session 39 -gotris co-modal trafikledning för inlandssjöfart
TRANSCRIPT
ITS-stöd för
effektiv godstransport på och tvärs
Göta Älv
2012-12-13
ITS för effektiv godstransport på Göta Älv
www.viktoria.se
…ABOUT THE BACKGROUND• Prestudy 2010
(VGR, Göteborg Energi, Swedish ICT)http://reports.viktoria.se/gotris/
• Planning project 2011 (Vinnova)
• Pilot project 2012-2014 (Vinnova, VGR, Region Värmland, Göteborgs Stad, Karlstad, Kristinehamn, Trafikverket)
www.viktoria.se
…ABOUT CO-MODAL TRAFFIC CONTROL
Passing of bridgesand available slots
Planned openingof bridges
Järnväg
MaritimeRoad-traffic
Public transport
PedestriansBicyclists
www.viktoria.se
THE IDÉA
http://www.youtube.com/watch?v=JyjlVIEKQAY
www.viktoria.se
DELIVERABLES IN THE PROJEKT• A demonstrator of how ITS can be
used to efficiently control differnt traffic modes, competing for the save resource – The
• To genereate new knowledge, models and functionality that can be used when implementing a permanent RIS in the Göta Älv IW-area.
• Developing common views in how a RIS should be organized, prioritized and implemented.
• To build the ”foundation” of a comming RIS platform for Göta Älv.
www.viktoria.se
FUNCTIONALITY IN THE PILOT
“Green Wave” and Meeting synchronization
Stakeholder interaction Integration platform forStakeholder information sources
ETA-modelling, Open API forThird party integration
www.viktoria.se
LONG-TERM VISION FOR GOTRIS• RIS-functionality matching the needs of this
region (differs some from other European RIS)
• Re-use of existing systems and Infrastructure (AIS,ECDIS, SSNT, MonaLisa)
• Functionality like:• ETA prediction• Active speed guidance for ”green-
wave” passing bridges & locks• Synchronizing of passing ships• Platooning• Notice to Skippers• Stakeholder system integration• Open information platform
• Neutral platform handling multiple interests.
www.viktoria.se
EFFECTS ANTICIPATED FROM THE PROJECT
Better information integration between traffic modes
Tool to implement agreements for infrastructure resources
Bridge openingIn 45 min
Reliable information to travellerson road, PT, bike etc
Saved fuel and CO2 through planned routes
www.viktoria.se
..AND AFTER GOTRIS II
Smart Energi
SOU Inre vattenv
GOTRISPre-study
Vinnova
UDI A-projekt
VinnovaDemonstrator-
projekt
Implementation
Vinnova UDI C-Projekt
?
2010/2011 2011/2012 2012/2014