8/10/2019 SAP PP Reports Ecc6 http://slidepdf.com/reader/full/sap-pp-reports-ecc6 1/77  SAP PP/QM Configuration Pack Published by Team of SAP Consultants at SAPTOPJOBS Visit us at www.sap-topjobs.com Copyright 2008-10@SAPTOPJOBS  ALL RIGHTS RESERVED. NO PART OF THIS PUBLICATION MAY BE REPRODUCED, STORED IN A RETRIEVAL SYSTEM, OR TRANSMITTED IN  ANY FORM, OR BY ANY MEANS ELECTRONIC OR MECHANICAL INCLUDING PHOTOCOPYING, RECORDING OR ANY INFORMATION STORAGE AND RETRIEVAL SYSTEM WITHOUT PERMISSION IN WRITING FROM SAPTOPJOBS 

Upload: vinod8282

Post on 02-Jun-2018

366 views

Category:

Documents


38 download

TRANSCRIPT

Page 1: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 1/77

 

SAP PP/QM

Configuration Pack

Published by Team of SAP

Consultants at SAPTOPJOBS

Visit us at www.sap-topjobs.com 

Copyright 2008-10@SAPTOPJOBS

 ALL RIGHTS RESERVED. NO PART OF THIS PUBLICATION MAY BE

REPRODUCED, STORED IN A RETRIEVAL SYSTEM, OR TRANSMITTED IN

 ANY FORM, OR BY ANY MEANS ELECTRONIC OR MECHANICAL

INCLUDING PHOTOCOPYING, RECORDING OR ANY INFORMATION

STORAGE AND RETRIEVAL SYSTEM WITHOUT PERMISSION IN WRITING

FROM SAPTOPJOBS 

Page 2: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 2/77

 

INDEX

1.  REPORTS AND GENERAL NAVIGATION IN REPORTING 5 

1.1  Multiple Selection Range 7 

1.2  Creating and Using Selection Variants 12 

1.3  Adding and Removing columns from a List 16 

1.4  Filtering a List 19 

1.5  Using Totals and Sub-Totals 22 

1.6  Exporting Data to a Excel Spread sheet 25 

2.  REPORTS – RELATED TO MASTER DATA 29 

2.1  Material List – MM60 30 

2.2  Stock over view - MMBE 31 

2.3  Stock over view Collective- MB52 33 

2.4  Multi level BOM explosion – CS11 36 

2.5  BOM Structure – CS12 38 

2.6  Where used List – CS15 40 

2.7  BOM Comparison – CS14 42 

2.8  Work center List – CR05 44 

2.9  Where used list - CA80 45 

2.10  Where used List - CA80 46 

2.11  Print List - CA51 47 

3.  REPORTS - MATERIAL REQUIREMENT PLANNING 50 

3.1  Stock Requirements List – MD04 51 

3.2  MRP List – MD05 53 

3.3  MRP List collective display MD06 54 

Page 3: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 3/77

 

3.4  Order Report MD4C:- 56 

3.5  Planned order Display MD16 59 

3.6  Missing Parts Info system 61 

4.  REPORTS - PRODUCTION PROCESSING 65 

4.1  Mass processing 66 

4.2  Production Order Information COOIS 69 

4.3  Material Usage Analysis MCRE 71 

4.4  Target / Actual cost comparison report for an order 73 

4.5  Actual cost report for an order 74 

4.6  Order Cost Comparison 76 

Page 4: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 4/77

 

REPORTS

&

NAVIGATION

IN REPORTING 

Page 5: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 5/77

 

1. 

Reports and General navigation in reporting

It is now time for us to cover the Reporting functionality inSAP PP. I am sure you would love this piece of document as you would be using this very often in your SAP career. So letsmove ahead.

 There are three types of Reports available in SAP. They are

1. Standard List Reports:-

Reports which will only display the data, no transactioncan be performed through this report display is known as

Standard report. This report is used to

  Display Master Data related information

  Display any transactional reports

  E.g. CS11 – Multi level BOM, CR05 – list workcenter.

