012-2013 61
Strategy: Build community and organisational resilience in order to adapt to the impacts of climate change
Outcome: All residents and employees residing in our townships are equipped to deal with emergencies and disasters as a result of climate change.Performance Measure Baseline data
•Numberofemployeeswhohavecompletedemergencyservices training as at 30 June 2012
•Typesofemergencyservicestrainingcompletedbyemployees as at 30 June 2012
effectiveness•NumberofLocalCounterDisasterPlanningCommittee
Meetings•Numberofemployeesenrolledforemergencyservices
training•Numberofemployeeswhohavecompletedemergency
services training year to date•Typesofemergencyservicestrainingcompletedyeartodate•NumberofDisasterRecoveryPlanscompletedyeartodateefficiency•Averagecostperemployeeforemergencytraining•Percentageofemployeeswhocompletedtrainingagainst
number enrolled•Percentageincreaseintheemployeeswhohavecompleted
emergency services training year to date•Averagecostpertrainingsessiondeliveryinemergency
services•trainingcompletedyeartodate
Milestones Responsibility TimeframeEmergency Services training Director Technical Services October 2012
Completion of Disaster Recovery Plans Director Technical Services October 2012
62
Goal 4
improve our infrastructure
Strategy: Maintain existing Shire road infrastructure and roadside furniture
Outcome: All roads and roadside furniture within the Shire is managed in the most cost effective manner and to reduce occurrence of incidents, damage or accidents while maintaining access.
Performance Measure Baseline data•Totallengthofsealedroads•Totallengthofunsealedroads
effectiveness•Lengthofsealedroadsmaintained•Lengthofunsealedroadsmaintained
efficiency•Maintenancecostperkilometresealedroad•Maintenancecostperkilometreunsealedroad•Maintenancecostsasapercentageofassetvalueofsealroads•Totalroadexpenditureasapercentageoftotalcouncilexpenditure•Numberofroadcomplaints•Changeinthelevelofroadcomplaints
Quality•Annualresidentsatisfactionsurvey
Milestones responsibility Timeframe
Roads Management Plan including Roads Hierarchy, Repairs and Maintenance Plan
Manager Technical ServicesAssets Manager
Shire Plan 2012-2013 63
Strategy: Maintain existing Shire infrastructure, Open Space and assets (other than roads)
Outcome: All existing infrastructure and assets within the Shire are managed in the most cost effective manner to improve service.
Performance Measure Baseline data•Numberofparks,gardens,reservesandplaygrounds
managed and maintained by the Shire•NumberofcemeteriesmanagedandmaintainedbytheShire•Totalcostofinsuranceinpreviousfinancialyeareffectiveness•Averagenumberoftimesperweekparks,gardens,reserves
and playgrounds are mowed, whipper snipped etc by township,
•Numberofcemeterieswhichhavebeenplottedandburialinformation recorded
•Totalcostofinsuranceforcurrentfinancialyearefficiency•Maintenancecostpertownshipforparks,gardens,reserves
and playgrounds•Totalparks,gardensandopenspacesexpenditureasa
percentage of total Council expenditure•Percentageofcostsrecoveredfortheprovisionofburial
services•Totalcostofinsuranceagainsttotalvalueinfrastructure•TotalamountofinsuranceclaimstodateQuality•Residentsatisfactionsurveyannually•Numberofparks,gardensetccomplaints•Changeinthelevelofparks,gardensetccomplaints•Numberofawardspertainingtocareofassetsand
infrastructure such as Tidy Towns and Landcare etc
Milestones responsibility Timeframe
•CemeteryManagementPlan•PlanofManagementforParksandOpen
Spaces•WasteManagementMasterplan
Director Technical Services Ongoing
64
Strategy: Strategically develop the infrastructure assets of the Shire to meet the current and future needs
Outcome: An increased life and reduced operational costs for infrastructure assets to enable savings to meet the future infrastructure assets needs
Performance Measure Baseline data•Totalcostofinfrastructurerepairsandmaintenanceto
30 June 2012•TotalnumberandtypeofinfrastructureassetsintheShire•Totalvalueofproposedinfrastructureprojectsforthe
2012-13 year•Total‘agencyfunded’infrastructureprojectsforthe
2012-13 year•Total‘shire’fundedinfrastructureprojectsforthe
2012-13 year
effectiveness•Costofrepairsandmaintenancetodate•Totalrunningcoststodate•Totalexpendituretodateoninfrastructureprojectsforthe
2012-13 year•Totalexpendituretodateon‘agencyfunded’infrastructure
projects for the 2012-13 year•Totalexpendituretodateon‘shire’fundedinfrastructure
projects for the 2012-13 year
efficiency•Totalrepairsandmaintenanceexpenditureasapercentage
of total council expenditure•Runningcostsexpenditureasapercentageoftotalcouncil
expenditure•TotalexpenditureasapercentageoftotalShireexpenditure
to date on infrastructure projects for the 2012-13 year•TotalexpenditureasapercentageoftotalShiretodateon
‘agency funded’ infrastructure projects for the 2012-13 year•TotalexpenditureasapercentageoftotalShiretodateon
‘shire’ funded infrastructure projects for the 2012-13 year
Quality•Employeeandcustomersurvey•100%compliancewithLocalGovernmentActprocurement
Milestones Responsibility TimeframeCompletion of Assets and Infrastructure Management Plan
Director Technical ServicesAssets Manager
March 2013
Completion of infrastructure assets audit Assets Manager December 2012
Shire Plan 2012-2013 65
Strategy: Secure a Shire headquarters .
Outcome: A joint Shire Headquarters.Performance Measure effectiveness
•Progressofconstructionagainstprogresspaymentsinbuilding contracts
efficiency•Expenditureagainstactual
•percentageofprocesscompleted
Quality•FeedbackfromCouncillors•Employeesurvey
Milestones Responsibility TimeframeCommencement of construction CEO 2012
50%ofconstructioncompleted CEO December 2012
Headquarters completed and occupied CEO July 2013
Develop and maintain strong regional partnerships
CEO Ongoing
66
Strategy: implementation of cost effective asset Management Program .
Outcome: A significant reduction in the costs of repairs and maintenance of Shire assets.Performance Measure Baseline data
•NumberandtypesoffixedassetswithintheShire•NumberandtypesofplantandequipmentwithintheShire•Totalcostofinsuranceinpreviousfinancialyear•Totalexpenditureforrepairsandmaintenanceoffixedassets
in previous financial year•Totalexpenditureforrepairsandmaintenanceofplantand
Equipment & fleet in previous financial year
effectiveness•Totalcostofinsuranceagainsttotalvalueoftheasset•Costofrepairsconductedonfixedassets•Costofrepairsconductedonplantandequipment
efficiency•Totalamountexpendedoninsuranceclaimsandnumberof
claims•Averagemaintenancecostperfixedasset•Averagemaintenancecostperplantandequipmentasset•Totaloperationaltimelossduetounscheduledrepairsand
maintenance•Totalmaintenancecostsasa%ofthetotalassetsvalue•Totalrepairsandmaintenanceexpenditureasa%oftotal
council expenditure
Quality•Timelossduetounscheduledrepairsandmaintenance
Milestones Responsibility TimeframeCompletion of Assets Audit Assets Manager Ongoing
Completion and implementation of Assets Management Policies and Standard Operating Procedures.
Assets Manager Ongoing
Policy for Fleet Replacement Assets Manager December 2012
Shire Plan 2012-2013 67
Goal 5
Good Governance
Strategy: Strong and effective representative governance
Outcome: Stronger community voice through Local Boards, Council Representatives and Community Engagement to strengthen the decision making process and accountability of the Roper Gulf Shire through local training, monitoring and reporting system.Performance Measure Baseline data
•NumberofOCMandFCMmeetingsscheduledforthefinancial year
•NumberofOCMandFCMmeetingsscheduledforthefinancial year
•Numberoflocalboardmeetingsscheduledforthefinancialyear, by location
•Numberoflocalboardmembersbyboard•NumberofTownPriorities(CommunityPriorities)achievedin
previous financial year•NumberandtypeofTownPrioritiesforthecurrentfinancial
year•NumberofTownPrioritiescarriedforwardfromprevious
financial year
effectiveness•NumberofOCMandFCMmeetingsheld•NumberofmeetingsattendedbyCouncillor•NumberofCouncillorsattendingthemeetings•Numberoflocalboardmeetingsheld•Numberofmeetingsattendedbytheboardmember•Numberofboardmembersattending•Numberoftrainingsessionsconducted•NumberofCouncillorsattendingtrainingsessions•NumberofTownPriorities(CommunityPriorities)achieved
to date•Numberof“core”TownPrioritiesachieved•Numberof“agency”TownPrioritiesachieved•Numberof“advocacy”TownPrioritiesachieved•Numberandtypeofcommunityorciviceventssuchas
Clean Up Day and Australia Day•Numberofresidentsparticipatingincommunityorcivic
events such as Clean Up Day and Australia Day
68
Performance Measure efficiency•AveragecostperCouncillorpermeetingattended•PercentageofattendancebyCouncillors•Percentageoflocalboardmeetingsheld•PercentageofattendancebyBoardMembers•PercentageofMinuteslodgedwithin10daysofmeeting
Local Boards•PercentageofMinuteslodgedwithin10daysofmeeting
FCM and OCM•Averagetimetakentocomplete/resolvedactionsLocal
Boards•Averagetimetakentocomplete/resolvedactionsFCMand
OCM•Costpertrainingsession•CostperCouncillorpertrainingsession•PercentageofTownPriorities(CommunityPriorities)
achieved in to date•Percentageof“core”TownPrioritiesachieved•Percentageof“agency”TownPrioritiesachieved•Percentageof“advocacy”TownPrioritiesachieved
Quality•Councillorfeedback•Awardsfortrainingprogram/s
Milestones Responsibility TimeframeCompletion of Councillor 4 year training package
CEO 2012/13
Shire Plan 2012-2013 69
Strategy: Strong and effective corporate governance .
Outcome: Performance Measure Baseline data
•CompliancewithLocal Government Act as at 30 June 2012•AveragenumberofsupplementaryagendaitemsforFCM
and OCM in 2011/12 year
effectiveness•NumberofsupplementaryagendaitemsforFCMandOCM•Numberofoutstandingactionitemsateachmeetingcarried
forward from previous meeting•NumberofExecutiveManagementTeammeetings•NumberofManagersMeetingsheld•NumberofShireServiceManagersMeetingsheld•NumberofBusinessUnitandSDCStaffmeetingsheldefficiency•PercentagecompliancewiththeLocal Government Act•Percentageofagendaitemspermeetingwhichare
supplementary•AveragetimetakentocompleteactionsarisingfromCouncil•End-of-YearGeneralPurposeandSpecialPurposeFinancial
Statements•Compliancewithfundingagreements•Deliveryoffinancialreports
Milestones Responsibility TimeframeCompletion and implementation of Occupational Health and Safety policies and procedures manual.
