SAN ANTONIO RIVER IMPROVEMENTS

PROJECT

September 28, 2009

Page 2: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

2

Project Limits

Page 3: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

3

Project Partners

• City of San Antonio– Provides project funding for project amenities (i.e.. Sidewalks,Landscaping, Lighting, etc.) and recreation. San Antonio Water System is providing funding for utility relocation

• Bexar County– Provides project funding for flood control and river restoration elements of the project

• San Antonio River Authority (SARA)– Provides project administration and management

• U.S. Army Corps of Engineers (USACE)– Provides federal funding for river restoration and some recreational components

• San Antonio River Foundation– Provides private funding to support project

• San Antonio River Oversight Committee– A 22 person citizens committee established in 1998 with members appointed by the City, County and SARA representing the various neighborhood and business stakeholders along the river.

Page 4: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

4

Project Budget

Total City County Private Funds

SAWS USACE

Concept Design $1.0 $0.3 $0.7 - - -

Downtown Reach $13.3 $2.4 $10.9 - - -

Eagleland $13.6 $6.2 $4.8 - - $2.6

Mission Reach $271.9 $4.5 $115.3 $4.8 $6.0 $141.3

Museum Reach Urban

$72.1 $52.3 $13.1 $6.5 $0.2 -

Museum Reach Park

$12.6 $11 $1.6 - - -

TOTAL $384.5 $76.7 $146.4 $11.3 $6.2 $143.9

Presented in millions of dollars

Page 5: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

5

Project Benefits

• Ecosystem Restoration – The changes proposed will increase water quality and the quantity and diversity of plant and animal species.

• Flood Damage Reduction – Project will maintain or decrease the elevation of the 100 year floodplain.

• Quality of Life – Add to San Antonio’s unique charm and make the city more attractive to residents, visitors, and businesses and provide enhanced recreational opportunities along an expanded linear park system.

• Cultural connections – Linking people, neighborhoods and cultural resources and celebrating the historical connection of the river to four of the five historic missions in the San Antonio Missions National Historical Park.

• Economic Development – Promote business development along and adjacent to the river. Improvements will also enhance tourism.

Page 6: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

6

Museum Reach: Urban SegmentLexington Ave. to Josephine Street

Page 7: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

7

Hugman Dam looking downstream

Page 8: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

8

Brooklyn Ave. at Lock and Dam

Page 9: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

9

Roy Smith Street looking downstream

Page 10: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

10

Turning Basin at the Pearl looking downstream

Page 11: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

11

‘Shimmer Field’by Martin Richman at Lexington Ave

Photos: San Antonio River Foundation and Mark Menjivar

Page 12: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

12

‘29° 25' 57" N / 98° 29' 13" W’by Stuart Allen at McCullough and Brooklyn Streets

Photos: San Antonio River Foundation and Mark Menjivar

Page 13: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

13

‘Under the Over Bridge’by Mark Schlesinger at 9th Street

Photos: San Antonio River Foundation and Mark Menjivar

Page 14: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

14

‘Sonic Passage’by Bill Fontana at Jones Avenue (Sound Art)

Photos: San Antonio River Foundation and Mark Menjivar

Page 15: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

15

‘F.I.S.H.’by Donald Lipski

at I‐35

Photos: San Antonio River Foundation and Mark Menjivar

Page 16: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

16

‘The Grotto’by Carlos Cortes 

at Camden & Newell Streets

Photos: San Antonio River Foundation and Mark Menjivar

Page 17: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

• Museum Reach Park Segment: Extends from Josephine Street to Hildebrand Avenue

• Priority Betterments as approved by the San Antonio River Oversight Committee:

– Initial Trail Construction (to connect Josephine Street to Avenue B) with signage

– Habitat Restoration and Temporary Irrigation

– Removal of invasive plants and debris Removal, Channel Stabilization along San Antonio River and Catalpa-Pershing Channel

– Wetlands at Witte– Acequia Madre flow diversion– Additional trail connections and

improvements along Avenue B, to Mulberry and Avenue A and to and through Brackenridge Park up to Hildebrand Avenue

– New pedestrian bridge at Mulberry

Museum Reach Park Segment

Page 18: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

Park Segment Concepts

Under US 281

Along Catalpa Channel

Along Avenue ANear Hildebrand at Historic Upper Labor

Page 19: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

19

Mission Reach: Project Limits

Page 20: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

Mission Reach Ecosystem Restoration

* per USACE study; based on scale with 1 as extremely degraded and 10 as pristine; proposed condition rating is at 50 year maturity period