2. Work List Reports:-

Reports which will allow user to perform transactionwhile displaying the report is known as work list report. This report is used to

  Display and work with production orders

 E.g. to COOIS – Production Order informationreport, COID – process order information report.

3. Logistics Information Structure Reports:-

Information structure is the place where data are storedin addition to the SAP data base. Reports generated using

Page 6: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 6/77

 

the data stored in the information structure is known asLIS report.

E.g. MCRE – Material usage report

Page 7: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 7/77

 

1.1 

Multiple Selection Range

BACKGROUND

When calling a report you can search for more than one value

at a time, or search for data that falls within a range ofselectable criteria.Eg; you may wish to view all goods issues for two different rawmaterials, or all goods receipts between two dates

Ranges

Within certain reports, instead of being asked to select onecriteria to match, you will be offered the choice to enter a

range of data to search within.In the example below, you can enter a date range as shown,and the system will search for matches within those dates(inclusive of the from and to dates entered)

If only the first field is populated the system will treat that as

the only value to matchIf only the second field is populated the system treats that asthe maximum value and will report on all data up to andincluding that value.

Multiple selections

When you can enter more than one selection, or more than

one range then the “multiple selection” button can be used.

When the multiple selection button is used it presents fourtypes of data selection.

Page 8: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 8/77

 

Single Values

Used for multiple single values that need not be numericallysequential

Ranges

Used to include multiple selections within ranges of values(such as dates and incremental numbers)

Page 9: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 9/77

Page 10: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 10/77

 

Concurrent use of selection tabs

You may use any or all selection tabs to restrict the dataselection.

For example: you may wish to view all data between two datesexcluding one day. You would use the tab to enterthe dates required

 Then use the tab to exclude the unwanteddate.

Page 11: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 11/77

 

Page 12: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 12/77

 

1.2 

Creating and Using Selection Variants

BACKGROUND

What is a selection variant?

A selection variant is a tool that allows you to recall frequentlyused data directly into a report’s selection screen. This savesthe retyping of repetitive entries.

For example: If you use the same report everyday withconstant data, e.g. same production line, plant number andMRP controller, you can create a variant that contains thisconstant data. This allows you to select the variant as opposed

to entering data repeatedly.Creating and saving a variant

Before we can save a variant we need to enter the data into thefields that we wish to store for repeated use.

Note:  When saving a variant it is important to ensure that thevariant name and/or descriptions are meaningful and relevantto its purpose, as all users can view a saved variant. Thedescription should also contain your plant number

SCENARIO

You use the transaction MF51 every day for your role as aproduction manager. Rather than enter the same informationeach time you use the transaction you need to set up a variantto enter the information for you.

INSTRUCTIONS

Follow the Menu Path: Logistics Production Repetitive

manufacturing Planning MF51--Production listDouble click MF51 – Production list.

1.  Update the following required and optional fields:

Field Name Description Values

Plant A plant is place where nter your

Page 13: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 13/77

 

Field Name Description Values

either material isproduced, or goodsand services are

provided. This is thekey that defines thatplant 

plant

ProductionLine

 The production line isrequired for capacityplanning and formaking yourselections that arespecific to one area

Enterproductio

n line

Start date The first date that youwant to view PlannedOrders from

01.08.2008

Finish date The last date that youwant to view PlannedOrders from

30.08.2008

2.  Click Radio button Production Line

3.  Check checkbox Only Firmed Orders

4.  Click GoTo  

Variants  

Save as Variant  

5.  Enter name of Variant

6.  Enter description of variant

Page 14: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 14/77

 

7.  Click Save 

8.  Click Back 

Now repeat the transaction, as follows, using the variant

Access transaction MF51 

Follow the Menu Path: Logistics Production Repetitive

manufacturing Planning MF51--Production list

Double click MF51 – Production list.