Director Corporate and Community/ Governance and Planning
Ongoing
Completion and implementation of Human Resources policies and procedures manual.
Director Corporate and Community / Human Resource
Governance and Planning
Ongoing
Review and amendment of Shire’s Strategic Plan
Council Governance and Planning
June 2013
Lodgement of Annual Shire Plan on 31st July Annually
EMT Governance and Planning
31st July
Lodgement of Annual Shire Report on 15th November Annually.
CEO 15th November 2012
Lodgement of Annual Audit on the 15th November annually.
CEO 15th November 2012
70
3 . FinanCial PlanninG
Shire Plan 2012-2013 71
3 .1 Budget Summary 2012-2013The budget for 2012-2013 has been completed on a consultative basis and aims to address the needs of residents and the programs under the Roper Gulf Shire Council’s direction.
During the 2012-13 financial year, Roper Gulf Shire Councilisexpectedtoreceiverevenueof$35.8million.Of this revenue, 62 per cent is expected to be sourced from grants, 25 per cent from government contracts, and less than 2 per cent from rates.
In expenditure terms, the five largest service delivery program areas for the Shire are: Community Development and Employment Projects (CDEP), Night Patrol, Territory Housing Repairs and Maintenance Contract, Municipal Services, and Shire Services General. The largest component of operating expenditure is on wages and salaries,foratotalof$18.3millionor51percent.Thisis budgeted to fund 384 employment positions across the Shire (not including CDEP participants). This makes the Shire one of the largest employers in the Big Rivers region, and the largest employer of Indigenous people in the Roper Gulf Shire area.
Additionally, theShirehasbudgeted$3.19million forcapital expenditure. The majority of this budget will be used for fleet renewal, four new waste management compactor trucks for Borroloola, Barunga-Beswick and Mataranka-Jilkminggan, and Bulman upgrades to waste dumps, and minor upgrades to council offices in communities.
An allowance has also been made for six months of loan expenses to fund the construction of a new joint administration centre in Katherine, to be occupied by Roper Gulf and Victoria Daly Shires.
This budget is balanced, however capital depreciation remains underfunded and is not adequate to renew the Shire’s assets and infrastructure over the long term. This underlies a broader issue of latent cost-shifting from agency-funded services, and a tendency for many program funding agreements to insufficiently fund corporate services and administration costs, assets and infrastructure required to deliver the agency services.
72
income and expenditure report 2012-2013 Budget
income Year to Date Budget ($)
Income Rates 603,745
Income Council Fees and Charges 251,000
Income Operating Grants Subsidies 21,482,259
Income Investments 600,000
Income Agency and Commercial Services 9,034,551
Income Capital Grants 506,482
Sale of Assets 3,336,075
Total income 35,814,112
expenditure
Employee Expenses 18,270,547
Contract and Material Expenses 9,289,119
Fleet, Plant & Equipment 1,733,766
Asset Expense / Depreciation 1,510,415
Other Operating Expenses 4,710,264
Finance Expenses 300,000
Internal Cost Allocations 0
Total expenditure 35,814,111
Surplus/(Deficit) 0
Capital expenditure
Plant & Equipment 1,550,631
Fleet 1,164,821
Infrastructure & Building 470,866
Total Capital expenditure 3,186,318
income by Type, 2012-2013 Budget
1+9+2+1+60+2+250.7%
60%
1.7%
25.2%
1.7%9.3%
1.4%
expenditure by account Category, 2012-2013 Budget
1+51+26+5+4+130.8%
0%
51%
25.9%
4.8%
4.2%
13.2%
3 .2 estimates of revenue and expenditure 2012-2013 Consolidated Budget 2012-2013 by Category
Shire Plan 2012-2013 73
income and expenditure report 2012-2013 Budget
income Year to Date Budget ($)
Core Services 10,077,868
Agency Services 18,248,234
Commercial Services 7,488,009
Total income 35,814,112
expenditure
Core Services 12,718,214
Agency Services 17,413,916
Commercial Services 5,681,981
Total expenditure 35,814,111
Surplus/(Deficit) 0
expenditure by Service Group
40+45+15Core Services
Agency Services
Commercial Services
35.5%
48.6%
15.9%
income by Service Group
30+50+20Core Services
Agency Services
Commercial Services
28.1%
51%
20.9%
Consolidated Budget 2012-2013 by Service Group
74
expenditure report: 2012-13 Budget as at 30 June 2013 Barunga
expenditure by Service Group Year to Date Budget ($)
CORE – Admin and Exec 149,453COMMERCIAL Services 247,895AGENCY – Night Patrol 236,048AGENCY – Employment and Training 18,500AGENCY – Family and Community Services 36,852COMM / AGENCY – Housing and Outstations 98,463CORE – Civil Works and Roads 58,523CORE – Shire Services 717,216AGENCY – Sport and Recreation 270,135
Total expenditure 1,832,995
expenditure by account Category
56+12+4+5+7+1655.6%
3.8%
4.3%
7.7%
16.9%
11.8%
expenditure by Service Group
9+13+13+1+2+5+3+39+1512.9%
39.1%
3.2%
14.7%
13.5%
5.4% 1%
2%
8.2%
expenditure by account Category
Employee Expenses 1,003,248Contract and Material Expenses 184,500Fleet, Plant & Equipment 60,046Other Operating Expenses 72,712Internal Cost Allocations 245,163WIP Assets 267,327
Total expenditure 1,832,995
expenditure
Human Resources 250Local Boards 1,200Community Services Management 148,003Airstrip maintenance – DCI Katherine 68,120Slashing and Litter Collection Contracts 24,000Centrelink agency 51,892Commercial Australia Post 16,600Power Water contract 87,283Night Patrol 236,048CDEP Wages 13,000CDEP Work Ready & Community Development 5,500CACP 800HACC services 26,600Indigenous Broadcasting 8,852Library 600Territory Housing Tenancy Management Contract 98,463Local Roads Maintenance 58,523Animal Control 12,000Customer Service and Records Management 25,900Municipal Services 187,485Shire Services General 174,623Street lighting 10,000Visitor Accommodation 6,680Waste management 95,000HMP Program 83,750Staff Housing -8,736Facility Development 49,856
Indigenous Employment in Core Service 130,424
DoHA Sport Rec CDEP conversions 116,400Active Remote Communities – Staff 1,500AG Sport and Rec Program Management 100,179Sport and Rec admin 2,200
Total expenditure 1,832,996
Capital expenditure
Night Patrol Assets Cap Purch MV 52,471
Facility Development Sport & Rec Hall 49,856
Municipal Service Vehicle with trade in 40,000
Shire Service Vehicle with trade in 30,000
New Compactor with trade in 95,000
Total Capital expenditure 267,327
Budget 2012-2013 by Community
Shire Plan 2012-2013 75
expenditure by account Category
61+13+3+7+6+1060.9%
2.7%
6.9%
6.8%
9.7%
13.0%
expenditure by Service Group
6+6+10+11+22+1+3+38+311.6%
37.8%
3.4%
10.1%
6.3%
21.9%
0.3%3.0%
5.6%
expenditure report: 2012-13 Budget as at 30 June 2013 Beswick
expenditure by Service Group Year to Date Budget ($)
CORE – Admin and Exec 156,426COMMERCIAL Services 174,895AGENCY – Night Patrol 281,530AGENCY – Employment and Training 322,961AGENCY – Family and Community Services 607,615COMM / AGENCY – Housing and Outstations 7,549CORE – Civil Works & Roads 82,321CORE – Shire Services 1,047,918AGENCY – Sport and Recreation 94,682
Total expenditure 2,775,896
expenditure by account Category
Employee Expenses 1,663,098Contract and Material Expenses 342,680Fleet, Plant & Equipment 71,790Other Operating Expenses 185,504Internal Cost Allocations 255,354WIP Assets 257,471
Total expenditure 2,775,896
expenditure by activity
General Council Operations 1,000Human Resources 250IT services 1,000Local Boards 1,200Community Services Management 152,976Centrelink agency 51,892Commercial Australia Post 18,100Power Water contract 104,902Night Patrol 281,530CDEP Wages 70,000CDEP Development & Support 59,303CDEP Work Ready & Community Development
193,658
CACP 146,857DoHA Aged Care CDEP conversions / Indigenous Workforce
237,003
HACC services 63,025IBS CDEP Conversions 51,505Indigenous Broadcasting 9,232JET Creche – Wugular 99,994Territory Housing Tenancy Management Contract
7,549
Local Roads maintenance 82,321Animal Control 12,000Customer Service and Records Management 60,200Municipal Services 228,890Shire Services General 333,721Street lighting 10,000Visitor Accommodation 10,680Waste management 50,000
HMP Program 83,750Staff Housing -35,038Indigenous Employment in Core Services 228,921AMRRIC Animal Welfare Project 64,794DoHA Sport Rec CDEP conversions 92,182Active Remote Communities – Staff 1,500
Sport and Rec admin 1,000
Total expenditure 2,775,896
Capital expenditure
Night Patrol Vehicle 52,471
Power Water Vehicle with trade in 45,000
Municipal Service 84 HP Tractor 65,000
Shire Services Office Upgrade 60,000
Shire Services Vehicle with trade in 35,000
Total Capital expenditure 257,471
76
expenditure report: 2012-13 Budget as at 30 June 2013 Borroloola
expenditure by Service Group Year to Date Budget ($)
CORE – Admin and Exec 2,460COMMERCIAL Services 58,000AGENCY – Night Patrol 431,994AGENCY – Family and Community Services 72,801CORE – Civil Works and Roads 158,809CORE – Shire Services 1,368,788AGENCY – Sport and Recreation 187,695OTHER – Swimming Pools 190,985AGENCY – Youth Services 457,731Total expenditure 2,929,252
expenditure by account Category
Employee Expenses 1,318,161Contract and Material Expenses 261,200Fleet, Plant & Equipment 228,389Other Operating Expenses 202,267Internal Cost Allocations 549,964WIP Assets 369,271Total expenditure 2,929,252
expenditure by activityGeneral Council Operations 1,000Human Resources 250Local Boards 1,200Airstrip maintenance – DCI Tennant Creek 58,000Night Patrol 431,994Library 72,801Local Roads maintenance 158,809Animal Control 48,803Customer Service and Records Management 143,492Municipal Services 488,851Shire Services General 236,463Street lighting 20,000Visitor Accommodation 12,000Waste management 341,093Staff Housing -51,821Indigenous Employment in Core Services 129,907Facility Development 41,800DoHA Sport Rec CDEP conversions 48,460Active Remote Communities – Staff 73,695Sport and Rec admin 23,740Swimming Pool 190,985Juvenile Diversion 141,453Youth Services Extension Program 111,431Suicide Prevention Education Program 204,847Total expenditure 2,929,252
Capital expenditure
Night Patrol Vehicle 52,471
Sport and Rec Facilities 41,800
Municipal Services Vehicle 40,000
Municipal Services 84 HP Tractor 65,000
Shire Service Vehicle with trade in 25,000
Staff House tiling and upgrade 10,000
Waste Management New Compactor 135,000
Total expenditure 369,271
expenditure by account Category
48+9+8+7+14+1444%
9%
19%
13%
7%
8%
2+15+2+5+47+6+7+1615%
5%
47%
6%
7%
16%
2%
2%0%expenditure by Service Group
Shire Plan 2012-2013 77
7+9+13+1+20+5+4+38+37.2%
9.2%
13.4%
20.3%
38%
4.6%3.7%
1%
2.5%expenditure by Service Group
expenditure by account Category
53+15+3+6+10+1352.5%
14.8%
10.2%
13.2%
5.7%
3.5%
expenditure by activity
General Council Operations 2,000Human Resources 250IT services 1,000Local Boards 1,200Employee Mentoring Project 1,000Community Services Management 145,333Airstrip maintenance – DCI Katherine 68,120Centrelink agency 49,601Commercial Australia Post 6,600Power Water contract 69,175Night Patrol 283,157CDEP Wages 8,000CDEP Development & Support 6,500CDEP Work Ready & Community Development
