MASTER DATA UPLOAD Master Data Upload : To upload master data we should need to follow the below procedure Master Data upload Flat File approach : If your source system is non SAP and the client decided to upload master data into BPC System then we should follow FFU (Flat File Upload) to upload all MDs. Note : If you are uploading data through flat file, excel file should be converted into CSV format first. Building Blocks 1) Ensue Dimensions are created 2) Ensure Model is created 3) Ensure Connection is established through connection manager 4) Ensure all properties have maintained in all dimensions. Master Data Upload Procedure: 1) Click on office client

Upload: satish-kumar-boddu

Post on 20-Jul-2015

276 views

Category:

Software


9 download

TRANSCRIPT

Page 1: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

MASTER DATA UPLOAD Master Data Upload : To upload master data we should need to follow the below procedure

Master Data upload Flat File approach: If your source system is non SAP and the client decided

to upload master data into BPC System then we should follow FFU (Flat File Upload) to upload

all MDs.

Note : If you are uploading data through flat file, excel file should be converted into CSV

format first.

Building Blocks

1) Ensue Dimensions are created

2) Ensure Model is created

3) Ensure Connection is established through connection manager

4) Ensure all properties have maintained in all dimensions.

Master Data Upload Procedure:

1) Click on office client

Page 2: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

2) Select required connection from the connection manager

3) Verify you are connected to right model and placed your entire dimensions in report

layout.

4)Click on Data Manger Tab on top of the Ribbon and select ‘Upload Data’ data option.

Page 3: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

5)Click on Browse button and select the required CSV file from your system server. Click

upload button.

6 Save this CSV file with proper name as below

Page 4: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

7) Need to select a new transformation file from the Data Manager tab by clicking

Transformation file option.

Page 5: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

8) Select required option from ‘options section’ and leave mapping as blank in case of

Master data upload through flat file approach.

9)Click on validation and process file under data manger tab by clicking Transformation

file option.

Page 6: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

10) Select Data type as Master Data from Flat file, Select Data – File should be selected,

Select a dimension as P_Account as below. Click Save button.

Page 7: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

11)Save that file as .xls and give proper business name and save.

Verify the validation status.

Note : If the validation is failed so you need to identify the errors and change them in

source file upload again and re run the validation file until it gets Validated.

Page 8: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

12) Need to create Data Manager Package (Extract data from front end to Back End BPC

system to BW).

Click on Organise button under Data Mager Tab, select Organise Package Iist.

13) Select the Model and right click on that and click on Add package Group

Page 9: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

14) Right click on created package group and select Package option and add Package.

Please refer the below screen shot

15) Select the appropriate process chain by clicking select button

Page 10: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

16) Select process chain as /CPMB/IMPORT _MASTER (Flat file approach)

17) Filled required information and Add the package

Page 11: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

18) Need to run the package from Data Manager tab by clicking Run package option as

below

19)Select DM Package and click Run button

Page 12: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

20) Browse the file by clicking Browse button

21) Select source file (CSV) form the server and click on next button

Page 13: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

22)Select source file (xls) from the server and click on next button

23) Select Dimension Name and click on next

24) Click on Finish button

Page 14: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

25) By clicking the View status button package success details can be shown

Page 15: SAP BPC 10.0 NW FLAT FILE (csv)Master data upload doc

Note : Please follow the same procedure for other dimension master data upload, If you

are uploading master data first time in your model and then you need to create DM

package or else it is not required from next time onwards.