9.  Click Get Variant 

Page 15: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 15/77

 

10. Select the variant you created

11. Click Enter 

Page 16: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 16/77

 

1.3 

Adding and Removing columns from a List

BACKGROUND

When you first display a report, it displays the standard set ofcolumns. However, you may wish to remove columns you arenot interested in, and add columns containing informationthat you are interested in viewing.

SCENARIO

In the Order Information report, you want to remove thecolumn Reservation Item, as you are not interested in this

information. However, you want to see the order number onthe report, so you need to add this column.

INSTRUCTIONS

Follow the Menu Path: Logistics Production Process

Process Order Reporting – Order information systemCOID – Individual object list

Double Click COID – Individual object list 

1.  Click Enter  .

2.  Click matchcode  in Profile select field

3.  Update the following required and optional fields:

Field Name Description Values

Plant A plant is place where

either material isproduced, or goodsand services areprovided. This is thekey that defines thatplant 

Enter your

plant

Page 17: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 17/77

 

Field Name Description Values

AbsoluteBasic startdate

Earliest start date that you wish to select theProcess Orders from

01.08.2008

 To Latest start date of thedesired ProcessOrders

30.08.2008

4.  Click Execute 

5.  Click the right-hand part of the Select Layout button

6.  Select Change Layout 

Note: The columns on the left are currently displayed inthe report. The columns on the right are all the availablecolumns. 

7.  To remove the column Production scheduler, highlightthe name of the column on the left and then click

8.  To add the column Confirmation number, highlight the

name of the column on the right and then click

9.  When you have finished adding and removing columns,

click Transfer 

10. To save the layout for future use, click the right-hand part

of the Select Layout 

11. Select Save Layout

12. Enter a name for the layout in the Save layout field (Thename must start with the character /.)

Page 18: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 18/77

 

13. Enter a description for the layout in the Name field

14. Click Continue 

15. Click Exit 

Page 19: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 19/77

 

1.4 

Filtering a List

BACKGROUND

Filtering a list

Filtering a list allows you to hide values that you do not wishto view.Some reports offer this as part of selection also, but not allfields in all reports are selectable, so this is where filteringwould be used.

E.g. If you had a list of material documents and you wanted to

reduce the data to show a specific movement type only, youcan use the filter function to achieve this.

 To filter a column you must first select the column you wish to

filter, and then click

Note:  Wild cards “*” can also be used in filters.

SCENARIO

As a production manager you want to view which products you are scheduled to make over the next month. You onlywant to view one particular product and need to filter out allother materials

INSTRUCTIONS

Follow the Menu Path: Logistics Production Process

Process Order Reporting – Order information systemCOID – Individual object list

Double Click COID – Individual object list 

1.  Click Enter  .

Page 20: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 20/77

 

2.  Click matchcode  in Profile select field

3.  Update the following required and optional fields:

Field Name Description Values

Plant A plant is place whereeither material isproduced, or goodsand services areprovided. This is thekey that defines thatplant 

Enter yourplant

AbsoluteBasic startdate

Earliest start date that you wish to select theProcess Orders from

01.08.2008

 To Latest start date of thedesired ProcessOrders

31.08.2008

4.  Click Execute 

5.  Select the Material Number columnheading

6.  Click Filter 

7.  Update the following required and optional fields:

Field Name Description Values

Material This will restrict the

view of the report tothe Material number you have entered here 

Enter your

material

number

Page 21: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 21/77

 

8.  Click Execute 

Page 22: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 22/77

 

1.5 

Using Totals and Sub-Totals

BACKGROUND

Totalling allows us to take a specific column in a list reportand display the total sum for that column.

E.g.: you may have a list of values posted against a customeraccount, the dollar value column could be totalled to see whatthe total dollar value is for this customer.

Subtotalling allows us to breakdown totals by subtotalling

groups of common data.

E.g.: if we had the total dollar value for a customer we couldthen sub total that value by date to see the total by day as wellas the grand total.