7,500
CACP 13,800DoHA Aged Care CDEP conversions / Indigenous Workforce
133,443
HACC services 48,662IBS CDEP Conversions 26,988Indigenous Broadcasting 11,132School Nutrition Program – Bulman 193,460Local Roads maintenance 78,525Outstations Housing Maintenance 7,573Outstations municipal services 35,000Territory Housing Tenancy Management Contract 55,296Animal Control 12,000Customer Service and Records Management 25,900Municipal Services 249,752Shire Services General 152,535Street lighting 10,000Visitor Accommodation -9,480HMP Program 98,661Staff Housing 9,898NTG Special Purpose Grants 135,617Indigenous Employment in Core Services 116,231DoHA Sport Rec CDEP conversions 51,960Active Remote Communities – Staff 1,500Total expenditure 2,107,886
Capital expenditure
Waste Management Compactor 135,617
Municipal Vehicle with trade in 50,000
84 HP Tractor and Slasher 80,000
Total expenditure 265,617
expenditure report: 2012-13 Budget as at 30 June 2013 Bulman – Weemol
expenditure by Service Group Year to Date Budget ($)
CORE – Admin and Exec 150,783COMMERCIAL Services 193,495AGENCY – Night Patrol 283,157AGENCY – Employment and Training 22,000AGENCY – Family and Community Services 427,484COMM / AGENCY – Housing and Outstations 97,869CORE – Civil Work and Roads 78,525CORE – Shire Services 801,113AGENCY – Sport and Recreation 53,460Total expenditure 2,107,886
expenditure by account Category
Employee Expenses 1,082,791Contract and Material Expenses 293,282Fleet, Plant & Equipment 70,868Other Operating Expenses 112,784Internal Cost Allocations 282,544WIP Assets 265,617Total expenditure 2,107,886
78
expenditure by activityHuman Resources 250Local Boards 1,200Airstrip maintenance – DCI Katherine 68,120Centrelink agency 2,500Commercial Australia Post 10,000Power Water contract 35,690Night Patrol 101,947CDEP Wages 24,000CDEP Work Ready & Community Development
10,735
DoHA Aged Care CDEP conversions / Indigenous Workforce
40,901
HACC services 20,300JET Creche – Jilkminggan 20,000JET Creche – Manyallaluk 90,000Local Roads Maintenance 28,613School Nutrition Program – Manyallaluk 53,550Animal Control 9,000Customer Service and Records Management 15,900Municipal Services 101,076Shire Services General 114,151Street lighting 10,000Visitor Accommodation 18,000Waste management 25,000Staff Housing -15,651Indigenous Employment in Core Services 159,728Facility Development 50,000DoHA Sport and Rec CDEP conversions 22,873Active Remote Communities – Staff 2,000
Total expenditure 1,019,881
Capital expenditure
Sport and Rec Facility Development 50,000
Shire Vehicle with trade in 40,000
Tractor 25,000
Total expenditure 115,000
11+10+3+22+3+43+7+111.4%
10.0%
3.4%
22%
7.3%
42.9%
0.1%
2.8%
expenditure by Service Group
expenditure by account Category
53+15+3+6+10+1352.5%
17.1%
13.2%
11.1%
4.9%
1.2%
expenditure report: 2012-13 Budget as at 30 June 2013 Manyallaluk
expenditure by Service Group Year to Date Budget ($)
CORE – Admin and Exec 1,450COMMERCIAL Services 116,310AGENCY – Night Patrol 101,947AGENCY – Employment and Training 34,735AGENCY – Family and Community Services 224,751CORE – Civil Work & Roads 28,613CORE – Shire Services 437,203AGENCY – Sport and Recreation 74,873Total expenditure 1,019,881
expenditure by account Category
Employee Expenses 505,018Contract and Material Expenses 174,808Fleet, Plant & Equipment 9,992Other Operating Expenses 47,350Internal Cost Allocations 167,714WIP Assets 115,000Total expenditure 1,019,881
Shire Plan 2012-2013 79
expenditure by account Category
59+11+6+5+13+659%
11%
5%
13%
6%
6%
7+13+10+15+3+3+40+97%
13%
10%
15%
3%3%
40%
9%
expenditure by Service Group0%
expenditure report: 2012-13 Budget as at 30 June 2013 Jilkminggan
expenditure by Service Group Year to Date Budget ($)
CORE – Admin and Exec 2,450COMMERCIAL Services 126,333AGENCY – Night Patrol 241,514AGENCY – Employment and Training 194,867AGENCY – Family and Community Services 288,284COMM / AGENCY – Housing and Outstations 55,157CORE – Civil Work & Roads 58,708CORE – Shire Services 752,396AGENCY – Sport and Recreation 178,527Total expenditure 1,898,236
expenditure by activity
Employee Expenses 1,134,478Contract and Material Expenses 205,581Fleet, Plant & Equipment 115,131Other Operating Expenses 93,350Internal Cost Allocations 242,225WIP Assets 107,471Total expenditure 1,898,236
expenditure by activityGeneral Council Operations 1,000Human Resources 250Local Boards 1,200Centrelink agency 66,246Commercial Australia Post 10,100Power Water contract 49,987Night Patrol 241,514CDEP Wages 45,000CDEP Development & Support 3,000CDEP Work Ready & Community Development
143,526
CDEP PEPI programs 3,341CACP 16,250HACC services 2,825JET Creche – Jilkminggan 269,209Outstations municipal services 7,500Territory Housing Tenancy Management Contract 47,657Local Roads Maintenance 58,708Animal Control 7,000Customer Service and Records Management 52,007Municipal Services 221,742Shire Services General 239,592Street lighting 10,000Waste management 35,000HMP 68,205Staff Housing 5,806Indigenous Employment in Core Services 113,044After School Care – Jilkminggan 88,997DoHA Sport and Rec CDEP conversions 45,746Active Remote Communities – Staff 32,747Sport and Rec admin 11,037
Total expenditure 1,898,236
Capital expenditure
Night Patrol Vehicle 52,471
Municipal Vehicle with trade in 20,000
Shire Service Vehicle with trade in 35,000
Total expenditure 107,471
80
expenditure by activityHuman Resources 250Local Boards 1,200Community Services Management 123,811Slashing and Litter Collection Contracts 266,400Centrelink agency 42,009Commercial Australia Post 6,600Night Patrol 232,254CDEP Wages 15,000CDEP Development & Support 3,000CDEP Work Ready & Community Development
82,087
CACP 73,670DoHA Aged Care CDEP conversions / Indigenous Workforce
98,915
HACC services 96,349Library 31,615Local Roads Maintenance 49,911Animal Control 36,003Customer Service and Records Management 114,395Municipal Services 342,692Rural Transaction Centre 42,600Shire Services General 151,321Street lighting 10,000Waste management 145,000Staff Housing -14,085Indigenous Employment in Core Services 102,039Active Remote Communities – Staff 2,000Sport and Rec admin 1,000Total expenditure 2,056,036
Capital expenditure
Municipal Vehicle with trade in 40,000
Shire Service Vehicle with trade in 30,000
Waste Management Compactor 135,000
Lot 84 – Power House 20,000
Total expenditure 205,000
expenditure by account Category
49+12+4+6+19+1048.6%
12.3%4.6%
18.6%
10.4%
5.5%
6+15+11+5+14+2+46+10.1%
2.4%
15.3%
11.3%
4.9%
14.6%
45.2%
6.1%
expenditure by Service Group
expenditure report: 2012-13 Budget as at 30 June 2013 Mataranka
expenditure by Service Group Year to Date Budget ($)
CORE – Admin and Exec 125,261COMMERCIAL Services 315,009AGENCY – Night Patrol 232,254AGENCY – Employment and Training 100,087AGENCY – Family and Community Services 300,548CORE – Civil Work & Roads 49,911CORE – Shire Services 929,965AGENCY – Sport and Recreation 3,000Total expenditure 2,056,036
expenditure by account Category
Employee Expenses 986,098Contract and Material Expenses 242,050Fleet, Plant & Equipment 89,475Other Operating Expenses 101,625Internal Cost Allocations 411,788WIP Assets 225,000Total expenditure 2,056,036
Shire Plan 2012-2013 81
expenditure by account Category
55+19+5+5+7+954.5%4.7%
5.2%
6.9%
9.3%
19.4%
7+9+10+11+4+4+8+33+4+5+4+10.5%
9.3%
9.7%
10.3%
4.3%
3.7%
33.1%
7.5%
4.2%
5.7%4.2% 7.4%
expenditure by Service Group
expenditure report: 2012-13 Budget as at 30 June 2013 ngukurr
expenditure by Service Group Year to Date Budget ($)
CORE – Admin and Exec 25,450COMMERCIAL Services 402,377AGENCY – Night Patrol 507,880AGENCY – Employment and Training 530,084AGENCY – Family and Community Services 557,781COMM / AGENCY – Housing and Outstations 235,112CORE – Mechanical Workshops -200,913CORE – Civil Work & Roads 410,590CORE – Shire Services 1,800,905AGENCY – Sport and Recreation 229,069OTHER – Swimming Pools 311,882AGENCY – Youth Services 228,342Total expenditure 5,038,559
expenditure by account Category
Employee Expenses 2,523,391Contract and Material Expenses 935,184Fleet, Plant & Equipment 205,401Other Operating Expenses 233,986Internal Cost Allocations 713,125WIP Assets 427,471Total expenditure 5,038,559
expenditure by activityGeneral Council Operations 10,000Human Resources 250IT services 10,000Local Boards 1,200Employee Mentoring Project 2,000Community Services Management 2,000Airstrip maintenance – DCI Katherine 68,120Centrelink agency 96,185Commercial Australia Post 20,400Power Water contract 217,672Night Patrol 507,880CDEP Wages 142,011CDEP Development & Support 39,701CDEP Work Ready & Community Development 299,695CDEP PEPI programs 48,677CACP 83,648DoHA Aged Care CDEP conversions / Indigenous Workforce
81,301
HACC services 91,907Indigenous Broadcasting 7,132JET Creche – Ngukurr 273,192Library 20,600Environmental health service 65,488Outstations CDEP transition positions 58,098Outstations municipal services 55,870Territory Housing Tenancy Management Contract 55,656Mechanical Workshop -200,913Local Roads maintenance 410,590Animal Control 22,000Customer Service and Records Management 137,823Municipal Services 562,883Shire Services General 459,250Street lighting 20,000Visitor Accommodation 142,000Waste management 72,324Staff Housing 19,051Indigenous Employment in Core Services 298,130AMRRIC Animal Welfare Project 67,444Facility Development 50,000After School Care – Ngukurr 98,898DoHA Sport Rec CDEP conversions 72,746Active Remote Communities – Staff 2,383Sport and Rec admin 5,042Swimming Pool 311,882Youth Services Extension Program 27,616Youth In Communities 199,725Suicide Prevention Education Program 1,000Total expenditure 5,038,559
Capital expenditure
Night Patrol Vehicle 52,471
Pool-shade, lights, lane ropes 50,000
Power Water Vehicle with trade in 35,000Municipal Vehicle with trade in 45,000Ride-on Mower 35,000Shire Services Building Upgrade 10,000Shire Service Vehicle with trade in 55,000Security Cameras 20,000Pool Concrete Chemical Storage Building 100,000Pool Kubota ATV 25,000Total expenditure 427,471
82
expenditure report: 2012-13 Budget as at 30 June 2013 numbulwar
expenditure by Service Group Year to Date Budget ($)
CORE – Admin and Exec 167,362COMMERCIAL Services 167,021AGENCY – Night Patrol 209,299AGENCY – Employment and Training 543,880AGENCY – Family and Community Services 419,653COMM / AGENCY – Housing and Outstations 55,656CORE – Mechanical Workshops 67,704CORE – Shire Services 1,365,372AGENCY – Sport and Recreation 111,616
AGENCY – Youth Services 117,606Total expenditure 3,225,170
expenditure by account Category
Employee Expenses 1,757,140Contract and Material Expenses 743,050Fleet, Plant & Equipment 111,958Other Operating Expenses 179,682Internal Cost Allocations 221,340WIP Assets 212,000Total expenditure 3,225,170
expenditure by activity
