seams: should i manage the assets or the projects?

19
Driving Value from Assets produced by: Should I Manage the Projects or Manage the Assets? Jon Greensill - SEAMS Ltd

Upload: seamsltd

Post on 16-Apr-2017

53 views

Category:

Data & Analytics


1 download

TRANSCRIPT

Page 1: SEAMS: Should I manage the assets or the projects?

Driving Value from Assetsproduced by:

Should I Manage the Projects or Manage the Assets?

Jon Greensill - SEAMS Ltd

Page 2: SEAMS: Should I manage the assets or the projects?

2

Page 3: SEAMS: Should I manage the assets or the projects?

3 Critical Success Factors learnt from Successful Asset Planning Projects in Large Organisations

1. Get more people involved in the process– Make it simple and repeatable– Have a consistent planning process across assets and departments– Transparent / auditable process which captures local decision making knowledge

2. Speed up the process– Days and weeks not months– Easier to do means asset planning is not a special event– You can respond quickly when things change

3. Make best use of available data– Don’t wait for perfect data - measure data quality and use what you have– Relate decisions to data and understand uncertainty– Have a framework to make use of new data sources as they becomes available

Page 4: SEAMS: Should I manage the assets or the projects?

Project or Asset Level Planning The Challenge

• Strategic Asset Management is often executed by evaluation

of a large portfolio of possible Projects that the company

could choose to do - Project Portfolio Optimization.

• But where do these Projects come from?

• Is a new Asset focussed approach possible?

Page 5: SEAMS: Should I manage the assets or the projects?

Asset Centric or Project CentricProject Centric

– Looks to optimise a set of predefined projects– Investments are described as discrete projects with benefits/costs described at project level – Selects the optimal mix from the previously defined projects provided to it

Asset Centric – Considers all capital, operational and inspection interventions for each asset within specific asset classes – Investment model trades investment at asset level or across multiple asset classes– Uses latest asset data – often changing

Or a Combined Approach?

Page 6: SEAMS: Should I manage the assets or the projects?

Portfolio Optimization

Page 7: SEAMS: Should I manage the assets or the projects?

Project Based PlanningBenefits of Portfolio Modelling

• Delivers more value from the investment program for a level of spend• Increases the transparency of the investment planning cycle• Maximises the value of existing and ‘siloed’ investment approaches • Ensures the highest ‘value engineering’ projects are taken forward• Increases buy-in from all stakeholders

Constraints

• Have the right projects been created to be optimized?• Have the benefits and costs been accurately reflected? • Controls need to be in place to avoid gaming• Do the projects represent a broad enough set of options• How much effort did it take to generate the projects, many of which will not be taken forward

Page 8: SEAMS: Should I manage the assets or the projects?

Asset Based PlanningBenefits of Asset Modelling• Right investment intervention for the right asset at the right time • Increases buy-in from all stakeholders• High efficiencies, typically between 7 and 17% • Increases the transparency of the investment planning cycle• Challenges historic, recurring decisions• Making best use of available asset data

Constraints of Asset Modelling• Where there are large volumes of assets, models can be time consuming to run as the data is granular• Cohorts or combined approach may be recommended• Models may need constraining to reflect external factors, eg regional spending, rates of change etc

Page 9: SEAMS: Should I manage the assets or the projects?

What’s Changed?• Big Data

– More asset data available and even more to come (IOT)

– Some you asked for, lots you didn’t

• Big Data Processing– Distributed Computing (AWS / Azure)– Analytics of various flavours– Ability to solve/search/optimize very

large problems

…and businesses that need to respond to change faster than before

Model Metrics

Page 10: SEAMS: Should I manage the assets or the projects?

A Note on Data Quality - Measure and Improve

10

Page 11: SEAMS: Should I manage the assets or the projects?

An Example of Integrated Asset and Project Planning• Population Served – 7.7M

• Water Mains – 28,000 Miles• Water Production – 1,800 MLD• Water Treatment – 2,500 MLD (>1000 Treatment

Works)• ~40% Metered• Leakage 440MLD (24%)

Some Current Issues..• Responding to regulatory changes• Speeding up the planning process• New Environmental pressures, e.g. Flooding

Page 12: SEAMS: Should I manage the assets or the projects?

FinancialPortfolioAsset Resource

EDA Project Portal

EDA Optimise

Data Labs

Data Integration Layer

Wor

kflow

& A

utom

atio

n

EDA Developer

Monte Carlo What-If

Data Hub

AssetRegister

Results Viewer

Dash-board

MapView

EDA Platform

EDA Core Applications

Page 13: SEAMS: Should I manage the assets or the projects?

Continue to Simplify the Asset Modelling…

13Manages process from raw data to optimised investment plans - quick to rerun the analyses given new data..

Page 14: SEAMS: Should I manage the assets or the projects?

The Asset Modelling Process

14

Assets & external

data

Page 15: SEAMS: Should I manage the assets or the projects?

Automated Analysis of Asset Data

15Previously a manual/consultancy exercise – new results automatically re-configure the model

Page 16: SEAMS: Should I manage the assets or the projects?

Combine Outputs from Asset Models into a Project Portfolio Model

16

Assets & external

data

Assets & external

data

Assets & external

data

StrategicCross Asset

Results

EDA Portfolio

Manual Schemes(Risks &

Solutions)

Non-Infrastructure Strategic

Waste Water Strategic

Clean Water Strategic

StrategicCross Asset

Portfolio Model

Page 17: SEAMS: Should I manage the assets or the projects?

17

EDA Asset

SAP

EDA Portfolio

Strategic AMP Planning

Operational Risk Management

EDA Portfolio

Integrated Business Planning

Named Schemes

EDA AssetStrategic Asset

Planning(Models)

Issues (Fix now)

Risks (Fix later maybe)

Import

EngineeringStaff

Risk Evaluation & Management

Opti

ons

Opti

ons

Real-time

Monthly

Annual

EDA AssetDeployment Asset Planning (Models)

Committed Plan

Advanced EDAP

Web App

EDAP Web App

Advanced EDAP

Web App

ORM Portal

Dashboards

AMP Plan

STW’s Vision - Integrated Business Planning

Page 18: SEAMS: Should I manage the assets or the projects?

Conclusion

• The industry has traditionally been solving the investment planning problem by using disparate systems, spreadsheets and ad-hoc solutions

• Organisations often struggle to deal with the differing decision time frames of strategy and delivery. This results in disjointed processes for the translation of strategic objectives into the everyday operational pressures

• Significant efficiencies can be achieved through the appropriate implementation of tools that have a link between both asset level optimization and project\programme optimization

• To solve the Service/Risk/$ challenges an enterprise solution is required which covers– Derivation of strategic investment plans– Cascade of a strategic plan to a delivery plan– ‘In-flight’ management and update of that plan

18Got a question? Contact [email protected]

Page 19: SEAMS: Should I manage the assets or the projects?

Driving Value from Assetsproduced by:

Jon GreensillSEAMS Ltd

[email protected]