SCENARIO

As a production manager you want to view which products you are scheduled to make over the next month. You want tosee the complete totals for independent materials.

INSTRUCTIONS

Follow the Menu Path: Logistics Production Process

Process Order Reporting – Order information systemCOID – Individual object list

Double Click COID – Individual object list 

1.  Click Enter 

2.  Click matchcode  in Profile select field

3.  Update the following required and optional fields:

Page 23: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 23/77

 

Field Name Description Values

Plant A plant is place whereeither material isproduced, or goods

and services areprovided. This is thekey that defines thatplant 

Enter yourplant

AbsoluteBasic startdate

Earliest start date that you wish to select theProcess Orders from

01.08.2008

 To Latest start date of thedesired ProcessOrders

31.08.2008

4.  Click Execute 

5.  Select the Total Order Quantity  columnheading

6.  Click Total 

This now gives you the total for all the materials at thebottom of the column.

Page 24: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 24/77

 

7.  Select the Material Number columnheading

8.  Click Subtotals 

Page 25: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 25/77

 

1.6 

Exporting Data to a Excel Spread sheet

BACKGROUND

Although SAP allows us to perform some basic datamanipulation in list reports, it can be useful to export datainto a different file format.

 Types of file formats that data can be exported to are:Unconverted (Flat data file)Spreadsheet (Excel)Rich text format (Fonts and styles are kept with data)HTML (Web documents)

 The most common file format to export to is Spreadsheet.

SCENARIO

You want to export the production schedule from SAP to Excelto give copies to your production line.

INSTRUCTIONS

Follow the Menu Path: Logistics Production Repetitivemanufacturing Planning MF51--Production listDouble click MF51 – Production list.

1.  Update the following required and optional fields:

Field Name Description Values

Plant A plant is place whereeither material isproduced, or goods

and services areprovided. This is thekey that defines thatplant 

Enter yourplant

ProductionLine

 The production line isrequired for capacityplanning and for

Enterproductionline

Page 26: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 26/77

 

Field Name Description Values

making your selectionsthat are specific to onearea

Start date The first date that youwant to view PlannedOrders from

01.08.2008

Finish date The last date that youwant to view PlannedOrders from

30.08.2008

2.  Click Radio button Production Line

3.  Check checkbox Only Firmed Orders

4.  Click Execute 

5.  Click Export 

6.  Click Spreadsheet 

7.  Click Enter 

8.  Enter the directory path and file name. File namesshould be given an .XLS extension

9.  Click Transfer 

10.  Click Exit 

Page 27: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 27/77

 

11.  View the file you created.

Page 28: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 28/77

 

Reports

Related to

Master Data

Page 29: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 29/77

 

2. 

Reports – Related to Master Data

Important reports related to Master data are

Master Data related reports

Material Master ListStock over viewStock over view collective

BOM

Multi level BOM explosionBOM Structure

Where used listBOM Comparison

Work Center

Work center ListWhere use list of work center

Routing

List of RoutingWhere used list of routing

Note:-As the reports are self explanatory, most of thereports are simply explained and only few are displayed.

Page 30: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 30/77

 

2.1 

Material List – MM60

List of material can be displayed for various filteringcriteria.

Menu Path: - LogisticsProductionMaster Data  MaterialMasterOtherMM60 Material List

Page 31: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 31/77

 

2.2 

Stock over view - MMBE

Available stock of material at any given instant can beknown from this transaction

Menu Path: - LogisticsProductionMaster data  MaterialMasterOtherMM60 Material List

Page 32: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 32/77

 

 To look at the stock

Enter Material number, Plant and click

Page 33: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 33/77

 

2.3 

Stock over view Collective- MB52

Available stock of material at any given instant can beknown from this transaction for a range of materials.

Menu Path: - Logistics  Materials management   InventorymanagementEnvironment Stock MB52 Warehouse Stock

Double Click MB52 Warehouse Stock

Page 34: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 34/77

 

Enter the required filtering criteria to generate the report.