Human Resources 250Local Boards 1,200Employee Mentoring Project 2,000Community Services Management 163,912Airstrip maintenance – DCI Katherine 68,120Centrelink agency 86,301Commercial Australia Post 12,600Night Patrol 209,299CDEP Wages 35,000CDEP Development & Support 44,201CDEP Work Ready & Community Development
413,572
CDEP PEPI programs 44,607CDEP Administration 500Numbulwar Workforce Development 6,000CACP 89,105DoHA Aged Care CDEP conversions / Indigenous Workforce
194,433
HACC services 82,356IBS CDEP Conversions 47,607Indigenous Broadcasting 6,152Territory Housing Tenancy Management Contract 55,656Mechanical Workshop 67,704Animal Control 18,000Customer Service and Records Management 86,343Municipal Services 405,207Shire Services General 388,182Street lighting 20,000Visitor Accommodation 96,500Waste management 110,000Staff Housing -82,666Indigenous Employment in Core Services 323,806DoHA Sport Rec CDEP conversions 96,079Active Remote Communities – Staff 2,000Sport and Rec admin 13,537Youth Services Extension Program 18,431Youth In Communities 98,176Suicide Prevention Education Program 1,000Total expenditure 3,225,170
Capital expenditure
Municipal Motor Vehicle 70,000
84 HP Tractor & Slasher & ATV 80,000
New loud speaker system 12,000
Waste Management Fencing for Dump 50,000
Total expenditure 212,000
expenditure by account Category
54+23+3+6+7+754%3%
6%
7%
7%
23%
5+5+6+17+13+2+2+43+3+45%
5%
6%
3% 4%
17%
13%
2%2%
43%
expenditure by Service Group
Shire Plan 2012-2013 83
3 .3 Financial Objectives, Measures and indicatorsGoal 2 – Move towards sustainability
Financial Objective Financial Strategy Baseline Measure Effectiveness Measure
Efficiency Indicator
Increase cost-effectiveness of RGSC operations
Increase in the quality and number of services delivered as a result of cost reductions due to effective and efficient decision making processes which are accountable, communicative, planned and responsive
Increase the value of Commercial Contracts and the Unit’s profitability
Revenue surplus ratio as at 30 June 2011
Revenue surplus ratio Increase from previous year
Percentage rate of unspent funds reimbursed to funding agencies as at 30 June 2011
Percentage rate of reduction in unspent funds reimbursed to funding agencies Number of program funding agreements/agency contracts with unexpended funds at the end of the period
Reduction in the number and the amounts refunded to funding agencies from the previous year
Percentage rate of outstanding payments to creditors over 30 days as at 30 June 2011
Percentage rate of reduction in outstanding payments to creditors over 30 days
Reduction from previous year
Percentage rate in outstanding payments from debtors over 30 days as at 30 June 2011
Percentage rate of reduction in outstanding payments from debtors over 30 days
Reduction from previous year
Percentage of recovery of all property rates charges as at 30 June 2011
Percentage of recovery of all property rates charges
Increase in rates recovery
Net and gross profit for the financial year
Profit or loss on commercial contracts for the previous quarter
Operating cost of rubbish dumps per property by township
Total road expenditure as a percentage of total council expenditure
Net profit margin on each commercial contract
Gross profit margin on each commercial contract
Maintenance costs as a percentage of asset value of seal roads
Maintenance cost per kilometre unsealed road
Maintenance cost per kilometre sealed road
84
Goal 4 – improve our infrastructure
Financial Objective Financial Strategy Baseline Measure Effectiveness Measure
Efficiency Indicator
To achieve a significant reduction in the costs of repairs and maintenance of Shire assets
Manage assets efficiently
Total expenditure for repairs and maintenance of plant and equipment in previous financial year
Average maintenance cost per plant and equipment asset
Average operational time loss due to unscheduled repairs and maintenance
Total expenditure for repairs and maintenance of fixed assets in previous financial year
Total repairs and maintenance expenditure as a percentage of total council expenditure
Average maintenance cost per fixed asset
Maintenance costs as a percentage of the assets value
Total cost of insurance in previous financial year
Total cost of insurance against total value of the asset
Total amount expended on insurance claims and number of claims
Insurance costs as a percentage of the total value of the asset
Number and types of plant and equipment within the Shire
Number and types of repairs conducted on plant and equipment
Running costs expenditure as a percentage of total council expenditure
Number and types of fixed assets within the Shire
Number and types of repairs conducted on fixed assets
Running costs expenditure as a percentage of total council expenditure
An increased life and reduced operational costs for infrastructure assets to enable savings to meet the future infrastructure assets needs
Strategically develop the infrastructure assets of the Shire to meet the current and future needs
Total value of proposed infrastructure projects for the 2011/12 year
Total expenditure to date on infrastructure projects for the year
Total expenditure as a percentage of total Shire expenditure to date on infrastructure projects for the year
Total number and type of infrastructure assets in the Shire
Total cost of insurance against total value infrastructure
Total amount of insurance claims to date
Total cost of infrastructure repairs and maintenance to 30 June 2011
Cost of repairs and maintenance to date
Total repairs and maintenance expenditure as a percentage of total council expenditure
Total ‘shire’ funded infrastructure projects for the 2011/12 year
Total expenditure to date on ‘shire’ funded infrastructure projects for the 2011/12 year
Total expenditure as a percentage of total Shire to date on ‘shire’ funded infrastructure projects for the 2011/12 year
Shire Plan 2012-2013 85
Goal 4 – improve our infrastructure
Financial Objective Financial Strategy Baseline Measure Effectiveness Measure
Efficiency Indicator
To achieve a significant reduction in the costs of repairs and maintenance of Shire assets
Manage assets efficiently
Total expenditure for repairs and maintenance of plant and equipment in previous financial year
Average maintenance cost per plant and equipment asset
Average operational time loss due to unscheduled repairs and maintenance
Total expenditure for repairs and maintenance of fixed assets in previous financial year
Total repairs and maintenance expenditure as a percentage of total council expenditure
Average maintenance cost per fixed asset
Maintenance costs as a percentage of the assets value
Total cost of insurance in previous financial year
Total cost of insurance against total value of the asset
Total amount expended on insurance claims and number of claims
Insurance costs as a percentage of the total value of the asset
Number and types of plant and equipment within the Shire
Number and types of repairs conducted on plant and equipment
Running costs expenditure as a percentage of total council expenditure
Number and types of fixed assets within the Shire
Number and types of repairs conducted on fixed assets
Running costs expenditure as a percentage of total council expenditure
An increased life and reduced operational costs for infrastructure assets to enable savings to meet the future infrastructure assets needs
Strategically develop the infrastructure assets of the Shire to meet the current and future needs
Total value of proposed infrastructure projects for the 2011/12 year
Total expenditure to date on infrastructure projects for the year
Total expenditure as a percentage of total Shire expenditure to date on infrastructure projects for the year
Total number and type of infrastructure assets in the Shire
Total cost of insurance against total value infrastructure
Total amount of insurance claims to date
Total cost of infrastructure repairs and maintenance to 30 June 2011
Cost of repairs and maintenance to date
Total repairs and maintenance expenditure as a percentage of total council expenditure
Total ‘shire’ funded infrastructure projects for the 2011/12 year
Total expenditure to date on ‘shire’ funded infrastructure projects for the 2011/12 year
Total expenditure as a percentage of total Shire to date on ‘shire’ funded infrastructure projects for the 2011/12 year
Total ‘agency funded’ infrastructure projects for the 2011/12 year
Total expenditure to date on ‘agency funded’ infrastructure projects for the 2011/12 year
Total expenditure as a percentage of total Shire to date on ‘agency funded’ infrastructure projects for the 2011/12 year
Total value of infrastructure transferred to Shire responsibility and types
Maintenance cost per township for parks, gardens, reserves and playgrounds
Total parks, Gardens and open spaces expenditure as a percentage of total council expenditure
percentage of costs recovered for the provision of burial services
Goal 5 – Good Governance
Financial Objective Financial Strategy Baseline Measure Effectiveness Measure
Efficiency Indicator
Strong and effective corporate governance
To provide timely and accurate financial information to Council on a monthly basis
To acquit grants as close as possible to the time in which the project funds have been exhausted or reporting deadline whichever is the sooner
To implement an internal audit process
End-of-Year General Purpose and Special Purpose Financial Statements
The number of breaches in compliance with the reporting of Financial Statements and various financial commitments
To complete compliance requirements a minimum of 14 days prior to the deadline
Delivery of financial reports
Compliance with funding agreements
Annual audit requirements
Average time taken to complete actions arising and the number of actions arising
A reduction in the number of qualifiers requiring clarification from the previous year
86
3 .4 Council Member expensesCouncillor allowances
approved Councillor allowances approved amount $
Budget amount $
Councillor – base* 12,001.11 12,001.11
Electoral** 4,391.59 4,391.59
$16,392.70 $16,392.70
Deputy Mayor – base* 24,673.97 24,673.97
Electoral** 4,391.59 4,391.59
$29,065.56 $29,065.56
Mayor – base* 66,727.29 66,727.29
Electoral** 17,563.16 17,563.16
$84,290.45 $84,290.45
TOTal BaSe+eleCTOral allOWanCe $277,283 .01 $277,283 .01
Professional Development allowance** including:
Course Fees
Travel
Meals and Accommodation$40,008.00 $40,008.00
extra Meeting allowance**** ($66 .52 per meeting maximum claimable $8000 .74 per Councillor)
Joint HQ Meetings x 2 Councillors
Finance Committee Meetings x 2 Councillors
Grant Selection Committee Meetings x 2 Councillors$66.52per
meeting per Councillor $5,055.52
acting Principal Member***** ($232 .15 per day maximum claimable 90 days $20,835 .89) $232.15perday $17,843.92
*Base Allowance ClaimsThe base allowance is automatically paid to council members each month or at such frequency as resolved by council, in arrears.
