ATP

TRANSCRIPT

  • 1 2009 Oracle Corporation Proprietary and Confidential

  • 2 2009 Oracle Corporation Proprietary and Confidential

    Day, Date, 2004time p.m. ET

    Teleconference Access:North America: xxxxInternational: xxxxPassword: Advisor

    Wednesday, May 17, 201111:00 AM ET / 09:00 MT

    Teleconference Access:Conference ID: OM Advisor or 54157957

    North America:(866) 627-3315

    International:+1-706-679-4880

    Other Global Toll Free:Doc ID: 1148600.1

    Upcoming Value Chain Planning Community Webcasts:June 21, 2011: Order Import: An Easy Digest (Doc Id 1288737.1)

    July 19, 2011: To be announced

    August 16, 2011: To be announced

    For complete details Order Management Webcast Events, please see Note 1288737.1.

    For complete details on All Other upcoming Oracle Advisor Webcast Events, please Note 398884.1.

    Do you have any requests for future Order Management Advisor Webcast Events? Please email your suggestions to [email protected], subject: Topics of Interest.

    Order Management Advisor Webcast

  • Troubleshooting Scheduling & ATP Issues in R12 Order ManagementKathy CalliesPrincipal Technical Support Engineer

  • 4 2010 Oracle Corporation Proprietary and Confidential

    The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decision. The development, release, and timing of any features or functionality described for Oracles products remains at the sole discretion of Oracle.

    Safe Harbor Statement

  • Troubleshooting Scheduling & ATP Issues in R12 Order ManagementKathy CalliesPrincipal Technical Support Engineer

  • 6Welcome to Trouble Shooting Scheduling & ATP Issues in R12 OM

    This presentation is intended to provide functional users and support engineers with information and tools to trouble shoot Scheduling & ATP issues in Order Management.

    A couple of quick definitions: The Scheduling process in OM passes data to the ATP process

    which determines the availability of a product and returns the 'Schedule Ship Date' for the line item. This process is invoked even if you are not using ATP, since this is the process that checks to determine the status and availability of an item.

    ATP stands for 'Available to Promise'. ATP is the quantity of current on-hand stock, outstanding receipts and planned production that has not already been committed to sales orders or other sources of demand.

  • 7What will be Covered

    Setups that affect ATP/Scheduling Profile Options that affect ATP/Scheduling System Parameters that affect

    ATP/Scheduling How to capture OM Debug and ATP Session

    files for trouble shooting Common ATP Issues in OM R12 Enhancements Important notes

  • 8Setups for ATP/Scheduling Item attributes for ATP in Inventory > OM tab

  • 9Setups for ATP/Scheduling Transaction Type: Scheduling Level & Auto Schedule:

    Shipping tab - (optional)

  • 10

    Setups for ATP/Scheduling Defaulting Rules: Latest Schedule LimitLatest Schedule Limit + Request Date =

    Latest Acceptable Date on the line: (optional)

  • 11

    Setups for ATP/Scheduling Defaulting rules: Order Date Type (Ship/Arrival) If Ship: SSD = Request Date If Arrival: SAD = SSD + lead time

  • 12

    Setups for ATP/Scheduling Define ATP Rules: INV > Setup > Rules > ATP

  • 13

    Setups for ATP/Scheduling Assign ATP Rules to Item or Org:

    INV > Setup > Org > Parameters > ATP, Pick, Item-Sourcing tab

  • 14

    Setups for ATP/Scheduling Run Data Collection: By running the Data

    Collection program, the data necessary to give a complete picture of availability are transferred from the Source ERP tables to the Destination APS tables which reside in the MSC schema.

    Data Collection should run without failure, but can complete with a warning. Warnings can be ignored as they will not affect ATP from OM.

    OM > Scheduling > ATP Data Collection

    See related Notes:

    Note 401158.1 - How to Set Up Data Collection for OM ATP Availability

    Note 145419.1 - How to Setup & Run Data Collection

  • 15

    Profile options affect ATP/Scheduling

    INV: Capable to Promise Controls how ATP is calculated:

    If you license ASCP (Advanced Supply Chain Planner) and want to use planning output, choose ATP/CTP based on Planning Output.

    If you are not licensed for ASCP but want to calculate ATP, choose ATP based on Collected Data.

    OM: Authorized To Override ATP Allows user to

    check the Override ATP flag on the line, and override the Schedule ship date or Arrival date

  • 16

    Profile options affect ATP/Scheduling OM: AutoSchedule Controls display of the

    Availability pop-up window when the sales order form is opened and whether scheduling occurs automatically as each line is saved. (Yes/No)

    OM: Delay Scheduling Controls whether scheduling of a line is performed only when changes are committed to the database, or when you simply navigate out of the line. (Yes/No)

    OM: Schedule ATO Item Without BOM new in R12.