Click 

Page 35: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 35/77

 

Page 36: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 36/77

 

2.4 

Multi level BOM explosion – CS11

Bill of Material for any given product may be seen for multilevel.

Menu Path: - Logistics  Production  Master DataBillsof materialEvaluations  BOM Explosion  MaterialBOMCS11 – BOM (Multi level)

a.  Enter

  Material Number  Plant  Alternative BOM as “1”  BOM application as “PP01”  Valid from date

b.  Click

Page 37: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 37/77

 

Page 38: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 38/77

 

2.5 

BOM Structure – CS12

 This is similar to CS11, but displays information in differentway.

Menu Path: - Logistics  Production  Master DataBillsof materialEvaluations  BOM Explosion  MaterialBOMCS12 – Structure (Multi level)

Enter

a. Material Numberb. Plantc.  Alternative BOM as “1”d. BOM application as “PP01”

Page 39: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 39/77

 

e.  Valid from date

b. Click

Page 40: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 40/77

 

2.6 

Where used List – CS15

 To look at the usage of any material in any of the BOM, thisreport is very much useful. i.e if it is required to know theusage of particular Raw material in number of BOM.

Menu Path: - Logistics  Production  Master DataBillsof materialEvaluations UsageCS15 – Material

Entera. Material code numberb. Tick the check box - Direct, Via classes,

and material BOM

c. Click

Page 41: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 41/77

 

EnterRequired qty  - Quantity to which the individualcomponent quantities refer in display

Resulting qty - Quantity of an assembly material whichis produced with certainrequired quantity. It replaces base quantity.

Click

Page 42: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 42/77

 

2.7 

BOM Comparison – CS14

It may be required to compare the BOM of different materialfor analysis purpose. There is a standard report to generatethe report after comparing two BOM.

Menu Path: - Logistics  Production  Master DataBills ofmaterialEvaluations CS14 – BOM Comparison

Enter

Material

Plant

Usage

Click

Page 43: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 43/77

 

Page 44: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 44/77

 

2.8 

Work center List – CR05

 To display the list of work center in any given plant, thisreport is used.

Menu Path: - Logistics  Production  MasterDataWork centers  ReportingCR05 – Work centerlist

Enter Plant

click

Page 45: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 45/77

 

2.9 

Where used list - CA80

 To know the list of routing where any specific work center isused, this report is used.

Menu Path: - Logistics  Production  Master DataWorkcenters ReportingWhere usedCA80 – Work center

EnterWork center

Plant Task list type from “N” for Routing

Click

Page 46: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 46/77

 

2.10 

Where used List - CA80

Similar to that of Work center.

Page 47: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 47/77

 

2.11 

Print List - CA51

It may be required to take the list of routing created inthe system. There is a facility to print out of the routingwhich will give the complete list.

Menu Path:- LogisticsProductionMaster Data RoutingReportingCA51 – Print List

Page 48: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 48/77

 

Enter Task list typePlantMaterialKey date

Select other radio button and check box as per the

required output.

click

Page 49: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 49/77

 

REPORT

RELATED TO

 TRANSACTIONS

Page 50: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 50/77

 

3. 

Reports - Material Requirement Planning

Six important evaluation reports for MRP are

  Stock Requirement List – MD04

  MRP List – MD05

  MRP List Collective display – MD06

  Order Report – MD4C

  Display Planned Order – MD16

  Missing parts info report

Page 51: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 51/77

 

3.1 

Stock Requirements List – MD04

 This report will display the current requirements detail andreceipts details status of any material at any given instant.

Menu Path:- Logistics   Produciton   MRP  EvaluationsMD04 Stock/Reqmts list

Enter Material and Plant

Click

Page 52: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 52/77

 

Above display is the self explanatory. All positive quantity inthe Rec/reqd qty column indicate that will increase the stockand all the negative quantity indicate that that will consumethe stock.

