manage risks in projects
TRANSCRIPT
-
7/27/2019 Manage Risks in projects
1/26
A special lecture for BusinessLeadersPresented by:
Masilamani Ramasamy
-
7/27/2019 Manage Risks in projects
2/26
is important for success
especially in projects
need to have a process/s five steps project
manager/s can use
-
7/27/2019 Manage Risks in projects
3/26
Risk management processes are cyclic start from identification of a risk, and may result in identification of another
new risk
each individual has different opinions &ways to deal with risks, SO risk should be consistent to meetproject objectives
documented in a risk managementplan
-
7/27/2019 Manage Risks in projects
4/26
The Process
-
7/27/2019 Manage Risks in projects
5/26
-
7/27/2019 Manage Risks in projects
6/26
-
7/27/2019 Manage Risks in projects
7/26
Identify risks that affect theproject
positively or negatively, anddocument their characteristics
Do this as thoroughly as youcan
-
7/27/2019 Manage Risks in projects
8/26
Identify Risks Mind Map
-
7/27/2019 Manage Risks in projects
9/26
Assess the risk impact Analyze the probability of riskoccurrence, and
prioritize the risks numerically analyze the effect ofidentified risks on project
objectives usually on cost, schedule and scopetargets
-
7/27/2019 Manage Risks in projects
10/26
SCALE PROBABILITY +/- IMPACT ON PROJECT OBJECTIVESTIME COST QUALITY
VHI > 90% 20DAYS
>200K Very significant impact onoverall functionality
HI 71 90% 11 2
0DAYS
101 200K Significant impact on
overall functionality
MED 51 70% 4 10DAYS
51 100K Some impact in keyfunctional areas
LO 31 50% 1 3
DAYS
10 50K Minor impact on overall
functionality
VLO 11 30% < 1 DAY
-
7/27/2019 Manage Risks in projects
11/26
-
7/27/2019 Manage Risks in projects
12/26
Perform Quantitative Risk Analysis Mind Map
-
7/27/2019 Manage Risks in projects
13/26
Explore all the possible ways to reduce the impact of threats , and/or exploit opportunities
Plan actions to eliminate the risks and/or enhance the opportunities
Action plans should be appropriate, cost effective, and
realistic
-
7/27/2019 Manage Risks in projects
14/26
: PLAN ACTIONS-Standard Risk Breakdown Structure (RBS)RBS LEVEL 0 RBS LEVEL 1 RBS LEVEL 2
RBSLEVEL 0
RBS LEVEL 1 RBS LEVEL 2 RBS LEVEL 2
0. PROJECT RISK
1. TECHNICAL RISK1.1 Scope definition1.2 Requirements definition1.3 Estimates, assumptions & constraints1.4 Technical processes1.5 Technology1.6 Technical interfaces
1.7 Design1.8 Performance1.9 Reliability & maintainability1.10 Safety1.11 Security1.12 Test & acceptance
2. MANAGEMENT RISK 2.1 Project management2.2 Programme/portfolio management2.3 Operations management2.4 Organisation2.5 Resourcing2.6 Communication2.7 Information
2.8 HS&E
2.9 QuaLITY2.10 Reputation
3. COMMERCIAL RISK 3.1 Contractual terms & conditions3.2 Internal procurement3.3 Suppliers & vendors3.4 Subcontracts
3.5 Client/customer stability3.6 Partnerships & joint ventures
4. EXTERNAL RISK 4.1 Legislation4.2 Exchange rates4.3 Site/facilities4.4 Environmental/weather4.5 Competition
4.6 Regulatory
4.7 Political4.8 Country4.9 Social/demographic4.10 Pressure groups4. EXTERNAL RISK
4.11 Force majeure
-
7/27/2019 Manage Risks in projects
15/26
Plan Risk Management Mind Map
-
7/27/2019 Manage Risks in projects
16/26
Track the risks throughout the project If risks occur then,
implement the risk strategy based on
action plan Risk strategies may include
Mitigation
Acceptance Avoidance, and
Exploitation
-
7/27/2019 Manage Risks in projects
17/26
This is no problem You can perform a risk assessment on the
project and begin to apply project riskmanagement at any time
The risk assessment should find some of themajor things which are about to go wrong,and identify potential failures as the project
continues
-
7/27/2019 Manage Risks in projects
18/26
AvoidThe best thing that you can do
with a risk is avoid itif you can
prevent it from happening, it
Definitely wont hurt your project.
The easiest way to avoid this riskis to walk away
from the cliff but that may notbe an option on this project.
-
7/27/2019 Manage Risks in projects
19/26
TransferOne effective wayto deal with a risk
is to pay someoneelse to accept itfor you. The most
common way todo this is to buyinsurance.
-
7/27/2019 Manage Risks in projects
20/26
MitigateIf you cant avoid the
risk, you can mitigateit.This means takingsome Risk Response
Strategies
-
7/27/2019 Manage Risks in projects
21/26
If you cant avoid the risk,and theres nothing you can
do to reduce its impact,then accepting it is youronly choice
AcceptWhen you cant avoid, mitigate,or transfer a risk, then you haveto accept it. But even when youaccept a risk, at least youvelooked at the alternatives and
you know what will happen if itoccurs.
-
7/27/2019 Manage Risks in projects
22/26
Plan Risk Responses Mind Map
-
7/27/2019 Manage Risks in projects
23/26
Measure the effectiveness of theplanned action and
controlling the risk impact by understanding risk triggers
& timely implementation of
planned actions
-
7/27/2019 Manage Risks in projects
24/26
RiskCategory Risk Name RiskNumberProbability (1-3)
Impact(1-3)RiskScore(1-5) Mitigation Contingency Action By
ActionWhen
GuestsThe guestsfind thepartyboring
1.1. 2 2 4 Invite crazyfriends, providesufficient liquor
Bring out thekaraoke
Ahmadwithin2hrs
GuestsDrunkenbrawl
1.2. 1 3 3Dont invitecrazy friends,don't provide
too much liquor
Call 911 Samy Now
Nature Rain 2.1. 2 2 4 Have the partyindoors
Move theparty indoors
Milind 10mins
Nature
Earthquake
or fire 2.2. 1 3 3Start the partywith instructions
on what to do inthe event of fireor earthquake
Implementtheappropriate
naturaldisasterresponseplan
Everyone
As per
plan
FoodNotenoughfood
3.1. 1 2 2 Have a buffet Order pizza Zainal 30minsFood Food is
spoiled3.2. 1 3 3 Store the food in
deep freezerOrder pizza Susi 30mins
http://en.wikipedia.org/wiki/Karaokehttp://en.wikipedia.org/wiki/Karaoke -
7/27/2019 Manage Risks in projects
25/26
Monitor & Control Risks Mind Map
-