    Option to schedule ATO items even without a Bill of Materials (BOM) attached to the ATO item .(Yes/No)

  • 17

    Profile options affect ATP/Scheduling

    OM: Scheduling Role Controls the access to the Scheduling tab in the Order Organizer form for scheduling across multiple orders.

    OM: Auto Push Group Date Controls rescheduling when adding a new line to a ship set or configuration.

    MRP: Calculate Supply Demand - Set to 'Yes' to enable the ATP Supply/Demand screen from the Availability pop-up window in sales order form.

    MSC: Use Shipping/Receiving Calendar - Set to Yes if you want to use any shipping, receiving, or carrier calendar for planning/scheduling. When set to No, only the Org manufacturing calendar is used for ATP/Scheduling.

  • 18

    OM System Parameter settings that affect ATP/Scheduling

    Latest Acceptable Date: Honor the Latest Acceptable Date, Ignore the Latest Acceptable Date with warning, Ignore the Latest Acceptable Date without warning

    Promise Date Setup: First Request Date, First Schedule Ship/ Arrival Date, Manual Entry, Request Date, Schedule Ship / Arrival Date

    Reschedule with Request Date Change: Yes/No Reschedule with Ship Method Change: Yes/No

  • 19

    System Parameters that affect ATP/Scheduling

    Profile options moved to System Parameters on R12: Reservation Time Fence: Controls automatic

    reservation during scheduling. Value is number of days into the future that scheduling will reserve.

    Schedule Line On Hold: Yes/No

    New on Release 12.1.3: OM: Auto Schedule Sets: To improve performance

    and accuracy in ship-set scheduling, you can delay scheduling lines automatically when you add them to a new ship or arrival set. You can schedule the lines manually whenever it is required. (Yes/No)

  • 20

    How to capture OM Debug and ATP session files

    Note 122372.1 - Getting ATP Inquiry Debug FilesNote 121054.1 - How to generate OM Debug

    Set profile options at user level: MSC: ATP Debug Mode = Debug Only OM: Debug Level = 5 Turn on OM Debug (Tools > Debug) in SO form Reproduce scheduling issue or error Turn off OM Debug (Tools > Debug) exit SO form ATP Session file is captured during scheduling

    action Reset MSC:ATP Debug Mode = null

  • 21

    How to capture OM Debug and ATP session files

    Retrieve the OM Debug and ATP Session Files: OM Debug: Navigate in Order Management:Run Request > Diagnostics: OM Debug File Retrieval

    > Enter Debug file name (file name always begins with the lower case letter el' (not the number '1'). For example: l2045076.dbg

    ATP Session file will be located in the last directory in sql results:

    select value from v$parameter where name like 'utl%file%';

    (file name will be in the format of: session-99999)

  • 22

    Capture ATP session & OM Debug log

  • 23

    OM Debug Log

  • 24

    Note 120183.1 - How To Investigate Mtl_demand_interface Errors

    Nonshippable item requiring no ATP checks, n included in ATP

  • 25

    ATP session file

  • 26

    Common ATP/Scheduling issues/errors

    Calendar errorsVerify the workday calendar used for the Org:

    Shipping > Setup > Org Parameters > Calendar

  • 27

    ATP/Scheduling Calendar issues Verify Org calendar is current & rebuilt if there were

    any changes: Shipping > Setup > Calendar > EnterSee workday calendar is 5 on, 2 off (weekend)

  • 28

    ATP/Scheduling Calendar issues

    If MSC: Use Shipping/Receiving Calendar = Yes, check for Shipping calendar that overrides Org calendar:

    Shipping > Setup > Calendar > Assign

  • 29

    ATP/Scheduling Calendar issues:Calendar used for ATP is setup to ship:

    7 days a week 0 days off

  • 30

    Common ATP/Scheduling issues/errors

    Cannot meet request date or latest acceptable dateCheck defaulting rule for Latest Schedule Limit on order header. Latest Acceptable Date = Latest Schedule Limit + Request Date. Latest Schedule Limit is a numeric value (60,90,300, etc.) and can be setup in defaulting rule as a constant or default from customer record. Check setting for system parameter Latest Acceptable Date.

    If there is quantity on hand for the Request Date, then check if ATP Data Collection request is running without error on a regular basis. If yes, capture OM Debug and ATP session file for further analysis.

  • 31

    Common ATP/Scheduling issues/errors

    Scheduling failed. Try ATP Again LaterATP Data Collection is currently running or failed.

    Schedule Ship Date is updated when change is made on line:

    Check system parameters:Reschedule with Request Date changeReschedule with Ship Method change

    Note 445044.1 - Why does updating ordered quantity trigger reschedule action? Lists the fields that if changed, will trigger rescheduling the line.

  • 32

    Common ATP/Scheduling issues/errors

    Incorrect Schedule Ship Date calculatedCheck related setups, system parameters, profile options.Verify that Data Collections is running without error.Capture OM Debug and ATP Session file for analysis.