**Electoral Allowance ClaimsThe electoral allowance is automatically paid to council members each month or at such frequency as resolved by council, in arrears.
***Professional Development Allowance Claims(i) The allowance is available to all council members. (ii) The professional development allowance may be claimed multiple times each year, but the total value of those claims must not exceed the maximum specified in the table (see clause 8). (iii) The professional development allowance is to be used to cover the cost of travel to the course or conference, course or conference fees, meals and accommodation for the duration of the course or conference. (iv) Claims must be made using the forms approved by council. (v) Only approved courses/conferences consistent with council policy attract professional development allowance.
****Extra Meeting Allowance Claims(i) Council members may only claim an extra meeting allowance for meetings referred to in the council policy. (ii) An extra meeting allowance may be claimed for up to a maximum of two meetings per day. (iii) Council members must not claim for an extra meeting more than once for the same meeting. (iv) When a council member is required to travel in order to attend an approved extra meeting, the
council member may claim an extra meeting allowance for each full day of travel, unless that travel falls on the same day on which the meeting is held. In this context, a full day of travelling means at least four hours of travelling, which may include time in transit. (v) Claims must be made using the forms approved by council. (vi) Forms must include the date on which the meeting was held and indicate the period of time the member was present at the meeting. (vii) The member must have attended at least 75 per cent of the duration of the meeting to claim an extra meeting allowance. (viii) Claims for extra meeting allowance must be made by the second working day in the month following the meeting for which the claim is made, or as resolved by council. Payment of extra meeting allowance is monthly or as resolved by council. (ix) Claims for extra meeting allowance not made in accordance with (viii) will be regarded as a late claim and paid with the next monthly payment. However, if the claim is not made within three months of the meeting for which the extra meeting allowance is claimed, the right to an extra meeting allowance for that meeting is forfeited. (x) Claims forms must be submitted by the approved method.
*****Acting Principal Member Claims(i) When the deputy principal member carries out the functions of the principal member as outlined in section 43(2)(b) and section 43(2)(c) of the Local Government Act, the deputy principal member is entitled to be paid an allowance as the acting principal member. (ii) If some other council member is acting as the principal member in accordance with section 43(3) of the Local Government
Act, the member is entitled to be paid an allowance as the acting principal member. (iii) The acting principal member is entitled to be paid the daily rate, as outlined in the table of allowances. While a council member is acting principal member, the extra meeting and base allowances are suspended. In the case of base allowance, this is on a pro rata basis. The member is still entitled to their usual electoral allowance. The daily rate includes Saturdays, Sundays and public holidays. (iv) The maximum number of days (including Saturdays, Sundays and public holidays) that a council member may be paid as the acting principal member is an aggregate of 90 days in a financial year. A member may continue to hold the position for a longer period if council so resolves, however, the allowance reverts to the usual rate for that member.
Shire Plan 2012-2013 87
Council and elected Member expenses
roper Gulf Shire Budget expense report for year ending 30 June 2013 $
Consulting Fee Exp 5,000.00
Freight and Delivery Expenses 1,100.00
Material Exp General 2,000.00
MaterialExpAssetPurchases<$5,000 6,000.00
Food, Catering & Cleaning Supplies 2,000.00
Ins Premium Exp Fleet & Plant 600.00
Vehicle Registration Exp 702.00
Fleet, Plant & Equipment R&M 1,500.00
Fuel and Oil Exp Motor Vehicles 9,999.96
Mobile Telephone Exp 12,000.00
Advertising Exp 2,400.00
Conference or Seminar Course Fee Exp 18,000.00
Accommodation Exp 43,200.00
Airfare and Travel Fare Expense 61,017.50
Travel Allowance Expenses 65,146.00
Councillor Allowance Exp 300,182.50
Printing and Stationery 2,000.00
Meeting Catering 12,000.00
Membership or Subscription Exp 1,500.00
Sundry & miscellaneous 5,000.00
Computing Subscription Cost Alloc 5,000.00
Internal Workshop allocation 5,703.60
Total Council and elected Member expenditure 562,051 .56
3 .5 long Term Financial PlanStatement of Major initiatives
The Roper Gulf Shire Council Long-term Financial Plan is consistent with the Big Rivers Regional Management Plan. During the next four years it is expected that there will be a drawdown of equity reserves to fund the Joint HQ development. The majority of which will be over the 2013-2014 years. Outside of the Joint HQ expenditure, capital expenditure is expected to fluctuate between $3mto$4m.
Roper Gulf Shire Council has budgeted $3.19millionfor capital expenditure in the 2012-2013 financial year. The majority of this budget will be used for fleet
renewal, waste management, council office upgrades in communities, plant and equipment upgrades, and sporting facility infrastructure upgrades.
Four new waste management compactor trucks for Borroloola, Barunga – Beswick, Bulman, and Mataranka – Jilkminggan communities are due to be ordered to improve the delivery of waste management services to residents.
Over the next six months we are aiming to improve our asset management plan with the objective of better planning for peaks and troughs in asset renewal costs.
88
roper Gulf Shire 4-Year Projected Budget
2012-20162012-13
$2013-14
$2014-15
$2015-16
$
income
Income Rates 603,745 633,932 665,629 698,910
Income Council Fees and Charges 251,000 276,100 303,710 334,081
Income Operating Grants Subsidies 21,482,259 17,726,727 18,258,528 18,806,284
Income Investments 600,000 618,000 636,540 655,636
Income Agency and Commercial Services 9,034,551 18,305,587 18,854,755 19,420,398
Income Capital Grants 506,482 521,676 537,327 553,447
Other Income 3,336,075 3,436,157 3,539,242 3,645,419
Total income 35,814,112 41,518,180 42,795,731 44,114,175
expenditure
Employee Expenses 18,270,547 20,818,663 21,443,223 22,086,520
Contract and Material Expenses 9,289,119 10,567,793 10,884,827 11,211,371
Fleet, Plant & Equipment 1,733,766 1,785,779 1,839,352 1,894,533
Asset Expense 1,510,415 3,185,372 3,312,940 3,446,900
Other Operating Expenses 4,710,264 4,560,572 4,715,389 4,874,851
Finance Expenses 300,000 600,000 600,000 600,000
Total income 35,814,111 41,518,180 42,795,731 44,114,175
Operating Surplus/(Deficit) 0 0 0 0
Capital expenditure
Asset Purchases 3,186,318 3,185,372 3,312,940 3,446,900
Asset Purchases (Administrative Centre Devt) 1,000,000 2,000,000 2,000,000 0
Total Capital expenditure 4,186,318 5,185,372 5,312,940 3,446,900
Budget Assumptions• 5%paincreaseinrates• 10%paincreaseincharges• Lossof$4.5mgrantsfundingin2013-14fromlossofCDEP,plus$9mincreaseingovtcontractfundingin2013-14fromgainofRJCP• Resultantincreaseinsalariesandcontracts&materialsexpensesduetoincreaseinRJCPfunding• Matchingofdepreciationexpensestocapexfrom2013-14• Increaseinloanexpensesfrom$300Kin2012-13to$600Kpathereafter• Useof$500Kequityreservesin2012-13,$1min2013-14,and$500Kin2014-15
Projections of income and expenditure
The underfunding of capital depreciation in the 2012-13 budget raises concerns for the Shire’s long four year forecast of financial sustainability. In the past, capital expenditure requirements for core services have effectively been covered by under-expenditure on wages and salaries. However, this is not a preferred
budgetary solution over the long term. In order to ensure ongoing financial sustainability, negotiations with both the Northern Territory and Australian Governments will need to be progressed to ensure adequate funding for asset and infrastructure renewal, establish an equitable funding from government agencies for corporate services and administrative costs, and cease conditional rating and rate capping.
Shire Plan 2012-2013 89
3 .6 Capital expenditureThe Roper Gulf Shire is committed to developing long term asset management and planning processes which includes a ‘whole of life’ costs and financial sustainability plan, and emphasizes the ‘stewardship’ role of councils and their elected members. The Council also has the challenge of finding ways to manage a ‘funding gap’ which sees it overloaded with assets many in need of replacement and upgrade.
As the council decision makers, elected members have an important role to play in this long term community planning. Key messages include:•Understandingourstewardshipresponsibilities;•KnowwhatCouncilcanafford;and•Movetowardslongtermplanningandbudgeting
To ensure adequate provision is made for the long-term replacement of major assets Council will:•Ensure that Council’s services and infrastructure
are provided in a sustainable manner, with the appropriate levels of service to residents, visitors and the environment.