Existing Riverine System Rating = 1.2*

Existing River Channel Proposed River Channel

ProposedRiverine System Rating = 8.2*

Page 21: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

• 20,000+ young trees • 334 acres of riparian woodland habitat• 113 acres of aquatic habitat • 31 riffles • 13 acres of embayment• 2 river remnants: San Juan & Espada

Restoring Habitat Features

Page 22: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

Photos: Sally & Andy Wasowski, Lady Bird Johnson Wildflower Center

Native Grasses & Wildflowers Native Trees & Shrubs

Page 23: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

23

A partial list of trees and vegetation to be planted and of the wildlife that will be supported by the Mission Reach project:

BIRDS:•American Woodcock

•Winter Wren

•Red-eyed Vireo

•Peregrine Falcon

•Reddish Egret

•Yellow-billed Cuckoo

•Red-winged Blackbird

•Belted Kingfisher

•Red-headed Woodpecker

VEGETATION:•Live Oak

•Pecan

•Sycamore

•Cypress

•American Elm

•Anaqua

•Redbud

•Sugar Hackberry

•Condalia

•Native grasses

•Bluebonnets and other native flowers

FISH:•Bluegill

•Channel Catfish

•Red Shiner

•Yellow Bullhead

•Largemouth Bass

•Green Sunfish

•Texas Shiner

•Gizzard Shad

•Central Stoneroller

Page 24: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

Ecological & Cultural Connections

• Throughout the 1700’s development of what is now known as the City of San Antonio, occurred when Spanish Colonial missions were established near the natural river banks for the access to water and food.

• Restoring the river will re-establish the ecological context of the historic Spanish Missions; The project will reconnect the river’s significance to the National Park Service’s San Antonio Missions National Historical Park.

Mission San Jose

Mission Concepcion

Mission Espada

Mission San Juan

Page 25: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

Restoration Project Limits: Mission Reach

Phase 1: Construction underway; completion spring 2010

Phase 2A: Construction award Nov. 2009; duration 12-18 months

Phase 2B, 2C & 3:Construction award March 2010; duration 3 years

Phase 4: Construction award June 2010; duration 3 years

Page 26: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

26

Phase 1 - Roosevelt Park

Page 27: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

27

Phase 1 – Mitchell St.

Page 28: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

28

Phase 1 - Weir and Pedestrian Bridge

Page 29: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

29

Phase I Betterments

• Enhanced weirs and riffles • Additional trail at Lone Star

Brewery• Upgraded trail surface • Under-bridge improvements

for future art features• Additional aquatic plants• Art enhancements

Page 30: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

30

Mission Reach ConceptUpgraded Trail Surfaces and Seating Area

Page 31: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

31

Phase 2A Betterments

• Pocket park street connection at Theo

• Additional trail on west bank from Theo to Mission Road

• Additional fly over bridge at Concepcion Creek

• Upgraded shaded structure • Upgraded trail surface • Portal at Mission Concepcion

Page 32: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

32

Pocket park street connection at Theo

Page 33: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

33

Phase 2A Betterments – Trail/Bridge

Page 34: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

34

Phase 2A Betterments – Shade Structure

Page 35: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

35

Mission Reach Phase II

Page 36: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

36

Mission Reach Phase III

Page 37: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

37

Phase 2 B,C and Phase 3 Betterments

Phase II B,C• Additional trail at Hot Wells • Enhancements to San Juan Diversion Structure• Street connections at Mission, Roosevelt,

Southcross and VFW.• Mission Portals/Connection to Mission Trails for

Mission Concepcion and Mission San Jose • Art enhancements

Phase III• Additional trails near Davis Lake/Military Dr.• Overlook at Espada Park• Habitat/ecosystem restoration improvements to

San Antonio River remnant at Symphony Lane

Page 38: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

38

Mission Reach Phase IV

Page 39: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

39

Phase 4 Betterments

• Mission Portals/Connection to Mission Trails at Mission San Juan and Mission Espada

• Overlook at bottomland hardwood forest near Piedras Creek

• Create picnic area across from Historic Espada Dam

• Create art project at Bergs Mill• Restore Historic San Antonio River

bridge at Ashley Road and river remnant

Page 40: SAN ANTONIO RIVER IMPROVEMENTS PROJECT · 2009. 10. 9. · Title: SAN ANTONIO RIVER IMPROVEMENTS PROJECT Author: Jolyn Gross Subject: executive summary Created Date: 10/9/2009 9:30:32

40

For More SARIP Information

www.sanantonioriver.org• Information on project status• Design details• Project history• Construction progress photos