    Incorrect Schedule Arrival Date - Note 262124.1 -(Setup Intransit Lead Time to Use with ATP Inquiries)

    Be sure to follow all steps, including running Shipping Interfaces and Data Collection at the end.

    Scheduling Failed. No APS instance defined. Data Collection is not setup and running regularly.Set APS instance and run collections (Note 421069.1)

  • 33

    What's new in R12 for ATP/SchedulingNote 396089.1 - R12 Scheduling Enhancements

    Enhanced Mass Scheduling / Schedule Orders Concurrent Program Supports Schedule, Reschedule and Un-schedule actions in batch mode

    Use Flexible query parameters based on business need

    Specify a Schedule Date, Warehouse when Scheduling / Rescheduling

    Second Order By parameter which allows additional prioritization based on business need to ensure FIFO functionality

  • 34

  • 35

    What's new in R12 for ATP/Scheduling Ability to control scheduling manually after

    the order is booked using a new workflow sub process 'Schedule Line, Manual.

    If the new sub-process is used in the line workflow, then after booking the order, lines will be blocked at the Schedule-Eligible activity. User can progress the Schedule-Eligible activity from Sales Order Form or use the Schedule Orders program to schedule the lines.

    Note 403688.1 - R12: How To Control Scheduling Manually After The Order Is Booked?

  • 36

    What's new in R12 for ATP/Scheduling

    Other ATP/Scheduling notes:

    Note 428310.1 - R12 Order Management Suite -Scheduling Enhancements Library

    Note 436771.1 - FAQ - Understanding the ATP Results and the Availability Window of the Sales Order Form

    Note 473072.1 - Order Management: Trouble Shooting Scheduling and ATP Issues

  • 37

  • 38 2009 Oracle Corporation Proprietary and Confidential

    Collaborate with a large network of your industry peers, support professionals, and Oracle experts to exchange information, ask questions & get answers. Find out how your peers are using Oracle technologies and services to better meet their support and business needs.

    Exchange Knowledge

    Resolve Issues

    Gain Expertise

    Visit My Oracle Communities

    Visit the Order Management Support Community now!!

    1. Log into My Oracle Support.

    2. Select the Community link.

    3. Select the Enter Here button.

    4. Select the Order Management link under the E-Business Suite section of the My Communities Menu on the left side of the window.

  • 39 2009 Oracle Corporation Proprietary and Confidential

    Order Management Advisor Webcast Calendar and Archive (Doc ID 1288737.1)

  • 40 2009 Oracle Corporation Proprietary and Confidential

    Order Management News (Doc Id 207.1)

    Established in 2006.

    Oracle Support Newsletters bring you

    News

    Technical Content

    Technical Updates

    from the various Oracle Support teams.

    Can be viewed in My Oracle Support.

    Subscribe to receive email distribution.

    Go to My Oracle Support Doc Id 207.1

  • 41 2009 Oracle Corporation Proprietary and Confidential

    You will receive a survey via email in a few days.

    These surveys ensure consistent delivery of quality webcasts.

    Also helps identify opportunities for improvement.

    Feedback will be used to help evolve the program to fit your needs.

    Your feedback is greatly appreciated.

    You may also send feedback to me at [email protected].

    Advisor Webcast Assessment

  • 42 2010 Oracle Corporation Proprietary and Confidential

    THANK YOU

  • 43 2009 Oracle Corporation Proprietary and Confidential

    1. Find and use the name of the form, report, or concurrent program whenever possible. Doc Id 121916.1

    My Oracle Support Search Top 5

    2. Use exact error strings and the name of the code to get the best search results. For example, 'ORA-1400: mandatory (NOT NULL) column'.

    3. Refine your search results to fit the situation and narrow your results. On the right side of the search results, you'll see a number of Refine Search options. Here you may narrow the search results by Product Category, Task/Intent, Document Type, and Updated (date range).

    4. Avoid entering full sentences with punctuation that describe your issue, and remove unnecessary words and characters that may unintentionally restrict search results from being returned. This includes words similar to "the", "and", and with" and symbols like number(#), dashes(-), colons(:), semi-colons(;), etc.

    5. Recommended Links, Support Recommended, and Targeted notes are documents identified by Oracle Support Services to specifically address issues based on the keywords, navigation, or service request templates you select. It is highly recommended that you review these documents.Learn More Visit My Oracle Support Doc ID 1082829.1

    Slide Number 1Slide Number 2Troubleshooting Scheduling & ATP Issues in R12 Order ManagementSafe Harbor StatementTroubleshooting Scheduling & ATP Issues in R12 Order ManagementWelcome to Trouble Shooting Scheduling & ATP Issues in R12 OMWhat will be CoveredSlide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34Slide Number 35Slide Number 36Slide Number 37Visit My Oracle CommunitiesOrder Management Advisor Webcast Calendar and Archive (Doc ID 1288737.1)Order Management News (Doc Id 207.1)Advisor Webcast AssessmentSlide Number 42My Oracle Support Search Top 5