•Safeguard Council assets including physical assetsand employees by implementing appropriate asset management strategies and appropriate financial resources for those assets.
•CreateanenvironmentwhereallCouncilemployeestake an integral part in overall management of Council assets by creating and sustaining asset management awareness throughout the organisation by training and development.
•Meetlegislativerequirementsforassetmanagement.•Ensure resources and operational capabilities are
identified and responsibility for asset management is allocated.
•Demonstrate transparent and responsible assetmanagement processes that align with demonstrated best practice.
A strategic approach to asset management will ensure that the Council delivers the highest appropriate level of service through its assets. This will provide positive impact on;
•Membersofthepublicandstaff;•Council’sfinancialposition;
•TheabilityofCounciltodelivertheexpectedlevelofservice and infrastructure;
•ThepoliticalenvironmentinwhichCounciloperates;and
•ThelegalliabilitiesofCouncil.The Roper Gulf Shire is working with the Local Government Association NT to develop a thorough Asset Management Plan which will inform the Council of its obligations and challenges in providing sustainable asset management to the people of the Shire.
asset replacement Program
In essence our asset replacement program consists of the following parameters:•Unlessaprogram’sfundingagreementmakesexplicit
provision for capital expenditure, all asset purchases are to be costed to the Assets Management activity code at the time of purchase (Activity 109).
•A program that controls and uses an asset on anongoing basis will be charged an annual Internal Plant,FleetandEquipmentLeasefeeof33.3%oftheasset’s acquisition value.
•After 3 years or 100,000km of use (whichever isreached first), the asset will be disposed through sale or trade-in, and the service group that controlled the asset will receive the income from the disposal.
•Ifanassetisdisposedofearlierthan3yearssincethe acquisition date, the program will be charged the remainder of the acquisition value.
•Alloperatingcosts,fuelandrepairsandmaintenanceexpenses for the asset will be charged directly to the controlling program.
•Income derived from the sale of assetswill in thefirst instance be used to cover operating costs of the Asset Management unit.
•It is recommended that all additional income fromthe sale of a program’s assets be used to renew that program’s asset stock. However, this is a flexible guideline that is subject to the negotiation with the relevant managers and directors.
•If an asset is not regularly and diligently repaired,maintained and cleaned, the manager of the program controlling the asset will be given a formal written warning from the CEO and will be requested to submit a remedial plan.
90
repairs and Maintenance, and infrastructure Development
YEAR 1 – 2012-2013
Capital expenditure
Capital Purchase/Construct Buildings 420,866.00
Capital Construct Infrastructure 50,000.00
Capital Purchases Plant & Equipment 1,550,631.00
Capital Purchase Vehicles 1,164,821.12
Total Capital expenditure 3,186,318 .12
repairs and Maintenance
Asset R&M Expense 1,026,158.64
Fleet, Plant & Equipment R&M 363,138.08
Total income 1,389,296 .72
asset and infrastructure Development Scheduled for 2012-2013 $
Barunga
Night Patrol New Hilux with tray and accessories 52471
Municipal Services New HiLux minus trade-in 40000
Shire Services General New HiLux minus trade-in 30000
Waste management New compactor minus trade-in 95000
Facility Development Office area upgrade at Sport and Rec Hall 49856
Beswick
Power Water contract New vehicle minus trade-in 45,000
Night Patrol New Hilux with tray and accessories 52,471
Municipal Services 84 HP Tractor 65,000
Shire Services General New HiLux minus trade-in; Council Office Upgrade 95,000
Borroloola
Night Patrol New Hilux with tray and accessories 52,471
Municipal Services New HiLux minus trade-in; 84 HP Tractor 105,000
Shire Services General New HiLux minus trade-in 25,000
Waste management New compactor 135,000
Staff Housing Upgrade and tiling of staff house 10,000
Facility Development Softball netting and coaches' boxes 41,800
Bulman
Municipal Services New HiLux minus trade-in; 84 HP Tractor and slasher 130,000
NTGC Special Purpose Grants New Compactor 135,617
Shire Plan 2012-2013 91
asset and infrastructure Development Scheduled for 2012-2013 cont . $
Jilkminggan
Night Patrol New Hilux with tray and accessories 52,471
Municipal Services New 2WD HiLux minus trade-in 20,000
Shire Services General New HiLux minus trade-in 35,000
Manyallaluk
Shire Services General New HiLux minus trade-in 40,000
Waste management New tractor 25,000
Facility Development 2nd stage – connect power, sewerage and water and construct roof and verandah at Sport and Rec facility
50,000
Mataranka
Municipal Services New HiLux minus trade-in; Purchase of old Power House at Lot 84
60,000
Shire Services General New HiLux minus trade-in 30,000
Waste management New compactor 135,000
ngukurr
Power Water contract New vehicle minus trade-in 35,000
Night Patrol New Hilux with tray and accessories 52,471
Municipal Services New HiLux minus trade-in; John Deere ride-on mower 80,000
Shire Services General New vehicle minus trade-in; security cameras 85,000
Facility Development Pool – shade, lighting and lane ropes 50,000
Swimming Pool New RTV Kubota 2-seater; new concrete chemical storage building
125,000
numbulwar
Municipal Services New HiLux minus trade-in; 84 HP Tractor and slasher; ATV Kubota 6-seater
150,000
Shire Services General New loudspeaker system 12,000
Waste management Fencing for new dump site (with matching funding from elsewhere)
50,000
Minyerri
Night Patrol Minyerri Night Patrol Vehicle 52,471
Other Locations
shire vehicles Motor Vehicles with trade-ins x 3 80,000
Night Patrol Motor Vehicle 59,995
Civil Works Plant and Equipment 565,000
Civil Works Motor Vehicle 50,000
Infrastructure Mulgan Camp Toilet Upgrade 79,210
Plant & Equipment CTG plant and Equipment 53,014
$3,186,318
92
SDC infrastructure Project Details
Barunga Establishment of a Women’s Centre
Footpaths around the town to enable old people and children to move through the township without having to use roadways
Nursery for the community or garden
Street lighting through out the township
Beswick Ablution block at the red shed
All weather road from top to bottom or improve current road to all weather, in partnership with ABA
Light footpath to new subdivision
Public toilet block in new sub-division
Refurbishment of the red shed
Relocate oval
Roads reseals (old town area)
School crossing signs at the school
Shower and toilet block at basketball court
Street lighting along the road which runs from top to bottom. From the highway turn off to the new subdivision
Traffic calming devices – speed humps in the lower area after the road is resealed
Borroloola Anyula Street and Robinson Road – surface drainage, footpaths, kerbs and gutter
Awning and workshop shed and chemical storage
Backhoe
Bobcat plus trailer and trencher, post-hole digger
Box drain at pool car park
Construction of a Sport and Community Centre to serve as a multi-purpose facility
Continue to develop recreation facilities based around the swimming pool
Develop further public internet access
Provision of pedestrian pathways inclusive of, but not restricted to, school crossing zone
Repairs to Searcy Street drain
Sheeting and line marking on Robinson River Road
Upgrade street lighting to eliminate dark spots
Bulman Drainage improvements near Council Offices and Workshop area
Dust suppression and park areas – grade to remove rocks, topsoil and lawn
Homelands roads – Access road to Mt Catt several sections which need crossings for all weather access
Kerbs and gutters – Bulman and Weemol
Roads reseals – Bulman and Weemol – Council Office area
Upgrade water supply system at Mt Catt current solar pump does not work at night or during the wet season due to cloud cover
Vehicle and trailer to tow the septic pump out
Daly Waters Maintenance/upgrade of ablution block at Roy Beebe Park
Ongoing monitoring of dump
Tennis court repairs
Jilkminggan Cemetery development
Storage Container
Fencing around dump
Shire Plan 2012-2013 93
SDC infrastructure Project Details cont .
Resurfacing of the football and the installation of a softball diamond
Shed over the basketball court
Sport and recreation bus
Street lighting in the following areas: •SportandRecreationarea(BasketballCourt) •Mainroad–gatetoschool •Schoolcarpark •Workshoparea •Crècheareatothemainroadturnoff.
larrimah Dump maintenance and new landfill required
Improvements to the Park area at Lot 62 (subject to transfer of lease from Larrimah Development Association to RGSC)
Road repairs at old trucking yard
Manyallaluk Compact rubbish truck
Seal from the highway to the jump up on the Manyallaluk access road
Sealing of internal roads and the main town road to the jump up for dust suppression.
Sport and recreation vehicle such as a gator
Sports oval
Street lighting – In the middle park and outer areas, from the undercover courts to the workshop and on at the parking bay at the tourist park
Mataranka Tipper
Improve drainage at Mulgan Camp – at the entrance there is flooding during the wet which causes the power to cut out
Land release
Road repairs and up grades – Warlock road – priority, Beswick, Sterling, Gunn , Conway (drainage) and Dump roads
Skate park and bike track
Sport and recreation grounds – multi function court (covered)
The purchase of a sport and recreation bus for Mataranka.
Upgrade of Golf Course
Minyerri Maintenance of dump
ngukurr Tip truck – 3 tonne
ATV – 6 seater Kubota
Fencing around dump
Develop a submission for sport and recreation grants to upgrade facility, improve co-ordination and standards of sport and recreation programs, including swimming and other carnivals
Develop park area at barge landing
Discussion and agreement on the management and maintenance of the new Child and Family Centre post construction including car parking and landscaping
Enclose open drains
Government will review the safe place infrastructure and program delivery of both the women’s centre and men’s centre in negotiation with the community, including improved links to the night patrol service
Playground and shade structure at oval
Rehabilitate road surface on pool/oval street
Shire to invest in more street lighting in the community
94
SDC infrastructure Project Details cont .
Sporting Facility Management Plan incorporate infrastructure development
Stop people driving fast in the community by encouraging safe driving and by installing traffic control signs and pedestrian crossings at important community locations i.e. school, health centre, store, sporting facilities
Upgrade dump
Construction of new BRACS facility (television and radio)
numbulwar Develop a proposal for a one stop shop for government services and other local businesses. A range of services may be provided from this building and options will be considered for local organizations to build and own the shop front with long-term tenancy
Early Childhood – Complete a study on future of education and associated infrastructure needs including the establishmentofacrècheandchildcarefacilityinNumbulwar
Extend bitumen roads from community to airstrip and around and out to the dump
Footpaths in the community
Installation of a communications system such as loud speakers
Internal fence around play equipment near recreation hall
Market Garden
New cemetery and ongoing management
Relocation of football/sports oval
Shed and roof around basketball courts
Tow Truck
Undertake a detailed survey of road network in and around Numbulwar including options for progressive road upgrade, sealing of road to airport. Prepare submission to upgrade roads
Upgrade/repair street lighting, sewers and drainage. More lights need for some areas
Shire Plan 2012-2013 95
3 .7 rates assessment of the Social and economic effects of the rating Policy and Declaration
Rates to be levied on property owners by Roper Gulf Shire in 2012-13 remain affordable and at very low levels compared to other local government jurisdictions in Australia. Further, rates levied on Territory Housing dwellings are paid in the first instance by Territory Housing, so have no direct financial impact on public housing tenants. As such, the Shire does not anticipate any detrimental socio-economic impact from levying rates in 2012-13.
