Page 1: Scanvi Interyards NG3

Color Line – NG3 Plug shore solution since 2011

Page 2: Scanvi Interyards NG3

Color Line • Six vessels in operation – four using PLUG• Color Magic and Color Fantasy connecting in Oslo• Superspeed 1 & 2 connecting in Kristiansand and Larvik• PLUG for MS Viking in Sandefjord, being installed in April • PLUG baselined for Colorhybrid, Ulstein Shipyard in Sandefjord• Cooperation between Color Line, Oslo Havn, Bellona and Hafslund net• Connected to shore based electrical power;Discharge of CO2 reduced is 3000 ton/year and NOX is 50 ton/year, 1700 carsLess particles, less noise from the engines• Oslo Havn, Colorline and Bellona deserve praise for the engagement/ability

Page 3: Scanvi Interyards NG3

Hurtigruten – and harbours from Bergen-Kirkenes• Hurtigruten want a NG3 Smart Plug – fully automated solution• One person on the vessel operate the connection with a remote control• Connection/disconnection less than 30 seconds• Longer time for shore power- higher return on investment • Small footprint in the vessel and on the quay side• Reliable and dependable shore solution

Page 4: Scanvi Interyards NG3

Movies from NG3 - shore powerhttps://www.youtube.com/watch?v=6PaVF_qyl6khttps://www.youtube.com/watch?v=POTumU8GQ2Ahttps://www.youtube.com/watch?v=eoubHI7ZIDU

Page 5: Scanvi Interyards NG3

Hurtigruten - shore power solution ship and quay side

Page 6: Scanvi Interyards NG3

THANK YOU!