Page 53: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 53/77

 

3.2 

MRP List – MD05

 This report will give you the status of material as on date whenMRP run took place. This is useful when it is required to referthe result of the last MRP run. It will NOT give the currentstatus of the material.

Menu Path:- Logistics   Produciton   MRP  EvaluationsMD05 MRP list-Material

 This list will look similar to the MD04 list, but the results areas on at the time of MRP run. NOT the current one.

All other entries are similar to the MD04 transaction.

Page 54: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 54/77

Page 55: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 55/77

 

Make the required filtering criteria

 To make more filtering click on the further tab screens and

enter the required filtering criteria.

Display of the report is similar to that of MD04.

Page 56: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 56/77

 

3.4 

Order Report MD4C:-

 This report will give the clear visibility of a specific order.Following details are displayed

o  MRP Element – whether planned order orproduction order etc..

o  Required Date – Date on which material is required

o  Exception Message – Message generated by MRP to

indicate the further processing to this order

o  Recpt/rqmt – Expected receipt(+ve) or requiredquantity (-ve)

o  Available qty – Available quantity to consume orcommit.

Menu Path:- Logistics   Produciton   MRP  

EvaluationsMD4C Order Report

Page 57: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 57/77

 

Click

Click

Page 58: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 58/77

 

Note:- In the above report, any new exceptional messages arereported with red color icon.

Bottom of the screen it is possible to navigate the MD04

screen.

Page 59: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 59/77

 

3.5 

Planned order Display MD16

Planned order is the result of MRP. It is generated for theshortage quantity during MRP run, it can also be createdmanually.

It is essential to look at the planned order collectively at anygiven instant. Which will give the idea of how much isrequired.

Menu Path:- Logistics   Produciton   MRP   PlannedorderDisplay MD16 collective display

Planned order can be listed based on MRP controller or onMaterial.

Let’s check for MRP controller.

Select MRP controller and click

Page 60: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 60/77

 

Enter Plant, MRP controller and click

From this menu planned order can be

•  Deleted – Select pl.order and click

•  Displayed – Select pl.order click•  Convert to prod.order or process order – Select pl.order

•  & click or

•  Convert to Purchase req. - Select pl.order & click

•  Possible to jump to MD04 screen

Page 61: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 61/77

 

3.6 

Missing Parts Info system

When the production order or process order is released,depending on the settings and availability checking rule,Availability of components are checked.

It may be required to note the availability of component for aparticular production details.

 This report will provide the net result of availability check forvarious combination of input.

Menu Path: - Logistics   Production   MRP  Environment  CO24 Missing Parts Info System

Double click CO24 Missing parts info system

Page 62: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 62/77

 

Enter the data as per the required filtering condition.

Enter the profile as 000000000001 standard profile.

Click

Page 63: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 63/77

 

Page 64: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 64/77

 

REPORT

RELATED TO

 TRANSACTIONS

Page 65: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 65/77

 

4. 

Reports - Production processing

 There are very important reports to analyze the production

execution process.

 These are basically to get the details of production order orprocess order status and about its status.

Mass Processing

Order information system

Material usage Analysis

 Target / Actual cost comparison report

Actual cost report for an Order

Order cost comparison

Let us discuss the above reports one by one

Page 66: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 66/77

 

4.1 

Mass processing

 There is a facility to mass process the production orders. Thisis a kind of work list report.Following Mass processing can be performed

  Release of production order collectively

  Confirmation of production order

  Technically complete production order

  Carry out Availability check

Apart from the above, there are some more functions. Let usdiscuss how to confirm production order collectively and setproduction orders status to Technically Complete throughmass processing.

Guys, since it is bit complicated, step by step procedure isgiven below here.

. Menu Path: Logistics Production Production Control

Control COHV - Mass Processing

Double click COHV - Mass Processing

1.  Update the following required and optional fields:

Field Name Description Values

Material Code identifying aproduct orcomponent

Enter your materialcode no.

Page 67: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 67/77

 

Productionplant

Key identifying theplant where thecreation of goodsare done.