Additionally, rates revenue remains a small proportion ($609,481)oftheShire’stotalbudget,atlessthan2percent of the total. This underlies the fact that the Shire is effective in securing significant non-rate revenue for all of its communities, including government grants and contracts. This allows for services and employment opportunities to be delivered to Shire residents far above what the rates revenue would alone enable, resulting in a net positive socio-economic impact for residents.
rates Declaration Summary 2012-2013
The following rates declaration was recommended by the 2008-12 Roper Gulf Shire Council. Adjustments
have been made to incorporate the Minister for Local Government’s approved conditional rating levies for mining and pastoral leases.
Thisratesdeclarationwilllevymorethan$475,736inrates revenue (2011-12 = $459,347) and $133,745 inwastecollectioncharges(2011-12=$129,724).
Rates for most properties is to increase by the Consumer Price Index (CPI) from the 2011-12 rates. The exception is for properties in Mataranka, Borroloola, Larrimah and Daly Waters, for the property types:•Residential•Commercial•Horticultural/agricultural/ruralliving•VacantLand
The rates for these properties is to increase by 10 per cent above the 2011-12 rates.
Please note that revenue estimates for pastoral and mining leases are based on past Unimproved Capital Values (UCVs), and do not reflect updated UCV data recently received by the Shire.
96
rates – residential Properties 2011-12 2012-13
For residential properties on Aboriginal land and in areas excluding Borroloola, Mataranka, Larrimah and Daly Waters townships
$655 $675.31
For residential properties in Borroloola, Mataranka, Larrimah and Daly Waters townships. $276.50 $304.15
rates – Commercial Properties 2011-12 2012-13
For commercial properties on Aboriginal land and in areas excluding Borroloola, Mataranka, Larrimah and Daly Waters townships, a flat rate of:
$776 $800.06
For commercial properties in Borroloola, Mataranka, Larrimah and Daly Waters townships, a flat rate of:
$522.19 $574.41
rates – Pastoral and rural 2011-12 2012-13
For rural residential living, horticultural or agricultural purpose properties under 200 hectares, a flat rate of:
$322.96 $355.26
For rural residential living, horticultural or agricultural purpose properties over 200 hectares, a flat rate of:
$482.36 $530.60
2011-12 DeCreeD 2012-13
For pastoral properties, a differential rate multiplying the Unimproved Capital Value (UCV) of each property in the 2009-10 financial year by:
0.0656% 0.0672%
Withaminimumchargedamount(setatupto$500,000UCV)of: $328 $336.09
rates – Mining and extraction leases 2011-12 DeCreeD 2012-13
Forminingandextractionleaseswithanassessedvalueofthepropertyunder$250,000,aflatrateof:
$777 $795.42
Forminingandextractionleaseswithanassessedvalueofthepropertyofover$250,000,adifferential rate multiplying the assessed value of each property by:
0.325837% 0.318%
Other 2011-12 DeCreeD 2012-13
For vacant land in Borroloola, Mataranka, Larrimah and Daly Waters townships, a flat rate of: $276.50 $304.15
For all other properties not defined elsewhere in the proposal, a flat rate of: $655 $675.31
Waste management charges
For all town or community properties, or those receiving waste management services from or on behalf of Roper Gulf Shire Council, a flat charge of:
2011-12 2012-13 increase
$164/bin $169 .08/bin CPi (3 .1%)
per annum per property in respect of the garbage collection service provided, multiplied by the number of standard rubbish bins at the property and by the number of services per week.
Shire Plan 2012-2013 97
3 .8 Fees and Charges ScheduleAseniorsdiscountof15%appliestoallthebelowlistedfeesandchargesforresidentsholdingaSeniorsCard. This discount does not apply to rates.
Description GST inc CommentsTrades and labour
All of Shire where available
Tradesman $110.00perhour includes all trades
ESO $88.00perhour
Mechanic $115.00perhour
Trades Assistant – includes apprentice $90.00 All other labour
Travel $2.60perkm Includes sealed and unsealed
Labour on travel $49.00perhour 50%oflabourcosts
Emergency call out fee $220.00percallout Outside of Council operating hours
Plant and equipment
(The following charges are for the provision of short term hire of Plant, Machinery & Labour. Need to check location for availability). All of Shire where available. Dry hire is not available.
Tilt Tray $150.00perhour+$2.80per km
"Small Deck Large Deck 5%fuellevy"
Prime Mover with 1 Trailer $180.00+$8.80perkm Plus fuel levy
Prime Mover with 2 Trailers $220.00+$9.90perkm Plus fuel levy
Prime Mover with 3 Trailers $260.00+$11.00perkm Plus fuel levy
10m Ridged Truck $120.00perhour
3/6 Ton Small Drop Side Tipper $88.00perhour
Backhoe $155.00perhour Includes attachments
Grader (Large) $180.00perhour
Grader (Flea $160.00perhour
Bobcat $140.00perhour
Mini Excavator Hitachi 24 T $240.00perhour plus$85Standby
Front End Loader $180.00perhour Includes attachments
Tractor – up to 70hp with Slasher or Post Hole Borer $155.00perhour Need to check locations for availability
Tractor – over 70hp with slasher or Post Hole Borer $180.00perhour
Quad Bike & Spray Pack $115.00perhour Does not include chemicals
Ingersoll Rand SP 100 Vibrating Roller $110.00perhour Comes with flat drum and/or pad shells
Ride-On-mower – with operator $115.00perhour
98
Description GST inc Comments
Waste Management
Service Charge $164.00perannum Per bin
registration companion animals
Dog Registration per dog $35.00peryear
Registration per dog De-sexed $15.00peryear
Registration per dog License for more than two dogs $90.00peryear
Cemetery services
Burial charges include digging and backfilling of grave $650.00perburial
Communications, publications and administration
Rates Search $33.00
Post Box – Large $50.00peryear
Post Box – Small $17.00peryear
Internet Café $2.00per15mins
A4 Black 1-49 pages single sided (without own paper) $0.35perpage
A4 Black over 50 pages single sided (without own paper) $0.25perpage
A4 Black 1-49 pages two sided (without own paper) $0.70perpage
A4 Black over 50 pages two sided (without own paper) $0.50perpage
A4 Black 1-49 pages single sided (with own paper) $0.20perpage
A4 Black over 50 pages single sided (with own paper) $0.15perpage
A4 Black 1-49 pages two sided (with own paper) $0.40perpage
A4 Black over 50 pages two sided (with own paper) $0.30perpage
A4 Colour 1-49 pages single sided (without own paper) $0.60perpage
A4 Colour over 50 pages single sided (without own paper) $0.50perpage
A4 Colour 1-49 pages two sided (without own paper) $1.20perpage
A4 Colour over 50 pages two sided (without own paper) $1.00perpage
A4 Colour 1-49 pages single sided (with own paper) $0.50perpage
A4 Colour over 50 pages single sided (with own paper) $0.40perpage
A4 Colour 1-49 pages two sided (with own paper) $1.00perpage
A4 Colour over 50 pages two sided (with own paper) $0.90perpage
A3 Black single sided (without own paper) $0.40perpage
A3 Black two sided (without own paper) $0.80perpage
A3 Black single sided (with own paper) $0.30perpage
A3 Black two sided (with own paper) $0.60perpage
A3 Colour single sided (without own paper) $0.70perpage
A3 Colour two sided (without own paper) $1.40perpage
A3 Colour single sided (with own paper) $0.60perpage
A3 Colour two sided (with own paper) $1.20perpage
Transmit or Receive a fax per A4 page $1.00perpage
Shire Plan 2012-2013 99
Description GST inc Comments
Annual Report or Shire Plan black and white copy $10.00 Free copies can be downloaded at: www.ropergulf.nt.gov.au Copies of the document are free to read at all any SDC's
Copy of Minutes black and white copy $5.00permeeting Free copies can be downloaded at: www.ropergulf.nt.gov.au Copies of the document are free to read at all
Venue hire, general
Basic Facility Hire $165.00perday Includes main buildings such as Community Halls, Board Rooms; Training Rooms and singular sport and rec buildings
Whole Facility Hire $264.00perday Incorporates the hire of several buildings on the same grounds including kitchen, toilets and showers
Office Space $180.00perweek 3x2 metre area. Long term leases can be negotiated
Visitor Accommodation – Service Charge $110.00perroom per day
Per room. Long term leases can be negotiated
Table $2.30perday per table, payable in advance
Chairs $0.60perday per chair, payable in advance
Delivery of Table/Chairs $66.00perevent Local delivery only
BBQ $22.00perday $100.00depositrequired. Hire includes a gas bottle with gas. The hirer is responsible for ensuring they have adequate gas as hire does not include a full gas bottle
Camping Fees $11.00perday per site* Please note that hire and other services are not available at all Shire Service Delivery Centres.
Please check with the particular centre in your area for specific details.
100
appendix i – Shire Plan legislative requirementsThis Plan is prepared in accordance with the requirements of the Northern Territory Local Government Act 2008. Relevant sections of the Act are as follows:
Part 3 .2 Municipal or shire plans
22 Municipal or shire plan
(1) Each council must have a plan for its area.
(2) The plan for a municipal council is called the municipal plan and for a shire council, the shire plan.
(3) A council's municipal or shire plan:
(a) must be accessible on the council's website; and
(b) must be available for inspection at the council's public office; and
(c) must be available for purchase at a fee fixed by the council from the council's public office.
23 Contents of municipal or shire plan
(1) A municipal or shire plan: (a) must contain: (i) a service delivery plan
for the period to which the municipal or shire plan relates prepared in accordance with planning requirements specified in a relevant regional management plan; and
(ii) the council’s budget and (b) must contain, or incorporate
by reference (i) any long term community
or strategic plans adopted by the council or a local
board and relevant to the period to which the municipal or shire plan relates; and
(ii) the council’s long term financial plan; and
(c) must contain, or incorporate by reference, the council’s most recent assessment of:
(i) the adequacy of c o n s t i t u t i o n a l arrangements presently in force for the council under this Act and, in particular, whether they provide the most effective possible representation for the area; and
(ii) the opportunities and challenges for local government service delivery in the council’s area; and
(iii) possible changes in the administrative and regulatory framework for delivering local government services in the council’s area over the period for which the plan relates; and
(iv) where the possibilities exist for improving local government service delivery by cooperation with other councils, or with government agencies or other organisations; and
(d) must define indicators for judging the standard of its performance
(2) A council must make or revise an assessment of the matters mentioned in subsection (1) (c) at least once in the council's term and, until the
council makes or revises the assessment, the municipal or shire plan is to include the assessment (if any) made during the previous term of the council.
