  • 8/10/2019 Sembmarine Integrated Yard@Tuas

    1/2

    Location & Facilities

    SINGAPORE HUB

    PT KarimunSembawang

    Shipyard

    PT SMOEIndonesia

    JurongShipyard

    SembawangShipyard

    SMOE

    Jurong

    SML

    PPL

    ShipyardKARIMUN

    Sembmarine

    IntegratedYard @ Tuas

    SINGAPORE HUB

    KARIMUN

    BATAMBATAM

    CRANAGEFACILITIES

    MAXIMUMCAPACITY

    MAXIMUMREACH

    CAPACITY @MAXIMUM

    REACH

    TOTAL NO.OF CRANES

    Dry Dock 100T 75M 15T 3

    Quay Side 50T 100M 15T 11

    Fabrication Area 300T x 150M 1

    QUAYSBERTHING

    LENGTH

    MAX DRAFT

    at zero tideQUAYS

    BERTHING

    LENGTH

    MAX DRAFT

    at zero tide

    YST 01 210m 12m YST 07 318m 15m

    YST 02 375m 9m YST 08 318m 15m

    YST 03 375m 9m YST 09 318m 15m

    YST 04 300m 9m YST 10 318m 15m

    YST 05 400m 9m YST 11 318m 15m

    YST 06 318m 15m YST 12 350m 9m

    DOCK NO. SIZECAPACITY

    (DWT)

    YST D1 350m x 66m x (-8.5m) 350,000

    YST D2 360m x 89m x (-8.5m) 500,000

    YST D3 412m x 66m x (-11.0m) 350,000

    YST D4 350m x 66m x (-8.5m) 350,000

    FACILITIESTOTAL AREA

    (SQM)

    PCC 14,700

    Owners Office 8,300

    Learning Centre 7,500

    Warehouse 16,800

    Dormitory (Phase I) 50,700

    Workshops 22,700

    M ul ti -fu nct io n B ui ld in gs 1 6, 60 0

    SPECIALISED

    SHIPBUILDING

    80 Tuas South Boulevard, Singapore 637051 Tel: (65) 6265 1766 Fax: (65) 6261 0738 Website: www.sembmarine.com Co. Reg. No: 196300098Z

    SHIP CONVERS

    ION

    & OFFSHORE

    OFFSHORE

    ENGINEERING &

    CONSTRUCTION

    REPAIRS(Including Rigs)

    RIG BUILDING

    Globally renowned for its rig building

    and offshore conversion expertise,

    Sembcorp Marine has over the years

    established a proven track record in

    jack-up design and building, fast-

    track semi-submersible construction,

    production of offshore platforms,

    and the conversion of floating

    production and storage facilities for

    major oil and energy companies.

    OUR CORE CAPABILITIES

  • 8/10/2019 Sembmarine Integrated Yard@Tuas

    2/2

    Background

    Unveiled plans on 4 November 2009 Strategic

    Positioning for the Future: Sembcorp Marine unveils

    plans for a modern, work-efficient and integrated new

    yard facility.

    18 November 2009 Award of New Yard Construction

    contract to Zhen Hua (S) Engineering: 4 VLCC

    drydocks, wharves, quays and ancillary facilities

    scheduled for completion by May 2013.

    21 June 2010 Ground-breaking of new yard with

    Mr Lim Hng Kiang, Minster for Trade and Industry, asGuest-of-Honour.

    Location of New Yard

    Located at Tuas View Extension in the west ofSingapore, the planned 206-hectare new yard facility

    is strategically located along the major sea lanes in

    the Singapore Straits.

    The 206-hectare new yard will be built in threephases. Phase I of the new yard spans 73.3 hectares

    with Phase II at 34.5 hectares and the balance in

    Phase III.

    Phase I

    The 73.3-hectare Phase I Sembmarine Integrated

    Yard @ Tuas has commenced operations on 5 August2013.

    Capable of serving a wide range of vessels and

    rigs, including VLCCs, new generations of mega

    containerships, LNG carriers and passenger ships,Phase I of the new yard is equipped with 4 VLCC

    drydocks with a total dock capacity of 1.55 million dwt

    as well as finger piers and basin lengths totalling 3.9 km.

    The state-of-the-art new yard facility is designed to

    maximise operational synergy, production efficiency

    and critical mass with optimised docking and

    berthing facilities, an improved dock and quay ratio,

    a centralised work-efficient layout and integrated

    facilities. This will sharpen our competitive edge toachieve greater productivity and efficiency to deliver

    innovative, value-added and cost-efficient solutions

    to customers.

    The facilities at the new yard include a drydock

    (YST D2) of 360m length, 89m width and a draft of

    8.5m. This is the widest drydock in Singapore and

    is designed to accommodate jack-ups and semi-submersible rigs.

    Another drydock (YST D3) measuring 412m in

    length and 66m in width with a draft of 11.0m, is the

    longest and deepest ship repair drydock in Asia. It isequipped with an innovative intermediate dock gate

    system and is capable of docking containerships of

    up to 18,000 TEU, providing exibility to congure the

    dock and allow smaller ships to dock in front while

    other works are carried out at the rear. This translatesto greater cost-efficiency and better dock utilisation

    during operations.

    The natural deep waters at the new yard also enable

    the installation of thrusters for semi-submersibleswithout towing the rig to sea, providing significant

    savings for customers.

    There is also a special reinforced load-out area foroffshore platforms of up to 20,000T.

    To maximise the waterfront coverage in Singapore,

    the yard is configured with three finger piers and a

    basin ranging from 210m to 400m with maximum draftfrom 9m to 15m, allowing for ultra deepwater semi-

    submersible rigs and cruise vessels to be berthed

    without restrictions in the new yard.

    Besides these operational innovations, the yard alsoredefines employee care with a new in-yard living

    concept where employees live in self-contained

    dormitories and accommodation within the new yard

    premises. Comprising two phases of development,

    the dormitories will be capable of housing almost9,400 employees when fully completed. The Phase I

    precinct comprises 3 blocks of 7-storey dormitories

    and 1 block of 7-storey apartments to house some

    5000, complete with a centralised kitchen, sports

    and recreational facilities, in-house laundry services

    and other amenities and services to provide for abetter quality of life for employees. The convenience

    of residing in the yard enables employees to have

    sufficient time to rest and relax after work, translating

    to greater productivity and job efficiency.

    Brief Overview

    Sembmarine Integrated Yard @ Tuas: Enhanced Capabilit

    Finger Pier

    Finger Pier

    YST D4 YST D3

    Advanced production technology.

    Compreh en si ve works hop fac il it ies. The d ormi to ry deve lopmen t h as a wi de r an ge o f fac il it iesand amenities.

    Studio apartment.

    Project Coordination Centre and Customer Office located inclose proximity. H igh s tand ards of Heal th , S afet y