Enter your plant

2.  Click Mass processing tab

3.  Select Confirmation in the Function list box.

4.  Click the Execute Button .5.  Change the layout to include the Confirmed Quantity.

Note: Some orders may have been partially confirmed

during the month.

6.  Select the orders you want to confirm. 

7.  Click the Execute Mass Processing Button .

8.  Click the Refresh list Button .

Note: You must click the Refresh button to update theinformation shown on the screen.

9.  Select Mass Processing Execute ....

10. Select Technically complete in the Function list box.

Page 68: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 68/77

 

11. Click Copy Button .

12. Select the orders that you want to technically complete.

13. Click the Execute Mass Processing Button .

14. Click the Refresh list Button .

Page 69: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 69/77

 

4.2 

Production Order Information COOIS

Users have created a lot of production orders against differentmaterials. Now you would like to run report to see the statusof each order. In this exercise we shall be running a reportcontaining all the production orders for Plant.

We would like to see the status of production orders thatbelong to plant.

Menu Path: Logistics → Production → Production Control → 

Information System → COOIS - Order Information System

Double click COOIS - Order Information System

1.  Update the following required and optional fields:

Field Name Description Values

Productionplant

Code identifyingthe

operationalunit of thecompanywhere thematerial ismanufacturedand stored.

Enter your plant

Basic startdate

Date at which theselection will

start.

01.08.2008 

 To Start Date Date whichdefines theend of therange.

31.08.2008 

2.  Click Execute .

Page 70: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 70/77

 

3.  Select the desired production order

4.  Click Order Button .

5.  Click Back F3 .

Page 71: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 71/77

 

4.3 

Material Usage Analysis MCRE

 The standard analyses provide a means for reporting on ShopFloor activities during production.

Menu Path: Logistics Production Production Control

Information System Shop Floor Information System

Standard Analyses MCRE - Material Usage

Double click MCRE - Material Usage

1.  Update the following required and optional fields:

Field Name Description Values

Plant Key identifying thechosen plant.

 Type your plant

Material Code identifying aproduct orcomponent

 Type your material

to Last number ofthe material range you want todisplay

 Type your material

Date Date theproduction runwas created

One week beforetoday

to Date theproduction run

was completed

 Today

2.  Click Execute Button .

3.  Click Back F3  .

Page 72: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 72/77

 

4.  Click No Button 

Page 73: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 73/77

 

4.4 

Target / Actual cost comparison report for anorder

Cost incurred during manufacturing process may be analyzedto monitor the actual cost incurred. It may be required tocompare the actual cost incurred with the target cost.

Menu Path: Logistics Production Production Control

Information System Controlling Reports Detailed

Reports For order Variance AnalysisS_ALR_87013167 – Target/Actual Comparision

Double click S_ALR_87013167 – Target/ActualComparision

Enter the Order number

Click 

Page 74: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 74/77

 

4.5 

Actual cost report for an order

Cost incurred during manufacturing process may be analyzedto monitor the actual cost incurred.

Menu Path: Logistics Production Production Control

Information System Controlling Reports Detailed

Reports For order S_ALR_87013165 – Actual Cost

Double click S_ALR_87013165 – Actual Cost

Enter the order number

Click

Page 75: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 75/77

 

Page 76: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 76/77

 

4.6 

Order Cost Comparison

Cost incurred during manufacturing process may be analyzedto monitor the actual cost incurred.

It is possible to compare the cost incurred between any twoorders.

Menu Path: Logistics Production Production Control

Information System Controlling Reports Object

Comparison For order S_ALR_87013099 – OrderComparison

Double click S_ALR_87013099 – Actual Cost

Enter the two required order numbers to be compared.

Click

Page 77: SAP PP Reports Ecc6

8/10/2019 SAP PP Reports Ecc6

http://slidepdf.com/reader/full/sap-pp-reports-ecc6 77/77

 

This ends the PP sample report creation.