(3) A municipal or shire plan incorporates a plan or assessment by reference if it refers to the plan or assessment and includes a link or reference to a webpage on which the plan or assessment.
24 Annual review of municipal or shire plan
(1) A council must adopt its municipal or shire plan (or revisions to its municipal or shire plan) between 1 April and 31 July in each year and forward a copy of the plan (or the revised plan) to the Agency by the latter date.
(2) Before the council adopts its municipal or shire plan (or revisions to its municipal or shire plan) for a particular year, the council must:
(a) prepare a draft of the plan (incorporating any proposed revisions); and
(b) make the draft plan accessible on the council's website and make copies available for public inspection at the council's public offices; and
(c) publish a notice on its website and in a newspaper circulating generally in the area inviting written submissions on the draft plan within a period (at least 21 days) from the date of the notice; and
(d) consider the submissions made in response to the
Shire Plan 2012-2013 101
invitation and make any revisions to the draft the council considers appropriate in the light of the submissions.
(3) Although the council's budget forms part of its municipal or shire plan, this section does not apply to the adoption of the budget or of amendments to it.
(4) The adoption of a budget, or of amendments to it, operates to amend the municipal or shire plan so that it conforms with the most recent text of the council's budget.
aPPenDiX iiroper Gulf Shire Council
rates Declaration for 2012-2013
Rates
Roper Gulf Shire Council (the “Council”) makes the following declaration of rates pursuant to Chapter 11 of the Local Government Act (the” Act”).
Pursuant to Section 149 of the Act, the Council adopts the Unimproved Capital Value (UCV) method as the basis of the assessed value of allotments within the shire area used for pastoral and commercial purposes.
(1) The UCV of each property in the Roper Gulf Shire Council for the purposes of this rates declaration is defined as the UCV as at 1 July 2012, as determined by the Australian Valuation Office (AVO).
(2) The Council intends to raise, for general purposes by way of rates, more than $475,736which will be raised by the application of:
(a) Differential valuation-based charges (“differential rates”)
(b) Differential rates with differential minimum amounts being payable in application of each of those differential rates.
(c) A fixed charge (“flat rates”). (d) Flat rates for different classes
of allotments within the shire area.
(3) Rates for each allotment within the shire area set by differential and flat rates shall be set using the methodology set out in this declaration.
(4) The Council hereby declares the following rates:
RESIDENTIAL PROPERTIES (a) With respect to every
allotment of rateable land owned by a Land Trust or Aboriginal community living area association within the shire area that is used for residential purposes, and for properties used for residential purposes in areas excluding Borroloola, Mataranka, Larrimah and Daly Waters townships, aflatrateof$675.31foreachallotment will be applied, multiplied by:
(i) The number of separate parts or units that are adapted for separate occupation or use (pursuant to section 148(4) of the Act) on each allotment; or
(ii) The number 1;
Whichever is greater.
(b) With respect to every allotment of rateable land
within the localities of Borroloola, Mataranka, Larrimah and Daly Waters that is used for residential purposes, a flat rate of $304.15 for each allotmentwill be applied, multiplied by:
(i) The number of separate parts or units that are adapted for separate occupation or use (pursuant to section 148 (4) of the Act) on each allotment; or
(ii) The number 1; Whichever is greater.
COMMERCIAL PROPERTIES (c) With respect to every
allotment of rateable land owned by a Land Trust or Aboriginal community living area association within the shire area that is used for commercial purposes, and for properties used for commercial purposes in areas excluding Borroloola, Mataranka, Larrimah and Daly Waters townships, aflatrateof$800.06foreachallotment will be applied, multiplied by:
(i) The number of separate parts or units that are adapted for separate occupation or use (pursuant to section 148 (4) of the Act) on each allotment; or
(ii) The number 1; Whichever is greater.
(d) With respect to every allotment of rateable land within the localities of Borroloola, Mataranka, Larrimah and Daly Waters
102
that is used for commercial purposes, a flat rate of $574.41 for each allotmentwill be applied, multiplied by:
(iii) The number of separate parts or units that are adapted for separate occupation or use (pursuant to section 148 (4) of the Act) on each allotment; or
(iv) The number 1; Whichever is greater.
RURAL, HORTICULTURAL, AGRICULTURAL AND PASTORAL PROPERTIES (e) With respect to every
allotment of rateable land within the shire area that is used for rural residential living, horticultural or agricultural purposes, is under 200 hectares in size and not situated on land owned by a Land Trust or an Aboriginal community living area association, a flat rate of$355.26foreachallotmentwill be applied, multiplied by:
(i) The number of separate parts or units that are adapted for separate occupation or use (pursuant to section 148(4) of the Act) on each allotment; or
(ii) The number 1; Whichever is greater.
(f) With respect to every allotment of rateable land within the shire area that is used for rural residential living, horticultural or agricultural purposes, is over 200 hectares in size
and not situated on land owned by a Land Trust or an Aboriginal community living area association, a flat rate of$530.60foreachallotmentwill be applied, multiplied by:
(i) The number of separate parts or units that are adapted for separate occupation or use (pursuant to section 148(4) of the Act) on each allotment; or
(ii) The number 1; Whichever is greater.
(g) With respect to every allotment of conditionally rateable land within the shire area held under a pastoral lease or freehold property used for pastoral purposes, a differential rate of0.0672%oftheUCVoftheproperty will be applied, with the minimum amount being payable in the application of that differential rate being $336.09.
MINING AND EXTRACTION LEASES (h) For land occupied under a
mining tenement, being an active mining, extractive or petroleum lease with UCVs assessedasunder$250,000,aflatrateof$795.42willbeapplied.
(i) For land occupied under a mining tenement, being an active mining, extractive or petroleum lease with UCVs assessed as above $250,000 a differential rateof 0.318% of the UCV ofall land held under lease will be applied.
OTHER PROPERTIES (j) With respect to every
allotment of rateable land within the localities of Borroloola, Mataranka, Larrimah and Daly Waters that is vacant land, a flat rate of$304.15foreachallotmentwill be applied, multiplied by:
(i) The number of separate parts or units that are adapted for separate occupation or use (pursuant to section 148 (4) of the Act) on each allotment; or
(ii) The number 1; Whichever is greater.
(k) With respect to every allotment of rateable land within the shire area not otherwise described elsewhere in this declaration, aflatrateof$675.31foreachallotment will be applied, multiplied by:
(i) The number of separate parts or units that are adapted for separate occupation or use (pursuant to section 148 (4) of the Act) on each allotment; or
(ii) The number 1; Whichever is greater.
Charges(5) Pursuant to Section 157 of the
Act, the Council declares the following charges in respect of the garbage collection services it provides for the benefit of all residential land within or near the following designated communities and townships within the shire area (except such land as the Council from
Shire Plan 2012-2013 103
time to time determines to be exempt or excluded from the provision of such services or for which the Council has determined it is impractical to provide such services).
(6) The designated communities, localities and townships within the shire area are Barunga, Beswick, Borroloola, Bulman, Jilkminggan, Jodetluk, Manyallaluk, Mataranka, Ngukurr, Numbulwar, Urapunga, Weemol and Werenbun.
(7) Council intends to raise $133,745bythesecharges.
(8) For the purposes of this determination:
•“residential dwelling”meansa dwelling house, flat or other substantially self contained residential unit or building on residential land and includes a unit within the meaning of the Unit Titles Act.
•“residential land” meansland used or capable of being used for residential purposes (but does not include land on which there is no residential dwelling).
•“commercial and industrialactivity” means those activities that are carried out by individuals, partnerships, associations and corporations for the purposes of generating revenue for profit.
•“governmental activity” means those activities that are carried out by employees of the Australia or Northern Territory Governments for the purpose of providing support to the residents of the townships and communities within the shire as identified in paragraph 5 above.
•the “garbage collectionservice” comprises a collection service of one garbage collection visit per week with a maximum of one 240 litre mobile bin per garbage collection visit.
(m) The following charges are declared:
(i) A charge of $169.08 perannum for each residential dwelling or allotment used for commercial, industrial or governmental activity in respect of the garbage collection service provided, multiplied by the number of standard rubbish bins at the dwelling.
(ii) Charges for other services provided for, or which Council is willing and able to provide for, the benefit of the land, or the occupiers of the land, within the shire, are set by the Council’s current service charges and fees schedule.
Relevant interest rate (n) The Council fixes the relevant
interest rate for the late payment of rates and charges in accordance with Section 162 of the Act at the rate of 18 per cent per annum which is to be calculated on a daily basis.
Payment (o) The Council determines
that the rates and charges declared under this declaration may be paid by two (2) approximately equal instalments on the following dates, namely:-
•FirstInstalmenttobepaidon or before the due date
issued on the rates notice •Second Instalment to be
paid within four months of the due date issued on the rates notice.
(p) Instalments falling due on a weekend or public holiday may be paid by the following business day, without incurring any penalty.
(q) Details of due dates and specified amounts will be listed on the relevant rates notice under section 159 of the Act (“the Rates Notice”).
(r) Variations to those options for payment will be administered according to the conditions outlined on the front and reverse of the Rates Notice.
(s) A ratepayer who is experiencing difficulty with making a payment on time or in its entirety may contact the Council, and the Council may at its own discretion offer the ratepayer an alternative schedule of payments.
(t) A ratepayer who fails to pay the rates and charges notified under the relevant rates notice under section 159 of the Act may be sued for recovery of the principal amount of the rates and charges, late payment penalties, and costs reasonably incurred by Council in recovering or attempting to recover the rates and charges.
104
appendix iiiacknowledgements
Our sincere thanks to all the residents of our Shire who took the time to speak to us and contribute valuable suggestions on our direction over the life of this Shire Plan and beyond. Your contributions will assist to improve service delivery to benefit all Shire residents and customers.
We appreciate the contributions received from our stakeholders and partners across the region. Shire staff have assisted and supported community consultations and the drafting of this plan.
Shire Plan 2012-2013 105
nUMBUlWar nUMBirinDi
WarD
YUGUl ManGi WarD
SOUTh WeST GUlF WarD
Source: as adapted from DHLGRS www.bushtel.nt.gov.au